SlideShare a Scribd company logo
1 of 3
Bts commissioning (alcatel lucent)Presentation Transcript


         1. Switch OFF the BTS cabinet and disconnect Abis connectors fromDDF before
         offline start
         2. Disconnect the Abis connectorfrom The DDF
         3. Switch ON the BTS cabinet breakers and connect the Laptop with BTS
         4. User Name “COMMTE” Password“COMMTE”
         5. Communication Port setting
         6. OR
         7. After connecting this windowwill be appear
         8. Go toConfiguration-> BTS-SW Download-> to download BTS software
         9. After BTS- SW downloadthis window will appear
         10. Go to offlineFiles and select First File of Master File.
         11. Go to offlineFiles and select First File of DDL file.
         12. Click ok to startdownloading SW
         13. BTS software starts to download.
         14. All these Files aredownloaded
         15. Go toConfiguration BTScommissioning
         16. Click startcommissioning
         17. Edit Qmux Address
         18. Edit sector Mapping
         19. Check AllTwin TRE’s.
         20. Click EndCommissioning Click << arrow to move selected modules to available
         modules
         21. All modules Shifted to update modules.
         22. Click No to end
         23. Reconnect theAbis connector at DDF by verifyingthe TX/RX cables properly
         24. Give Hard Reset to BTS cabinet as theOML has established to put the site on
         Downloading.
         25. OFF Line Commissioning Completed Successfully.
         26. BTS ON-Line commissioning Procedure using B10 Go toconfiguration>>
         Hardware setting>>BeginHW modification
         27. Go to configuration> BTS commissioning Go to start commissioning> Edit
         Q1Address, Edit SectorMapping and Twin TRA setting as in offline.
         28. Go toconfiguration> Hardware setting>“EndModification” to end
         onlinecommissioning
         29. Online commissioning steps Connect the Abis connector at DDF by verifying
         Tx/Rx cable properly. OML will be established after primary Abis has connected to
         DDF. Give hard reset to BTS after OML has established. Put site on Downloading
         from OMC. O&M will be established as downloading completes. Connect Laptop
         to BTS MMI port. Go to configuration>Hardware setting>Begin Hardware
         modification.
         30. Online commissioning steps Go to configuration>BTS commissioning>start
         commissioning. Edit Qmux Address Edit sector mapping Check all Twin TRA
         setting. Click end commissioning and shift all modules from selected modules to
         available modules. Go to configuration>Hardware setting>End Hardware
         modification. Click “yes” when an automatically hardware modification window
         appears. Hw Audit will be run and all Hardware will be shown after sometime.
         31. ON Line Commissioning Completed Successfully.
32. Software components combiner Fan UnitHardwareShown insoftware window
Tre’s clock Alarm card
33. Alarmswindow
34. Transceivers Shown in window
35. Transceivers Types Four type of Transceivers in Alcatel Equipment
TRAGE>Gsm Single TRE TRADE>Dcs single TRE TGT09>Gsm Twin TRE
TGT18>DCS Twin TRE TAGHE>High power TRE
36. VSWRShown in window
37. Sectors ShownIn window
38. Station units
39. BSC SBLs(security block levels)BTS OM & Sectors.Sec RSLs can be unlock
from local Terminal.
40. Troubleshooting If a TRE or combiner is in “Not Operational” or “FOS” state
then disable it then initialize it by using “init” command. If TRE or combiner can not
operational by doing above command then remove it by using the following method.
Go to configuration>>Hardware setting>>Begin HW modification. Go to
Configuration>>Hardware setting>>Remove. Remove the Hardware from BTS.
Window will be appear of Hardware removal, select the module to remove. Go to
Configuration>>Hardware setting>>End Modification. Click ”yes” when
configuration changes window appears.
41. HardwareRemoval Method Step:1
42. HardwareRemoval Step:2
43. HardwareRemoval Step:3
