Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Commissioning Checklist for Alcatel G2 BSC Release B7
1. A L EC T L
3BK 17416 3001 QZZZA 02
AAAAllllccccaaaatttteeeellll BBBBSSSSSSSS
G2 BSCG2 BSCG2 BSCG2 BSC
Commissioning Manual CCLCommissioning Manual CCLCommissioning Manual CCLCommissioning Manual CCL
Release B7Release B7Release B7Release B7
2. 2 / 6 3BK 17416 3001 QZZZA 02A L EC T L
Status Released
Change Note UPDATE
Short Title Completion Check List
All rights reserved. Passing on and copying of this
document, use and communication of its contents not
permitted without written authorization from Alcatel.
3. Completion Check List
3BK 17416 3001 QZZZA 02 3 / 6A L EC T L
CCL
G2 BSC
Commissioning Manual
Release B7
Identification
Customer
name
Customer
contract number
Equipment identification
Type:
Factory Serial number:
BSC configuration:
Site:
Address:
Documents applied
Document Ed OK NOK Document Ed OK NOK
3DF 00462 0015 UAZZA 3BK 20458 0001 RJZZA
3DF 00300 0015 UAZZA 3BK 17278 0002 QZZZA
8BL 00704 0016 DRBRA 3BK 17358 0001 PCZZA
8BL 00704 0015 DRBRA 3BK 17257 0001 RJZZA
8BL 00704 0018 DRBRA
Signature and comments of the people involved
Name Signature Name Signature
Start
date
End
date
Time spent
on site
General comments
4. Completion Check List
4 / 6 3BK 17416 3001 QZZZA 02A L EC T L
REPORT Record the results as the work proceeds in table 1
Record fault details in table 2.
yes put a cross if task performed
no put a cross if task not performed
n.a not applicable (for option example)
a.r fault cleared on site for this chapter (enter the fault number from table 2)
a.n.r fault not cleared for this chapter (enter the fault number from table 2)
Table 1 Operating steps in the method document
Chapter Title work performed yes no n.a. a.r a.n.r
2
2.1
2.2
Preliminary checks
Before leaving for the site
Before starting (on arrival at the site)
¨
¨
¨
¨
¨
¨
3 Hardware check ¨ ¨ ¨
4 Checking the power supply and powering
up
¨ ¨ ¨
5 Installing the BSC Terminal and BSS SW
5.1
5.2
5.3
Installing the BSC Terminal software and X.25
communication board
Installing the Craft Terminal
Installing the BSS software
¨
¨
¨
¨
¨
¨
¨
¨
¨
6 Commissioning tests
6.1
6.2
6.3
6.4
6.5
Relocation of system-CPRCs
Loading and activating the BSC software
Checking battery backup of S-CPRC boards
Correcting the BSC date and time
Option: Testing the external alarms
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
7 Option: Hardware test ¨ ¨ ¨
8 Option: Checking BSC - TC link ¨ ¨ ¨
9 Setting and checking the BSC - OMC-R link ¨ ¨ ¨
10 Finishing commissioning ¨ ¨ ¨
5. Completion Check List
3BK 17416 3001 QZZZA 02 5 / 6A L EC T L
Comments
Table 2 Notes - Comments - Faults
Number Description Cleared
1
Method chapter :
Fault report reference : date :
name :
date:
2
Method chapter :
Fault report reference : date :
name :
date::
3
Method chapter :
Fault report reference : date :
name :
date:
4
Method chapter :
Fault report reference : date :
name :
date:
5
Method chapter :
Fault report reference : date :
name :
date:
6. Completion Check List
6 / 6 3BK 17416 3001 QZZZA 02A L EC T L
6
Method chapter :
Fault report reference : date :
name :
date:
7
Method chapter :
Fault report reference : date :
name :
date:
8
Method chapter :
Fault report reference : date :
name :
date:
9
Method chapter :
Fault report reference : date :
name :
date:
10
Method chapter :
Fault report reference : date :
name :
date: