International Journal of Pharmaceutical Science Invention
ISSN (Online): 2319 – 6718, ISSN (Print): 2319 – 670X
www.ijpsi.org Volume 6 Issue 2 ‖ February 2017 ‖ PP. 26-30
www.ijpsi.org 26 | P a g e
Analyzing the Flexibility of Pharmaceutical and
Biopharmaceutical Facility Options
Sidney Backstrom,
Executive Director, Business Management, G-CON Manufacturing, Inc.
I. Introduction
In the pharmaceutical and biopharmaceutical industry several factors have converged to
change the landscape in regard to facilities: the wide scale adoption of single use equipment, greater
emphasis on reducing capital expenditures, the need for “in country for country” production, and the
advent of personalized medicines and industry focus on orphan drug production to name a few. Such
factors militate against the traditional brick and mortar facility approach which is designed for the
forecasted global production demand of a blockbuster quantity of product. The expense to build and
operate, time to build and validate, single-use nature, and risk of product loss based on building a
facility based on forecasted demand,have caused the Goliaths and Davids of the industry to seek a
better solution. The search for that solution will inevitably lead the tasked construction project
manager to a single word that is often incanted in the facilities world – flexibility. he or she will look
for it or be told that he or she needs it in the chosen option.
What does this profound incantation mean you ask?One can look high and low in white
papers, presentations, articles and the like but at least with respect to the pharma and biopharma
industry there does not seem to be a settled upon definition.1
So let’s begin at the beginning. What is
the definition of flexibility? Merriam-Webster defines flexible or flexibility as “characterized by a
ready capability to adapt to new, different, or changing requirements.” Applying that definition to
pharma and/or biopharma production, what does that mean? Substituting in the subject we are
concerned with, the facility has to be readily capable to adapt to new, different or changing
requirements. In the pharma and biotech context new, different or changing requirements seem most
closely related to:
 capacity, either more or less than originally contemplated;
 a change in process;
 change in regulatory requirements;
 the need to move the production capability, due to shifting demand needs or political instability;
 the need add a new product or replace an existing product; and/or
 the need to respond to an excursion or contamination issue.
The question is, do any of the current facility schemes allow for this flexibility? To answer
the question we must consider what the current facility options are.Theoptions readily available today
are: modular construction onsite, modular construction off-site, stick-built construction and/or pre-
fabricated cleanroom modules. Defining each further is in order.
Modular construction onsite is generally considered as building processing space using
modular panels at the ultimate production location. There are many companies that provide such
panels. Some even provide for the installation of the panels. There are many cleanroom contractors
who can assemble such panels onsite.
Modular construction offsite is generally considered to be building an entire facility at a
manufacturing location module by module, then erecting a structure entirely of those modules and
1
See, for example, H. L. Levine, J. E. Lilja, R. Stock, H. Hummel, S. D. Jones (2012) Efficient, Flexible Facilities
for
the 21st Century, BioProcess International 10(11); Hodge G. Hodge (2009) The Economic and Strategic Value of
Flexible Manufacturing Capacity. ISPE Strasbourg Conference, 28–29 September 2009, Strasbourg, France; A.
Shanley, P. Thomas (2009) Flexible Pharma: Puzzling Out the Plant of the Future, PharmaManufacturing.com
Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options
www.ijpsi.org 27 | P a g e
connecting the modules, testing the facility for functionality and then disassembling the facility,
shipping the modules individually and re-erecting the facility with the modules at the ultimate
production site.
Stick built construction is commonly regarded as building internal infrastructures, cleanrooms and
ancillary spaces, at the production site. Gypsum wall board is generally used if panels are not.
Pre-fabricated cleanrooms are offsite built modules that provide clean space including floors,
walls, ceilings, windows and doors in appropriate finishes. In some instances such modules include
their own mechanical space where automation PLCs, HVAC, fire suppression systems, utility
connections, etc.are housed.
Analysis of the Options – Flexible or Not
Modular construction onsite. Using panel systems, it is not hard to appreciate that there is
some flexibility benefit. In a greenfield or brownfield application, the cleanroom build out can morph
to the layout of the host facility. If the host facility is a large rectangular clear span facility, the
cleanrooms can be built in a large rectangular arrangement. If the host facility is partially built out and
has columns in the unimproved area, the panelized approach can be contained in that space. The
approach can be likened to making “houses” out of playing cards. There is no inherent limit to the size
and shape.
But is this apparent flexibility valuable? In deciding that, it should be noted that every other
option mentioned above has the same flexibility. Each, whether it is stick built or offsite modular, can
be sized according to the client’s desires. So this apparent flexibility really has no relative value.2
A more important analysis would be to consider whether modular construction onsite can meet the
new, different or changing requirements identified above. That analysis is below:
 Change in capacity – modular construction onsite, while initially flexible in terms of size and
shape, is not very malleable once it is built. Wall panels, doors, ceilings and the like are
permanently placed in position. Ductwork and utilities are provided in intricate detail above the
cleanroom structures. Adding to or reducing the footprint of the fixed structures requires onsite
construction or demolition, which will interrupt ongoing production. Once construction and/or
demolition are complete, rebalancing of the HVAC system and revalidation of the cleanroom
space will be required.
 Change in process – would lead to a similar result if the change in process required more or less
space, different air classification, or a different flow of materials, waste or personnel. All of these
changes would require some form of construction onsite which would interrupt ongoing
operations and require re-validation of the cleanroom space.
 Change in regulatory requirements – whether it be air classification, pressurization, flows,
washing, gowning, etc. - one can scarcely imagine a scenario that doesn’t affect the HVAC,
utilities requirements, and/or footprint of the cleanroom space. And any of those changes would
require onsite construction or changes to mechanical equipment, such that production is
interrupted and revalidation required after changes are made.
 Adding a new product or changing product being produced – a critical step in such an endeavor is
cleaning the cleanroom and ductwork. While the cleanroom itself may be able to be cleaned, the
extensive ductwork above ceiling may present a formidable challenge. Moreover, unless the new
product requires the same footprint, processing equipment, process flows, etc., it is very easy to
see that some amount of retro-fitting will be required leading again to interruptions and
revalidation efforts.
 Contamination –if an excursion occurs or contamination is discovered, it is likely that
decontaminating the entire cleanroom area will be required as it is most common that all of the
cleanroom spaces will share HVAC equipment and airflow. In that instance, cleaning in the area
of the spill or contamination only will not sufficiently clean the affected area. The entire area will
have to be cleaned resulting in downtime and revalidation once the system is brought back up.
2
A simple example illustrates the point. If everyone in the country is given $100, has anyone gained any
wealth?
Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options
www.ijpsi.org 28 | P a g e
 Moving production capacity – if there is a desire to move production from one facility to the next
or even from city or country to another, it is universally accepted that deconstructing the panels,
moving then and reconstructing them would not be feasible or time efficient.
Modular construction offsite. This approach has been employed by a number of entities, some
still operating and some not. While the concept has visceral appeal, in practice there are shortcomings.
On the appealing side, being able to build offsite ostensibly provides the ability to build without
permitting delays and without the need for the client to oversee the construction onsite. Permitting
though is not foregone but only delayed as permitting for the construction onsite will still be required.
Construction oversight will also be required offsite at the manufacturing site and then again upon
delivery. So these two benefits are really just extending the time before such activity is required.See
Figure 1, (below) courtesy of Jacobs.
How does modular construction offsite fare as it relates to new, different or changing requirements?
Let’s consider the points previously considered:
 Change in capacity – The modular building has been designed, built, disassembled, shipped and
rebuilt onsite. The modules have been permanently connected to one another as have the utilities
and HVAC throughout the facility. Increasing the capacity would require more or larger
processing equipment which would also increase the space needed as well as utility and heat
loads. Adding to meet these requirements in a now hardened facility is not feasible. The
additional capacity would require either a new facility or “bolt on” approach similar to adding a
tool shed in the backyard when the garage gets full. Reducing the capacity would simply means
less of the hardened facility is used. Redeploying that space is not possible.
 Change in process – recalling the examples previously considered, or adding a step or taking
away a step, would all result in some construction or re-balancing onsite or losing the efficacy of
some previously used space.
 Change in regulatory requirements –reviewing the examples noted above, e.g., change in product,
personnel or waste flow, none of them can be readily accomplished without some modification to
the overall process flow or mechanical plan of the building.
 Adding a product or changing products – Adding a product and not affecting the production
capacity of the original product cannot be accomplished unless the building was originally
designed with this excess capacity in mind. Such would not be a tribute to the flexibility of the
facility. Credit in that case would be due to planning and a much higher budget. Changing
products would require a complete facility sanitization and validation of the new process. Such
could be accomplished but time and costs loom large in such an effort. The number of mothballed
pharma facilities stands as a testament to the unenticing nature of this decision.
 Contamination – given that centralized HVAC systems are employed in this type of construction
in the same way that they are in brick and mortar facilities, a contamination in one area is likely to
spread to others. There have been many examples of facility contamination and the efforts taken
to remedy it. The process halts production, is time consuming and expensive. The hardened nature
of this type of facility would lead to
no different result.
 Moving production capacity – not
cost or time efficient.
Stick built.This method is probably the
best known option for the life
sciences industry. Building
cleanrooms in place within a facility
is well understood both in terms of
its benefits and shortcomings. It is
similar to the modular construction
onsite in terms of being construction
onsite, requiring permits, initial
flexibility of design, etc. But it is
Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options
www.ijpsi.org 29 | P a g e
even less flexible than the
paneled approach. In the paneled
approach, walls can be moved
more easily than a stick built
wall which is most often gypsum
board covered with epoxy.
Moving a wall in this option
means demolition. Both suffer in
regard to changes in utilities or
HVAC distribution. Centralized
distribution of both requires
adding capacity and rebalancing
with respect to HVAC.
Assessing this methodology
against the six categories of
change, it fares slightly worse
than the modular construction
onsite scoring the same on four areas (change in capacity, process and regulatory and ability to
move) and about the same on two (product change and contamination).
Pre-fabricated cleanrooms. The relatively new kid on the block, pre-fabricated cleanrooms
emerged onto the scene almost ten years ago. These cleanrooms are built offsite, tested, shipped and
then put in place in the production facility. See Figure 2, (below) courtesy of G-CON Manufacturing,
Inc. The most advanced form includes their own HVAC systems within the cleanroom footprint
providing compactness and autonomy from the facility or other cleanrooms. Such a characteristic is a
major distinguishing factor in regard to other options and has been recognized by leaders in the
industry as a major advantage.3
They can function alone or as part of a cleanroom cluster where larger
processes can be accommodated.4
An analysis of the five points considered for this option is required.
 Change in capacity – While it may seem that changes in capacity would not be possible with such
discrete units, the contrary is true. New units can be added when needed and without interrupting
the existing process. They can be added in a linear fashion or added to the existing cluster via the
use of a corridor or previously placed knock out panel. A reduction in capacity in this context
does not mean that previously placed units are shut down. Rather, they can be disconnected and
moved out of the facility for deployment elsewhere.See Figure 3, below, Courtesy of Pfizer.
3
A. Pralong (2013) Single-use technologies and facility layout – a paradigm shift, Biopharma Asia Magazine, Vol
2, Issue 1 (“Until now, modular facilities have reproduced traditional architecture with regard to embedding
utilities piping and HVAC ducts in the interspace between the physical module limits and the suspended ceiling
making refurbishment, if required, extremely complicated.”)
4
P. Nixon, (2015) Transforming the Pharmaceutical Industry: Portable, Continuous, Miniature & Modular
Development and Manufacturing (PCMM),2015 PDA/FDA Joint Regulatory Conference. (explaining the benefits
of per-fabricated cleanrooms in an oral solid dosage application)
Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options
www.ijpsi.org 30 | P a g e
 Change in process. If steps are added or taken away, air classification changes, etc. units can be
added or reduced. Additional capacity from each internal air handler can be deployed.
Importantly, the use of individual air handlers per unit or unit cluster allows for changes to air
flow, air changes per hour, etc. without having to add to or rebalance the entire system.
 Regulatory changes – Much like the way a change in process can be accommodated, a regulatory
change can also be accommodated. Units can be added or taken away like “Legos” within the
larger open warehouse type structure that houses the units.
 Adding or changing a product – with the ability to have discrete process steps in each unit adding
a new product line into a facility simply requires adding additional units to accommodate the
process. Changing the product means complete sanitization of the units, which given their
integrated HVAC system, is significantly less challenging than cleaning elaborate facility wide
ductwork.
 Contamination – because of the separate HVAC of the units and unit clusters, contamination can
be well-contained and if necessary the affected units can be removed from service and replaced
with other units or returned after decontamination if such was completed offsite.5
 Moving – This is the only option that can be effectively moved either within the facility or out of
a facility. If demand lags in a particular area, the entire production process can be picked up and
moved to where the demand is.
So What Have We Learned?
Having reviewed the leading facility options and seeking to determine if flexibility is a
characteristic of each, we have learned about each offering. We have learned that all offer initial
flexibility, i.e., the ability to design what is desired. But this flexibility is no different from the
flexibility offered by a traditional brick and mortar building. And this flexibility is really not valuable
relative to other options because all options offer it. Some options offer additional flexibility, the
ability to morph into a space already built – onsite modular, stick built and pre-fabricated cleanrooms.
But only one proves to offer flexibility beyond that – flexibility once the system has been built and
placed. Prefabricated autonomous cleanrooms stand well above the rest in terms of their ability to
meet the true definition of flexibility, the ability to meet new, different or changing requirements. So
if true flexibility is desired, autonomous pre-fabricated cleanrooms stand well above the rest.
5
At least one provider of this technology uses integrated air-bearings within each unit that allows the unit to
float like an air hockey puck over a flat concrete surface. Such makes the need for indoor lifting unnecessary
and allows for easy moving into and out of the facility.

More Related Content

Viewers also liked

A Review on the Challenges of Teaching Physical Education
A Review on the Challenges of Teaching Physical EducationA Review on the Challenges of Teaching Physical Education
A Review on the Challenges of Teaching Physical Educationinventionjournals
 
Role of Law in Dealing with the Cyber Crime and Social Change
Role of Law in Dealing with the Cyber Crime and Social ChangeRole of Law in Dealing with the Cyber Crime and Social Change
Role of Law in Dealing with the Cyber Crime and Social Changeinventionjournals
 
The Factors Affecting the Development of Entrepreneurship School in Education...
The Factors Affecting the Development of Entrepreneurship School in Education...The Factors Affecting the Development of Entrepreneurship School in Education...
The Factors Affecting the Development of Entrepreneurship School in Education...inventionjournals
 
Controversies and Navigation of Inclusive Education in the Context of Bangladesh
Controversies and Navigation of Inclusive Education in the Context of BangladeshControversies and Navigation of Inclusive Education in the Context of Bangladesh
Controversies and Navigation of Inclusive Education in the Context of Bangladeshinventionjournals
 
A Course-Based Qualitative Inquiry into the Potential Impact of the Bachelor ...
A Course-Based Qualitative Inquiry into the Potential Impact of the Bachelor ...A Course-Based Qualitative Inquiry into the Potential Impact of the Bachelor ...
A Course-Based Qualitative Inquiry into the Potential Impact of the Bachelor ...inventionjournals
 
The Debilitating Effect of Conflict on the Female Gender: The Syrian Conflict...
The Debilitating Effect of Conflict on the Female Gender: The Syrian Conflict...The Debilitating Effect of Conflict on the Female Gender: The Syrian Conflict...
The Debilitating Effect of Conflict on the Female Gender: The Syrian Conflict...inventionjournals
 
MeĢrutiyet Devrimi Sürecinde Ġran’da Ulemânın Rolü ve Etkisi (1906-1911)
MeĢrutiyet Devrimi Sürecinde Ġran’da Ulemânın Rolü ve Etkisi (1906-1911)MeĢrutiyet Devrimi Sürecinde Ġran’da Ulemânın Rolü ve Etkisi (1906-1911)
MeĢrutiyet Devrimi Sürecinde Ġran’da Ulemânın Rolü ve Etkisi (1906-1911)inventionjournals
 
Terminalia Chebula A Traditional Herbal Drug – A Short Review
Terminalia Chebula A Traditional Herbal Drug – A Short ReviewTerminalia Chebula A Traditional Herbal Drug – A Short Review
Terminalia Chebula A Traditional Herbal Drug – A Short Reviewinventionjournals
 