44. Troubleshooting cont.. When a module goes in “FOS” state then it must be
disable by using ”disable” command before initializing it by using “init” command
otherwise it will not goes to operational state. When a module is in “Not
Operational” state with color white then it means it has not got it’s RSL number still.
Reload BTS data by going to “configuration>Reload Bts data” or using a method of
“Begin Hardware then End Hardware” as discussed earlier. It will take some time to
become operational. When a module is in “MSD” or “MSA” state then it will not get
any command because its maintenance has seized for a while. When TRE RSL has
locked then then its RSL will not be stable, so unlock the TRE from OMC.
45. Troubleshooting cont.. Sometime there is some faulty hardware in Bts that’s why
other sectors or TRE’s can effect and can not work properly. Due to these faulty
hardware other sectors or TRE’s can be down so simply remove this hardware. By this
method other hardware become in operational state. Some time “SUMA” can not
work properly that’s why whole Bts effects so change the slot of “SUMA” and give
hard reset to Bts. If modules in a shelf can not powers up then check it’s power cable
at the back ports of Bts or check it “RI” cable. Also check the power switch for the
concern shelf. If a “EACB” card is Not operational or “FIT” state then initialize it
from software. If it again goes in “FIT” state then Alarm card is faulty.
46. Troubleshooting cont.. Some time Primary Abis is stable by showing LED on
Suma card but OML can not become stable, It means that Abis LED is fake. So check
the Tx/Rx cable from both Bts end and microwave end and make sure that it is
correctly connected. Also check Tx/Rx patching on DDF by using LED. Make sure
that LED blinks on every pair on DDF. Also check the BNC and Abis connectors.
Abis cable which is connected from Suma card to Bts board can be faulty so also
verify it. If a TRE or combiner can not operational than change its slot then verify
it. Vswr issues can be resolved by checking connectors from Bts end and feeder
end. The last option for Alcatel equipment to become operational is the “Hard reset
of Bts”.
47. External Alarms of MBO2
48. ALCATEL GLOSSARY AAN Antenna Network BBCB BTS Control BusBSII
Base Station ControllerBSS Base Station SubsystemBTS Base Station
TransceiverBTSW BTS-Terminal for Windows CCCF Cabinet Cooling FanCDM
Configuration Data MessageCLEI Common Language EquipmentCLLK Clock
LinkCPF Configuration Parameter FileCRC Cyclic Redundancy CheckCU Carrier
Unit
49. ALCATEL GLOSSARY DDC Direct CurrentDMA Deferred Maintenance Alarm
EEQU Equipped FFIA Format Identifier for Application part of RIFIM Format
Identifier ManufacturingFIT Faulty In TrafficFLT FaultyFOS Faulty Out of
ServiceICS Item Change StatusIT In Traffic LLDA Local Defence ActionLRA Local
Recovery Action MMI Maintenance InformationMSA MSD AutoMSD Maintenance
Seized
50. ALCATEL GLOSSARY NNEQ Not EquippedNOP Not Operational OO&M
Operation and MaintenanceOMU Operation and Maintenance UnitOMUA OMU A
RITOMUB OMU B RITOP OperationalOPR Operator PPADD Physical
AddressPMA Prompt Maintenance
51. ALCATEL GLOSSARY RRA Radio AccessRF Radio FrequencyRFH Radio
Frequency Hopping ( also known as : Synthesizer Hopping )RI Remote InventoryRIT
Replaceable ItemRX Receiver or receive .....RTC Remote Tunable Combiner SSBL
Security Block LevelSCFE Station Unit Control Function Entity RITSOS System Out
of ServiceSUM Station Unit ModuleSUMP SUM PCM RITSW Software
52. ALCATEL GLOSSARY SSBL Security Block LevelSCFE Station Unit Control
Function Entity RITSOS System Out of ServiceSUM Station Unit ModuleSUMP
SUM PCM RITSW Software TTLV Tag, Length, ValueTRE Transceiver Module
(combined Transmitter / Receiver functionality for base band and RF signals)TS
TimeslotTX Transmitter or transmit . VVPMA Very Prompt Maintenance
AlarmVSWR Voltage Standing Wave Ratio
53. ALCATEL GLOSSARY WWBC Wide Band CombinerWTC Wait Traffic Clear
XXBCB External BCBXCLK External ClockXIOB External Input Output Board

More Related Content

What's hot

Mini link tn configuration
Mini link tn configurationMini link tn configuration
Mini link tn configuration
Hammad Tabish
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training
Shelton Siziba
 
83092299 rru3804-overview
83092299 rru3804-overview83092299 rru3804-overview
83092299 rru3804-overview
Serik123
 
12 gsm bss network kpi (tch assignment success rate) optimization manual
12 gsm bss network kpi (tch assignment success rate) optimization manual12 gsm bss network kpi (tch assignment success rate) optimization manual
12 gsm bss network kpi (tch assignment success rate) optimization manual
tharinduwije
 

What's hot (20)

3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
 
ZTE BTS Manual
ZTE BTS ManualZTE BTS Manual
ZTE BTS Manual
 
08. DRIVE TEST Analysis
08. DRIVE TEST Analysis08. DRIVE TEST Analysis
08. DRIVE TEST Analysis
 
Mini link tn configuration
Mini link tn configurationMini link tn configuration
Mini link tn configuration
 
2G Handover Details (Huawei)
2G Handover Details (Huawei)2G Handover Details (Huawei)
2G Handover Details (Huawei)
 
Huawei RET alarms Troubleshooting Guide Flow Chart
Huawei RET alarms Troubleshooting Guide   Flow Chart Huawei RET alarms Troubleshooting Guide   Flow Chart
Huawei RET alarms Troubleshooting Guide Flow Chart
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini link
 
Enm cli
Enm cliEnm cli
Enm cli
 
Xpic implementation xpd alignment interference test
Xpic implementation xpd alignment interference testXpic implementation xpd alignment interference test
Xpic implementation xpd alignment interference test
 
Rtn
RtnRtn
Rtn
 
Huawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware StructureHuawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware Structure
 
Zte macro bts introduction
Zte macro bts  introductionZte macro bts  introduction
Zte macro bts introduction
 
83092299 rru3804-overview
83092299 rru3804-overview83092299 rru3804-overview
83092299 rru3804-overview
 
Alcatel lucent bts
Alcatel lucent btsAlcatel lucent bts
Alcatel lucent bts
 
Kpi 2g troubleshootin
Kpi 2g troubleshootinKpi 2g troubleshootin
Kpi 2g troubleshootin
 
12 gsm bss network kpi (tch assignment success rate) optimization manual
12 gsm bss network kpi (tch assignment success rate) optimization manual12 gsm bss network kpi (tch assignment success rate) optimization manual
12 gsm bss network kpi (tch assignment success rate) optimization manual
 
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-enE nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
 
rru.pdf
rru.pdfrru.pdf
rru.pdf
 
Ericsson important optimization parameters
Ericsson important optimization parametersEricsson important optimization parameters
Ericsson important optimization parameters
 

Viewers also liked

Bts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucentBts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucent
Sayed Qaisar Shah
 
Emua quick installation manual for bts3900 l
Emua quick installation manual for bts3900 lEmua quick installation manual for bts3900 l
Emua quick installation manual for bts3900 l
alex natel
 
Wavelink Presentation(Updated)
Wavelink Presentation(Updated)Wavelink Presentation(Updated)
Wavelink Presentation(Updated)
slavun
 
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
Max Gathers
 
Field commissioning
Field commissioningField commissioning
Field commissioning
Amjad Jamil
 
FLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONFLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATION
Max Gathers
 
Md Reyaz Alam NSN
Md Reyaz Alam NSNMd Reyaz Alam NSN
Md Reyaz Alam NSN
reyaz alam
 
Adewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTSAdewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi
 

Viewers also liked (20)

Mpr mss 1 c_user_manual (Alcatel Lucent)
Mpr mss 1 c_user_manual (Alcatel Lucent)Mpr mss 1 c_user_manual (Alcatel Lucent)
Mpr mss 1 c_user_manual (Alcatel Lucent)
 
Alcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and CommissioningAlcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and Commissioning
 
Bts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucentBts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucent
 
Emua quick installation manual for bts3900 l
Emua quick installation manual for bts3900 lEmua quick installation manual for bts3900 l
Emua quick installation manual for bts3900 l
 
msvel
msvelmsvel
msvel
 
G2 bsc commissioning manual release b7.2 ccl
G2 bsc commissioning manual   release b7.2 cclG2 bsc commissioning manual   release b7.2 ccl
G2 bsc commissioning manual release b7.2 ccl
 
Wavelink Presentation(Updated)
Wavelink Presentation(Updated)Wavelink Presentation(Updated)
Wavelink Presentation(Updated)
 
G2 bsc commissioning manual release b7.2
G2 bsc commissioning manual   release b7.2G2 bsc commissioning manual   release b7.2
G2 bsc commissioning manual release b7.2
 
