PROJECT PLANNING AND SCHEDULING USING MSP
Assignment Submitted by: Jaspreet Singh
Registration No. 233-05-53-51472-2241
Date of Submission: 28-10-2023
Project Planning and Scheduling Using MSP
Assignment: MICROSOFT PROJECT
National Institute of Construction Management
and Research (NICMAR), Pune
Executive Development Programme in Project Management
PROJECT PLANNING AND SCHEDULING USING MSP
Contents
1. Silent Feature of the project...........................................................................................................2
2. Project Schedule .............................................................................................................................0
3. Project Reports ...............................................................................................................................0
A. Milestone report.........................................................................................................................0
B. Cash Flow Report ........................................................................................................................1
C. Critical Task Report .....................................................................................................................2
PROJECT PLANNING AND SCHEDULING USING MSP
1. Silent Feature of the project
S.no Description Summary
1 Name of Work
Fabrication, assembly & launching of 1x76.2m span open web
Girder (OWG) EACH OVER THREE LINES of NH-352 W(Pataudi
Road) between Manesar and Patli stations including supplying &
fixing of H-Beam sleepers in connection with laying of New BG
Double Railway Line of HORC Project at km. 54.498.
2 Letter Of Acceptance
HORC/HRIDC/Br-1/2022/TC Dated xx.xx.xxx (Return the same
signed copy within 7 days of the receipt of the LOA )
3
Signing of Contract
Agreement
HORC/HRIDC/Br-1/2022, dated-xx.xx.xxxx
4
Commencement of
Works
GC-HORC-Br-1-MGC-2207-0008, Dated xx.xx.xxxx The
commencement date shall be xx.xx.xxxx
5
Employer’s Name and
address
Haryana Rail Infrastructure Development Corporation Limited
(HRIDC) Plot No. 143, 5th
floor, Railtel Tower, Sector-44,
Gurugram, Haryana-122003
Email:-xxxxxxxxxx@gmail.com
6
Engineer’s name and
address
RITES Limited in Consortium with SMEC international PVT. Ltd. 4th
floor, Plot no.144, RITES Limited, Sector 44 Gurugram, Haryana-
122003
7 Contractor
M G Contractors Pvt Ltd
Head Office :
Plot No. 376 Industrial Area Phase 1,
Punchkula-134113, Haryana
Regd. Office:
603, Ring Road Mall, Sector -3 Rohini New Delhi-110085
8 Design Consultant RITES
9 Estimated Cost Rs. xx,xxx Cores
10
Date of commencement
of works
xx.xx.xxxx
11 Period Of Completion 365 Days
12
Time for the parties to
sign the Contract
Agreement
35 Days after receipt of the Letter of Acceptance
PROJECT PLANNING AND SCHEDULING USING MSP
S.no Description Summary
13 Performance Security
Performance Security
(1) Equal to 5% of the Contract Amount
The performance security will be in the form of a “Demand
Guarantee” in the amount of 5% of the Accepted Contract Amount
14
Time for access to the
Site
Performance security submit within 28 days after receiving of the
letter of acceptance
1. The Contractor can start fabrication of the open Web GIRDER
(OWG) in RDSO approved workshop immediately after the
Commencement Date.
2. Access to the site for the launching of OWG will be provided as
follows:
(a) For Manesar –Patli single line Connectivity-120 days after
Commencement Date.
(b) For the mainline -240 days after the commencement Date
15 Subcontractor Subcontracting is not permitted for any part of the work.
16 Natural Conditions
1. a) Summer –March to May
b) Monsoon – June to September
c) Post Monsoon – October to November
d) Winter – December to February
2. Winds = winds are generally light to Moderate, Increase in
intensity during the late summer & Monsoon.
3. Rainfall= Rainfall is moderate in Gurugram District Average
Rainfall is 596mm.
4. There is no major river crossing in the proposed alignment and
there is no history of a major flood in this area.
5. The elevation varies approximately between 228m to 256m
above the Mean sea level (MSL).
17 Packages
The Entire project for HORC has been divided into 9 different
contract packages
18
List of Exceptional Risks
which shall not be
excluded from the
insurance cover for the
works
1. Earthquake
2. Flood
3. Rain
19 Mobilization Advance
1. The Authority shall, on request of the Concessionaire, make an
advance payment in a sum not exceeding 10 of the Bid Project
Cost.
PROJECT PLANNING AND SCHEDULING USING MSP
S.no Description Summary
2. This advance payment shall be made in two equal instalments.
The Concessionaire may request the Authority for the first
instalment of the advance payment at any time after the
Appointed Date, along with furnishing a Bank Guarantee in a form
satisfactory to the Authority.
3. Upon satisfactory utilization of the first instalment, the second
instalment shall be paid after the Engineer’s approval. The
contractor shall submit a utilization statement supported by a
certified Chartered Accountant under their seal and Stamp. It shall
be paid against an Advance payment Certificate.
20
The maximum amount
of Delay damage
1). 5% of the accepted Contract Amount, less the provisional sum.
21
INSURANCE
1) The Death of or injury to any person (WC Policy)
2) The loss of or damage to any property (Other Than the works)
(CAR Policy).
3) All insurances obtained by the Concessionaire in accordance
with sub-clause 19.2.4 shall be maintained with insurers on terms
consistent with Good Industry Practice. Within 15 days of
obtaining any insurance cover, the Concessionaire shall furnish to
the Authority, notarized true copies of the certificate(s) of
insurance, copies of insurance policies and premium payment
receipts in respect of such insurance, and no such insurance shall
be cancelled, modified, or allowed to expire or lapse until the
expiration of at least 45 days after notice of such proposed
cancellation, modification or nonrenewal has been delivered by
the Concessionaire to the Authority.
Project Completion
Schedule
PROJECT MILESTONE-I
1. Project Milestone-I (MS1) Trial assembly of 1st open Web
Girder (OWG). Time for completion from the commencement date
i.e. 120 days (Date: xx.xx.xxxx).
PROJECT MILESTONE-II
2. Project Milestone-II Launching/erection of 1st
OWG on
Mnaesar –Patli connectivity i.e. Time for completion from the
commencement date i.e 180 days (Date: xx.xx.xxx).
PROJECT MILESTONE-III
3. Project Milestone-III Completion of track works on Manesar-
Patli connectivity. Time for completion from the commencement
date i.e 195 days (Date: xx.xx.xxxx).
Stipulated Date of Completion =xx.xx.xxxx
Defect Notification Period = 365 days calculated from the date of
issue of the taking over the certificate for the work.
23
Facilities for Employer’s
/ Engineer’s Personnel’s.
(i) Site Office Approximate space 20Sqm. (Section viii-i page-76)
PROJECT PLANNING AND SCHEDULING USING MSP
2. Project Schedule
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
PROJECT PLANNING AND SCHEDULING USING MSP
3. Project Reports
A. Milestone report
PROJECT PLANNING AND SCHEDULING USING MSP
B. Cash Flow Report
PROJECT PLANNING AND SCHEDULING USING MSP
C. Critical Task Report
PROJECT PLANNING AND SCHEDULING USING MSP

More Related Content

Similar to MSP

HM hub and NPD second masterclass seminar 6.11.15.PPT
HM hub and NPD second masterclass seminar 6.11.15.PPTHM hub and NPD second masterclass seminar 6.11.15.PPT
HM hub and NPD second masterclass seminar 6.11.15.PPT
Euan Pirie
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
Arvind Solanki
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
Maatla Moadi
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
Anep Botak
 
NEC Contracts - Programmes under ECC and PSC webinar
NEC Contracts - Programmes under ECC and PSC webinarNEC Contracts - Programmes under ECC and PSC webinar
NEC Contracts - Programmes under ECC and PSC webinar
Association for Project Management
 

Similar to MSP (20)

The Project Brief
The Project BriefThe Project Brief
The Project Brief
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 
Cl report final
Cl report finalCl report final
Cl report final
 
NEC3 programme
NEC3 programmeNEC3 programme
NEC3 programme
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and fa
 
Time Related Professional Practice
Time Related Professional PracticeTime Related Professional Practice
Time Related Professional Practice
 
HM hub and NPD second masterclass seminar 6.11.15.PPT
HM hub and NPD second masterclass seminar 6.11.15.PPTHM hub and NPD second masterclass seminar 6.11.15.PPT
HM hub and NPD second masterclass seminar 6.11.15.PPT
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
M Simpson coursework
M Simpson courseworkM Simpson coursework
M Simpson coursework
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
 
Mobilisation advance-CVC.pdf
Mobilisation advance-CVC.pdfMobilisation advance-CVC.pdf
Mobilisation advance-CVC.pdf
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxThe importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
 
NEC Engineering and Construction Contract (ECC) - compensation events webinar
NEC Engineering and Construction Contract (ECC) -  compensation events webinarNEC Engineering and Construction Contract (ECC) -  compensation events webinar
NEC Engineering and Construction Contract (ECC) - compensation events webinar
 
td_arr.pdf
td_arr.pdftd_arr.pdf
td_arr.pdf
 
NEC Contracts - Programmes under ECC and PSC webinar
NEC Contracts - Programmes under ECC and PSC webinarNEC Contracts - Programmes under ECC and PSC webinar
NEC Contracts - Programmes under ECC and PSC webinar
 

More from Jaspreet singh

RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWRE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
Jaspreet singh
 

More from Jaspreet singh (19)

Project Quality Management-Assinment.pdf
Project Quality Management-Assinment.pdfProject Quality Management-Assinment.pdf
Project Quality Management-Assinment.pdf
 
Soft Skills - Teams Building and Leadership Skills.pdf
Soft Skills - Teams Building and Leadership Skills.pdfSoft Skills - Teams Building and Leadership Skills.pdf
Soft Skills - Teams Building and Leadership Skills.pdf
 
Export Procedures and Documentation Assinement.pdf
Export Procedures and Documentation Assinement.pdfExport Procedures and Documentation Assinement.pdf
Export Procedures and Documentation Assinement.pdf
 
Assignment -02 HR & OB.docx
Assignment -02 HR & OB.docxAssignment -02 HR & OB.docx
Assignment -02 HR & OB.docx
 
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdfHuman Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
 
Martig Construction Assi (1).pdf
Martig Construction Assi (1).pdfMartig Construction Assi (1).pdf
Martig Construction Assi (1).pdf
 
Legal Aspects of Project Management Assignments.pdf
Legal Aspects of Project Management Assignments.pdfLegal Aspects of Project Management Assignments.pdf
Legal Aspects of Project Management Assignments.pdf
 
tcc primavera
tcc primaveratcc primavera
tcc primavera
 
staad pro
staad prostaad pro
staad pro
 
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWRE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training Report
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
 
Paperspace
PaperspacePaperspace
Paperspace
 
Paper rca
Paper rcaPaper rca
Paper rca
 
Solid wealth
Solid wealthSolid wealth
Solid wealth
 
Alternate building materials
Alternate building materialsAlternate building materials
Alternate building materials
 
Minor project 2011 goup f
Minor project 2011 goup fMinor project 2011 goup f
Minor project 2011 goup f
 
Synopsis
SynopsisSynopsis
Synopsis
 
Airport engineering
Airport engineering Airport engineering
Airport engineering
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
hublikarsn
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 

Recently uploaded (20)

