The pursuit of operational effectiveness is seductive
because it is concrete and actionable.
Caught up in the race for operational effectiveness, many
managers simply do not understand the need to have a
strategy.
– Dr. Michael E. Porter – Professor of Business
Administration, Harvard Business School
In our balanced scorecard-based approach to planning and performance
management, we always start with strategy.
We are not innovating in the ITD for the sake of innovating.
Rather we are building a core capability that allows us to provide
measureable value to the districts clients and stakeholders defined through
our Value Proposition.
2
Vision
IT Tech Plan
ITD Balanced
Scorecard
Technical
Measures
5 Goals of the Tech Plan and 6 CIO Goals
connected to the Master Plan
Strategic Initiatives defined in a Strategy
Map with cause and effect connections.
Numeric measures for each KPI with
baseline value with variance values.
ü Why We Exist
ü What We Do To
Deliver Value To Our
Stakeholders
ü What We Strive To
Be For Our
Stakeholders
ü What Our
Stakeholders Want
Us To Be
ü Implementation
Framework For
Turning Strategy Into
Execution.
Mission
Vision
GQ(I)M
Master Plan
Mission and Vision of as the starting point
for IT Initiatives and their connections to
the Master Plan
IT Operating Plan
IT operational activities based on BSC for
each operational outcome using ITIL V3.
GQ(I)M
Goal, Question, (Indicator), Measure, to
capture CSFs, KPIs, and connections to
projects through a Strategy Map.
Elements of the Balanced Scorecard
Strategy Map, with four perspectives.
§ Stakeholder perspective – describes the initiatives that directly
impact the stakeholders of the IT Department in pursuit of their
mission and vision.
§ Internal Process Perspective – describes the activities undertaken
by ITD to deliver the stakeholder initiatives.
§ Learning and Growth Perspective – the activities if ITD develop and
maintain the skills, knowledge, and experience needed to implement
the Strategic Initiatives.
§ Budget Perspective – the management initiatives needed to operate
the ITD in a responsible manner while delivering value to the BCSP
Stakeholders.
Score Card
§ Vision – what the future should look like for ITD
§ Narrative – an elevator pitch for this Strategic Initiative telling what
the desired outcome will be in the future (the Vision).
§ Strategic Initiative – a statement of the work to be undertaken to
fulfill the Vision
§ Performance Goals – a stated measureable goal from the work
effort to deliver the Strategic Initiative that fulfills the Vision
§ Critical Success Factors – for each goal, what are the Critical
Success Factors that must be in place for completion of the
Performance Goal
§ Key Performance Indicators – the units of measure and the upper
and lower limits of these measures to satisfy the Critical Success
Factor
4
Cascading The Balanced Scorecard
§ Cascading the scorecard means translating the
“corporate” (ITD – Tier 1) scorecard down to the
“business units” (ITD Departments – Tier 2), and then to
a team of individuals (Department individuals – Tier 3).
§ The current BSC is cascaded to Tier 2.
§ The result is “line of sight” visibility from top to bottom
and back again for each top level strategic initiative.
§ With the strategy map, goals, performance measures
and targets are connected to the top level Mission and
Vision of ITD.
5
Benefits of Cascading the Scorecard
§ Top level Goals - Master Plan and ITD Tech Plan –
remain focused on the Race to the Top initiatives at the
strategy level.
§ Individual department managers can connect these
strategies to their individual technical and operational
performance goals.
§ The department scorecards can then be used to
connect ITD CIO goals with Critical Success Factors
and Key Performance Indicators in the vernacular of
Balanced Scorecard.
6
Connecting the Dots From Tier 1 to Tier 2
7
The scorecard initiative
is expanded in the
performance description
“card”
The “theme,” and the Initiative are flowed down the
Tier 2 scorecard to establish the basis for the
performance of the ITD department.
This answers the question - “what is the
department doing to support the top level ITD
strategy?”