Mobiserve
MobiserveMobiserve
Mobiserve
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineering
 
Field commissioning
Field commissioningField commissioning
Field commissioning
 
Certificate5
Certificate5Certificate5
Certificate5
 
FLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONFLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATION
 
Notes on gsm
Notes on gsmNotes on gsm
Notes on gsm
 
Review on Green Networking Solutions
Review on Green Networking SolutionsReview on Green Networking Solutions
Review on Green Networking Solutions
 
Md Reyaz Alam NSN
Md Reyaz Alam NSNMd Reyaz Alam NSN
Md Reyaz Alam NSN
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioning
 
Adewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTSAdewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTS
 

Similar to Bts commissioning

ALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
ALC_PDH_RADIO_Technical_Training_Siae_Mi.pptALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
ALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
MauricioWeisser
 
Radio installation
Radio installationRadio installation
Radio installation
kpphelu
 
eRAN8.1 Radio & Performance-Interference Handling-CAMC feature introduction.ppt
eRAN8.1 Radio & Performance-Interference Handling-CAMC feature introduction.ppteRAN8.1 Radio & Performance-Interference Handling-CAMC feature introduction.ppt
eRAN8.1 Radio & Performance-Interference Handling-CAMC feature introduction.ppt
Ahmed963381
 
04.ppt grd200 introduction 2020_july
04.ppt grd200 introduction 2020_july04.ppt grd200 introduction 2020_july
04.ppt grd200 introduction 2020_july
Ngoc Tran
 

Similar to Bts commissioning (20)

Alcatel Lucnet bts offline commissioning
Alcatel Lucnet bts offline commissioningAlcatel Lucnet bts offline commissioning
Alcatel Lucnet bts offline commissioning
 
Commisioning.pptx
Commisioning.pptxCommisioning.pptx
Commisioning.pptx
 
Settingupgsm1208modem
Settingupgsm1208modemSettingupgsm1208modem
Settingupgsm1208modem
 
ALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
ALC_PDH_RADIO_Technical_Training_Siae_Mi.pptALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
ALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
 
Dp s7300
Dp s7300Dp s7300
Dp s7300
 
Hướng dẫn cài đặt switch planet layer 3
Hướng dẫn cài đặt switch planet layer 3Hướng dẫn cài đặt switch planet layer 3
Hướng dẫn cài đặt switch planet layer 3
 
Huawei bts3012 hardware structure issue1.0
Huawei bts3012 hardware structure issue1.0Huawei bts3012 hardware structure issue1.0
Huawei bts3012 hardware structure issue1.0
 
Wiring cp1 e_s_analogicas
Wiring cp1 e_s_analogicasWiring cp1 e_s_analogicas
Wiring cp1 e_s_analogicas
 
En mtac 01_um_b
En mtac 01_um_bEn mtac 01_um_b
En mtac 01_um_b
 
How to setup ACS Controller and Omron CJ2M PLC EtherNet/IP Configuration Steps
How to setup ACS Controller and Omron CJ2M PLC  EtherNet/IP Configuration StepsHow to setup ACS Controller and Omron CJ2M PLC  EtherNet/IP Configuration Steps
How to setup ACS Controller and Omron CJ2M PLC EtherNet/IP Configuration Steps
 
Pms System Training
Pms System TrainingPms System Training
Pms System Training
 
Radio installation
Radio installationRadio installation
Radio installation
 
eRAN8.1 Radio & Performance-Interference Handling-CAMC feature introduction.ppt
eRAN8.1 Radio & Performance-Interference Handling-CAMC feature introduction.ppteRAN8.1 Radio & Performance-Interference Handling-CAMC feature introduction.ppt
eRAN8.1 Radio & Performance-Interference Handling-CAMC feature introduction.ppt
 
Dtmf robot
Dtmf robotDtmf robot
Dtmf robot
 
04.ppt grd200 introduction 2020_july
04.ppt grd200 introduction 2020_july04.ppt grd200 introduction 2020_july
04.ppt grd200 introduction 2020_july
 
