SlideShare a Scribd company logo
1 of 15
Adewale Adeyemi
15 Spindles, Tilbury
Essex. RM18 8NP
+44 01375858966
+44 07828878350
wale100@yahoo.com
TRAINING AND CERTIFICATION:
Fibre optic and Cat5/Cat6 Structured cabling by BrandRex (BICC), UK
Installation and commissioning of Tellabs 8600 series Training
Alcatel-Lucent 7470 MSP & 7670 RSP & DWDM ATM/SDH equipment training
Nokia Siemens Network NOKIA Flexi) BTS training
Huawei Training/Accreditation (QPL)
Prince 2 Project Management Certificate
CSCS certificate
Rooftop Safety Awareness Certificate
Signing Lighting and Guarding
NRSWA certificate
Health and Safety certificate
Advanced Health and Safety certificate
RF Awareness Certificate
Emergency & First Aid at work Training
Asbestos Awareness certificate
Manual Handling certificate
First Aid at height
Rooftop Restraint certificate
QUALIFICATIONS /EDUCATION:
B.Sc. Degree Electrical Engineering (Second Class Honours, Upper Division-2.1) 1989 – 1995
Flexible working hours. Full UK driving License. Owned vehicle.
Current CSCS Card holder
SKILLS
Highly self motivated, brilliant team player
Excellent Project Management skill
Experience of Microsoft Windows, Microsoft word, Excel, Access, Power-point and design tool, Ms Project, MS Visio
Expert in LAN Structured cabling, installation, termination and testing (CAT5/CAT5e/CAT6 /Cat7, fibre cable and
Coaxial cable)
Huawei 3900 (A’s & L’s) installation and commissioning
Huawei Refresh project for MBNL
RBSs Swap for NSN BTS Flexi RBSs Swap for NSN BTS Flexi
Nokia Flexi BTS installation, commissioning and integration in 2G and 3G/4G
Nokia Flexi WBTS upgrade configuration (FSMEs, FSMFs, ESMBs, FGRP/T, and FSMBs)
DWDM equipment installations – Siemens, Alcaltel-Lucent, Huawei, Tellabs, Nortel
Installation, commissioning and integration of Tellabs 8660, 8630 and 8605 in 2G and 3G/4G(LTE) networks
Fibre cord patching and labelling
Ericsson RBS 2000, 3000 & 6000 installation & Commissioning
BTS site survey for Darwin Project, VF, MBNL and Ericsson
Proficient in the installation and commissioning of NOKIA FLEXI (NSN), Alcaltel-Lucent, Huawei, Tellabs, Nortel
Understanding of Network architecture and G900/G1800/U2100/U900 technologies with Ericsson and NSN BTS flexi
Survey for Darwin Project
Wireless network installations
Installations of wireless router for network connections and interconnections
Huawei Refresh project for MBNL
Huawei installation site survey and audit
Proficient skills in working with DCNs
Fibre Optics cabling installation and testing
Huawei 3900 (A’s & L’s) installation and commissioning
Ericsson RBS installation & Commissioning.
NSN Flexi BTS installation, commissioning and integration in 2G and 3G/4G
NSN Flexi WBTS upgrade configuration (FSMEs, FSMFs, ESMBs, FGRP/T, and FGRFs)
DC power installations for BTS NSN Flexi
Huawei BTS and UPS Power installations on MBNL
Very Skilled in installation, testing and commissioning of DWDM, OTM, PDH and SDH-Based
Ericsson RBS 2000, 3000 &6000 installation & Commissioning
Telecommunication transmission network
Huawei 3900 A’s and L’s site Survey on VF BTS
Huawei 3900 Full Beacon completion and commissioning on Vodafone sites
Installation of DWDM transmission kits.
Installation and commissioning of Alcatel-Lucent 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for British
Telecoms -BT MSIP Project across UK
Decommissioning, Installation and testing of DC PSUs/PDUs
Installation of DC power PSUs and PDUs in VF sites
Ericsson RBS 6000 installation & Commissioning
Tellabs 8660 and 8605 transmission switch installation and commissioning
Ericsson RBS installation & Commissioning.
NSN Flexi BTS installation, commissioning and integration in 2G/3G 4G
NSN Flexi WBTS upgrade configuration (FSMEs, FSMDs, FSMBs, FGRP, and FGRFs)
DC power installations for BTS NSN Flexi
Huawei BTS and UPS Power installations on MBNL
Decommissioning, Installation and testing of DC PSUs/PDUs
NSN Flexi BTS installation, commissioning and integration in 2G and 3G/4G(LTE)
DC power installations for BTS NSN Flexi
Survey of mobile operator BTS site for health & Safety requirement for decommissioning and commissioning work
Survey for access for Crane/cherry pickers for the removal & delivery of telecoms kits on site
Decommissioning of BTS/RF telecoms kits
Survey of BSC/BTS Node and completion/submitting of survey report
Site survey and Audit on Vodafone and MBNL cell sites
Survey of BTS site for traffic management for site access
Liaising with the site owner or 3rd
party regarding site access
Site audit and planning
Site survey for parking requirement
Decommissioning of RF kits
Site audits for Telecoms’ Vendors
Survey of site for telecoms kit decommissioning
BTS Site survey for civil work requirement for decommissioning and installation work
Survey for vehicle access for removal of decommissioned kits from site
Huawei 3900A’s and 3900L’s installation and commissioning
Interconnection with ADVA Ethernet equipment in British Telecommunications Exchanges
Replacement and configuration of ADVA equipment
Installation, commissioning and integration of Tellabs 8660, 8630 and 8605 in 2G and 3G networks
Huawei BTS and UPS Power installations on MBNL
Installation of Huawei transmission equipment
RBSs Swap for NSN BTS Flexi
NSN Flexi BTS installation, commissioning and integration in 2G and 3G/4G
NSN Flexi WBTS upgrade configuration (FSMEs, FSMDs, FSMBs, FGRP, and FGRFs)
Proficient in use of Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
DC power installations for BTS NSN Flexi
Survey of BSC/BTS Node and completion of survey report
Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM line cards for data, voice and video
transmissions
Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project
across UK
installation, testing and commissioning of DWDM, OTM, PDH and SDH-Based
E1 Jumpering/termination using CAT5e/CAT6 cabling and RJ45 connections
BT leased line circuit
Very skilled in E1, Ethernet, IVR, DSL, ADSL, ISDN
Fibre leads testing and patching
Site audit and planning
RU10 Base Band commissioning and testing
Installation of Ericsson RBS PICO cells in stores and customers’ site
Installation of RF cables
Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
Very Skilled in planning, installation, and commissioning of DWDM, OTM, PDH and SDH-Based equipment
Commissioning and Integration of Ericsson RBS 2409 PICO cells
Ericsson RBS 2409 Lower Power PICO cells Installation and Interface over IP in TESCO Extra stores
Tellabs 8660 and 8605 transmission switch deployment in RBS sites for MBNL and VF
Good understanding of 2G /3G network structured
Strong understanding of 2G and 3G Network elements
Familiar with Mobile network/Radio cell sites
Experience in Cisco and 3com switches and wireless routers configuration and Ethernet/TCP/IP network
Skilled at installing and configuring hubs, switches, routers, bridges
Very good in Cisco Switching and routing IP protocols
Wireless network installations
Installations of wireless router for network connections and interconnections
Installation of E1 balun cables & fibres patches
Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project
across UK
DWDM installation proficient
Fibre transmission network installation
Installation of NEC radio equipment
Strong knowledge of FTTC (Roadside Cabinets & Headend Racks
Installation of the Rack and TC cabinet
DC cable installation and termination
Fibre cord patching and labelling
Installation and configuration of Switches and routers (Cisco, 3Comms and Tellabs)
Installation, termination and testing multipair copper, and Coaxial cable – 2003/3003/5000
Expert in cable trunking/Channel/Tray (Metal and Plastic) and Patch panel cable termination/Labelling, cable patching,
records and arrangement
Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
Jumpering of coaxial cable between the DDF blocks
E1 Jumpering using twisted pair and wire wrap DDF's
Jumpering of coaxial and cat5 cables between the DDF blocks and equipment
Very experience in fibre optics cable Network Design, laying, termination, fusion splicing, Mechanical
splicing and testing with OTDR, cable meter and ODF to ODF fibre termination on the Rack/cabinet
In-depth experience in LAN/MAN/WAN and FDDI cable network implementation
Data Centre operations experience, data centre IT equipment hardware, and excellent Servers and PC compatible skills
Strong ability to carryout site survey, implementation and supervise installation, commissioning and testing
Excellent Problem solving skill
Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT
MSIP Project across UK
Analysing and Understand of Schematic drawings for cable installation and terminations for Data cabling installations
Installation, termination and testing of Copper and fibre optic (Multimode/Singlemode) cable
Strong knowledge of network management and analysis tools, including Enterasys, HP OpenView
Excellent reporting & analytical skills
Delivery of Fibre optic and CAT5/CAT5e/CAT6 and Coaxial cabling installations and documentation within
timescales, creating scope of works documents for network builds & implementation work
Carrying out site maintenance checks
Troubleshooting and reconfiguration on of DWDM, OTM, PDH and SDH equipment
Fibre leads testing and patching
Strong ability to learn new skill and adapt to situations adequately
Delivering of first-class customers service, whilst being sales focused and motivated
Strong troubleshooting competencies and maintenance skills
Production platform protection during implementation work
Influencing positively members of the technical team for successful project implementation delivery within schedule,
cost and quality parameters
Excellent Communication skills
EXPERIENCE:
Magdalene Ltd December 2015 – Till Date
Position: Field Telecoms Installation & Commissioning Engineer
Responsibilities:
• Site Survey of Vodafone BTS sites for BTS installations and integration for Beacon Project
• Nokia Flexi installation and commissioning on VF BTS sites for 2G/3G/4G
• Beaconisation of VF BTS sites with Nokia Flexi kits - 2G/3G/4G
• VF BTS swap for Nokia Flexi - FSMFs, FSMEs, ESMB/Ds, FXDBs
• Nokia flexi BTS installation and commissioning on VF BTS sites
• NSN Full Beacon completion and commissioning/integration of 2G/3G/4G on VF BTS sites
• Decommissioning of Legacy Telecoms’ kits
• NSN swap for VF Beacon on Streetworks, Greenfield and Rooftop BTS sites
• Site survey for PIV completion
• Faults analysis and clearance on NSN kits on VF sites
• DC power installation on Delta PSU on VF BTS sites during Beacon installation
• Decommissioning, Installation and testing of PSUs
• Swapping and testing of DC PSUs
• Completion of Installation document - HOPs
Savills Telecom UK August 2015 – November 2015
Position: Field Telecoms BTS Installation & Commissioning Engineer
Responsibilities:
• Site Survey of Vodafone BTS sites for BTS installations and integration for Beacon Project
• Nokia Flexi installation and commissioning on VF BTS sites for 2G/3G/4G
• Beaconisation of VF BTS sites with Nokia Flexi kits - 2G/3G/4G
• VF BTS swap for Nokia Flexi - FSMFs, FSMEs, ESMB/Ds, FXDBs
• NSN BTS installation and commissioning on VF BTS sites
• NSN Full Beacon completion and commissioning/integration of 2G/3G/4G on VF BTS sites
• Decommissioning of Legacy Telecoms’ kits
• NSN swap for VF Beacon on Streetworks, Greenfield and Rooftop BTS sites
• Site Survey for Darwin Project for NSN
• Site clearance for faults on NSN kits on VF sites
• DC power installation on Delta PSU on VF BTS sites during Beacon installation
• Decommissioning, Installation and testing of PSUs
• Swapping and testing of DC PSUs
• Completion of Installation document - HOPs
Flint UK February 2015 – June 2015
Position: Telecoms Engineer - Newbury
Responsibilities:
• Review of Vodafone sites survey information & detailed designs to establish engineering baseline /
requirements for RBS 6000 deployment
• Engineering design
• Installation and commissioning of Ericsson RBS 6000 for Vodafone on the metropolitan network
• Installation and commissioning/integration of RBS6000 LTE upgrade for Vodafone BTS
• Site Surveying of Vodafone BTS sites for RBS6000 L800 and L2600 Metropolitan upgrade
• Propose site Engineering design for each Vodafone site for L800 and L2600 RBS6000 Metropolitan upgrade
• Support ASP in the installation and commissioning of Ericsson RBS6000
• Perform site survey activities to include provision of completed SIR documents
• SIR Survey prep & Survey QA review for other engineering resource
• Site survey and visit to Vodafone BTS sites to determine the requirement for RBS6000 LTE upgrade
• Reporting of status of each site in Site Handler
• Completion of Weekly report.
• Surveying RBS/BTS Vodafone/ O2 sites
• Produce site drawings of cabinet floor plan and photographing all details on site
• Survey Detail sources of AC and DC on site and record.
Huawei Technologies UK August 2014 – February 2015
Position: Field Telecoms Installation and Commissioning Engineer
Responsibilities:
• Huawei BTS 3900A’s installation and commissioning/integration on VF BTS sites
• Huawei BTS 3900L’s installation and commissioning on VF BTS sites
• Huawei BTS 3900 Full Beacon completion and commissioning/integration on VF sites
• Assisting partners in BTS LTE Installation and commissioning/integration on Beacon
• Survey of Vodafone BTS sites for Huawei Beacon installations
• Clearing of Defect on Vodafone BTS site for Huawei
• Completion of Installation outstanding HOP documents
• Installation and commissioning of Huawei 3900AL and 3900L for Vodafone on Beacon Project
• Clearing of Defect on Huawei LTE installations
• Performing technical support for fault resolution on 3900AL on Vodafone/O2 BTS sites
• Huawei 3900 Full Beacon completion and commissioning on VF sites
• Decommissioning of Telecoms/BTS sites
• Resolving faults on Huawei 3900 kits on VF sites
• Swapping and testing of DC PSUs along with partners
• Site pre-checks for proposed installations
ITL Ltd May 2014 – August 2014
Position: Field Telecoms Installation and Commissioning Engineer
Responsibilities:
• Survey of Vodafone BTS sites for BTS installations
• Installation of Ericsson RBS 6000 BTS for Vodafone
• Swapping of Ericsson RBS 2000 & 3000 for RBS 6000 for Vodafone
• Clearing of Defect on Ericsson RBS 6000 installations on VF BTS sites
• Completion of Installation HOP document
• Installation of Huawei BTS LTE APM30 for UK broadband
• Redline Drawing project for Vodafone
• Clearing of Defect on Huawei LTE installations for UK broadband
• Huawei 3900A’s installation and commissioning on VF BTS sites
• Huawei 3900L’s installation and commissioning on VF BTS sites
• Huawei 3900 Full Beacon completion and commissioning on VF sites
• Decommissioning of Telecoms’ kits
• Resolving faults on Huawei 3900 kits on VF sites when required
• Installation & commissioning of switches and routers
• Decommissioning, Installation and testing of PSUs
• Swapping and testing of DC PSUs
Magdalene Ltd January 2014 – May 2014
Position: Installation and Commissioning Engineer
Responsibilities:
• Survey of Vodafone BTS sites for BTS installations and integration
• Huawei 3900A’s installation and commissioning on VF BTS sites
• Huawei 3900 A’s and L’s Ex-KTL Survey
• Huawei 3900L’s installation and commissioning on VF BTS sites
• Huawei 3900 Full Beacon completion and commissioning/integration on VF sites
• Decommissioning of Telecoms’ kits
• Survey for the MBNL for H3G LTE proposed install
• Survey for Darwin Project for NSN
• Resolving faults on Huawei 3900 kits on VF sites when required
• Installation & commissioning of switches and routers
• Decommissioning, Installation and testing of PSUs
• Swapping and testing of DC PSUs
• Completion of Installation document
Black Box Network Services (UK) Ltd August 2013 – January 2014
Position: Installation Engineer
Responsibilities:
• Survey of clients’ sites for installations
• Decommissioning of Telecoms’ kits
• Installation of cable for installation telecoms’ kits in client’s site
• Installation & commissioning of switches and routers
• Decommissioning, Installation and testing of DC PSUs/PDUs
• Installation of cat5 cables on site prior to installation
• Swapping and testing of DC PSUs/PDUs
• Installation and commissioning of IP phones in customers’ sites
• Installation of transmission equipments
• Integration and commissioning of site
• Training of customers after integration
• Installation of the Racks and TC cabinets for kits installation
Indigo Telecom Group February 2013 – August 2013
Position: Telecoms Installation, Commissioning and Integration Engineer
Responsibilities:
• Installation & Commissioning of 8630/8660 and 8605 Tellabs equipments across UK on Vodafone
BTS ring
• Installation & commissioning of Tellabs 8660 transmission node at Vodafone Hubs and MTX sites
• Installation of Tellabs 8605 in outdoor Ericsson RBSs in BTS sites
• Installation of ADVA transmission equipment
• Installation of DWDM for fibre network upgrade for British Telecommunications UK
• Installation of the Racks and TC cabinets for Panels, ATM/SDH and Power Equipment at BT
exchanges in UK
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for
BT MSIP Project across UK
• Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM/SDH line cards for
data, voice and video transmissions for BT networks in UK
• Configuration and commissioning of IP networks for BT on Alcatel ATM/SDH equipments
• Patching, testing and labelling of fibre cords
• Survey of mobile operator BTS site for health & Safety requirement for decommissioning and
commissioning work
• Survey for access for Crane/cherry pickers for the removal & delivery of telecoms kits on site
• Infill and commissioning of New STM-1 cards in Tellabs 8660 in VF MTX sites
• Fibre optic structured cabling, installation, testing and commissioning
• Installation and commissioning of Tellabs switches in 2G and 3G networks
• DWDM card infill, upgrade and testing
• Loading of script and Call off with BT NOC for Installation and commissioning of 8605 Tellabs
• 8605 Tellabs Dual stack installation
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH transmission
equipment for BT MSIP Project across UK
• Fibre cord patching and labelling
• Fibre leads testing and patching
• Installation, testing and commissioning of DWDM, OTM, PDH and SDH-Based transmission
• Survey of BSC/BTS Node and completion of survey report
• Installation of radio equipment in Cell sites
• Decommissioning of BTS/RF telecoms kits
• Survey of BSC/BTS Node and completion/submitting of survey report
• Site survey and Audit on Vodafone and MBNL cell sites
• Survey of BTS site for traffic management for site access
• Laising with the site owner or 3rd
party regarding site access
• Site audit and planning
• Site survey for parking requirement
• Decommissioning of RF kits
• Site audits for Telecoms’ Vendors
• Survey of site for telecoms kit decommissioning
• BTS Site survey for civil work requirement for decommissioning and installation work
• Survey for vehicle access for removal of decommissioned kits from site
• DWDM transmission installation for fibre network upgrade
• Completion and submission of handover and report documents
• Installation of the Racks and TC cabinets for Patch Panels and active devices
• DC cabling and termination for the equipment
• Installation of new PDUs in equipment’s rack
• Installation, termination and Jumpering of coaxial(2000/3000/5000 cables between the DDF blocks
• Fibre optic cable run, termination, fusion splicing and testing for singlemode and Multimode
• Cable labelling and records on the DDF racks
• Installation and upgrade of DWDM equipment in BT exchanges
• Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
• Installation of line cards and Cat5 cables between ATM/SDH shelves and ADVA rack for BT
customers link
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH transmission
equipment for BT MSIP Project across UK
• Cat 5e /6 LAN cabling & terminating, cable running in BT exchanges and BT data centre
• Fibre optic structured cabling, installation, testing and commissioning
• DC cabling and termination for the equipment
• Upgrade of DWDM equipment in BT exchanges
• Fibre cord testing, patching and labelling
• Installation, termination, Patching, labelling and testing Coaxial cable(crimping & Soldering) at BT
Exchanges
• Installation and Jumpering of coaxial(2000/3000/5000 cables between the DDF blocks and ATM/SDH
equipment in BT Exchanges
• Multicore copper cable termination and testing
• DWDM transmission installation for fibre network upgrade
• Jumpering of coaxial cable between the DDF blocks in O2 Exchange
• Running and termination of Coaxial cables between the line cards(2MB transmission equipment) and
DDF blocks in BT and O2 Exchanges
• Cable labelling and records on the DDF racks
• Installation of cable tray/basket line for the running of cables
• Installation of cable tray/basket line for the running of cables
• Installation of the Rack and TC cabinet inside the BT and O2 exchanges in UK
• Installation, termination and testing Coaxial cable at O2 Exchanges
CAIP Limited (Contract) March 2012- February.2013
Position: Telecoms Installation, Commissioning & Integration Engineer
Responsibilities:
• Installation, commissioning and Integration of NSN Flexi BTS in Vodafone BTS sites in UK – SRAN
project
• Survey and Audit for Huawei refresh project
• Installation of PDUs for Huawei installations
• Huawei 3900 installation and commissioning EE
• Huawei Refresh project for MBNL
• Huawei 3900L’s installations and commissioning
• Installation of RBS 3000 & 6000 BTS for Vodafone
• Swapping of Ericsson RBS for NSN Flexi BTS (2G/3G swap) in Vodafone sites
• Decommissioning, installation and testing of DC PSU/PDU in VF sites
• Installation and commissioning of new 2G/3G Nokia Flexi BTS in VF sites on SRAN
• Decommissioning of 2G and 3G Ericsson RBS and RRUWs in VF sites
• RBS parasitic conversion for 2G and 3G BTS installation
• Huawei 3900L installation and commissioning
• Installation, commissioning of Nokia Siemens Network flexi BTS FSMEs, FSMDs and FSMBs in
consolidated and Back to Back sites
• Installation and commissioning of new 2G/3G Nokia Flexi BTS in VF sites on SRAN
• Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
• Installation, commissioning and Integration of NSN Flexi BTS in MBNL BTS sites in UK
• NSN Flexi BTS upgrade to Back-to-Back configuration on MBNL project
• RF Antenna cables installation and commissioning to NSN Flexi BTS equipment
• RF antenna cable installation between UCUs and Flexi BTS FRGFs/FRGPs
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment
• Reconfiguration of 8605 Tellabs for transmission link
• Huawei 3900 transmission equipment
• Huawei Referesh project for MBNL
• Fibre cord patching and labelling
• Replacement and re-commissioning of Tellabs 8605 for the new BTS upgrade
• RU10 Base Band installation and Testing
• MBNL 2G refresh on Huawei
• Huawei 3G RBS installations
• Huawei UPS swap installations on VF sites
• DC Power Installations
• MBNL 2G refresh site audit and planning
• Survey of BSC/BTS Node and completion of survey report
• Completing of SAM cert and site installation reports
• RU10 Flexi Node B commissioning & Integration
• RF Antenna cables installation and commissioning to NSN Flexi BTS equipment
• RF antenna cable installation between MRCs/UCUs and Flexi BTS
• Installation of VLAN and transmission cable interface for the Flexi BTS
• Patching and labelling of fibre cords
• Huawei Refresh project for MBNL
• Optical Fibre cable patching and labelling
• RU10 Base Band commissioning and testing
DMN Limited (Contract) August 2011- March 2012
Position: Telecoms Installation and Commissioning Engineer
Responsibilities:
• Installation, commissioning and Integration of NSN Flexi BTS in MBNL BTS sites in UK
• NSN Flexi BTS upgrade to Back-to-Back configuration on MBNL project
• NSN Flexi BTS upgrade in consolidated MBNL sites
• RU10 Base Band installation and Testing in MBNL project
• Survey of BSC/BTS Node and completion of survey report
• Installation, commissioning of Nokia Siemens Network flexi BTS FSMEs, FSMDs and FSMBs in
consolidated and Back to Back sites
• Fibre cord patching and labelling
• DC Power Installations
• RU10 Flexi Node B commissioning & Integration
• Decommissioning NSN flexi BTS equipment in H3G and T-Mobile sites (Outdoors & Indoors)
• NSN flexi BTS rack, Ladder and cabinets installations in MBNL project
• RF Antenna cables installation and commissioning to NSN Flexi BTS equipment
• RF antenna cable installation between UCUs and Flexi BTS FRGFs/FRGPs
• Installation of VLAN and transmission cable interface for the Flexi BTS
• Patching and labelling of fibre leads
• Optical Fibre cable patching and labelling
• RU10 Base Band commissioning and testing
Cable & Wireless – GTL-Europe (Temp contract) Feb.2011- April 2011
Position: Transmission Engineer
Responsibilities:
• Installation and Interface of Ericsson RBS 2409 Lower power PICO cells over IP in stores
• Installation of RF cables between PICOs in stores
• Installations of Ericsson RBS 2000 series in stores
• Commissioning and Integration of RBS 2409 PICO cells
• Ericsson RBS 2409 Lower Power PICO cells Installation and Interface over IP in TESCO Extra stores
• Loading of Script in Ericsson RBS 2409 for integration
• Installation and connection of Cat6 to the CE
• Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
• Installation and interfacing of RF Omni–direction Antennae
• Installation of Power over Ethernet (PoE) equipment
Indigo Telecom Group Nov 2008 – August 2011
Position: Field Transmission Engineer
Responsibilities:
• Deployment of 8660/8630 and 8605 Tellabs equipments across UK on behalf BT on Vodafone, T-Mobile and
H3G sites
• Installation of line cards and Cat5 cables between ATM shelves and ADVA rack for BT customers
link
• Installation and upgrade of DWDM equipment in BT exchanges
• Installation of Tellabs 8605 in outdoor Ericsson RBSs in BTS sites
• Installation and upgrade of DWDM equipment in BT exchanges
• Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
• Cat 5e /6/Cat7 LAN cabling & terminating, cable running in BT exchanges and BT data centres
• Fibre optic structured cabling, installation, testing and commissioning
• Installation, testing and commissioning of DWDM, OTM, PDH and SDH-Based transmission
• Installation and commissioning of Tellabs switches in 2G and 3G networks
• Fibre leads patching and labelling
• Installation of line cards and Cat5 cables between ATM shelves and ADVA rack for BT customers
link
• Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
• Configuration and commissioning of IP networks for BT on Alcatel-Lucent ATM equipments
• Loading of script and Call off with BT NOC for Installation and commissioning of 8605 Tellabs
• 8605 Tellabs Dual stack installation
• Transmission network Installation and commissioning for T-mobile, H3G and Vodafone for BT
• Installation and commissioning of Tellabs 8660 and 8605 equipments in Vodafone, T-Mobile and H3G cell
sites/Radio stations
• Fibre cords patching and labelling
• Survey of BSC/BTS Node and completion of survey report
• Installation of radio equipment in Cell sites
• Installation and commissioning of new Alcatel line cards in Alcatel MSP and ESE/RSP
• Installation of the Racks and TC cabinets for Panels, ATM/SDH and Power Equipment at BT exchanges in UK
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT
MSIP Project across UK
• Design, Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM line cards for
data, voice and video transmissions for BT networks in UK
• Installations of wireless router for network connections and interconnections
• Wireless network installations
• Optical Fibre cable patching and labelling
• Supervising installation team's rack, E1 balun cables & fibres on each cell site
• Completion and submission of handover and report documents remotely
• Configuration and commissioning of IP networks for BT on Alcatel-Lucent ATM equipments
• Metal and Plastic Cable trunking/tray installation
• Multicore copper cable termination and testing for BT
• Installation of the Racks and TC cabinets for Patch Panels and active devices
• Cat5/Cat5e/Cat6/Cat7 structured LAN cabling for difference companies structures and building sites
• Cat 5e /6/Cat7 LAN cabling & terminating, cable running in BT exchanges and BT data centres
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT
MSIP Project across UK
• Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
• Installation, termination, Patching, labelling and testing of optical fibre cable, Cat5/Cat5e/Cat6/Cat7 and
Coaxial cable(crimping & Soldering)
• DC cabling and termination for the equipment
• Installation, termination and Jumpering of coaxial(2000/3000/5000 cables between the DDF blocks and
ATM/SDH equipment in BT Exchanges
• Fibre optic cable run, termination, fusion splicing and testing for singlemode and Multimode
• Jumpering of coaxial cable between the DDF blocks in O2 Exchange
• Running and termination of Coaxial cables between the line cards(2MB transmission equipment) and DDF
blocks in BT and O2 Exchanges
• Patching and labelling of fibre cords
• Cable labelling and records on the DDF racks
• Installation of cable tray/basket line for the running of cables
• Installation of the Rack and TC cabinet inside the BT and O2 exchanges in UK
• Installation, termination and testing Coaxial cable at O2 Exchanges
iCobus Limited – Logistic International
Position: Field Cabling/Installation Engineer (Temp contract) July 2009 – Nov. 2009
Responsibilities:
• Installation of Cat5/Cat6/Cat7 structured LAN cabling for difference Outlets and customer’s sites
• Installation, termination, Patching, labelling and testing of Cat5/Cat5e/Cat6/Cat7 and Coaxial cable(crimping &
Soldering)
• Rationalisation of telecommunication facilities in various clients’ site(Voice and Data)
• Auditing of IT and telecoms equipments
• Fibre optic structured cabling, installation, testing and commissioning
• Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
• E1 Jumpering using twisted pair and wire wrap DDF's
• Cable termination on the DP and DDF
• Jumpering of coaxial between the DDF blocks and equipment and Cat5 cable Patching
• Installation of the Racks and TC cabinets for Patch Panels and active devices
• Site surveying and drawing readings.
Redbridge Management Services July 2007 – Nov. 2008
Position: Telecom Transmission Engineer
Responsibilities:
• Installation of line cards and Cat5 cables between ATM shelves and ADVA rack for BT customers
link
• Cat5/Cat5e/Cat6 structured LAN cabling for difference companies structures and building sites
• Cat 5e /6 LAN cabling & terminating, cable running in BT exchanges and BT data centre
• Fibre optic structured cabling, installation, testing and commissioning
• Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
• DC cabling and termination for the equipment
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT
MSIP Project across UK
• Installation and commissioning DWDM equipment in BT exchanges
• Installation, termination, Patching, labelling and testing Coaxial cable(crimping & Soldering) at BT Exchanges
• Installation and Jumpering of coaxial(2000/3000/5000 cables between the DDF blocks and ATM/SDH
equipment in BT Exchanges
• Multicore copper cable termination and testing
• Jumpering of coaxial cable between the DDF blocks in O2 Exchange
• Running and termination of Coaxial cables between the line cards(2MB transmission equipment) and DDF
blocks in BT and O2 Exchanges
• Cable labelling and records on the DDF racks
• Installation of cable tray/basket line for the running of cables
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT
MSIP Project across UK
• Installation of cable tray/basket line for the running of cables
• Installation of the Rack and TC cabinet inside the BT and O2 exchanges in UK
• Installation, termination and testing Coaxial cable at O2 Exchanges
• Installation of the Racks and TC cabinets for Panels, ATM/SDH and Power Equipment at BT exchanges in UK
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT
MSIP Project across UK
• Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM line cards for data,
voice and video transmissions for BT networks in UK
• Configuration and commissioning of IP networks for BT on Alcatel ATM equipments
Bauhaus Consultants May 2006 – July 2007
Position: Telecom Engineer (Contract)
Responsibilities:
• Installation of Cat5/Cat5e/Cat6 structured LAN cabling for building sites
• Cat 5 / LAN cabling & terminating, cable running in BT exchanges and installation of line cards
• Installation, termination and testing Coaxial cable(crimping & Soldering) at BT Exchanges
• Jumpering of coaxial cable between the DDF blocks in BT Exchanges
• Running and termination of Coaxial cables between the line cards(2MB transmission equipment) and DDF
blocks in BT and O2 Exchanges
• Cable labelling and records on the DDF racks
• Installation of cable trunking/tray/basket(Metal and Plastic) line for the running of cables
• Installation of the Rack and TC cabinet inside the BT and O2 exchanges in UK
• Installation, termination and testing Coaxial cable at O2 Exchanges
• Jumpering of coaxial cable between the DDF blocks in O2 Exchange
• Installation of the Racks and TC cabinets for the ATM/SDH and Power Equipment at BT exchanges in UK
• Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT
MSIP Project across UK
• Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM line cards for data, voice and
video transmissions for BT networks in UK
• Configuration and commissioning of IP networks for BT on Alcatel ATM equipments
Generic Software Consultant Limited
Milton Keynes, MK7 8LE July 10th – July 15th 2006
Position: Cabling Engineer (Contract)
Responsibilities:
• Site Survey and LAN points Mapping for the LAN Structured cabling
• Installation of CAT5e /CAT6 structured cabling for new ARGOS big building
• Installation of the Rack/TC cabinet
• Installation, termination and testing of CAT5 /CAT6 structured cabling
• Installation of Metal and white Plastic trunking for cable run
• Installation of PC hardware and Data communication networking equipment(Switches)
• Installation and integration of hardware
• Arrangement and termination of CAT5e/CAT6 on the patch panel
• Labelling of the LAN cable network
• Job performance and acceptance test and handing over and commissioning
• Network total delivery from start to finish
• Reporting to the Client’s Installation Coordinator
21st Century Technologies Limited Dec.2000 – May 2006
Position: Telecom Field Transmission Engineer
21st Century Technologies Limited is a leading Private Fixed Network telecommunications company. As the Telecom
Engineer, I was in charge of the installation of the telecommunications/IT network cabling infrastructure for voice,
data, video and broadband network services. (Fibre Optic cable, copper cable, CAT5/CAT5e/CAT6 structured cabling
network and transmission network).
Responsibilities:
• Implementation and support of Fibre optic cable transmission backbone and transmission and copper networks
for 21st
Century Telecoms.
• Data Centre operations and data centre IT equipment hardware support
• Installation of Fibre optic, Coaxial and CAT5 /CAT6 structured cabling for 21st
Century Technologies, Banks,
Oil companies, Local Authorities, Hospitals, Building complex and Corporate organisations
• Installation, termination and testing of CAT5 /CAT6 structured cabling and fibre optic(Multimode/Singlemode)
cables
• Installation and commissioning of DWDM equipment for existing fibre network expansion
• Data communication networking
• Fibre optics cable fusion splicing, Mechanical splicing and testing with OTDR, cable meter and ODF to ODF
fibre termination on the Rack/cabinet
• Responsible for supervising and managing a variety of projects ranging from cabling, systems/equipment
installations and telecommunications provisioning
• Design and Implementation of outside line plant copper cable network – Primary and secondary network. MDF,
Cabinet and Distribution Point (DP) planning for voice and data network
• Installation, termination and testing of CAT3 Multipair copper cable
• Installation of PDH/SDH STM-1 to STM-16 digital line transmission equipment
• Estimating, pricing and bidding for projects
• Responsible for delivering first-class customers service, whilst being sales focused and motivated
• Responsible for site inspections and ‘ad hoc’ maintenance checks
• Managing of projects for total delivery from start to finish
• Carrying out quality checks and management of contractors work and issuing job acceptance
• Representing my company at conferences as well as meetings with local authorities, suppliers and contractors
• Carrying out site maintenance checks
• Responsible for delivering first-class customers service, whilst being sales focused and motivated
Internet Associates Limited Feb.1999 –Dec. 2000
Position: Senior Systems Engineer
Internet Associates limited is an information technology company. The company is involved in connectivity and
interconnectivity networking –LAN and WAN structured cabling (Fibre optic cabling/Networking)
Responsibilities:
• Responsible for project design and implementation and supervision of fibre optic LAN and WAN projects.
• High level implementation of Fibre optic and CAT5 and CAT6 structured cabling for corporate
companies(100 to 2500+ LAN points)
• Responsible for design and development of corporate project proposal.
• Structured LAN cabling installation and support.
• Responsible for managing LAN network using HP Open view windows and 3COM Transcend Enterprise
Manager software
• Responsible for the implementation and management of campus FDDI(Dual Ring) fibre optic LAN
infrastructure network
• Planned and executed required routine inspections and maintenance of sites
• Prepared reports and made recommendations on routine inspections carried out
• Prepared forecasts and re-forecasts of expenditure against defined budget
• Establishing sound processes to ensure the smooth running of installations
• Managing the customers expectations
Balog Technologies Limited Nov.1997 – Jan.1999
Position: Systems Engineer
Responsibilities:
• Responsible for the coupling and assembly of PC hardware and installation of software.
• PC installation and fault troubleshooting
• CAT5 and coaxial cable LAN Structured Cabling
• Implementation and support of small LAN network.
• Delivering of first-Class customer service.
• Involved in product marketing
Acme Computers and Instrumentation Limited Jan.1997 – Oct.1997
Position: Systems/Network Engineer
Responsibilities
• Coupling and assembling of PC hardware.
• Organising training courses on computer assembling and operating systems
• Deputised for Engineering Director and assumed complete technical responsibility.
• Maintenance of corporate private LAN network (Star Network).
• Developed and executed pre-planned maintenance schedules.
• Prepared and presented reports of routine maintenance to director of engineering.
• Repair and servicing of faulty PCs and printers for corporate companies.
.
REFRENCE:
Available on Request