The Tier 2 Goals, CSF’s, and KPI’s answer the
question “what does the department do in support
of the ITD Master Initiatives. This connects the
dots between department level strategic activities,
and the top level ITD strategic activities.
ITD Balanced Scorecard
§ The Strategy Map and performance scorecards show
how ITD directly enables the initiatives of the Master
Plan
§ The Master ITD scorecard is augmented with individual
department scorecards for the 8 ITD department
leaders
8
Office of the CIO
(PMO)
Human Resource
Management
Systems
Business
Support Systems
Call Center
Services
Technical
Support Services
Teacher Support
Services (TSS)
Student
Information
Systems (SIS)
Security and
Data Center
Budget Perspective
B2: Budget
Management
B3: Resource
Management
Internal Processes Perspective
Stakeholder Perspective
S1: Be the
Preferred
Provider
S2: Use ITIL
to Manage
Services
S3: Provide
Needed
Systems and
Applications
S5: Manage
Stakeholder
Relations
S4: Ensure
Recognition
of Value
Service Attributes Relationships
P1: Use ITIL
for Op
Excellence
P2: Manage
Stakeholder
Relations
P3: Develop
Continuous
Improvement
Processes
P4: Assure
Security and
Privacy
Organizational Capabilities and Capacities
Learnings & Growth Perspective
Image
B1: Project
Performance
L1: Culture L2: Leadership L3: Alignment L4: Teamwork
ITD Strategy Map For
L5: Resource Capacity for
Work
L6: Resource Capabilities
for Work
StakeholderITDepartmentOperations
9
CIO ITD Goals IT Tech Plan
IT Department
Balanced Scorecard
Perspective
1:AlignAndExecute
2:Operational
Execution
3:DesignAndDevelop
Systems
4:PMO,PPM,AndITIL
ImproveQuality
5:ProcessDesignTo
SupportG&O’s
6:ITGovernanceAnd
RiskManagement
1:ImproveLearning
2:ProfessionalDev
3:TechnicalEfficiency
4:EquitableAccess
5:Improved
Infrastructure
S1: Preferred Provider
S2: ITIL Service Management
S3: Needed Applications
S4: Ensure Value Recognition
S5: Stakeholder Relations (External)
P1: Operational Excellence
P2: Stakeholder Relations (Internal)
P3: Develop Continuous Improvement Process
P4: Security and Privacy
L1: Culture
L2: Leadership
L3: Alignment
L4: Teamwork
L5: Capacity for Work
L6: Capability for Work
B1: Project Performance
B2: Budget Management
B3: Resource Management
10
Person
Balanced Score Initiative
Stakeholder Internal Learnings & Growth Budget
James
ü Server operations
ü Network
ü Telecom
ü Security
ü Business Continuity
ü CISSP
ü Cisco VOIP
ü Basic Routing and Switching
ü VM
ü Linux
ü Connect systems with budget
Chuck
ü SMS Operations
ü Tier 3 Help Desk
ü SMS operations ü Connect systems with budget
Shashi
ü Oracle Learning Management
(S3)
ü Oracle R12 Upgrade
ü Oracle performance
Management
ü Connect systems with budget
Jessica
ü Provide services for IT Mgmt
and CIO
ü Improve PM Methods ü Project Risk ü Align IT budgets
David
ü O1: P3
ü O2: P3, P1
ü O3: P3
ü O4: P3
ü O5: P1
ü O6: P3
ü O7: P3
ü Connect systems with budget
Bert
ü Provide support for instructional
technology
ü Provide support for
administrative application
ü Provide requirements for
administrative and instructional
applications
ü Understand applications to
deliver training to stakeholders
ü Use budget for PDC facility
ü Field support staff equipped
with tools and expenses
ü Consultant budget for changes
and improvements
Ann
ü Use technology to improve
management and operations
(3)(P1)
ü Ensure access to equitable
access (4)(S2)
ü ITIL training and certification
(L3)
ü (B1), (B2), (B3) Connect budget
with activities FTE and some
capital equipment
Tyrone
ü Empower the stakeholder to be
self sufficient as much as
possible on the student
technical.
