1. Gerald Dukes
4607 Mohawk ave
Pas
cagoula MS 39581
228-355-3593
Objective: I am an industrial electrician with twenty years exprerience I am
able to work in a fast pace low tolerance for error enviroment and i do not require
direct supervision to complete my job assingments.I am effective at running any
kind of screw conduit alumnium,staniless,rigid,and rob roy i can also read wire
pull Gerald Dukes
4607 Mohawk ave
Pascagoula MS 39581
228-355-3593
Objective: I am an industrial electrician with twenty years exprerience I am
able to work in a fast pace low tolerance for error enviroment
and i do not require direct supervision to complete my job
assingments.I am effective at running any kind of screw conduit
alumnium,staniless,rigid,and rob roy i can also read wire pull
sheets and system pull sheets for low voltage controls
for plc's.I can also terminate devices such as but not limited to
temp transmitters, proxy switches,vibration transmitters,flow
transmitters etc.I am also effective at cable tray and conduit
support systems
Experience: airways electric 2177 alcy rd memphis tn
electrcian 1994 to 1998
was an apprentice electrician here did service work and
2. troubleshooting work along with new construction on
hospitials,banks,concrete plants,restraunts,large scale
wharehouses,learned the nec and how to read blue prints
during my apprenticeship with this company
steele beard electric 406 vanderhorn dr memphis tn
electrician 1999 to 2004
work at several industrial sites including mapco petroleum
where we installed 4'' rigid conduit for motors,heaters and
controls on holding tanks in the plant also worked at slim fast
production facalities in covington tn on diffrent equipment such
as conveyors doleing machines buss duct.also worked at shelby
tissue paper mill where we did a turn arround wwe shut the
entire plant down cut into the the main sub feeds to the plant
and re feed the sub pannels becuase the conduits and structure
became compermised due to the acidy of the water vapor put
off by the mill or yankee dryer machine.
northrop grumman pascagoula ms
marine electrician 2004 to 2006
worked on the lpd 15 and 17 wired control compartments mcc
gunner stations, galley,jic,jcc control rooms on militiary vessels.
branch electric gulfport ms
electrician 2006 to 2009
commercial work lighting in schools fire alarm general conduit
running back up generators transformers main distrubition
pannels also worked out at NASA emergencey operations
center where i ran all the main feeds for server rooms
kbr pascagoula ms
electrician/instrument helper 2013 to 2014
bending tubing arround valves for steam trace at chevron also
running rigid conduit for their field buss systems throughout the
PBOP project.
gaylor electri mt vernon al
electrician 2009 to 2010
worked out at tyhssen krup steel ran conduit and cable tray for
motor banks and low voltage controls on mov "motor operated
valves"in their zinc pods and acid wash stations also ran 4''rigid
for their overhead cranes throughout the plant terminated allen
bradley plc controlers as pre spec.
h rocker electric orange teaxs
3. electrician 2011 to 2013
wired annadarko oil rig living quarters and heli deck general
alarm systems fire alarm system main power system hvac
systems gia tronics systems and ran a crew of 5 electricians
with one supervisior over me.
Questcom controls and networking,Gloster,MS Drax biomass
project 2013 to 2014.Electrician primary duties included
rumnning rigid conduit for primary and secondary hammer mills
and filter systems for the instruments controling conveyor
systems and mill process operations,duties also included lay out
pulling and terminations of control wires for mill operations also
terminations in allen bradley plc's I layed out all of the wire pulls
from plc's to instruments controlling mill process operations.
Excel conractors Methanex rolocation project.Geismar LA. 2014
to 2015.
Electrician primary duties included terminations on kst-201 and
kst-301 syngass compressors IJB boxes, pulling and glanding
clx cables for hazaradous locations mostly triad and instrument
cable.terminations in kst-201&kst-301 plc interlock
cabinents.Terminations on all process control instruments and
cable and cable tray routing for instruments and compressor
skids and lube oil system.Able to read process control loop
diagrams and P&ID to determine location of insruments such as
TIT,TE,PT,PDIT,AIT,ZE,FT,VT,also terminated and glanded
sensitive platinum thermocouple wires on compressor inboard
and outboard bearings.
Education: southaven high southaven ms
diploma 1994
References: daniel smitherman 1-251-656-1287 kbr electrician
kirby post 1-601-620-6316 isc electrician
sabrina prayther 662-279-5927 kbr instrument fitter
jeff rowland 865-654-6963 zachary instrument fitter
sheets and system pull sheets for low voltage controls
for plc's.I can also terminate devices such as but not limited to
temp transmitters, proxy switches,vibration transmitters,flow
4. transmitters etc.I am also effective at cable tray and conduit
support systems
Experience: airways electric 2177 alcy rd memphis tn
electrcian 1994 to 1998
was an apprentice electrician here did service work and
troubleshooting work along with new construction on
hospitials,banks,concrete plants,restraunts,large scale
wharehouses,learned the nec and how to read blue prints
during my apprenticeship with this company
steele beard electric 406 vanderhorn dr memphis tn
electrician 1999 to 2004
work at several industrial sites including mapco petroleum
where we installed 4'' rigid conduit for motors,heaters and
controls on holding tanks in the plant also worked at slim fast
production facalities in covington tn on diffrent equipment such
as conveyors doleing machines buss duct.also worked at shelby
tissue paper mill where we did a turn arround wwe shut the
entire plant down cut into the the main sub feeds to the plant
and re feed the sub pannels becuase the conduits and structure
became compermised due to the acidy of the water vapor put
off by the mill or yankee dryer machine.
northrop grumman pascagoula ms
marine electrician 2004 to 2006
worked on the lpd 15 and 17 wired control compartments mcc
gunner stations, galley,jic,jcc control rooms on militiary vessels.
branch electric gulfport ms
electrician 2006 to 2009
commercial work lighting in schools fire alarm general conduit
running back up generators transformers main distrubition
pannels also worked out at NASA emergencey operations
center where i ran all the main feeds for server rooms
kbr pascagoula ms
electrician/instrument helper 2013 to 2014
bending tubing arround valves for steam trace at chevron also
running rigid conduit for their field buss systems throughout the
PBOP project.
gaylor electri mt vernon al
5. electrician 2009 to 2010
worked out at tyhssen krup steel ran conduit and cable tray for
motor banks and low voltage controls on mov "motor operated
valves"in their zinc pods and acid wash stations also ran 4''rigid
for their overhead cranes throughout the plant terminated allen
bradley plc controlers as pre spec.
h rocker electric orange teaxs
electrician 2011 to 2013
wired annadarko oil rig living quarters and heli deck general
alarm systems fire alarm system main power system hvac
systems gia tronics systems and ran a crew of 5 electricians
with one supervisior over me.
Questcom controls and networking,Gloster,MS Drax biomass
project 2013 to 2014.Electrician primary duties included
rumnning rigid conduit for primary and secondary hammer mills
and filter systems for the instruments controling conveyor
systems and mill process operations,duties also included lay out
pulling and terminations of control wires for mill operations also
terminations in allen bradley plc's I layed out all of the wire pulls
from plc's to instruments controlling mill process operations.
Excel conractors Methanex rolocation project.Geismar LA. 2014
to 2015.
Electrician primary duties included terminations on kst-201 and
kst-301 syngass compressors IJB boxes, pulling and glanding
clx cables for hazaradous locations mostly triad and instrument
cable.terminations in kst-201&kst-301 plc interlock
cabinents.Terminations on all process control instruments and
cable and cable tray routing for instruments and compressor
skids and lube oil system.Able to read process control loop
diagrams and P&ID to determine location of insruments such as
TIT,TE,PT,PDIT,AIT,ZE,FT,VT,also terminated and glanded
sensitive platinum thermocouple wires on compressor inboard
and outboard bearings.
Education: southaven high southaven ms
diploma 1994
References: daniel smitherman 1-251-656-1287 kbr electrician
6. kirby post 1-601-620-6316 isc electrician
sabrina prayther 662-279-5927 kbr instrument fitter
jeff rowland 865-654-6963 zachary instrument fitter
Gerald Dukes
4607 Mohawk ave
Pascagoula MS 39581
228-355-3593
Objective: I am an industrial electrician with twenty years exprerience I am
able to work in a fast pace low tolerance for error enviroment and i do not require
direct supervision to complete my job assingments.I am effective at running any
kind of screw conduit alumnium,staniless,rigid,and rob roy i can also read wire
pull Gerald Dukes
4607 Mohawk ave
Pascagoula MS 39581
228-355-3593
Objective: I am an industrial electrician with twenty years exprerience I am
able to work in a fast pace low tolerance for error enviroment
and i do not require direct supervision to complete my job
assingments.I am effective at running any kind of screw conduit
alumnium,staniless,rigid,and rob roy i can also read wire pull
sheets and system pull sheets for low voltage controls
for plc's.I can also terminate devices such as but not limited to
temp transmitters, proxy switches,vibration transmitters,flow
transmitters etc.I am also effective at cable tray and conduit
support systems
Experience: airways electric 2177 alcy rd memphis tn
7. electrcian 1994 to 1998
was an apprentice electrician here did service work and
troubleshooting work along with new construction on
hospitials,banks,concrete plants,restraunts,large scale
wharehouses,learned the nec and how to read blue prints
during my apprenticeship with this company
steele beard electric 406 vanderhorn dr memphis tn
electrician 1999 to 2004
work at several industrial sites including mapco petroleum
where we installed 4'' rigid conduit for motors,heaters and
controls on holding tanks in the plant also worked at slim fast
production facalities in covington tn on diffrent equipment such
as conveyors doleing machines buss duct.also worked at shelby
tissue paper mill where we did a turn arround wwe shut the
entire plant down cut into the the main sub feeds to the plant
and re feed the sub pannels becuase the conduits and structure
became compermised due to the acidy of the water vapor put
off by the mill or yankee dryer machine.
northrop grumman pascagoula ms
marine electrician 2004 to 2006
worked on the lpd 15 and 17 wired control compartments mcc
gunner stations, galley,jic,jcc control rooms on militiary vessels.
branch electric gulfport ms
electrician 2006 to 2009
commercial work lighting in schools fire alarm general conduit
running back up generators transformers main distrubition
pannels also worked out at NASA emergencey operations
center where i ran all the main feeds for server rooms
kbr pascagoula ms
electrician/instrument helper 2013 to 2014
bending tubing arround valves for steam trace at chevron also
running rigid conduit for their field buss systems throughout the
PBOP project.
gaylor electri mt vernon al
electrician 2009 to 2010
worked out at tyhssen krup steel ran conduit and cable tray for
motor banks and low voltage controls on mov "motor operated
valves"in their zinc pods and acid wash stations also ran 4''rigid
for their overhead cranes throughout the plant terminated allen
bradley plc controlers as pre spec.
8. h rocker electric orange teaxs
electrician 2011 to 2013
wired annadarko oil rig living quarters and heli deck general
alarm systems fire alarm system main power system hvac
systems gia tronics systems and ran a crew of 5 electricians
with one supervisior over me.
Questcom controls and networking,Gloster,MS Drax biomass
project 2013 to 2014.Electrician primary duties included
rumnning rigid conduit for primary and secondary hammer mills
and filter systems for the instruments controling conveyor
systems and mill process operations,duties also included lay out
pulling and terminations of control wires for mill operations also
terminations in allen bradley plc's I layed out all of the wire pulls
from plc's to instruments controlling mill process operations.
Excel conractors Methanex rolocation project.Geismar LA. 2014
to 2015.
Electrician primary duties included terminations on kst-201 and
kst-301 syngass compressors IJB boxes, pulling and glanding
clx cables for hazaradous locations mostly triad and instrument
cable.terminations in kst-201&kst-301 plc interlock
cabinents.Terminations on all process control instruments and
cable and cable tray routing for instruments and compressor
skids and lube oil system.Able to read process control loop
diagrams and P&ID to determine location of insruments such as
TIT,TE,PT,PDIT,AIT,ZE,FT,VT,also terminated and glanded
sensitive platinum thermocouple wires on compressor inboard
and outboard bearings.
Education: southaven high southaven ms
diploma 1994
References: daniel smitherman 1-251-656-1287 kbr electrician
kirby post 1-601-620-6316 isc electrician
sabrina prayther 662-279-5927 kbr instrument fitter
jeff rowland 865-654-6963 zachary instrument fitter
sheets and system pull sheets for low voltage controls
for plc's.I can also terminate devices such as but not limited to
9. temp transmitters, proxy switches,vibration transmitters,flow
transmitters etc.I am also effective at cable tray and conduit
support systems
Experience: airways electric 2177 alcy rd memphis tn
electrcian 1994 to 1998
was an apprentice electrician here did service work and
troubleshooting work along with new construction on
hospitials,banks,concrete plants,restraunts,large scale
wharehouses,learned the nec and how to read blue prints
during my apprenticeship with this company
steele beard electric 406 vanderhorn dr memphis tn
electrician 1999 to 2004
work at several industrial sites including mapco petroleum
where we installed 4'' rigid conduit for motors,heaters and
controls on holding tanks in the plant also worked at slim fast
production facalities in covington tn on diffrent equipment such
as conveyors doleing machines buss duct.also worked at shelby
tissue paper mill where we did a turn arround wwe shut the
entire plant down cut into the the main sub feeds to the plant
and re feed the sub pannels becuase the conduits and structure
became compermised due to the acidy of the water vapor put
off by the mill or yankee dryer machine.
northrop grumman pascagoula ms
marine electrician 2004 to 2006
worked on the lpd 15 and 17 wired control compartments mcc
gunner stations, galley,jic,jcc control rooms on militiary vessels.
branch electric gulfport ms
electrician 2006 to 2009
commercial work lighting in schools fire alarm general conduit
running back up generators transformers main distrubition
pannels also worked out at NASA emergencey operations
center where i ran all the main feeds for server rooms
kbr pascagoula ms
electrician/instrument helper 2013 to 2014
bending tubing arround valves for steam trace at chevron also
running rigid conduit for their field buss systems throughout the
PBOP project.
10. gaylor electri mt vernon al
electrician 2009 to 2010
worked out at tyhssen krup steel ran conduit and cable tray for
motor banks and low voltage controls on mov "motor operated
valves"in their zinc pods and acid wash stations also ran 4''rigid
for their overhead cranes throughout the plant terminated allen
bradley plc controlers as pre spec.
h rocker electric orange teaxs
electrician 2011 to 2013
wired annadarko oil rig living quarters and heli deck general
alarm systems fire alarm system main power system hvac
systems gia tronics systems and ran a crew of 5 electricians
with one supervisior over me.
Questcom controls and networking,Gloster,MS Drax biomass
project 2013 to 2014.Electrician primary duties included
rumnning rigid conduit for primary and secondary hammer mills
and filter systems for the instruments controling conveyor
systems and mill process operations,duties also included lay out
pulling and terminations of control wires for mill operations also
terminations in allen bradley plc's I layed out all of the wire pulls
from plc's to instruments controlling mill process operations.
Excel conractors Methanex rolocation project.Geismar LA. 2014
to 2015.
Electrician primary duties included terminations on kst-201 and
kst-301 syngass compressors IJB boxes, pulling and glanding
clx cables for hazaradous locations mostly triad and instrument
cable.terminations in kst-201&kst-301 plc interlock
cabinents.Terminations on all process control instruments and
cable and cable tray routing for instruments and compressor
skids and lube oil system.Able to read process control loop
diagrams and P&ID to determine location of insruments such as
TIT,TE,PT,PDIT,AIT,ZE,FT,VT,also terminated and glanded
sensitive platinum thermocouple wires on compressor inboard
and outboard bearings.
Education: southaven high southaven ms
diploma 1994
11. References: daniel smitherman 1-251-656-1287 kbr electrician
kirby post 1-601-620-6316 isc electrician
sabrina prayther 662-279-5927 kbr instrument fitter
jeff rowland 865-654-6963 zachary instrument fitter