Commissioning Manual CCLCommissioning Manual CCLCommissioning Manual CCLCommissioning Manual CCL
Release B7Release B7Release B7Release B7
2 / 6 3BK 17416 3001 QZZZA 02A L EC T L
Status Released
Change Note UPDATE
Short Title Completion Check List
All rights reserved. Passing on and copying of this
document, use and communication of its contents not
permitted without written authorization from Alcatel.
Completion Check List
3BK 17416 3001 QZZZA 02 3 / 6A L EC T L
CCL
G2 BSC
Commissioning Manual
Release B7

Identification
Customer
name
Customer
contract number
Equipment identification
Type:
Factory Serial number:
BSC configuration:
Site:
Address:
Documents applied
Document Ed OK NOK Document Ed OK NOK
3DF 00462 0015 UAZZA 3BK 20458 0001 RJZZA
3DF 00300 0015 UAZZA 3BK 17278 0002 QZZZA
8BL 00704 0016 DRBRA 3BK 17358 0001 PCZZA
8BL 00704 0015 DRBRA 3BK 17257 0001 RJZZA
8BL 00704 0018 DRBRA
Signature and comments of the people involved
Name Signature Name Signature
Start
date
End
date
Time spent
on site
General comments
Completion Check List
4 / 6 3BK 17416 3001 QZZZA 02A L EC T L
REPORT Record the results as the work proceeds in table 1
Record fault details in table 2.
yes put a cross if task performed
no put a cross if task not performed
n.a not applicable (for option example)
a.r fault cleared on site for this chapter (enter the fault number from table 2)
a.n.r fault not cleared for this chapter (enter the fault number from table 2)
Table 1 Operating steps in the method document
Chapter Title work performed yes no n.a. a.r a.n.r
2
2.1
2.2
Preliminary checks
Before leaving for the site
Before starting (on arrival at the site)
¨
¨
¨
¨
¨
¨
3 Hardware check ¨ ¨ ¨
4 Checking the power supply and powering
up
¨ ¨ ¨
5 Installing the BSC Terminal and BSS SW
5.1
5.2
5.3
Installing the BSC Terminal software and X.25
communication board
Installing the Craft Terminal
Installing the BSS software
¨
¨
¨
¨
¨
¨
¨
¨
¨
6 Commissioning tests
6.1
6.2
6.3
6.4
6.5
Relocation of system-CPRCs
Loading and activating the BSC software
Checking battery backup of S-CPRC boards
Correcting the BSC date and time
Option: Testing the external alarms
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
7 Option: Hardware test ¨ ¨ ¨
8 Option: Checking BSC - TC link ¨ ¨ ¨
9 Setting and checking the BSC - OMC-R link ¨ ¨ ¨
10 Finishing commissioning ¨ ¨ ¨
Completion Check List
3BK 17416 3001 QZZZA 02 5 / 6A L EC T L
Comments
Table 2 Notes - Comments - Faults
Number Description Cleared
1
Method chapter :
Fault report reference : date :
name :
date:
2
Method chapter :
Fault report reference : date :
name :
date::
3
Method chapter :
Fault report reference : date :
name :
date:
4
Method chapter :
Fault report reference : date :
name :
date:
5
Method chapter :
Fault report reference : date :
name :
date:
Completion Check List
6 / 6 3BK 17416 3001 QZZZA 02A L EC T L
6
Method chapter :
Fault report reference : date :
name :
date:
7
Method chapter :
Fault report reference : date :
name :
date:
8
Method chapter :
Fault report reference : date :
name :
date:
9
Method chapter :
Fault report reference : date :
name :
date:
10
Method chapter :
Fault report reference : date :
name :
date:

More Related Content

What's hot

Ciclotron dynamic 12000 h 2ω
Ciclotron   dynamic 12000 h 2ωCiclotron   dynamic 12000 h 2ω
Ciclotron dynamic 12000 h 2ωMuniz Rodrigues
 
Mc cormick cx synchro tier 3 restyling (2009 2011) - rpc3 - 100 tractor servi...
Mc cormick cx synchro tier 3 restyling (2009 2011) - rpc3 - 100 tractor servi...Mc cormick cx synchro tier 3 restyling (2009 2011) - rpc3 - 100 tractor servi...
Mc cormick cx synchro tier 3 restyling (2009 2011) - rpc3 - 100 tractor servi...udfjjsjekkdmm
 