Zxdsl 9210 guide
Zxdsl 9210 guideZxdsl 9210 guide
Zxdsl 9210 guide
 
HUAWEI BTS3900 Hardware Structure and Principle-200903-ISSUE1.0-B.ppt
HUAWEI BTS3900 Hardware Structure and Principle-200903-ISSUE1.0-B.pptHUAWEI BTS3900 Hardware Structure and Principle-200903-ISSUE1.0-B.ppt
HUAWEI BTS3900 Hardware Structure and Principle-200903-ISSUE1.0-B.ppt
 
operating and configuring cisco a cisco IOS device
operating and configuring cisco a cisco IOS deviceoperating and configuring cisco a cisco IOS device
operating and configuring cisco a cisco IOS device
 
Exam viewer2
Exam viewer2Exam viewer2
Exam viewer2
 
Important cisco-chow-commands
Important cisco-chow-commandsImportant cisco-chow-commands
Important cisco-chow-commands
 

Bts commissioning

  • 1. Bts commissioning (alcatel lucent)Presentation Transcript 1. Switch OFF the BTS cabinet and disconnect Abis connectors fromDDF before offline start 2. Disconnect the Abis connectorfrom The DDF 3. Switch ON the BTS cabinet breakers and connect the Laptop with BTS 4. User Name “COMMTE” Password“COMMTE” 5. Communication Port setting 6. OR 7. After connecting this windowwill be appear 8. Go toConfiguration-> BTS-SW Download-> to download BTS software 9. After BTS- SW downloadthis window will appear 10. Go to offlineFiles and select First File of Master File. 11. Go to offlineFiles and select First File of DDL file. 12. Click ok to startdownloading SW 13. BTS software starts to download. 14. All these Files aredownloaded 15. Go toConfiguration BTScommissioning 16. Click startcommissioning 17. Edit Qmux Address 18. Edit sector Mapping 19. Check AllTwin TRE’s. 20. Click EndCommissioning Click << arrow to move selected modules to available modules 21. All modules Shifted to update modules. 22. Click No to end 23. Reconnect theAbis connector at DDF by verifyingthe TX/RX cables properly 24. Give Hard Reset to BTS cabinet as theOML has established to put the site on Downloading. 25. OFF Line Commissioning Completed Successfully. 26. BTS ON-Line commissioning Procedure using B10 Go toconfiguration>> Hardware setting>>BeginHW modification 27. Go to configuration> BTS commissioning Go to start commissioning> Edit Q1Address, Edit SectorMapping and Twin TRA setting as in offline. 28. Go toconfiguration> Hardware setting>“EndModification” to end onlinecommissioning 29. Online commissioning steps Connect the Abis connector at DDF by verifying Tx/Rx cable properly. OML will be established after primary Abis has connected to DDF. Give hard reset to BTS after OML has established. Put site on Downloading from OMC. O&M will be established as downloading completes. Connect Laptop to BTS MMI port. Go to configuration>Hardware setting>Begin Hardware modification. 30. Online commissioning steps Go to configuration>BTS commissioning>start commissioning. Edit Qmux Address Edit sector mapping Check all Twin TRA setting. Click end commissioning and shift all modules from selected modules to available modules. Go to configuration>Hardware setting>End Hardware modification. Click “yes” when an automatically hardware modification window appears. Hw Audit will be run and all Hardware will be shown after sometime. 31. ON Line Commissioning Completed Successfully.
  • 2. 32. Software components combiner Fan UnitHardwareShown insoftware window Tre’s clock Alarm card 33. Alarmswindow 34. Transceivers Shown in window 35. Transceivers Types Four type of Transceivers in Alcatel Equipment TRAGE>Gsm Single TRE TRADE>Dcs single TRE TGT09>Gsm Twin TRE TGT18>DCS Twin TRE TAGHE>High power TRE 36. VSWRShown in window 37. Sectors ShownIn window 38. Station units 39. BSC SBLs(security block levels)BTS OM & Sectors.Sec RSLs can be unlock from local Terminal. 40. Troubleshooting If a TRE or combiner is in “Not Operational” or “FOS” state then disable it then initialize it by using “init” command. If TRE or combiner can not operational by doing above command then remove it by using the following method. Go to configuration>>Hardware setting>>Begin HW modification. Go to Configuration>>Hardware setting>>Remove. Remove the Hardware from BTS. Window will be appear of Hardware removal, select the module to remove. Go to Configuration>>Hardware setting>>End Modification. Click ”yes” when configuration changes window appears. 