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 

MSP

  • 1. PROJECT PLANNING AND SCHEDULING USING MSP Assignment Submitted by: Jaspreet Singh Registration No. 233-05-53-51472-2241 Date of Submission: 28-10-2023 Project Planning and Scheduling Using MSP Assignment: MICROSOFT PROJECT National Institute of Construction Management and Research (NICMAR), Pune Executive Development Programme in Project Management
  • 2. PROJECT PLANNING AND SCHEDULING USING MSP Contents 1. Silent Feature of the project...........................................................................................................2 2. Project Schedule .............................................................................................................................0 3. Project Reports ...............................................................................................................................0 A. Milestone report.........................................................................................................................0 B. Cash Flow Report ........................................................................................................................1 C. Critical Task Report .....................................................................................................................2
  • 3. PROJECT PLANNING AND SCHEDULING USING MSP 1. Silent Feature of the project S.no Description Summary 1 Name of Work Fabrication, assembly & launching of 1x76.2m span open web Girder (OWG) EACH OVER THREE LINES of NH-352 W(Pataudi Road) between Manesar and Patli stations including supplying & fixing of H-Beam sleepers in connection with laying of New BG Double Railway Line of HORC Project at km. 54.498. 2 Letter Of Acceptance HORC/HRIDC/Br-1/2022/TC Dated xx.xx.xxx (Return the same signed copy within 7 days of the receipt of the LOA ) 3 Signing of Contract Agreement HORC/HRIDC/Br-1/2022, dated-xx.xx.xxxx 4 Commencement of Works GC-HORC-Br-1-MGC-2207-0008, Dated xx.xx.xxxx The commencement date shall be xx.xx.xxxx 5 Employer’s Name and address Haryana Rail Infrastructure Development Corporation Limited (HRIDC) Plot No. 143, 5th floor, Railtel Tower, Sector-44, Gurugram, Haryana-122003 Email:-xxxxxxxxxx@gmail.com 6 Engineer’s name and address RITES Limited in Consortium with SMEC international PVT. Ltd. 4th floor, Plot no.144, RITES Limited, Sector 44 Gurugram, Haryana- 122003 7 Contractor M G Contractors Pvt Ltd Head Office : Plot No. 376 Industrial Area Phase 1, Punchkula-134113, Haryana Regd. Office: 603, Ring Road Mall, Sector -3 Rohini New Delhi-110085 8 Design Consultant RITES 9 Estimated Cost Rs. xx,xxx Cores 10 Date of commencement of works xx.xx.xxxx 11 Period Of Completion 365 Days 12 Time for the parties to sign the Contract Agreement 35 Days after receipt of the Letter of Acceptance
  • 4. PROJECT PLANNING AND SCHEDULING USING MSP S.no Description Summary 13 Performance Security Performance Security (1) Equal to 5% of the Contract Amount The performance security will be in the form of a “Demand Guarantee” in the amount of 5% of the Accepted Contract Amount 14 Time for access to the Site Performance security submit within 28 days after receiving of the letter of acceptance 1. The Contractor can start fabrication of the open Web GIRDER (OWG) in RDSO approved workshop immediately after the Commencement Date. 2. Access to the site for the launching of OWG will be provided as follows: (a) For Manesar –Patli single line Connectivity-120 days after Commencement Date. (b) For the mainline -240 days after the commencement Date 15 Subcontractor Subcontracting is not permitted for any part of the work. 16 Natural Conditions 1. a) Summer –March to May b) Monsoon – June to September c) Post Monsoon – October to November d) Winter – December to February 2. Winds = winds are generally light to Moderate, Increase in intensity during the late summer & Monsoon. 3. Rainfall= Rainfall is moderate in Gurugram District Average Rainfall is 596mm. 4. There is no major river crossing in the proposed alignment and there is no history of a major flood in this area. 5. The elevation varies approximately between 228m to 256m above the Mean sea level (MSL). 17 Packages The Entire project for HORC has been divided into 9 different contract packages 18 List of Exceptional Risks which shall not be excluded from the insurance cover for the works 1. Earthquake 2. Flood 3. Rain 19 Mobilization Advance 1. The Authority shall, on request of the Concessionaire, make an advance payment in a sum not exceeding 10 of the Bid Project Cost.
