Construction Preliminary Implementation : Proposal

     Action by Owner/           Activity by            Status by Benchmarking and monitoring of
     Client                     CPWD                                CPWD Activities
                                                      Existence of Provision for Status of
                                                      CPWD           Monitoring     Monitoring
                                                      Service        (Benchmark
                                                      Benchmark      or
                                                                     otherwise)
A1   Requisition with details   Submission of PD.     Concept           Through    Arch/SA/CA
     of land and detail         Presentation to       Design with       WBPMS
     requirements               Client in various     specification.
                                mediums               Presentation
                                i.e.,Powerpoint,      to Client.
                                Model,                45 Days.
                                walkthrough
A2   Approval of PD             Submission of
                                P.E.
                                Calculation of
                                rough structural
                                sizes.
B1   Sanction of P.E.
     (AA & ES)
B2                              Submission of         Preparation of
                                drawings for D.E.     submission
                                Structural sizes to   drgs.and
                                be given by           submit to local
                                Structural            body for
                                Engineer.             approval.
                                Electrical Inputs     Preparation of
                                                      W.Drg.
                                                      alongwith D.E.
                                                      60 days
B3   Allotment letter
     clearance of all Dues
     are essential and
     responsibility of Owner
S1   Pursue with local body     Submission to         Cannot be
     along with EE (C) and      local body            quantified
     Architect for approval.    • Environmenta
                                     l                Minimum
                                • Fire                6 months
                                • Heritage
                                • Traffic Study
                                • Forest
                                • Airport
                                     Authority
                                • A.S.I.
C1   Completion certificate     After Completion      Cannot be
                                of building.          quantified.
                                Preparation of
                                Completion            Minimum 06
                                drawings and          months.
                                documents for
                                submission in
                                local body
                                Fire
                                DUAC
Construction Preliminary Implementation : Proposal

      Activities and             Activity of          Activities/ Responsibilities   Time Frame
      Responsibilities of        CPWD Civil,          of CPWD Architect
      Client                     electrical and
                                 Horticulture
P1    Requisition with details   Survey of land       Discussion with Client to      30 Days
      of land (area              and existing         assess and appreciate their
      dimensions) and detail     services,            requirements.
      of requirements            approach road        Incorporate the same and
                                 etc. Inputs on       prepare PD
                                 local byelaws.
P2    Approval of PD by Client   -                    -
P3                               Preparation of PE    -                              30 Days
P4    Approval of P.E.                                                               30 Days
      (AA & ES)
P5                                                    Preparation of submission      90 Days
                                                      drawings and review with
                                                      Client & modification if
                                                      required and submit in local
                                                      body for their approval.
P6                                                    Pursue with local body along   Cannot be quantified
                                                      with EE (C) for approval.
                                                      • Environmental                Minimum 6 months
                                                      • Fire
                                                      • DUAC
                                                      • Heritage
                                                      • Traffic Study
                                                      • Forest
                                                      • Airport Authority
                                                      • A.S.I.
P7                               Rough Structural                                    60 Days
                                 sizes and
                                 electrical inputs.
P8                                                    Preparation of working         90 Days
                                                      Drawing and detail working
                                                      drawing.
P9                               Preparation of                                      60 Days
                                 Structural
                                 Drawing
P10                              NIT,                                                30 Days
                                 Prequalification
P11                              Selection of                                        30 Days
                                 Contractors for
                                 prequalification
P12                              Call of tender                                      30 Days
                                 and pre bid
                                 conference
P13                              Receipt/ opening                                    30 Days
                                 of tender
P14                              Decision on                                         30 Days
                                 tender and award
                                 of work
E1                               Execution of work
                                 and Contract
                                 Management
C1   Completion of
     work
C2   Testing and
     commissioning
C4                     Preparation of completion      30 days
                       drawings and documents and
                       submission in local body.
C5                     Pursue with local body along   Cannot be quantified
                       with EE (C) for approval.
                       • Fire                         Minimum 6 months
                       • DUAC
                       Completion Certificate
C6   Handing over to
     Client
C7   Settlement of
     Accounts

More Related Content

Viewers also liked

Registering a company in india
Registering a company in indiaRegistering a company in india
Registering a company in india
Somesha MR
 
It entreprenures
It entreprenuresIt entreprenures
It entreprenures
Somesha MR
 
Presentation graphic memoir edit
Presentation graphic memoir editPresentation graphic memoir edit
Presentation graphic memoir edit
Vermont Jax
 
Case study of ajit 05 11 12
Case study of ajit 05 11 12Case study of ajit 05 11 12
Case study of ajit 05 11 12
Somesha MR
 
Pengaturan Starting Motor Secara Berurutan
Pengaturan Starting Motor Secara BerurutanPengaturan Starting Motor Secara Berurutan
Pengaturan Starting Motor Secara Berurutan
Edyan Noveri
 

Viewers also liked (17)

Virtual Datacenter
Virtual DatacenterVirtual Datacenter
Virtual Datacenter
 
Registering a company in india
Registering a company in indiaRegistering a company in india
Registering a company in india
 
Hakovietnam3
Hakovietnam3Hakovietnam3
Hakovietnam3
 
Retail Workshop Brochure
Retail Workshop BrochureRetail Workshop Brochure
Retail Workshop Brochure
 
Sevottam
SevottamSevottam
Sevottam
 
Jo slideshow
Jo slideshowJo slideshow
Jo slideshow
 
It entreprenures
It entreprenuresIt entreprenures
It entreprenures
 
Presentation graphic memoir edit
Presentation graphic memoir editPresentation graphic memoir edit
Presentation graphic memoir edit
 
Case study of ajit 05 11 12
Case study of ajit 05 11 12Case study of ajit 05 11 12
Case study of ajit 05 11 12
 