ü Processes and procedures
applied to all devices –
computers, peripherals, AV
(projectors, smart) – 47 types
ü Rights based training and
support through the PDC
activities
ü Identify train the trainer
opportunity
ü Connect systems with budget
11
12
Stakeholder Perspective
To reach our objectives, how do we create value for our stakeholders?
ITD stakeholders are the “customers” of the services provided by ITD. These are all the people who have an
interest in the ITD Organization, projects managed by ITD, the activities of ITD, the resources, and deliverables
produced by the resources.
The forms a complex network of impacted clients and stakeholders who exercise influence on ITD’s funding,
direction, and ability to fulfill its mission.
The strategic initiatives in this perspective address how ITD will satisfy the needs of these stakeholders and
clients, while maintaining the operational, security, privacy obligations to Master Plan and other governance
processes 13
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Have a measurable
contribution to all IT
supported initiatives in the
using the 6 CIO Goals and
the ITD Tech-Plan 5 Goals.
Provide proactive two way
communication of
stakeholder needs and
prompt response and
resolution of customer
concerns for all supported
systems and requests for IT
services.
Implement service
improvement plan per ITIL
[4]
Involve and develop ITD
staff to implement service
improvement plans
To be the preferred technology partner in the achievement of the Master Plan and other
mandated initiatives using Information Technology.
These actions are defined in the Information Technology Department (ITD) Technology Plan
(Tech Plan) through 5 Goals and the ITD CIO’s six (6) goals.
Provide IT products and
services traceable to each
Initiative as defined in a
variety of documents, from
the Master Plan to the
Race To The Top (RTTT).
When there is a choice, be
the preferred technology
partner to BCPSs.
When systems are
mandated, assure
customer satisfaction
exceeds expectations to
maintain preference
S1: Be The Preferred
Provider of IT Services
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Select from the 5 ITIL
components, which are
applicable for the current
strategy deployment
Develop operational
performance measures for
each of the ITD
departments at the
execution level guided by
the selected ITIL Service
Management Framework
elements
The ITIL Service Management Framework V3 defines the attributes and measures of the Fit
Purpose (Utility) and Fit for Use (Warranty).
Utility is the increase for the possible “benefit” to the BCPS.
Warranty is the availability and reliability in continuity and security of the services provided by
ITD. There are five (5) components: (1) Service, (2) Design, (3) Transition, (4) Operations, and
(5) Continuous Improvement as applied to the Stakeholder.
ITD will select which of these to implement over what periods of time to support the
improvement processes.
Implement selected
components of ITIL
Service Foundation V3. (1)
Service, (2) Design, (3)
Transition, (4) Operations,
and (5) Continuous
Improvement as applied to
the Stakeholder.
Deploy IT Service
Management best
practices guided by ITIL
Foundations V3.
S2: Use ITIL To Manage
Services
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Identify, implement, and
operate the applications and
systems of ITD to ensure
the Mission and Vision of
the is being met.
For each goal of the ITD
Technical Plan define an
operational plan to maintain
or increase the performance
of each critical application
and system.
Deliberate design of
processes to support BCPS
Understand existing
services and the needs of
the stakeholders
Define technical capabilities
inventory and rank those
against Mstr Plan
Model the capabilities and
capacities of critical systems
Model the infrastructure
needs to meet stakeholder
demand
Customer survey of needs
and satisfaction
assessment
Gap analysis of current
systems against critical
stakeholder needs
Skills, capabilities, and
capacity for work
assessment
Measureable contributed
value to Mstr Plan and IT
Technical Plan
Capacity, and “..ilities”
model for all infrastructure
with monetized value.
Capacity of services in
users, throughput or
volume.
Application and system strategy is about planning deliberate acts that increase shareholder
value. IT is run as an independent business and is therefore regarded as a supplier/outsourcer.
This mindset allows for provisioning services internally or externally, depending upon business
conditions and opportunities.
IT services are viewed as strategic business assets critical to an organization’s survival and
success. A formal business planning process must be designed to complement the strategic
planning process. The planning process includes a market definition step — determining need
and estimating revenue.
Take actions to identify
critical assets and increase
the measurable value of
ITD’s offerings to and
assure ITD is the provider
of choice for these IT
Services by operating and
providing applications that
meet the needs of schools
and administration.
Assure the ITD critical
assets directly contribute
to the success of and its
Mission and Vision in units
of measure meaningful to
the decision makers.
S3: Provide Needed Systems
and Applications
Assess ITD staff’s ability to
deliver value to
stakeholders
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Define and implement the
feedback processes and
their execution that will
connect the offerings of ITD
with the needs of the
stakeholders in units of
measure meaningful to
those stakeholders
Define and implement the
work processes needed to
close any gaps from
feedback from clients and
stakeholders to increase the
delivered value and the
recognition of this value.
Use business process
measures for meaningful
units
Periodic feedback capture
processes based in ITIL
Service measures
The value of the products and services produced by ITD must be recognized as having value.
ITD cannot declare there is value in the absence of consensus with the clients and stakeholders.
This recognized value comes from the measurable benefits to the stakeholders in units
meaningful to them.
Define the service catalog,
the service performance,
and connect this
performance to the
measures of value agreed
to by the stakeholders.
Have ITD stakeholders
acknowledge the value of
the products and services
provided to the consumers
S4: Recognized Value
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
For the external
stakeholders, define the
processes needed to asses
the needs of the
Stakeholder to determine
what should be in the
Service Portfolio and the
Stakeholder Portfolio.
For the Internal
Stakeholders, define the
organizational maturity of
ITD and the processes used
to manage those
stakeholders and their
project and programs using
the OGC P3M3 Framework
[3]
Increase the service
potential of capabilities and
resources
Increase the performance
potential that creates value
for the stakeholders
Identifying stakeholders – using a matrix of stakeholders and their affinity to projects,
processes or domain areas.
Understanding their expectations – by interviewing, surveys (least preferred) and face to face
interactions asking direct questions.
Managing those expectations – in the same way as managing projects or processes, through
defined outcomes.
Monitoring the effectiveness of stakeholder engagement activities – by defining units of
measure for this management.
Continuous review of the stakeholder community – through frequent and periodic meetings
through the Stakeholder Circle® (http://www.stakeholder-management.com/)
Install a relationship
management process and
identify staff needed to
ensure stakeholders are
satisfied with ITD products
and services.
Relations with the
Stakeholders are defined
and measurable to ensure
continued success of ITD
through a Value Network
of tangible and intangible
value producing
exchanges.
S5: Stakeholder Relations
Internal Process Perspective
What processes must we excel at to satisfy our stakeholders and clients?
Processes are structured activities, designed to accomplish a defined objective. Processes result in a goal-
oriented change, utilizing feedback for self-enhancing and self-corrective actions. Processes are:
ü Measureable because they are performance oriented
ü Have specific results
ü Provide these results to stakeholders
ü Respond to a specific event – either continually or iteratively – originating from that event. 19
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Measure alignment with
schools using traceability to
paragraphs and sections in
the Master Plan to the
portfolio of projects
managed in ITD.
Organize ITD around the
management of Projects,
Programs, and Portfolio of
projects with units of
measure meaningful to the
decision makers.
Line of sight traceability of
projects to the Master Plan
Monetized investment
analysis of this work
Develop a portfolio
management process using
P3M3 guidance
Use PPM to select and
prioritize projects in the
portfolio
Select project based on
“real options” decision
making
Operational excellence
metrics met
Monetized performance
metrics met within
variance bands
Performance measures for
the 7 P3M3 perspectives.