41. HardwareRemoval Method Step:1 42. HardwareRemoval Step:2 43. HardwareRemoval Step:3 44. Troubleshooting cont.. When a module goes in “FOS” state then it must be disable by using ”disable” command before initializing it by using “init” command otherwise it will not goes to operational state. When a module is in “Not Operational” state with color white then it means it has not got it’s RSL number still. Reload BTS data by going to “configuration>Reload Bts data” or using a method of “Begin Hardware then End Hardware” as discussed earlier. It will take some time to become operational. When a module is in “MSD” or “MSA” state then it will not get any command because its maintenance has seized for a while. When TRE RSL has locked then then its RSL will not be stable, so unlock the TRE from OMC. 45. Troubleshooting cont.. Sometime there is some faulty hardware in Bts that’s why other sectors or TRE’s can effect and can not work properly. Due to these faulty hardware other sectors or TRE’s can be down so simply remove this hardware. By this method other hardware become in operational state. Some time “SUMA” can not work properly that’s why whole Bts effects so change the slot of “SUMA” and give hard reset to Bts. If modules in a shelf can not powers up then check it’s power cable at the back ports of Bts or check it “RI” cable. Also check the power switch for the concern shelf. If a “EACB” card is Not operational or “FIT” state then initialize it from software. If it again goes in “FIT” state then Alarm card is faulty. 46. Troubleshooting cont.. Some time Primary Abis is stable by showing LED on Suma card but OML can not become stable, It means that Abis LED is fake. So check the Tx/Rx cable from both Bts end and microwave end and make sure that it is correctly connected. Also check Tx/Rx patching on DDF by using LED. Make sure that LED blinks on every pair on DDF. Also check the BNC and Abis connectors. Abis cable which is connected from Suma card to Bts board can be faulty so also verify it. If a TRE or combiner can not operational than change its slot then verify it. Vswr issues can be resolved by checking connectors from Bts end and feeder
  • 3. end. The last option for Alcatel equipment to become operational is the “Hard reset of Bts”. 47. External Alarms of MBO2 48. ALCATEL GLOSSARY AAN Antenna Network BBCB BTS Control BusBSII Base Station ControllerBSS Base Station SubsystemBTS Base Station TransceiverBTSW BTS-Terminal for Windows CCCF Cabinet Cooling FanCDM Configuration Data MessageCLEI Common Language EquipmentCLLK Clock LinkCPF Configuration Parameter FileCRC Cyclic Redundancy CheckCU Carrier Unit 49. ALCATEL GLOSSARY DDC Direct CurrentDMA Deferred Maintenance Alarm EEQU Equipped FFIA Format Identifier for Application part of RIFIM Format Identifier ManufacturingFIT Faulty In TrafficFLT FaultyFOS Faulty Out of ServiceICS Item Change StatusIT In Traffic LLDA Local Defence ActionLRA Local Recovery Action MMI Maintenance InformationMSA MSD AutoMSD Maintenance Seized 50. ALCATEL GLOSSARY NNEQ Not EquippedNOP Not Operational OO&M Operation and MaintenanceOMU Operation and Maintenance UnitOMUA OMU A RITOMUB OMU B RITOP OperationalOPR Operator PPADD Physical AddressPMA Prompt Maintenance 51. ALCATEL GLOSSARY RRA Radio AccessRF Radio FrequencyRFH Radio Frequency Hopping ( also known as : Synthesizer Hopping )RI Remote InventoryRIT Replaceable ItemRX Receiver or receive .....RTC Remote Tunable Combiner SSBL Security Block LevelSCFE Station Unit Control Function Entity RITSOS System Out of ServiceSUM Station Unit ModuleSUMP SUM PCM RITSW Software 52. ALCATEL GLOSSARY SSBL Security Block LevelSCFE Station Unit Control Function Entity RITSOS System Out of ServiceSUM Station Unit ModuleSUMP SUM PCM RITSW Software TTLV Tag, Length, ValueTRE Transceiver Module (combined Transmitter / Receiver functionality for base band and RF signals)TS TimeslotTX Transmitter or transmit . VVPMA Very Prompt Maintenance AlarmVSWR Voltage Standing Wave Ratio 53. ALCATEL GLOSSARY WWBC Wide Band CombinerWTC Wait Traffic Clear XXBCB External BCBXCLK External ClockXIOB External Input Output Board