Iglesia barabon a2
Iglesia barabon a2Iglesia barabon a2
Iglesia barabon a2Israel Calle
 
Esquema tv cce mod. hps 2171 fs
Esquema tv cce mod. hps 2171 fsEsquema tv cce mod. hps 2171 fs
Esquema tv cce mod. hps 2171 fsAdriano Luiz
 
Appron feeder common ckt-diagram
Appron feeder common ckt-diagramAppron feeder common ckt-diagram
Appron feeder common ckt-diagramyogagivananda
 
Mc cormick c max rps tier 2 (2004-2012) - rs21 - 75 tractor service repair ma...
Mc cormick c max rps tier 2 (2004-2012) - rs21 - 75 tractor service repair ma...Mc cormick c max rps tier 2 (2004-2012) - rs21 - 75 tractor service repair ma...
Mc cormick c max rps tier 2 (2004-2012) - rs21 - 75 tractor service repair ma...ufjjsjekkdemd
 
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACADDrawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACADGary mccoy
 

What's hot (10)

Ciclotron dynamic 12000 h 2ω
Ciclotron   dynamic 12000 h 2ωCiclotron   dynamic 12000 h 2ω
Ciclotron dynamic 12000 h 2ω
 
Mc cormick cx synchro tier 3 restyling (2009 2011) - rpc3 - 100 tractor servi...
Mc cormick cx synchro tier 3 restyling (2009 2011) - rpc3 - 100 tractor servi...Mc cormick cx synchro tier 3 restyling (2009 2011) - rpc3 - 100 tractor servi...
Mc cormick cx synchro tier 3 restyling (2009 2011) - rpc3 - 100 tractor servi...
 
Iglesia barabon a2
Iglesia barabon a2Iglesia barabon a2
Iglesia barabon a2
 
Esquema tv cce mod. hps 2171 fs
Esquema tv cce mod. hps 2171 fsEsquema tv cce mod. hps 2171 fs
Esquema tv cce mod. hps 2171 fs
 
Appron feeder common ckt-diagram
Appron feeder common ckt-diagramAppron feeder common ckt-diagram
Appron feeder common ckt-diagram
 
Mc cormick c max rps tier 2 (2004-2012) - rs21 - 75 tractor service repair ma...
Mc cormick c max rps tier 2 (2004-2012) - rs21 - 75 tractor service repair ma...Mc cormick c max rps tier 2 (2004-2012) - rs21 - 75 tractor service repair ma...
Mc cormick c max rps tier 2 (2004-2012) - rs21 - 75 tractor service repair ma...
 
10004455533
1000445553310004455533
10004455533
 
El estandar fisico rs232 c
El estandar fisico rs232 cEl estandar fisico rs232 c
El estandar fisico rs232 c
 
10004239951
1000423995110004239951
10004239951
 
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACADDrawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
 

Viewers also liked

US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001Max Gathers
 
Wavelink Presentation(Updated)
Wavelink Presentation(Updated)Wavelink Presentation(Updated)
Wavelink Presentation(Updated)slavun
 
G2 bsc commissioning manual release b7.2
G2 bsc commissioning manual   release b7.2G2 bsc commissioning manual   release b7.2
G2 bsc commissioning manual release b7.2chungminh1108
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringNeonetwireless
 
Field commissioning
Field commissioningField commissioning
Field commissioningAmjad Jamil
 
Bts commissioning
Bts commissioningBts commissioning
Bts commissioningginorosido
 
FLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONFLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONMax Gathers
 
Notes on gsm
Notes on gsmNotes on gsm
Notes on gsmuttam927
 
Review on Green Networking Solutions
Review on Green Networking SolutionsReview on Green Networking Solutions
Review on Green Networking Solutionsiosrjce
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioningAIRTEL
 
Md Reyaz Alam NSN
Md Reyaz Alam NSNMd Reyaz Alam NSN
Md Reyaz Alam NSNreyaz alam
 
Adewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTSAdewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTSAdewale Adeyemi
 
Alcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and CommissioningAlcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and Commissioningengramjadislam78
 
Ericsson Rbs 6201 commisioning (1)
Ericsson Rbs 6201 commisioning (1)Ericsson Rbs 6201 commisioning (1)
Ericsson Rbs 6201 commisioning (1)Behnam Dorudian
 
Flexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsFlexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsAchmad Salsabil
 
Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)ihtisham ulhaq
 

Viewers also liked (20)

Mobiserve
MobiserveMobiserve
Mobiserve
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
 
Wavelink Presentation(Updated)
Wavelink Presentation(Updated)Wavelink Presentation(Updated)
Wavelink Presentation(Updated)
 
G2 bsc commissioning manual release b7.2
G2 bsc commissioning manual   release b7.2G2 bsc commissioning manual   release b7.2
G2 bsc commissioning manual release b7.2
 
msvel
msvelmsvel
msvel
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineering
 
Field commissioning
Field commissioningField commissioning
Field commissioning
 
Certificate5
Certificate5Certificate5
Certificate5
 
Bts commissioning
Bts commissioningBts commissioning
Bts commissioning
 
FLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONFLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATION
 
Notes on gsm
Notes on gsmNotes on gsm
Notes on gsm
 
Review on Green Networking Solutions
Review on Green Networking SolutionsReview on Green Networking Solutions
Review on Green Networking Solutions
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioning
 
Md Reyaz Alam NSN
Md Reyaz Alam NSNMd Reyaz Alam NSN
Md Reyaz Alam NSN
 
Adewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTSAdewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTS
 
Alcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and CommissioningAlcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and Commissioning
 
Ericsson Rbs 6201 commisioning (1)
Ericsson Rbs 6201 commisioning (1)Ericsson Rbs 6201 commisioning (1)
Ericsson Rbs 6201 commisioning (1)
 
Flexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsFlexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirements
 
Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)
 

Similar to Commissioning Checklist for Alcatel G2 BSC Release B7

Quanta bd1 r3b_schematics_da0wj1mb6f0
Quanta bd1 r3b_schematics_da0wj1mb6f0Quanta bd1 r3b_schematics_da0wj1mb6f0
Quanta bd1 r3b_schematics_da0wj1mb6f0DATACORP
 
Z390 Designare REV1.0.pdf
Z390 Designare REV1.0.pdfZ390 Designare REV1.0.pdf
Z390 Designare REV1.0.pdfQuangSngBi
 
pdfcoffee.com_e11is2-rev-c-schematics-pdf-free.pdf
pdfcoffee.com_e11is2-rev-c-schematics-pdf-free.pdfpdfcoffee.com_e11is2-rev-c-schematics-pdf-free.pdf
pdfcoffee.com_e11is2-rev-c-schematics-pdf-free.pdfPabloLobo18
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
Visio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeñoVisio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeñoJesusLopez715693
 
6 switching technology session
6 switching technology session6 switching technology session
6 switching technology session53mahi
 
6 switching technology session
6 switching technology session6 switching technology session
6 switching technology session53mahi
 
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...MarceloJorquera5
 
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdfMANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdfSuparlan7
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfAmitKunduDVC
 
Project management report of stadium
Project management report of stadiumProject management report of stadium
Project management report of stadiumSLIIT, Sri Lanka
 
RTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdfRTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdfJrMerlinCabato2
 
Frdm k64 f-sch
Frdm k64 f-schFrdm k64 f-sch
Frdm k64 f-schFernando
 

Similar to Commissioning Checklist for Alcatel G2 BSC Release B7 (20)

Quanta bd1 r3b_schematics_da0wj1mb6f0
Quanta bd1 r3b_schematics_da0wj1mb6f0Quanta bd1 r3b_schematics_da0wj1mb6f0
Quanta bd1 r3b_schematics_da0wj1mb6f0
 
Z390 Designare REV1.0.pdf
Z390 Designare REV1.0.pdfZ390 Designare REV1.0.pdf
Z390 Designare REV1.0.pdf
 
pdfcoffee.com_e11is2-rev-c-schematics-pdf-free.pdf
pdfcoffee.com_e11is2-rev-c-schematics-pdf-free.pdfpdfcoffee.com_e11is2-rev-c-schematics-pdf-free.pdf
pdfcoffee.com_e11is2-rev-c-schematics-pdf-free.pdf
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
5583.pdf
5583.pdf5583.pdf
5583.pdf
 
Visio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeñoVisio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeño
 
Alto macro series
Alto macro seriesAlto macro series
Alto macro series
 
3 g ssv fc2233
3 g ssv fc22333 g ssv fc2233
3 g ssv fc2233
 
6 switching technology session
6 switching technology session6 switching technology session
6 switching technology session
 
6 switching technology session
6 switching technology session6 switching technology session
6 switching technology session
 
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
 
Gal20 v8datasheet
Gal20 v8datasheetGal20 v8datasheet
Gal20 v8datasheet
 
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdfMANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
 
aaa.pptx
aaa.pptxaaa.pptx
aaa.pptx
 
Project management report of stadium
Project management report of stadiumProject management report of stadium
Project management report of stadium
 
RTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdfRTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdf
 
Frdm k64 f-sch
Frdm k64 f-schFrdm k64 f-sch
Frdm k64 f-sch
 
Schematic amp
Schematic ampSchematic amp
Schematic amp
 
Colunas mt
Colunas mtColunas mt
Colunas mt
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 

Commissioning Checklist for Alcatel G2 BSC Release B7

  • 1. A L EC T L 3BK 17416 3001 QZZZA 02 AAAAllllccccaaaatttteeeellll BBBBSSSSSSSS G2 BSCG2 BSCG2 BSCG2 BSC Commissioning Manual CCLCommissioning Manual CCLCommissioning Manual CCLCommissioning Manual CCL Release B7Release B7Release B7Release B7
  • 2. 2 / 6 3BK 17416 3001 QZZZA 02A L EC T L Status Released Change Note UPDATE Short Title Completion Check List All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel.
  • 3. Completion Check List 3BK 17416 3001 QZZZA 02 3 / 6A L EC T L CCL G2 BSC Commissioning Manual Release B7 Identification Customer name Customer contract number Equipment identification Type: Factory Serial number: BSC configuration: Site: Address: Documents applied Document Ed OK NOK Document Ed OK NOK 3DF 00462 0015 UAZZA 3BK 20458 0001 RJZZA 3DF 00300 0015 UAZZA 3BK 17278 0002 QZZZA 8BL 00704 0016 DRBRA 3BK 17358 0001 PCZZA 8BL 00704 0015 DRBRA 3BK 17257 0001 RJZZA 8BL 00704 0018 DRBRA Signature and comments of the people involved Name Signature Name Signature Start date End date Time spent on site General comments
  • 4. Completion Check List 4 / 6 3BK 17416 3001 QZZZA 02A L EC T L REPORT Record the results as the work proceeds in table 1 Record fault details in table 2. yes put a cross if task performed no put a cross if task not performed n.a not applicable (for option example) a.r fault cleared on site for this chapter (enter the fault number from table 2) a.n.r fault not cleared for this chapter (enter the fault number from table 2) Table 1 Operating steps in the method document Chapter Title work performed yes no n.a. a.r a.n.r 2 2.1 2.2 Preliminary checks Before leaving for the site Before starting (on arrival at the site) ¨ ¨ ¨ ¨ ¨ ¨ 3 Hardware check ¨ ¨ ¨ 4 Checking the power supply and powering up ¨ ¨ ¨ 5 Installing the BSC Terminal and BSS SW 5.1 5.2 5.3 Installing the BSC Terminal software and X.25 communication board Installing the Craft Terminal Installing the BSS software ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ 6 Commissioning tests 6.1 6.2 6.3 6.4 6.5 Relocation of system-CPRCs Loading and activating the BSC software Checking battery backup of S-CPRC boards Correcting the BSC date and time Option: Testing the external alarms ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ 7 Option: Hardware test ¨ ¨ ¨ 8 Option: Checking BSC - TC link ¨ ¨ ¨ 9 Setting and checking the BSC - OMC-R link ¨ ¨ ¨ 10 Finishing commissioning ¨ ¨ ¨
  • 5. Completion Check List 3BK 17416 3001 QZZZA 02 5 / 6A L EC T L Comments Table 2 Notes - Comments - Faults Number Description Cleared 1 Method chapter : Fault report reference : date : name : date: 2 Method chapter : Fault report reference : date : name : date:: 3 Method chapter : Fault report reference : date : name : date: 4 Method chapter : Fault report reference : date : name : date: 5 Method chapter : Fault report reference : date : name : date:
  • 6. Completion Check List 6 / 6 3BK 17416 3001 QZZZA 02A L EC T L 6 Method chapter : Fault report reference : date : name : date: 7 Method chapter : Fault report reference : date : name : date: 8 Method chapter : Fault report reference : date : name : date: 9 Method chapter : Fault report reference : date : name : date: 10 Method chapter : Fault report reference : date : name : date: