1.
2. 1. Install the BTS 3900 and make sure that cabinet
bolts are fixed well to the shelter ground .
2. Install the L angels of BTS 3900 cabinet and fix
them well to the wall.
3. Cabinet to be earthed
4. BTS to be labeled.
Need OD cabinet photo
Cabinet bolts
L-Angle
3. Water leveling
1. Make sure of cabinet leveling during
installation by using water leveling.
4.
5. Alarm
ID
Alarm Name Boolean Number
65033 AC1 1
65034 AC2 2
65045 Main Power Failure 13-14-15-16
65049 Water 17
65050 Temp 18
65051 Smoke 19
65052 Door 20
65056 Humidity 24
9. 1. leave spacing of 4 cm between cabinet and
shelter wall.
2. At indoor sites install all cables : power , E1 ,
earth and alarm cables as shown on the shelter
wall using plastic clips.
3. Spacing between the plastic clips is 10 cm
between each other.
4. Install power and earth cables at left side .
5. Install E1 , fiber and alarm cables at right side.
6. Make sure that all cables are in good
arrangement and avoid any crossing.
10
cm
10. E1 & alarm cable
installed on the last hole
Jumper installed in u
shape over ladder
Power cables installed on
hole 7& 8 over ladder
1. Jumper installed in u shape over ladder.
2. E1 & alarm cable installed on the last hole
near shelter wall.
3. Power cables installed on hole (7)& (8) over
ladder.
11. 1. Install all cables into good arrangement using white tie
wraps.
2. Install fiber cables from right side and install them into
macaroni flexible (need to discuss).
3. Install the power and earth cables from left side.
4. All cables must have printed labels.
Macaroni Flexible
Fiber and alarm cables
from right side
Power cable from left side
12. Roxtec should be closed well not to allow any
dust or liquid to enter the cabinet. All non
used holes should be closed.
In reused cabinet cases, roxtec place should be
sealed using scotch
13. 1. BTS configuration as the delivered design sheet
2. E1 performance Check and alarm test done for cabinet
,IBBS and mini shelter
3. BTS is integrated
4. BTS is clear from alarms
14. 1. Don’t leave any unused dummy in the site.
2. Missing Dummy may affect negatively on cabinet
cooling system.
15.
16. 1. All cables inside RFC cabinet must installed in good
arrangement : jumpers , power cables and CPRI cables.
2. Jumpers under cabinet must arranged well to avoid any
crossing.
17. 3G cards should be installed as
per design.
All cards should be working
properly
All cables should be connected
in right ports
18.
19.
20. Roxtec should be closed well not to allow any
dust or liquid to enter the cabinet. All non
used holes should be closed.
In reused cabinet cases, roxtec place should
be sealed using scotch
21.
22. • 1. Make sure of cabinet leveling during
installation by using water leveling.
Water leveling