More Related Content

What's hot

060626 huawei umts end to-end solution
060626 huawei umts end to-end solution060626 huawei umts end to-end solution
060626 huawei umts end to-end solutionVacaba TOURE
 
83092299 rru3804-overview
83092299 rru3804-overview83092299 rru3804-overview
83092299 rru3804-overviewSerik123
 
Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1mohameddawood35
 
01 owa200001 3 g overview
01 owa200001 3 g overview01 owa200001 3 g overview
01 owa200001 3 g overviewAdnan Khan
 
Zte utran ur11.1 optional feature description
Zte utran ur11.1 optional feature descriptionZte utran ur11.1 optional feature description
Zte utran ur11.1 optional feature descriptionMd Kamruzzaman
 
1. oeb006910 e nodeb lte v100r008c10 product description issue 1.00
1. oeb006910 e nodeb lte v100r008c10 product description issue 1.001. oeb006910 e nodeb lte v100r008c10 product description issue 1.00
1. oeb006910 e nodeb lte v100r008c10 product description issue 1.00Ankit Mangla
 
Nokia siemens networks_active_antenna_system_white_paper_26_01_12
Nokia siemens networks_active_antenna_system_white_paper_26_01_12Nokia siemens networks_active_antenna_system_white_paper_26_01_12
Nokia siemens networks_active_antenna_system_white_paper_26_01_12ssk
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System StructureAtif Mahmood
 
02 umts network architecturenew
02 umts network architecturenew02 umts network architecturenew
02 umts network architecturenewsivakumar D
 
Huawei umts node b configuration principle
Huawei umts node b configuration principleHuawei umts node b configuration principle
Huawei umts node b configuration principleYaser Al-Abdali
 
02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-aWaheed Ali
 
Base Station Vendors
Base Station VendorsBase Station Vendors
Base Station Vendorsguest1e911f5
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini linkAhmed Nabeeh
 
Ml tn modems presentation
Ml tn modems presentationMl tn modems presentation
Ml tn modems presentationessafi
 
4 g(lte) principle and key technology training and certificate 2
4 g(lte) principle and key technology training and certificate 24 g(lte) principle and key technology training and certificate 2
4 g(lte) principle and key technology training and certificate 2Taiz Telecom
 

What's hot (20)

060626 huawei umts end to-end solution
060626 huawei umts end to-end solution060626 huawei umts end to-end solution
060626 huawei umts end to-end solution
 
83092299 rru3804-overview
83092299 rru3804-overview83092299 rru3804-overview
83092299 rru3804-overview
 
Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1
 
01 owa200001 3 g overview
01 owa200001 3 g overview01 owa200001 3 g overview
01 owa200001 3 g overview
 
Og003 dbs3900hardwarestructureissue2.0
Og003 dbs3900hardwarestructureissue2.0Og003 dbs3900hardwarestructureissue2.0
Og003 dbs3900hardwarestructureissue2.0
 
Zte 3g
Zte 3gZte 3g
Zte 3g
 
Zte utran ur11.1 optional feature description
Zte utran ur11.1 optional feature descriptionZte utran ur11.1 optional feature description
Zte utran ur11.1 optional feature description
 
1. oeb006910 e nodeb lte v100r008c10 product description issue 1.00
1. oeb006910 e nodeb lte v100r008c10 product description issue 1.001. oeb006910 e nodeb lte v100r008c10 product description issue 1.00
1. oeb006910 e nodeb lte v100r008c10 product description issue 1.00
 
Nokia siemens networks_active_antenna_system_white_paper_26_01_12
Nokia siemens networks_active_antenna_system_white_paper_26_01_12Nokia siemens networks_active_antenna_system_white_paper_26_01_12
Nokia siemens networks_active_antenna_system_white_paper_26_01_12
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System Structure
 
Antenna Installation Engineering.
Antenna Installation Engineering.Antenna Installation Engineering.
Antenna Installation Engineering.
 