Sosiaalinen media asiakaskokemuksessa
Sosiaalinen media asiakaskokemuksessaSosiaalinen media asiakaskokemuksessa
Sosiaalinen media asiakaskokemuksessa
 
Wap ppt
Wap pptWap ppt
Wap ppt
 
Sosiaalinen media asiakaskokemuksessa
Sosiaalinen media asiakaskokemuksessaSosiaalinen media asiakaskokemuksessa
Sosiaalinen media asiakaskokemuksessa
 
Biofuels
BiofuelsBiofuels
Biofuels
 
Manajemen mutu pendidikan Islam-Deden Makbuloh-Agus Mukhandar
Manajemen mutu pendidikan Islam-Deden Makbuloh-Agus MukhandarManajemen mutu pendidikan Islam-Deden Makbuloh-Agus Mukhandar
Manajemen mutu pendidikan Islam-Deden Makbuloh-Agus Mukhandar
 
Pengaturan Starting Motor Secara Berurutan
Pengaturan Starting Motor Secara BerurutanPengaturan Starting Motor Secara Berurutan
Pengaturan Starting Motor Secara Berurutan
 
Shassari catalogo virtual
Shassari catalogo virtualShassari catalogo virtual
Shassari catalogo virtual
 
Wap ppt
Wap pptWap ppt
Wap ppt
 

Similar to Sevottam

Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
Paul Allen
 
Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)
Mohamed Kamal
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
NASAPMC
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Denis Senin
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Versli Lietuva (Enterprise Lithuania)
 
Video Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationVideo Surveyor NSF FInal Presentation
Video Surveyor NSF FInal Presentation
Stanford University
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
NASAPMC
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
NASAPMC
 
Mary.zimmerman
Mary.zimmermanMary.zimmerman
Mary.zimmerman
NASAPMC
 

Similar to Sevottam (20)

3 5 Temporary Works Appendix A
3 5 Temporary Works   Appendix A3 5 Temporary Works   Appendix A
3 5 Temporary Works Appendix A
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)
 
Global Solar Summit
Global Solar SummitGlobal Solar Summit
Global Solar Summit
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02
 
Design for Six Sigma
Design for Six SigmaDesign for Six Sigma
Design for Six Sigma
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
 
Video Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationVideo Surveyor NSF FInal Presentation
Video Surveyor NSF FInal Presentation
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
Contract Manager Presentation
Contract Manager PresentationContract Manager Presentation
Contract Manager Presentation
 
Atlas Project Introductory Presentation
Atlas Project Introductory PresentationAtlas Project Introductory Presentation
Atlas Project Introductory Presentation
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
 
Mary.zimmerman
Mary.zimmermanMary.zimmerman
Mary.zimmerman
 

Recently uploaded

Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 

Recently uploaded (20)

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

Sevottam

  • 1. Construction Preliminary Implementation : Proposal Action by Owner/ Activity by Status by Benchmarking and monitoring of Client CPWD CPWD Activities Existence of Provision for Status of CPWD Monitoring Monitoring Service (Benchmark Benchmark or otherwise) A1 Requisition with details Submission of PD. Concept Through Arch/SA/CA of land and detail Presentation to Design with WBPMS requirements Client in various specification. mediums Presentation i.e.,Powerpoint, to Client. Model, 45 Days. walkthrough A2 Approval of PD Submission of P.E. Calculation of rough structural sizes. B1 Sanction of P.E. (AA & ES) B2 Submission of Preparation of drawings for D.E. submission Structural sizes to drgs.and be given by submit to local Structural body for Engineer. approval. Electrical Inputs Preparation of W.Drg. alongwith D.E. 60 days B3 Allotment letter clearance of all Dues are essential and responsibility of Owner S1 Pursue with local body Submission to Cannot be along with EE (C) and local body quantified Architect for approval. • Environmenta l Minimum • Fire 6 months • Heritage • Traffic Study • Forest • Airport Authority • A.S.I. C1 Completion certificate After Completion Cannot be of building. quantified. Preparation of Completion Minimum 06 drawings and months. documents for submission in local body Fire DUAC
  • 2. Construction Preliminary Implementation : Proposal Activities and Activity of Activities/ Responsibilities Time Frame Responsibilities of CPWD Civil, of CPWD Architect Client electrical and Horticulture P1 Requisition with details Survey of land Discussion with Client to 30 Days of land (area and existing assess and appreciate their dimensions) and detail services, requirements. of requirements approach road Incorporate the same and etc. Inputs on prepare PD local byelaws. P2 Approval of PD by Client - - P3 Preparation of PE - 30 Days P4 Approval of P.E. 30 Days (AA & ES) P5 Preparation of submission 90 Days drawings and review with Client & modification if required and submit in local body for their approval. P6 Pursue with local body along Cannot be quantified with EE (C) for approval. • Environmental Minimum 6 months • Fire • DUAC • Heritage • Traffic Study • Forest • Airport Authority • A.S.I. P7 Rough Structural 60 Days sizes and electrical inputs. P8 Preparation of working 90 Days Drawing and detail working drawing. P9 Preparation of 60 Days Structural Drawing P10 NIT, 30 Days Prequalification P11 Selection of 30 Days Contractors for prequalification P12 Call of tender 30 Days and pre bid conference P13 Receipt/ opening 30 Days of tender P14 Decision on 30 Days tender and award of work E1 Execution of work and Contract Management
  • 3. C1 Completion of work C2 Testing and commissioning C4 Preparation of completion 30 days drawings and documents and submission in local body. C5 Pursue with local body along Cannot be quantified with EE (C) for approval. • Fire Minimum 6 months • DUAC Completion Certificate C6 Handing over to Client C7 Settlement of Accounts