Human Papillomavirus Immunization completion rates increased by the use of th...
Human Papillomavirus Immunization completion rates increased by the use of th...Human Papillomavirus Immunization completion rates increased by the use of th...
Human Papillomavirus Immunization completion rates increased by the use of th...inventionjournals
 
The Geopolitics South American in Badia Malagrida Carlos
The Geopolitics South American in Badia Malagrida CarlosThe Geopolitics South American in Badia Malagrida Carlos
The Geopolitics South American in Badia Malagrida Carlosinventionjournals
 
Synthetic Utility of Aza Heterocyclics: A Short Review
Synthetic Utility of Aza Heterocyclics: A Short ReviewSynthetic Utility of Aza Heterocyclics: A Short Review
Synthetic Utility of Aza Heterocyclics: A Short Reviewinventionjournals
 
“Comparative Evaluation between Physics Forceps and Conventional Extraction F...
“Comparative Evaluation between Physics Forceps and Conventional Extraction F...“Comparative Evaluation between Physics Forceps and Conventional Extraction F...
“Comparative Evaluation between Physics Forceps and Conventional Extraction F...inventionjournals
 
An Phyto - Chemical Analysis of Seedless Amalaki Fruit (Emblica Officinalis) ...
An Phyto - Chemical Analysis of Seedless Amalaki Fruit (Emblica Officinalis) ...An Phyto - Chemical Analysis of Seedless Amalaki Fruit (Emblica Officinalis) ...
An Phyto - Chemical Analysis of Seedless Amalaki Fruit (Emblica Officinalis) ...inventionjournals
 
Qualitative & Quantitative Phytochemical analysis on the Leaves &fruits of Pa...
Qualitative & Quantitative Phytochemical analysis on the Leaves &fruits of Pa...Qualitative & Quantitative Phytochemical analysis on the Leaves &fruits of Pa...
Qualitative & Quantitative Phytochemical analysis on the Leaves &fruits of Pa...inventionjournals
 
Production of A Safety Helmet Using Palm Kernel Fiber And Shell Particulates
Production of A Safety Helmet Using Palm Kernel Fiber And Shell ParticulatesProduction of A Safety Helmet Using Palm Kernel Fiber And Shell Particulates
Production of A Safety Helmet Using Palm Kernel Fiber And Shell Particulatesinventionjournals
 
Legal Aid: A Process to Ensure Access to Justice and Human Rights in Bangladesh
Legal Aid: A Process to Ensure Access to Justice and Human Rights in BangladeshLegal Aid: A Process to Ensure Access to Justice and Human Rights in Bangladesh
Legal Aid: A Process to Ensure Access to Justice and Human Rights in Bangladeshinventionjournals
 
Designing learning Spaces with the Approach of Improving Children’s Creativit...
Designing learning Spaces with the Approach of Improving Children’s Creativit...Designing learning Spaces with the Approach of Improving Children’s Creativit...
Designing learning Spaces with the Approach of Improving Children’s Creativit...inventionjournals
 
Basic Computer Training Institute in Ambala ! BATRA COMPUTER CENTRE
Basic Computer Training Institute  in Ambala ! BATRA COMPUTER CENTRE Basic Computer Training Institute  in Ambala ! BATRA COMPUTER CENTRE
Basic Computer Training Institute in Ambala ! BATRA COMPUTER CENTRE jatin batra
 

Viewers also liked (20)

A Review on the Challenges of Teaching Physical Education
A Review on the Challenges of Teaching Physical EducationA Review on the Challenges of Teaching Physical Education
A Review on the Challenges of Teaching Physical Education
 
Role of Law in Dealing with the Cyber Crime and Social Change
Role of Law in Dealing with the Cyber Crime and Social ChangeRole of Law in Dealing with the Cyber Crime and Social Change
Role of Law in Dealing with the Cyber Crime and Social Change
 
The Factors Affecting the Development of Entrepreneurship School in Education...
The Factors Affecting the Development of Entrepreneurship School in Education...The Factors Affecting the Development of Entrepreneurship School in Education...
The Factors Affecting the Development of Entrepreneurship School in Education...
 
Controversies and Navigation of Inclusive Education in the Context of Bangladesh
Controversies and Navigation of Inclusive Education in the Context of BangladeshControversies and Navigation of Inclusive Education in the Context of Bangladesh
Controversies and Navigation of Inclusive Education in the Context of Bangladesh
 
A Course-Based Qualitative Inquiry into the Potential Impact of the Bachelor ...
A Course-Based Qualitative Inquiry into the Potential Impact of the Bachelor ...A Course-Based Qualitative Inquiry into the Potential Impact of the Bachelor ...
A Course-Based Qualitative Inquiry into the Potential Impact of the Bachelor ...
 
Cornea plana: a case report
Cornea plana: a case reportCornea plana: a case report
Cornea plana: a case report
 
The Debilitating Effect of Conflict on the Female Gender: The Syrian Conflict...
The Debilitating Effect of Conflict on the Female Gender: The Syrian Conflict...The Debilitating Effect of Conflict on the Female Gender: The Syrian Conflict...
The Debilitating Effect of Conflict on the Female Gender: The Syrian Conflict...
 
MeĢrutiyet Devrimi Sürecinde Ġran’da Ulemânın Rolü ve Etkisi (1906-1911)
MeĢrutiyet Devrimi Sürecinde Ġran’da Ulemânın Rolü ve Etkisi (1906-1911)MeĢrutiyet Devrimi Sürecinde Ġran’da Ulemânın Rolü ve Etkisi (1906-1911)
MeĢrutiyet Devrimi Sürecinde Ġran’da Ulemânın Rolü ve Etkisi (1906-1911)
 
Terminalia Chebula A Traditional Herbal Drug – A Short Review
Terminalia Chebula A Traditional Herbal Drug – A Short ReviewTerminalia Chebula A Traditional Herbal Drug – A Short Review
Terminalia Chebula A Traditional Herbal Drug – A Short Review
 
Human Papillomavirus Immunization completion rates increased by the use of th...
Human Papillomavirus Immunization completion rates increased by the use of th...Human Papillomavirus Immunization completion rates increased by the use of th...
Human Papillomavirus Immunization completion rates increased by the use of th...
 
The Geopolitics South American in Badia Malagrida Carlos
The Geopolitics South American in Badia Malagrida CarlosThe Geopolitics South American in Badia Malagrida Carlos
The Geopolitics South American in Badia Malagrida Carlos
 
Synthetic Utility of Aza Heterocyclics: A Short Review
Synthetic Utility of Aza Heterocyclics: A Short ReviewSynthetic Utility of Aza Heterocyclics: A Short Review
Synthetic Utility of Aza Heterocyclics: A Short Review
 
“Comparative Evaluation between Physics Forceps and Conventional Extraction F...
“Comparative Evaluation between Physics Forceps and Conventional Extraction F...“Comparative Evaluation between Physics Forceps and Conventional Extraction F...
“Comparative Evaluation between Physics Forceps and Conventional Extraction F...
 
An Phyto - Chemical Analysis of Seedless Amalaki Fruit (Emblica Officinalis) ...
An Phyto - Chemical Analysis of Seedless Amalaki Fruit (Emblica Officinalis) ...An Phyto - Chemical Analysis of Seedless Amalaki Fruit (Emblica Officinalis) ...
An Phyto - Chemical Analysis of Seedless Amalaki Fruit (Emblica Officinalis) ...
 
Qualitative & Quantitative Phytochemical analysis on the Leaves &fruits of Pa...
Qualitative & Quantitative Phytochemical analysis on the Leaves &fruits of Pa...Qualitative & Quantitative Phytochemical analysis on the Leaves &fruits of Pa...
Qualitative & Quantitative Phytochemical analysis on the Leaves &fruits of Pa...
 
Production of A Safety Helmet Using Palm Kernel Fiber And Shell Particulates
Production of A Safety Helmet Using Palm Kernel Fiber And Shell ParticulatesProduction of A Safety Helmet Using Palm Kernel Fiber And Shell Particulates
Production of A Safety Helmet Using Palm Kernel Fiber And Shell Particulates
 
Legal Aid: A Process to Ensure Access to Justice and Human Rights in Bangladesh
Legal Aid: A Process to Ensure Access to Justice and Human Rights in BangladeshLegal Aid: A Process to Ensure Access to Justice and Human Rights in Bangladesh
Legal Aid: A Process to Ensure Access to Justice and Human Rights in Bangladesh
 
Designing learning Spaces with the Approach of Improving Children’s Creativit...
Designing learning Spaces with the Approach of Improving Children’s Creativit...Designing learning Spaces with the Approach of Improving Children’s Creativit...
Designing learning Spaces with the Approach of Improving Children’s Creativit...
 
Basic Computer Training Institute in Ambala ! BATRA COMPUTER CENTRE
Basic Computer Training Institute  in Ambala ! BATRA COMPUTER CENTRE Basic Computer Training Institute  in Ambala ! BATRA COMPUTER CENTRE
Basic Computer Training Institute in Ambala ! BATRA COMPUTER CENTRE
 
Question 5
Question 5Question 5
Question 5
 

Similar to Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options

G con future flexible facility - mj 03-2015
G con future flexible facility  - mj 03-2015G con future flexible facility  - mj 03-2015
G con future flexible facility - mj 03-2015MWJornitz
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxlmelaine
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxmecklenburgstrelitzh
 
COAA Illinois Spring 2015 Modular Seminar Summary by Michael Bordenaro
COAA Illinois Spring 2015 Modular Seminar Summary by Michael BordenaroCOAA Illinois Spring 2015 Modular Seminar Summary by Michael Bordenaro
COAA Illinois Spring 2015 Modular Seminar Summary by Michael BordenaroMike Bordenaro
 
Facility Location/Prduction Design & Development/Process Selection
Facility Location/Prduction Design & Development/Process SelectionFacility Location/Prduction Design & Development/Process Selection
Facility Location/Prduction Design & Development/Process Selectionviveksangwan007
 
Economics poster 2 jdm rev3_lgl clfinal
Economics poster 2 jdm rev3_lgl clfinalEconomics poster 2 jdm rev3_lgl clfinal
Economics poster 2 jdm rev3_lgl clfinalChris Lutes
 
Demystifying Designing for ‘X’ by ProTek Medical
Demystifying Designing for ‘X’ by ProTek Medical Demystifying Designing for ‘X’ by ProTek Medical
Demystifying Designing for ‘X’ by ProTek Medical ProtekMedical
 
Future flexible facility needs - mj 06-2016
Future flexible facility needs - mj 06-2016Future flexible facility needs - mj 06-2016
Future flexible facility needs - mj 06-2016MWJornitz
 
IRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing SystemIRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing SystemIRJET Journal
 
prefabrication structure report
prefabrication structure report prefabrication structure report
prefabrication structure report AbhishekM45
 
Const. Productivity Management
Const. Productivity ManagementConst. Productivity Management
Const. Productivity Managementsmall_nomi
 
industrial microbial culture (1).pdf
industrial microbial culture (1).pdfindustrial microbial culture (1).pdf
industrial microbial culture (1).pdfRupajitBhattacharjee1
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayBrittany Berryman
 
FlexFactory Whitepaper R1
FlexFactory Whitepaper R1FlexFactory Whitepaper R1
FlexFactory Whitepaper R1Ken Clapp
 
Biomanufacturing debottlenecking and optimization
Biomanufacturing debottlenecking and optimizationBiomanufacturing debottlenecking and optimization
Biomanufacturing debottlenecking and optimizationGBX Summits
 
Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Scott Robinson
 
Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Denham Apperley
 
Ron wilkinson cx for new and exist bldgs
Ron wilkinson cx for new and exist bldgsRon wilkinson cx for new and exist bldgs
Ron wilkinson cx for new and exist bldgsEllieNowels
 

Similar to Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options (20)

G con future flexible facility - mj 03-2015
G con future flexible facility  - mj 03-2015G con future flexible facility  - mj 03-2015
G con future flexible facility - mj 03-2015
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
 
COAA Illinois Spring 2015 Modular Seminar Summary by Michael Bordenaro
COAA Illinois Spring 2015 Modular Seminar Summary by Michael BordenaroCOAA Illinois Spring 2015 Modular Seminar Summary by Michael Bordenaro
COAA Illinois Spring 2015 Modular Seminar Summary by Michael Bordenaro
 
Facility Location/Prduction Design & Development/Process Selection
Facility Location/Prduction Design & Development/Process SelectionFacility Location/Prduction Design & Development/Process Selection
Facility Location/Prduction Design & Development/Process Selection
 
Economics poster 2 jdm rev3_lgl clfinal
Economics poster 2 jdm rev3_lgl clfinalEconomics poster 2 jdm rev3_lgl clfinal
Economics poster 2 jdm rev3_lgl clfinal
 
Demystifying Designing for ‘X’ by ProTek Medical
Demystifying Designing for ‘X’ by ProTek Medical Demystifying Designing for ‘X’ by ProTek Medical
Demystifying Designing for ‘X’ by ProTek Medical
 
Future flexible facility needs - mj 06-2016
Future flexible facility needs - mj 06-2016Future flexible facility needs - mj 06-2016
Future flexible facility needs - mj 06-2016
 
IRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing SystemIRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing System
 
prefabrication structure report
prefabrication structure report prefabrication structure report
prefabrication structure report
 
Const. Productivity Management
Const. Productivity ManagementConst. Productivity Management
Const. Productivity Management
 
industrial microbial culture (1).pdf
industrial microbial culture (1).pdfindustrial microbial culture (1).pdf
industrial microbial culture (1).pdf
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here Today
 
CIA_application award paper
CIA_application award paperCIA_application award paper
CIA_application award paper
 
FlexFactory Whitepaper R1
FlexFactory Whitepaper R1FlexFactory Whitepaper R1
FlexFactory Whitepaper R1
 
Biomanufacturing debottlenecking and optimization
Biomanufacturing debottlenecking and optimizationBiomanufacturing debottlenecking and optimization
Biomanufacturing debottlenecking and optimization
 
Crit Analysis Final
Crit Analysis FinalCrit Analysis Final
Crit Analysis Final
 
Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?
 
Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16
 
Ron wilkinson cx for new and exist bldgs
Ron wilkinson cx for new and exist bldgsRon wilkinson cx for new and exist bldgs
Ron wilkinson cx for new and exist bldgs
 