02 umts network architecturenew
02 umts network architecturenew02 umts network architecturenew
02 umts network architecturenew
 
Huawei umts node b configuration principle
Huawei umts node b configuration principleHuawei umts node b configuration principle
Huawei umts node b configuration principle
 
02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a
 
Kathreins system
Kathreins systemKathreins system
Kathreins system
 
Base Station Vendors
Base Station VendorsBase Station Vendors
Base Station Vendors
 
BTS
BTSBTS
BTS
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini link
 
Ml tn modems presentation
Ml tn modems presentationMl tn modems presentation
Ml tn modems presentation
 
4 g(lte) principle and key technology training and certificate 2
4 g(lte) principle and key technology training and certificate 24 g(lte) principle and key technology training and certificate 2
4 g(lte) principle and key technology training and certificate 2
 

Viewers also liked

Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.pptAIRTEL
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioningAIRTEL
 
Md Reyaz Alam NSN
Md Reyaz Alam NSNMd Reyaz Alam NSN
Md Reyaz Alam NSNreyaz alam
 
Nokia ultra site bts
Nokia ultra site btsNokia ultra site bts
Nokia ultra site btsAnkit Ricks
 
Alcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and CommissioningAlcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and Commissioningengramjadislam78
 
Flexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsFlexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsAchmad Salsabil
 
Wavelink Presentation(Updated)
Wavelink Presentation(Updated)Wavelink Presentation(Updated)
Wavelink Presentation(Updated)slavun
 
G2 bsc commissioning manual release b7.2
G2 bsc commissioning manual   release b7.2G2 bsc commissioning manual   release b7.2
G2 bsc commissioning manual release b7.2chungminh1108
 
G2 bsc commissioning manual release b7.2 ccl
G2 bsc commissioning manual   release b7.2 cclG2 bsc commissioning manual   release b7.2 ccl
G2 bsc commissioning manual release b7.2 cclchungminh1108
 
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001Max Gathers
 
Nokia ultra bts connections1
Nokia ultra bts connections1Nokia ultra bts connections1
Nokia ultra bts connections1Moses Daramola
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringNeonetwireless
 
Field commissioning
Field commissioningField commissioning
Field commissioningAmjad Jamil
 
Bts commissioning
Bts commissioningBts commissioning
Bts commissioningginorosido
 
FLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONFLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONMax Gathers
 

Viewers also liked (20)

Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioning
 
Md Reyaz Alam NSN
Md Reyaz Alam NSNMd Reyaz Alam NSN
Md Reyaz Alam NSN
 
Nokia ultra site bts
Nokia ultra site btsNokia ultra site bts
Nokia ultra site bts
 
Alcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and CommissioningAlcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and Commissioning
 
Flexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsFlexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirements
 
Certificate4
Certificate4Certificate4
Certificate4
 
msvel
msvelmsvel
msvel
 
Mobiserve
MobiserveMobiserve
Mobiserve
 
Wavelink Presentation(Updated)
Wavelink Presentation(Updated)Wavelink Presentation(Updated)
Wavelink Presentation(Updated)
 
G2 bsc commissioning manual release b7.2
G2 bsc commissioning manual   release b7.2G2 bsc commissioning manual   release b7.2
G2 bsc commissioning manual release b7.2
 
G2 bsc commissioning manual release b7.2 ccl
G2 bsc commissioning manual   release b7.2 cclG2 bsc commissioning manual   release b7.2 ccl
G2 bsc commissioning manual release b7.2 ccl
 
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Nokia ultra bts connections1
Nokia ultra bts connections1Nokia ultra bts connections1
Nokia ultra bts connections1
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineering
 
Field commissioning
Field commissioningField commissioning
Field commissioning
 
Certificate5
Certificate5Certificate5
Certificate5
 
Bts commissioning
Bts commissioningBts commissioning
Bts commissioning
 
FLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONFLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATION
 

Similar to Adewale Adeyemi - Field Telecoms Engineer BTS

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerSyed Atif Shamim
 
AVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeavisheshb
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNANGOPALA46
 
Abid CURRICULUM 15112016
Abid CURRICULUM 15112016Abid CURRICULUM 15112016
Abid CURRICULUM 15112016ABID KAMAL
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvFarhan Awan
 
Asif Naveed Resume
Asif Naveed ResumeAsif Naveed Resume
Asif Naveed ResumeAsif Naveed
 
Robin garg resume
Robin garg resumeRobin garg resume
Robin garg resumeRobin Garg
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission EngineerEsrar Khan
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtSaif ul Amin
 
Raywood Mickles-resume
Raywood Mickles-resumeRaywood Mickles-resume
Raywood Mickles-resumeRay Mickles
 

Similar to Adewale Adeyemi - Field Telecoms Engineer BTS (20)

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineer
 
My_CV
My_CV My_CV
My_CV
 
AVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resume
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
Abid CURRICULUM 15112016
Abid CURRICULUM 15112016Abid CURRICULUM 15112016
Abid CURRICULUM 15112016
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cv
 
CV-Eng Abdulrhamn Al-Nawajha.
CV-Eng Abdulrhamn Al-Nawajha.CV-Eng Abdulrhamn Al-Nawajha.
CV-Eng Abdulrhamn Al-Nawajha.
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
Asif Naveed Resume
Asif Naveed ResumeAsif Naveed Resume
Asif Naveed Resume
 
jack george cv
jack george cv jack george cv
jack george cv
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
Stephen Sandeman cv7
Stephen Sandeman cv7Stephen Sandeman cv7
Stephen Sandeman cv7
 
Donald resume new
Donald resume newDonald resume new
Donald resume new
 
Robin garg resume
Robin garg resumeRobin garg resume
Robin garg resume
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-Mgmt
 
BrianTechResume
BrianTechResumeBrianTechResume
BrianTechResume
 
Raywood Mickles-resume
Raywood Mickles-resumeRaywood Mickles-resume
Raywood Mickles-resume
 

Adewale Adeyemi - Field Telecoms Engineer BTS

  • 1. Adewale Adeyemi 15 Spindles, Tilbury Essex. RM18 8NP +44 01375858966 +44 07828878350 wale100@yahoo.com TRAINING AND CERTIFICATION: Fibre optic and Cat5/Cat6 Structured cabling by BrandRex (BICC), UK Installation and commissioning of Tellabs 8600 series Training Alcatel-Lucent 7470 MSP & 7670 RSP & DWDM ATM/SDH equipment training Nokia Siemens Network NOKIA Flexi) BTS training Huawei Training/Accreditation (QPL) Prince 2 Project Management Certificate CSCS certificate Rooftop Safety Awareness Certificate Signing Lighting and Guarding NRSWA certificate Health and Safety certificate Advanced Health and Safety certificate RF Awareness Certificate Emergency & First Aid at work Training Asbestos Awareness certificate Manual Handling certificate First Aid at height Rooftop Restraint certificate QUALIFICATIONS /EDUCATION: B.Sc. Degree Electrical Engineering (Second Class Honours, Upper Division-2.1) 1989 – 1995 Flexible working hours. Full UK driving License. Owned vehicle. Current CSCS Card holder SKILLS Highly self motivated, brilliant team player Excellent Project Management skill Experience of Microsoft Windows, Microsoft word, Excel, Access, Power-point and design tool, Ms Project, MS Visio Expert in LAN Structured cabling, installation, termination and testing (CAT5/CAT5e/CAT6 /Cat7, fibre cable and Coaxial cable) Huawei 3900 (A’s & L’s) installation and commissioning Huawei Refresh project for MBNL RBSs Swap for NSN BTS Flexi RBSs Swap for NSN BTS Flexi Nokia Flexi BTS installation, commissioning and integration in 2G and 3G/4G Nokia Flexi WBTS upgrade configuration (FSMEs, FSMFs, ESMBs, FGRP/T, and FSMBs) DWDM equipment installations – Siemens, Alcaltel-Lucent, Huawei, Tellabs, Nortel Installation, commissioning and integration of Tellabs 8660, 8630 and 8605 in 2G and 3G/4G(LTE) networks Fibre cord patching and labelling Ericsson RBS 2000, 3000 & 6000 installation & Commissioning BTS site survey for Darwin Project, VF, MBNL and Ericsson
  • 2. Proficient in the installation and commissioning of NOKIA FLEXI (NSN), Alcaltel-Lucent, Huawei, Tellabs, Nortel Understanding of Network architecture and G900/G1800/U2100/U900 technologies with Ericsson and NSN BTS flexi Survey for Darwin Project Wireless network installations Installations of wireless router for network connections and interconnections Huawei Refresh project for MBNL Huawei installation site survey and audit Proficient skills in working with DCNs Fibre Optics cabling installation and testing Huawei 3900 (A’s & L’s) installation and commissioning Ericsson RBS installation & Commissioning. NSN Flexi BTS installation, commissioning and integration in 2G and 3G/4G NSN Flexi WBTS upgrade configuration (FSMEs, FSMFs, ESMBs, FGRP/T, and FGRFs) DC power installations for BTS NSN Flexi Huawei BTS and UPS Power installations on MBNL Very Skilled in installation, testing and commissioning of DWDM, OTM, PDH and SDH-Based Ericsson RBS 2000, 3000 &6000 installation & Commissioning Telecommunication transmission network Huawei 3900 A’s and L’s site Survey on VF BTS Huawei 3900 Full Beacon completion and commissioning on Vodafone sites Installation of DWDM transmission kits. Installation and commissioning of Alcatel-Lucent 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for British Telecoms -BT MSIP Project across UK Decommissioning, Installation and testing of DC PSUs/PDUs Installation of DC power PSUs and PDUs in VF sites Ericsson RBS 6000 installation & Commissioning Tellabs 8660 and 8605 transmission switch installation and commissioning Ericsson RBS installation & Commissioning. NSN Flexi BTS installation, commissioning and integration in 2G/3G 4G NSN Flexi WBTS upgrade configuration (FSMEs, FSMDs, FSMBs, FGRP, and FGRFs) DC power installations for BTS NSN Flexi Huawei BTS and UPS Power installations on MBNL Decommissioning, Installation and testing of DC PSUs/PDUs NSN Flexi BTS installation, commissioning and integration in 2G and 3G/4G(LTE) DC power installations for BTS NSN Flexi Survey of mobile operator BTS site for health & Safety requirement for decommissioning and commissioning work Survey for access for Crane/cherry pickers for the removal & delivery of telecoms kits on site Decommissioning of BTS/RF telecoms kits Survey of BSC/BTS Node and completion/submitting of survey report Site survey and Audit on Vodafone and MBNL cell sites Survey of BTS site for traffic management for site access Liaising with the site owner or 3rd party regarding site access Site audit and planning Site survey for parking requirement Decommissioning of RF kits Site audits for Telecoms’ Vendors Survey of site for telecoms kit decommissioning BTS Site survey for civil work requirement for decommissioning and installation work Survey for vehicle access for removal of decommissioned kits from site Huawei 3900A’s and 3900L’s installation and commissioning Interconnection with ADVA Ethernet equipment in British Telecommunications Exchanges Replacement and configuration of ADVA equipment Installation, commissioning and integration of Tellabs 8660, 8630 and 8605 in 2G and 3G networks Huawei BTS and UPS Power installations on MBNL Installation of Huawei transmission equipment RBSs Swap for NSN BTS Flexi
  • 3. NSN Flexi BTS installation, commissioning and integration in 2G and 3G/4G NSN Flexi WBTS upgrade configuration (FSMEs, FSMDs, FSMBs, FGRP, and FGRFs) Proficient in use of Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers DC power installations for BTS NSN Flexi Survey of BSC/BTS Node and completion of survey report Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM line cards for data, voice and video transmissions Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK installation, testing and commissioning of DWDM, OTM, PDH and SDH-Based E1 Jumpering/termination using CAT5e/CAT6 cabling and RJ45 connections BT leased line circuit Very skilled in E1, Ethernet, IVR, DSL, ADSL, ISDN Fibre leads testing and patching Site audit and planning RU10 Base Band commissioning and testing Installation of Ericsson RBS PICO cells in stores and customers’ site Installation of RF cables Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers Very Skilled in planning, installation, and commissioning of DWDM, OTM, PDH and SDH-Based equipment Commissioning and Integration of Ericsson RBS 2409 PICO cells Ericsson RBS 2409 Lower Power PICO cells Installation and Interface over IP in TESCO Extra stores Tellabs 8660 and 8605 transmission switch deployment in RBS sites for MBNL and VF Good understanding of 2G /3G network structured Strong understanding of 2G and 3G Network elements Familiar with Mobile network/Radio cell sites Experience in Cisco and 3com switches and wireless routers configuration and Ethernet/TCP/IP network Skilled at installing and configuring hubs, switches, routers, bridges Very good in Cisco Switching and routing IP protocols Wireless network installations Installations of wireless router for network connections and interconnections Installation of E1 balun cables & fibres patches Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK DWDM installation proficient Fibre transmission network installation Installation of NEC radio equipment Strong knowledge of FTTC (Roadside Cabinets & Headend Racks Installation of the Rack and TC cabinet DC cable installation and termination Fibre cord patching and labelling Installation and configuration of Switches and routers (Cisco, 3Comms and Tellabs) Installation, termination and testing multipair copper, and Coaxial cable – 2003/3003/5000 Expert in cable trunking/Channel/Tray (Metal and Plastic) and Patch panel cable termination/Labelling, cable patching, records and arrangement Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers Jumpering of coaxial cable between the DDF blocks E1 Jumpering using twisted pair and wire wrap DDF's Jumpering of coaxial and cat5 cables between the DDF blocks and equipment Very experience in fibre optics cable Network Design, laying, termination, fusion splicing, Mechanical splicing and testing with OTDR, cable meter and ODF to ODF fibre termination on the Rack/cabinet In-depth experience in LAN/MAN/WAN and FDDI cable network implementation Data Centre operations experience, data centre IT equipment hardware, and excellent Servers and PC compatible skills Strong ability to carryout site survey, implementation and supervise installation, commissioning and testing Excellent Problem solving skill Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK
  • 4. Analysing and Understand of Schematic drawings for cable installation and terminations for Data cabling installations Installation, termination and testing of Copper and fibre optic (Multimode/Singlemode) cable Strong knowledge of network management and analysis tools, including Enterasys, HP OpenView Excellent reporting & analytical skills Delivery of Fibre optic and CAT5/CAT5e/CAT6 and Coaxial cabling installations and documentation within timescales, creating scope of works documents for network builds & implementation work Carrying out site maintenance checks Troubleshooting and reconfiguration on of DWDM, OTM, PDH and SDH equipment Fibre leads testing and patching Strong ability to learn new skill and adapt to situations adequately Delivering of first-class customers service, whilst being sales focused and motivated Strong troubleshooting competencies and maintenance skills Production platform protection during implementation work Influencing positively members of the technical team for successful project implementation delivery within schedule, cost and quality parameters Excellent Communication skills EXPERIENCE: Magdalene Ltd December 2015 – Till Date Position: Field Telecoms Installation & Commissioning Engineer Responsibilities: • Site Survey of Vodafone BTS sites for BTS installations and integration for Beacon Project • Nokia Flexi installation and commissioning on VF BTS sites for 2G/3G/4G • Beaconisation of VF BTS sites with Nokia Flexi kits - 2G/3G/4G • VF BTS swap for Nokia Flexi - FSMFs, FSMEs, ESMB/Ds, FXDBs • Nokia flexi BTS installation and commissioning on VF BTS sites • NSN Full Beacon completion and commissioning/integration of 2G/3G/4G on VF BTS sites • Decommissioning of Legacy Telecoms’ kits • NSN swap for VF Beacon on Streetworks, Greenfield and Rooftop BTS sites • Site survey for PIV completion • Faults analysis and clearance on NSN kits on VF sites • DC power installation on Delta PSU on VF BTS sites during Beacon installation • Decommissioning, Installation and testing of PSUs • Swapping and testing of DC PSUs • Completion of Installation document - HOPs Savills Telecom UK August 2015 – November 2015 Position: Field Telecoms BTS Installation & Commissioning Engineer Responsibilities: • Site Survey of Vodafone BTS sites for BTS installations and integration for Beacon Project • Nokia Flexi installation and commissioning on VF BTS sites for 2G/3G/4G • Beaconisation of VF BTS sites with Nokia Flexi kits - 2G/3G/4G • VF BTS swap for Nokia Flexi - FSMFs, FSMEs, ESMB/Ds, FXDBs • NSN BTS installation and commissioning on VF BTS sites • NSN Full Beacon completion and commissioning/integration of 2G/3G/4G on VF BTS sites • Decommissioning of Legacy Telecoms’ kits • NSN swap for VF Beacon on Streetworks, Greenfield and Rooftop BTS sites
  • 5. • Site Survey for Darwin Project for NSN • Site clearance for faults on NSN kits on VF sites • DC power installation on Delta PSU on VF BTS sites during Beacon installation • Decommissioning, Installation and testing of PSUs • Swapping and testing of DC PSUs • Completion of Installation document - HOPs Flint UK February 2015 – June 2015 Position: Telecoms Engineer - Newbury Responsibilities: • Review of Vodafone sites survey information & detailed designs to establish engineering baseline / requirements for RBS 6000 deployment • Engineering design • Installation and commissioning of Ericsson RBS 6000 for Vodafone on the metropolitan network • Installation and commissioning/integration of RBS6000 LTE upgrade for Vodafone BTS • Site Surveying of Vodafone BTS sites for RBS6000 L800 and L2600 Metropolitan upgrade • Propose site Engineering design for each Vodafone site for L800 and L2600 RBS6000 Metropolitan upgrade • Support ASP in the installation and commissioning of Ericsson RBS6000 • Perform site survey activities to include provision of completed SIR documents • SIR Survey prep & Survey QA review for other engineering resource • Site survey and visit to Vodafone BTS sites to determine the requirement for RBS6000 LTE upgrade • Reporting of status of each site in Site Handler • Completion of Weekly report. • Surveying RBS/BTS Vodafone/ O2 sites • Produce site drawings of cabinet floor plan and photographing all details on site • Survey Detail sources of AC and DC on site and record. Huawei Technologies UK August 2014 – February 2015 Position: Field Telecoms Installation and Commissioning Engineer Responsibilities: • Huawei BTS 3900A’s installation and commissioning/integration on VF BTS sites • Huawei BTS 3900L’s installation and commissioning on VF BTS sites • Huawei BTS 3900 Full Beacon completion and commissioning/integration on VF sites • Assisting partners in BTS LTE Installation and commissioning/integration on Beacon • Survey of Vodafone BTS sites for Huawei Beacon installations • Clearing of Defect on Vodafone BTS site for Huawei • Completion of Installation outstanding HOP documents • Installation and commissioning of Huawei 3900AL and 3900L for Vodafone on Beacon Project • Clearing of Defect on Huawei LTE installations • Performing technical support for fault resolution on 3900AL on Vodafone/O2 BTS sites • Huawei 3900 Full Beacon completion and commissioning on VF sites • Decommissioning of Telecoms/BTS sites • Resolving faults on Huawei 3900 kits on VF sites • Swapping and testing of DC PSUs along with partners • Site pre-checks for proposed installations
  • 6. ITL Ltd May 2014 – August 2014 Position: Field Telecoms Installation and Commissioning Engineer Responsibilities: • Survey of Vodafone BTS sites for BTS installations • Installation of Ericsson RBS 6000 BTS for Vodafone • Swapping of Ericsson RBS 2000 & 3000 for RBS 6000 for Vodafone • Clearing of Defect on Ericsson RBS 6000 installations on VF BTS sites • Completion of Installation HOP document • Installation of Huawei BTS LTE APM30 for UK broadband • Redline Drawing project for Vodafone • Clearing of Defect on Huawei LTE installations for UK broadband • Huawei 3900A’s installation and commissioning on VF BTS sites • Huawei 3900L’s installation and commissioning on VF BTS sites • Huawei 3900 Full Beacon completion and commissioning on VF sites • Decommissioning of Telecoms’ kits • Resolving faults on Huawei 3900 kits on VF sites when required • Installation & commissioning of switches and routers • Decommissioning, Installation and testing of PSUs • Swapping and testing of DC PSUs Magdalene Ltd January 2014 – May 2014 Position: Installation and Commissioning Engineer Responsibilities: • Survey of Vodafone BTS sites for BTS installations and integration • Huawei 3900A’s installation and commissioning on VF BTS sites • Huawei 3900 A’s and L’s Ex-KTL Survey • Huawei 3900L’s installation and commissioning on VF BTS sites • Huawei 3900 Full Beacon completion and commissioning/integration on VF sites • Decommissioning of Telecoms’ kits • Survey for the MBNL for H3G LTE proposed install • Survey for Darwin Project for NSN • Resolving faults on Huawei 3900 kits on VF sites when required • Installation & commissioning of switches and routers • Decommissioning, Installation and testing of PSUs • Swapping and testing of DC PSUs • Completion of Installation document Black Box Network Services (UK) Ltd August 2013 – January 2014 Position: Installation Engineer Responsibilities: • Survey of clients’ sites for installations • Decommissioning of Telecoms’ kits • Installation of cable for installation telecoms’ kits in client’s site
  • 7. • Installation & commissioning of switches and routers • Decommissioning, Installation and testing of DC PSUs/PDUs • Installation of cat5 cables on site prior to installation • Swapping and testing of DC PSUs/PDUs • Installation and commissioning of IP phones in customers’ sites • Installation of transmission equipments • Integration and commissioning of site • Training of customers after integration • Installation of the Racks and TC cabinets for kits installation Indigo Telecom Group February 2013 – August 2013 Position: Telecoms Installation, Commissioning and Integration Engineer Responsibilities: • Installation & Commissioning of 8630/8660 and 8605 Tellabs equipments across UK on Vodafone BTS ring • Installation & commissioning of Tellabs 8660 transmission node at Vodafone Hubs and MTX sites • Installation of Tellabs 8605 in outdoor Ericsson RBSs in BTS sites • Installation of ADVA transmission equipment • Installation of DWDM for fibre network upgrade for British Telecommunications UK • Installation of the Racks and TC cabinets for Panels, ATM/SDH and Power Equipment at BT exchanges in UK • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK • Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM/SDH line cards for data, voice and video transmissions for BT networks in UK • Configuration and commissioning of IP networks for BT on Alcatel ATM/SDH equipments • Patching, testing and labelling of fibre cords • Survey of mobile operator BTS site for health & Safety requirement for decommissioning and commissioning work • Survey for access for Crane/cherry pickers for the removal & delivery of telecoms kits on site • Infill and commissioning of New STM-1 cards in Tellabs 8660 in VF MTX sites • Fibre optic structured cabling, installation, testing and commissioning • Installation and commissioning of Tellabs switches in 2G and 3G networks • DWDM card infill, upgrade and testing • Loading of script and Call off with BT NOC for Installation and commissioning of 8605 Tellabs • 8605 Tellabs Dual stack installation • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH transmission equipment for BT MSIP Project across UK • Fibre cord patching and labelling • Fibre leads testing and patching • Installation, testing and commissioning of DWDM, OTM, PDH and SDH-Based transmission • Survey of BSC/BTS Node and completion of survey report • Installation of radio equipment in Cell sites • Decommissioning of BTS/RF telecoms kits • Survey of BSC/BTS Node and completion/submitting of survey report • Site survey and Audit on Vodafone and MBNL cell sites • Survey of BTS site for traffic management for site access
  • 8. • Laising with the site owner or 3rd party regarding site access • Site audit and planning • Site survey for parking requirement • Decommissioning of RF kits • Site audits for Telecoms’ Vendors • Survey of site for telecoms kit decommissioning • BTS Site survey for civil work requirement for decommissioning and installation work • Survey for vehicle access for removal of decommissioned kits from site • DWDM transmission installation for fibre network upgrade • Completion and submission of handover and report documents • Installation of the Racks and TC cabinets for Patch Panels and active devices • DC cabling and termination for the equipment • Installation of new PDUs in equipment’s rack • Installation, termination and Jumpering of coaxial(2000/3000/5000 cables between the DDF blocks • Fibre optic cable run, termination, fusion splicing and testing for singlemode and Multimode • Cable labelling and records on the DDF racks • Installation and upgrade of DWDM equipment in BT exchanges • Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers • Installation of line cards and Cat5 cables between ATM/SDH shelves and ADVA rack for BT customers link • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH transmission equipment for BT MSIP Project across UK • Cat 5e /6 LAN cabling & terminating, cable running in BT exchanges and BT data centre • Fibre optic structured cabling, installation, testing and commissioning • DC cabling and termination for the equipment • Upgrade of DWDM equipment in BT exchanges • Fibre cord testing, patching and labelling • Installation, termination, Patching, labelling and testing Coaxial cable(crimping & Soldering) at BT Exchanges • Installation and Jumpering of coaxial(2000/3000/5000 cables between the DDF blocks and ATM/SDH equipment in BT Exchanges • Multicore copper cable termination and testing • DWDM transmission installation for fibre network upgrade • Jumpering of coaxial cable between the DDF blocks in O2 Exchange • Running and termination of Coaxial cables between the line cards(2MB transmission equipment) and DDF blocks in BT and O2 Exchanges • Cable labelling and records on the DDF racks • Installation of cable tray/basket line for the running of cables • Installation of cable tray/basket line for the running of cables • Installation of the Rack and TC cabinet inside the BT and O2 exchanges in UK • Installation, termination and testing Coaxial cable at O2 Exchanges CAIP Limited (Contract) March 2012- February.2013 Position: Telecoms Installation, Commissioning & Integration Engineer Responsibilities:
  • 9. • Installation, commissioning and Integration of NSN Flexi BTS in Vodafone BTS sites in UK – SRAN project • Survey and Audit for Huawei refresh project • Installation of PDUs for Huawei installations • Huawei 3900 installation and commissioning EE • Huawei Refresh project for MBNL • Huawei 3900L’s installations and commissioning • Installation of RBS 3000 & 6000 BTS for Vodafone • Swapping of Ericsson RBS for NSN Flexi BTS (2G/3G swap) in Vodafone sites • Decommissioning, installation and testing of DC PSU/PDU in VF sites • Installation and commissioning of new 2G/3G Nokia Flexi BTS in VF sites on SRAN • Decommissioning of 2G and 3G Ericsson RBS and RRUWs in VF sites • RBS parasitic conversion for 2G and 3G BTS installation • Huawei 3900L installation and commissioning • Installation, commissioning of Nokia Siemens Network flexi BTS FSMEs, FSMDs and FSMBs in consolidated and Back to Back sites • Installation and commissioning of new 2G/3G Nokia Flexi BTS in VF sites on SRAN • Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers • Installation, commissioning and Integration of NSN Flexi BTS in MBNL BTS sites in UK • NSN Flexi BTS upgrade to Back-to-Back configuration on MBNL project • RF Antenna cables installation and commissioning to NSN Flexi BTS equipment • RF antenna cable installation between UCUs and Flexi BTS FRGFs/FRGPs • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment • Reconfiguration of 8605 Tellabs for transmission link • Huawei 3900 transmission equipment • Huawei Referesh project for MBNL • Fibre cord patching and labelling • Replacement and re-commissioning of Tellabs 8605 for the new BTS upgrade • RU10 Base Band installation and Testing • MBNL 2G refresh on Huawei • Huawei 3G RBS installations • Huawei UPS swap installations on VF sites • DC Power Installations • MBNL 2G refresh site audit and planning • Survey of BSC/BTS Node and completion of survey report • Completing of SAM cert and site installation reports • RU10 Flexi Node B commissioning & Integration • RF Antenna cables installation and commissioning to NSN Flexi BTS equipment • RF antenna cable installation between MRCs/UCUs and Flexi BTS • Installation of VLAN and transmission cable interface for the Flexi BTS • Patching and labelling of fibre cords • Huawei Refresh project for MBNL • Optical Fibre cable patching and labelling • RU10 Base Band commissioning and testing DMN Limited (Contract) August 2011- March 2012
  • 10. Position: Telecoms Installation and Commissioning Engineer Responsibilities: • Installation, commissioning and Integration of NSN Flexi BTS in MBNL BTS sites in UK • NSN Flexi BTS upgrade to Back-to-Back configuration on MBNL project • NSN Flexi BTS upgrade in consolidated MBNL sites • RU10 Base Band installation and Testing in MBNL project • Survey of BSC/BTS Node and completion of survey report • Installation, commissioning of Nokia Siemens Network flexi BTS FSMEs, FSMDs and FSMBs in consolidated and Back to Back sites • Fibre cord patching and labelling • DC Power Installations • RU10 Flexi Node B commissioning & Integration • Decommissioning NSN flexi BTS equipment in H3G and T-Mobile sites (Outdoors & Indoors) • NSN flexi BTS rack, Ladder and cabinets installations in MBNL project • RF Antenna cables installation and commissioning to NSN Flexi BTS equipment • RF antenna cable installation between UCUs and Flexi BTS FRGFs/FRGPs • Installation of VLAN and transmission cable interface for the Flexi BTS • Patching and labelling of fibre leads • Optical Fibre cable patching and labelling • RU10 Base Band commissioning and testing Cable & Wireless – GTL-Europe (Temp contract) Feb.2011- April 2011 Position: Transmission Engineer Responsibilities: • Installation and Interface of Ericsson RBS 2409 Lower power PICO cells over IP in stores • Installation of RF cables between PICOs in stores • Installations of Ericsson RBS 2000 series in stores • Commissioning and Integration of RBS 2409 PICO cells • Ericsson RBS 2409 Lower Power PICO cells Installation and Interface over IP in TESCO Extra stores • Loading of Script in Ericsson RBS 2409 for integration • Installation and connection of Cat6 to the CE • Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers • Installation and interfacing of RF Omni–direction Antennae • Installation of Power over Ethernet (PoE) equipment Indigo Telecom Group Nov 2008 – August 2011 Position: Field Transmission Engineer Responsibilities: • Deployment of 8660/8630 and 8605 Tellabs equipments across UK on behalf BT on Vodafone, T-Mobile and H3G sites • Installation of line cards and Cat5 cables between ATM shelves and ADVA rack for BT customers link • Installation and upgrade of DWDM equipment in BT exchanges • Installation of Tellabs 8605 in outdoor Ericsson RBSs in BTS sites • Installation and upgrade of DWDM equipment in BT exchanges • Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers
  • 11. • Cat 5e /6/Cat7 LAN cabling & terminating, cable running in BT exchanges and BT data centres • Fibre optic structured cabling, installation, testing and commissioning • Installation, testing and commissioning of DWDM, OTM, PDH and SDH-Based transmission • Installation and commissioning of Tellabs switches in 2G and 3G networks • Fibre leads patching and labelling • Installation of line cards and Cat5 cables between ATM shelves and ADVA rack for BT customers link • Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers • Configuration and commissioning of IP networks for BT on Alcatel-Lucent ATM equipments • Loading of script and Call off with BT NOC for Installation and commissioning of 8605 Tellabs • 8605 Tellabs Dual stack installation • Transmission network Installation and commissioning for T-mobile, H3G and Vodafone for BT • Installation and commissioning of Tellabs 8660 and 8605 equipments in Vodafone, T-Mobile and H3G cell sites/Radio stations • Fibre cords patching and labelling • Survey of BSC/BTS Node and completion of survey report • Installation of radio equipment in Cell sites • Installation and commissioning of new Alcatel line cards in Alcatel MSP and ESE/RSP • Installation of the Racks and TC cabinets for Panels, ATM/SDH and Power Equipment at BT exchanges in UK • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK • Design, Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM line cards for data, voice and video transmissions for BT networks in UK • Installations of wireless router for network connections and interconnections • Wireless network installations • Optical Fibre cable patching and labelling • Supervising installation team's rack, E1 balun cables & fibres on each cell site • Completion and submission of handover and report documents remotely • Configuration and commissioning of IP networks for BT on Alcatel-Lucent ATM equipments • Metal and Plastic Cable trunking/tray installation • Multicore copper cable termination and testing for BT • Installation of the Racks and TC cabinets for Patch Panels and active devices • Cat5/Cat5e/Cat6/Cat7 structured LAN cabling for difference companies structures and building sites • Cat 5e /6/Cat7 LAN cabling & terminating, cable running in BT exchanges and BT data centres • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK • Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers • Installation, termination, Patching, labelling and testing of optical fibre cable, Cat5/Cat5e/Cat6/Cat7 and Coaxial cable(crimping & Soldering) • DC cabling and termination for the equipment • Installation, termination and Jumpering of coaxial(2000/3000/5000 cables between the DDF blocks and ATM/SDH equipment in BT Exchanges • Fibre optic cable run, termination, fusion splicing and testing for singlemode and Multimode • Jumpering of coaxial cable between the DDF blocks in O2 Exchange • Running and termination of Coaxial cables between the line cards(2MB transmission equipment) and DDF blocks in BT and O2 Exchanges • Patching and labelling of fibre cords • Cable labelling and records on the DDF racks • Installation of cable tray/basket line for the running of cables • Installation of the Rack and TC cabinet inside the BT and O2 exchanges in UK • Installation, termination and testing Coaxial cable at O2 Exchanges
  • 12. iCobus Limited – Logistic International Position: Field Cabling/Installation Engineer (Temp contract) July 2009 – Nov. 2009 Responsibilities: • Installation of Cat5/Cat6/Cat7 structured LAN cabling for difference Outlets and customer’s sites • Installation, termination, Patching, labelling and testing of Cat5/Cat5e/Cat6/Cat7 and Coaxial cable(crimping & Soldering) • Rationalisation of telecommunication facilities in various clients’ site(Voice and Data) • Auditing of IT and telecoms equipments • Fibre optic structured cabling, installation, testing and commissioning • Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers • E1 Jumpering using twisted pair and wire wrap DDF's • Cable termination on the DP and DDF • Jumpering of coaxial between the DDF blocks and equipment and Cat5 cable Patching • Installation of the Racks and TC cabinets for Patch Panels and active devices • Site surveying and drawing readings. Redbridge Management Services July 2007 – Nov. 2008 Position: Telecom Transmission Engineer Responsibilities: • Installation of line cards and Cat5 cables between ATM shelves and ADVA rack for BT customers link • Cat5/Cat5e/Cat6 structured LAN cabling for difference companies structures and building sites • Cat 5e /6 LAN cabling & terminating, cable running in BT exchanges and BT data centre • Fibre optic structured cabling, installation, testing and commissioning • Ethernet & BER tester, Optical analyzer, Oscilloscope, SDH analysers • DC cabling and termination for the equipment • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK • Installation and commissioning DWDM equipment in BT exchanges • Installation, termination, Patching, labelling and testing Coaxial cable(crimping & Soldering) at BT Exchanges • Installation and Jumpering of coaxial(2000/3000/5000 cables between the DDF blocks and ATM/SDH equipment in BT Exchanges • Multicore copper cable termination and testing • Jumpering of coaxial cable between the DDF blocks in O2 Exchange • Running and termination of Coaxial cables between the line cards(2MB transmission equipment) and DDF blocks in BT and O2 Exchanges • Cable labelling and records on the DDF racks • Installation of cable tray/basket line for the running of cables • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK • Installation of cable tray/basket line for the running of cables • Installation of the Rack and TC cabinet inside the BT and O2 exchanges in UK • Installation, termination and testing Coaxial cable at O2 Exchanges • Installation of the Racks and TC cabinets for Panels, ATM/SDH and Power Equipment at BT exchanges in UK • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK • Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM line cards for data, voice and video transmissions for BT networks in UK
  • 13. • Configuration and commissioning of IP networks for BT on Alcatel ATM equipments Bauhaus Consultants May 2006 – July 2007 Position: Telecom Engineer (Contract) Responsibilities: • Installation of Cat5/Cat5e/Cat6 structured LAN cabling for building sites • Cat 5 / LAN cabling & terminating, cable running in BT exchanges and installation of line cards • Installation, termination and testing Coaxial cable(crimping & Soldering) at BT Exchanges • Jumpering of coaxial cable between the DDF blocks in BT Exchanges • Running and termination of Coaxial cables between the line cards(2MB transmission equipment) and DDF blocks in BT and O2 Exchanges • Cable labelling and records on the DDF racks • Installation of cable trunking/tray/basket(Metal and Plastic) line for the running of cables • Installation of the Rack and TC cabinet inside the BT and O2 exchanges in UK • Installation, termination and testing Coaxial cable at O2 Exchanges • Jumpering of coaxial cable between the DDF blocks in O2 Exchange • Installation of the Racks and TC cabinets for the ATM/SDH and Power Equipment at BT exchanges in UK • Installation and commissioning of Alcatel 7470 MSP and 7670 ESE & RSP ATM/SDH equipment for BT MSIP Project across UK • Installation and configuration of STM-1e to STM-64, STM -1 optical and ATM line cards for data, voice and video transmissions for BT networks in UK • Configuration and commissioning of IP networks for BT on Alcatel ATM equipments Generic Software Consultant Limited Milton Keynes, MK7 8LE July 10th – July 15th 2006 Position: Cabling Engineer (Contract) Responsibilities: • Site Survey and LAN points Mapping for the LAN Structured cabling • Installation of CAT5e /CAT6 structured cabling for new ARGOS big building • Installation of the Rack/TC cabinet • Installation, termination and testing of CAT5 /CAT6 structured cabling • Installation of Metal and white Plastic trunking for cable run • Installation of PC hardware and Data communication networking equipment(Switches) • Installation and integration of hardware • Arrangement and termination of CAT5e/CAT6 on the patch panel • Labelling of the LAN cable network • Job performance and acceptance test and handing over and commissioning • Network total delivery from start to finish • Reporting to the Client’s Installation Coordinator 21st Century Technologies Limited Dec.2000 – May 2006 Position: Telecom Field Transmission Engineer 21st Century Technologies Limited is a leading Private Fixed Network telecommunications company. As the Telecom Engineer, I was in charge of the installation of the telecommunications/IT network cabling infrastructure for voice, data, video and broadband network services. (Fibre Optic cable, copper cable, CAT5/CAT5e/CAT6 structured cabling network and transmission network). Responsibilities:
  • 14. • Implementation and support of Fibre optic cable transmission backbone and transmission and copper networks for 21st Century Telecoms. • Data Centre operations and data centre IT equipment hardware support • Installation of Fibre optic, Coaxial and CAT5 /CAT6 structured cabling for 21st Century Technologies, Banks, Oil companies, Local Authorities, Hospitals, Building complex and Corporate organisations • Installation, termination and testing of CAT5 /CAT6 structured cabling and fibre optic(Multimode/Singlemode) cables • Installation and commissioning of DWDM equipment for existing fibre network expansion • Data communication networking • Fibre optics cable fusion splicing, Mechanical splicing and testing with OTDR, cable meter and ODF to ODF fibre termination on the Rack/cabinet • Responsible for supervising and managing a variety of projects ranging from cabling, systems/equipment installations and telecommunications provisioning • Design and Implementation of outside line plant copper cable network – Primary and secondary network. MDF, Cabinet and Distribution Point (DP) planning for voice and data network • Installation, termination and testing of CAT3 Multipair copper cable • Installation of PDH/SDH STM-1 to STM-16 digital line transmission equipment • Estimating, pricing and bidding for projects • Responsible for delivering first-class customers service, whilst being sales focused and motivated • Responsible for site inspections and ‘ad hoc’ maintenance checks • Managing of projects for total delivery from start to finish • Carrying out quality checks and management of contractors work and issuing job acceptance • Representing my company at conferences as well as meetings with local authorities, suppliers and contractors • Carrying out site maintenance checks • Responsible for delivering first-class customers service, whilst being sales focused and motivated Internet Associates Limited Feb.1999 –Dec. 2000 Position: Senior Systems Engineer Internet Associates limited is an information technology company. The company is involved in connectivity and interconnectivity networking –LAN and WAN structured cabling (Fibre optic cabling/Networking) Responsibilities: • Responsible for project design and implementation and supervision of fibre optic LAN and WAN projects. • High level implementation of Fibre optic and CAT5 and CAT6 structured cabling for corporate companies(100 to 2500+ LAN points) • Responsible for design and development of corporate project proposal. • Structured LAN cabling installation and support. • Responsible for managing LAN network using HP Open view windows and 3COM Transcend Enterprise Manager software • Responsible for the implementation and management of campus FDDI(Dual Ring) fibre optic LAN infrastructure network • Planned and executed required routine inspections and maintenance of sites • Prepared reports and made recommendations on routine inspections carried out • Prepared forecasts and re-forecasts of expenditure against defined budget • Establishing sound processes to ensure the smooth running of installations • Managing the customers expectations
  • 15. Balog Technologies Limited Nov.1997 – Jan.1999 Position: Systems Engineer Responsibilities: • Responsible for the coupling and assembly of PC hardware and installation of software. • PC installation and fault troubleshooting • CAT5 and coaxial cable LAN Structured Cabling • Implementation and support of small LAN network. • Delivering of first-Class customer service. • Involved in product marketing Acme Computers and Instrumentation Limited Jan.1997 – Oct.1997 Position: Systems/Network Engineer Responsibilities • Coupling and assembling of PC hardware. • Organising training courses on computer assembling and operating systems • Deputised for Engineering Director and assumed complete technical responsibility. • Maintenance of corporate private LAN network (Star Network). • Developed and executed pre-planned maintenance schedules. • Prepared and presented reports of routine maintenance to director of engineering. • Repair and servicing of faulty PCs and printers for corporate companies. . REFRENCE: Available on Request