  • 5. PROJECT PLANNING AND SCHEDULING USING MSP S.no Description Summary 2. This advance payment shall be made in two equal instalments. The Concessionaire may request the Authority for the first instalment of the advance payment at any time after the Appointed Date, along with furnishing a Bank Guarantee in a form satisfactory to the Authority. 3. Upon satisfactory utilization of the first instalment, the second instalment shall be paid after the Engineer’s approval. The contractor shall submit a utilization statement supported by a certified Chartered Accountant under their seal and Stamp. It shall be paid against an Advance payment Certificate. 20 The maximum amount of Delay damage 1). 5% of the accepted Contract Amount, less the provisional sum. 21 INSURANCE 1) The Death of or injury to any person (WC Policy) 2) The loss of or damage to any property (Other Than the works) (CAR Policy). 3) All insurances obtained by the Concessionaire in accordance with sub-clause 19.2.4 shall be maintained with insurers on terms consistent with Good Industry Practice. Within 15 days of obtaining any insurance cover, the Concessionaire shall furnish to the Authority, notarized true copies of the certificate(s) of insurance, copies of insurance policies and premium payment receipts in respect of such insurance, and no such insurance shall be cancelled, modified, or allowed to expire or lapse until the expiration of at least 45 days after notice of such proposed cancellation, modification or nonrenewal has been delivered by the Concessionaire to the Authority. Project Completion Schedule PROJECT MILESTONE-I 1. Project Milestone-I (MS1) Trial assembly of 1st open Web Girder (OWG). Time for completion from the commencement date i.e. 120 days (Date: xx.xx.xxxx). PROJECT MILESTONE-II 2. Project Milestone-II Launching/erection of 1st OWG on Mnaesar –Patli connectivity i.e. Time for completion from the commencement date i.e 180 days (Date: xx.xx.xxx). PROJECT MILESTONE-III 3. Project Milestone-III Completion of track works on Manesar- Patli connectivity. Time for completion from the commencement date i.e 195 days (Date: xx.xx.xxxx). Stipulated Date of Completion =xx.xx.xxxx Defect Notification Period = 365 days calculated from the date of issue of the taking over the certificate for the work. 23 Facilities for Employer’s / Engineer’s Personnel’s. (i) Site Office Approximate space 20Sqm. (Section viii-i page-76)
  • 6. PROJECT PLANNING AND SCHEDULING USING MSP 2. Project Schedule
  • 7. PROJECT PLANNING AND SCHEDULING USING MSP
  • 8. PROJECT PLANNING AND SCHEDULING USING MSP
  • 9. PROJECT PLANNING AND SCHEDULING USING MSP
  • 10. PROJECT PLANNING AND SCHEDULING USING MSP
  • 11. PROJECT PLANNING AND SCHEDULING USING MSP
  • 12. PROJECT PLANNING AND SCHEDULING USING MSP
  • 13. PROJECT PLANNING AND SCHEDULING USING MSP
  • 14. PROJECT PLANNING AND SCHEDULING USING MSP
  • 15. PROJECT PLANNING AND SCHEDULING USING MSP
  • 16. PROJECT PLANNING AND SCHEDULING USING MSP
  • 17. PROJECT PLANNING AND SCHEDULING USING MSP
  • 18. PROJECT PLANNING AND SCHEDULING USING MSP
  • 19. PROJECT PLANNING AND SCHEDULING USING MSP
  • 20. PROJECT PLANNING AND SCHEDULING USING MSP 3. Project Reports A. Milestone report
  • 21. PROJECT PLANNING AND SCHEDULING USING MSP B. Cash Flow Report
  • 22. PROJECT PLANNING AND SCHEDULING USING MSP C. Critical Task Report
  • 23. PROJECT PLANNING AND SCHEDULING USING MSP