Recently uploaded

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 

Recently uploaded (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 

Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options

  • 1. International Journal of Pharmaceutical Science Invention ISSN (Online): 2319 – 6718, ISSN (Print): 2319 – 670X www.ijpsi.org Volume 6 Issue 2 ‖ February 2017 ‖ PP. 26-30 www.ijpsi.org 26 | P a g e Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options Sidney Backstrom, Executive Director, Business Management, G-CON Manufacturing, Inc. I. Introduction In the pharmaceutical and biopharmaceutical industry several factors have converged to change the landscape in regard to facilities: the wide scale adoption of single use equipment, greater emphasis on reducing capital expenditures, the need for “in country for country” production, and the advent of personalized medicines and industry focus on orphan drug production to name a few. Such factors militate against the traditional brick and mortar facility approach which is designed for the forecasted global production demand of a blockbuster quantity of product. The expense to build and operate, time to build and validate, single-use nature, and risk of product loss based on building a facility based on forecasted demand,have caused the Goliaths and Davids of the industry to seek a better solution. The search for that solution will inevitably lead the tasked construction project manager to a single word that is often incanted in the facilities world – flexibility. he or she will look for it or be told that he or she needs it in the chosen option. What does this profound incantation mean you ask?One can look high and low in white papers, presentations, articles and the like but at least with respect to the pharma and biopharma industry there does not seem to be a settled upon definition.1 So let’s begin at the beginning. What is the definition of flexibility? Merriam-Webster defines flexible or flexibility as “characterized by a ready capability to adapt to new, different, or changing requirements.” Applying that definition to pharma and/or biopharma production, what does that mean? Substituting in the subject we are concerned with, the facility has to be readily capable to adapt to new, different or changing requirements. In the pharma and biotech context new, different or changing requirements seem most closely related to:  capacity, either more or less than originally contemplated;  a change in process;  change in regulatory requirements;  the need to move the production capability, due to shifting demand needs or political instability;  the need add a new product or replace an existing product; and/or  the need to respond to an excursion or contamination issue. The question is, do any of the current facility schemes allow for this flexibility? To answer the question we must consider what the current facility options are.Theoptions readily available today are: modular construction onsite, modular construction off-site, stick-built construction and/or pre- fabricated cleanroom modules. Defining each further is in order. Modular construction onsite is generally considered as building processing space using modular panels at the ultimate production location. There are many companies that provide such panels. Some even provide for the installation of the panels. There are many cleanroom contractors who can assemble such panels onsite. Modular construction offsite is generally considered to be building an entire facility at a manufacturing location module by module, then erecting a structure entirely of those modules and 1 See, for example, H. L. Levine, J. E. Lilja, R. Stock, H. Hummel, S. D. Jones (2012) Efficient, Flexible Facilities
for the 21st Century, BioProcess International 10(11); Hodge G. Hodge (2009) The Economic and Strategic Value of Flexible Manufacturing Capacity. ISPE Strasbourg Conference, 28–29 September 2009, Strasbourg, France; A. Shanley, P. Thomas (2009) Flexible Pharma: Puzzling Out the Plant of the Future, PharmaManufacturing.com
  • 2. Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options www.ijpsi.org 27 | P a g e connecting the modules, testing the facility for functionality and then disassembling the facility, shipping the modules individually and re-erecting the facility with the modules at the ultimate production site. Stick built construction is commonly regarded as building internal infrastructures, cleanrooms and ancillary spaces, at the production site. Gypsum wall board is generally used if panels are not. Pre-fabricated cleanrooms are offsite built modules that provide clean space including floors, walls, ceilings, windows and doors in appropriate finishes. In some instances such modules include their own mechanical space where automation PLCs, HVAC, fire suppression systems, utility connections, etc.are housed. Analysis of the Options – Flexible or Not Modular construction onsite. Using panel systems, it is not hard to appreciate that there is some flexibility benefit. In a greenfield or brownfield application, the cleanroom build out can morph to the layout of the host facility. If the host facility is a large rectangular clear span facility, the cleanrooms can be built in a large rectangular arrangement. If the host facility is partially built out and has columns in the unimproved area, the panelized approach can be contained in that space. The approach can be likened to making “houses” out of playing cards. There is no inherent limit to the size and shape. But is this apparent flexibility valuable? In deciding that, it should be noted that every other option mentioned above has the same flexibility. Each, whether it is stick built or offsite modular, can be sized according to the client’s desires. So this apparent flexibility really has no relative value.2 A more important analysis would be to consider whether modular construction onsite can meet the new, different or changing requirements identified above. That analysis is below:  Change in capacity – modular construction onsite, while initially flexible in terms of size and shape, is not very malleable once it is built. Wall panels, doors, ceilings and the like are permanently placed in position. Ductwork and utilities are provided in intricate detail above the cleanroom structures. Adding to or reducing the footprint of the fixed structures requires onsite construction or demolition, which will interrupt ongoing production. Once construction and/or demolition are complete, rebalancing of the HVAC system and revalidation of the cleanroom space will be required.  Change in process – would lead to a similar result if the change in process required more or less space, different air classification, or a different flow of materials, waste or personnel. All of these changes would require some form of construction onsite which would interrupt ongoing operations and require re-validation of the cleanroom space.  Change in regulatory requirements – whether it be air classification, pressurization, flows, washing, gowning, etc. - one can scarcely imagine a scenario that doesn’t affect the HVAC, utilities requirements, and/or footprint of the cleanroom space. And any of those changes would require onsite construction or changes to mechanical equipment, such that production is interrupted and revalidation required after changes are made.  Adding a new product or changing product being produced – a critical step in such an endeavor is cleaning the cleanroom and ductwork. While the cleanroom itself may be able to be cleaned, the extensive ductwork above ceiling may present a formidable challenge. Moreover, unless the new product requires the same footprint, processing equipment, process flows, etc., it is very easy to see that some amount of retro-fitting will be required leading again to interruptions and revalidation efforts.  Contamination –if an excursion occurs or contamination is discovered, it is likely that decontaminating the entire cleanroom area will be required as it is most common that all of the cleanroom spaces will share HVAC equipment and airflow. In that instance, cleaning in the area of the spill or contamination only will not sufficiently clean the affected area. The entire area will have to be cleaned resulting in downtime and revalidation once the system is brought back up. 2 A simple example illustrates the point. If everyone in the country is given $100, has anyone gained any wealth?
  • 3. Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options www.ijpsi.org 28 | P a g e  Moving production capacity – if there is a desire to move production from one facility to the next or even from city or country to another, it is universally accepted that deconstructing the panels, moving then and reconstructing them would not be feasible or time efficient. Modular construction offsite. This approach has been employed by a number of entities, some still operating and some not. While the concept has visceral appeal, in practice there are shortcomings. On the appealing side, being able to build offsite ostensibly provides the ability to build without permitting delays and without the need for the client to oversee the construction onsite. Permitting though is not foregone but only delayed as permitting for the construction onsite will still be required. Construction oversight will also be required offsite at the manufacturing site and then again upon delivery. So these two benefits are really just extending the time before such activity is required.See Figure 1, (below) courtesy of Jacobs. How does modular construction offsite fare as it relates to new, different or changing requirements? Let’s consider the points previously considered:  Change in capacity – The modular building has been designed, built, disassembled, shipped and rebuilt onsite. The modules have been permanently connected to one another as have the utilities and HVAC throughout the facility. Increasing the capacity would require more or larger processing equipment which would also increase the space needed as well as utility and heat loads. Adding to meet these requirements in a now hardened facility is not feasible. The additional capacity would require either a new facility or “bolt on” approach similar to adding a tool shed in the backyard when the garage gets full. Reducing the capacity would simply means less of the hardened facility is used. Redeploying that space is not possible.  Change in process – recalling the examples previously considered, or adding a step or taking away a step, would all result in some construction or re-balancing onsite or losing the efficacy of some previously used space.  Change in regulatory requirements –reviewing the examples noted above, e.g., change in product, personnel or waste flow, none of them can be readily accomplished without some modification to the overall process flow or mechanical plan of the building.  Adding a product or changing products – Adding a product and not affecting the production capacity of the original product cannot be accomplished unless the building was originally designed with this excess capacity in mind. Such would not be a tribute to the flexibility of the facility. Credit in that case would be due to planning and a much higher budget. Changing products would require a complete facility sanitization and validation of the new process. Such could be accomplished but time and costs loom large in such an effort. The number of mothballed pharma facilities stands as a testament to the unenticing nature of this decision.  Contamination – given that centralized HVAC systems are employed in this type of construction in the same way that they are in brick and mortar facilities, a contamination in one area is likely to spread to others. There have been many examples of facility contamination and the efforts taken to remedy it. The process halts production, is time consuming and expensive. The hardened nature of this type of facility would lead to no different result.  Moving production capacity – not cost or time efficient. Stick built.This method is probably the best known option for the life sciences industry. Building cleanrooms in place within a facility is well understood both in terms of its benefits and shortcomings. It is similar to the modular construction onsite in terms of being construction onsite, requiring permits, initial flexibility of design, etc. But it is
  • 4. Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options www.ijpsi.org 29 | P a g e even less flexible than the paneled approach. In the paneled approach, walls can be moved more easily than a stick built wall which is most often gypsum board covered with epoxy. Moving a wall in this option means demolition. Both suffer in regard to changes in utilities or HVAC distribution. Centralized distribution of both requires adding capacity and rebalancing with respect to HVAC. Assessing this methodology against the six categories of change, it fares slightly worse than the modular construction onsite scoring the same on four areas (change in capacity, process and regulatory and ability to move) and about the same on two (product change and contamination). Pre-fabricated cleanrooms. The relatively new kid on the block, pre-fabricated cleanrooms emerged onto the scene almost ten years ago. These cleanrooms are built offsite, tested, shipped and then put in place in the production facility. See Figure 2, (below) courtesy of G-CON Manufacturing, Inc. The most advanced form includes their own HVAC systems within the cleanroom footprint providing compactness and autonomy from the facility or other cleanrooms. Such a characteristic is a major distinguishing factor in regard to other options and has been recognized by leaders in the industry as a major advantage.3 They can function alone or as part of a cleanroom cluster where larger processes can be accommodated.4 An analysis of the five points considered for this option is required.  Change in capacity – While it may seem that changes in capacity would not be possible with such discrete units, the contrary is true. New units can be added when needed and without interrupting the existing process. They can be added in a linear fashion or added to the existing cluster via the use of a corridor or previously placed knock out panel. A reduction in capacity in this context does not mean that previously placed units are shut down. Rather, they can be disconnected and moved out of the facility for deployment elsewhere.See Figure 3, below, Courtesy of Pfizer. 3 A. Pralong (2013) Single-use technologies and facility layout – a paradigm shift, Biopharma Asia Magazine, Vol 2, Issue 1 (“Until now, modular facilities have reproduced traditional architecture with regard to embedding utilities piping and HVAC ducts in the interspace between the physical module limits and the suspended ceiling making refurbishment, if required, extremely complicated.”) 4 P. Nixon, (2015) Transforming the Pharmaceutical Industry: Portable, Continuous, Miniature & Modular Development and Manufacturing (PCMM),2015 PDA/FDA Joint Regulatory Conference. (explaining the benefits of per-fabricated cleanrooms in an oral solid dosage application)
  • 5. Analyzing the Flexibility of Pharmaceutical and Biopharmaceutical Facility Options www.ijpsi.org 30 | P a g e  Change in process. If steps are added or taken away, air classification changes, etc. units can be added or reduced. Additional capacity from each internal air handler can be deployed. Importantly, the use of individual air handlers per unit or unit cluster allows for changes to air flow, air changes per hour, etc. without having to add to or rebalance the entire system.  Regulatory changes – Much like the way a change in process can be accommodated, a regulatory change can also be accommodated. Units can be added or taken away like “Legos” within the larger open warehouse type structure that houses the units.  Adding or changing a product – with the ability to have discrete process steps in each unit adding a new product line into a facility simply requires adding additional units to accommodate the process. Changing the product means complete sanitization of the units, which given their integrated HVAC system, is significantly less challenging than cleaning elaborate facility wide ductwork.  Contamination – because of the separate HVAC of the units and unit clusters, contamination can be well-contained and if necessary the affected units can be removed from service and replaced with other units or returned after decontamination if such was completed offsite.5  Moving – This is the only option that can be effectively moved either within the facility or out of a facility. If demand lags in a particular area, the entire production process can be picked up and moved to where the demand is. So What Have We Learned? Having reviewed the leading facility options and seeking to determine if flexibility is a characteristic of each, we have learned about each offering. We have learned that all offer initial flexibility, i.e., the ability to design what is desired. But this flexibility is no different from the flexibility offered by a traditional brick and mortar building. And this flexibility is really not valuable relative to other options because all options offer it. Some options offer additional flexibility, the ability to morph into a space already built – onsite modular, stick built and pre-fabricated cleanrooms. But only one proves to offer flexibility beyond that – flexibility once the system has been built and placed. Prefabricated autonomous cleanrooms stand well above the rest in terms of their ability to meet the true definition of flexibility, the ability to meet new, different or changing requirements. So if true flexibility is desired, autonomous pre-fabricated cleanrooms stand well above the rest. 5 At least one provider of this technology uses integrated air-bearings within each unit that allows the unit to float like an air hockey puck over a flat concrete surface. Such makes the need for indoor lifting unnecessary and allows for easy moving into and out of the facility.