To be operationally excellent requires leadership, teamwork and problem solving resulting in
continuous improvement throughout the IT Department by focusing on the needs of the
customer, empowering employees, and optimizing existing activities in the process.
Once aligned with the Master Plan and IT Plan, the execution activities must be performed in the
context of operational excellence.
Operational aspects of ITD will be guided by the ITIL Foundations of IT Service Management
V3. Seven activities from the P3M3 provided during the delivery of this Operational Excellence
are: (1) Management Control; (2) Benefits Management; (3) Budget Management; (4)
Stakeholder Management; (5) Risk Management; (6) Organizational Governance; and (7)
Resource Management.
Focus IT activities on
systems and application
integration to enable
people, processes, and
technology to be traceable
to IT Tech Plan and
Master Plan, guided by
ITIL Foundations V3 and
OGC P3M3 processes.
Develop, align and
execute ITD initiatives with
the IT Technology Plan
and Master Plan
P1: Use ITIL for Operational
Excellence
Provide Operational
Excellence ITIL V3
guidance
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Define and oversee
measures connected to
customer facing
performance of all
initiatives.
Define and oversee
measures connected to all
internal operations in
support of external
initiatives.
Identify stakeholders and
their specific needs
Use Stakeholder
Typography to classify and
engage stakeholders [1]
Identify stakeholders and
their specific needs
Define risk, value, and
relationship
interactions
Stakeholder management is the process of managing the expectations of anyone that has an
interest in a project or will be effected by its deliverables or outputs.
Managing stakeholders means knowing what stakeholders want, defining what products and
services ITD is capable of providing, and confirming that the Stakeholders agree with and
acknowledge that ITD has the capabilities to provide those products and services.
This starts with identifying the Stakeholders and their attributes. Stakeholder management is
embedded in the overall risk management of projects and portfolios of projects managed by ITD.
Starting with the Race To
The Top (RTTT) initiative
and others, provide
measureable operational
excellence for all activities
performance by ITD
around stakeholder
management.
Define and deploy
management process to
provide operational
excellence for the Race to
the Top Initiative to the
external and internal
stakeholders.
P2: Stakeholder Management
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Create a service
improvement plan based on
the seven step improvement
process defined by ITIL.
Create an organization that
includes a CSI Management
and Service Management
role in ITD
Perform CSI audits and take
corrective actions
Processes are the internal affairs of the ITD as a service provider. The first step is the activities
that focus on gaining control of the systems that provide internally focused services. Until this
control is established, external focus will be difficult.
Create a Continual Service
Improvement (CSI)
process to support the
needs of the Stakeholder.
Apply a repeating pattern
of improvement efforts that
allow ITD to better meet
internal and external
stakeholder needs.
P3: Continual Improvement
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Develop of an Information
Security policy and
governance (Controls)
process.
Develop an Information
Security Management
Systems (ISMS) to plan,
implement, evaluate and
maintain the information
management policy and
governance processes
Information security is aligned with IT and business security is managed effectively in all
services and service management operations . This includes:
Information is available and useable when necessary (availability)
Information is available exclusively to authorized persons (confidentially)
The information is complete, accurate, and programs against unauthorized changes (integrity)
Information and information exchanges between other systems re reliable (authenticity)
Develop a security
management framework in
alignment with the ITD
governance process.
Align IT and business
security to ensure effective
management of services.
P4: Security and Privacy
24
Learning & Growth Perspective
How do we align our intangible assets – people, systems, and culture – to improve critical processes?
Learning-and-growth metrics is a framework for quantitatively assessing stakeholder satisfaction, productivity, and
retention in the framework of the balanced scorecard (BSC). These Goals, Critical Success Factors, and Key
Performance Indicators of the learning-and-growth perspective is “the foundation for all strategy” (Kaplan &
Norton, 2001, p. 93). These metrics are not just behavioral and statistical but “developmental.”
25
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Define the End Values to be
delivered through the
culture in terms of quality,
excellence, reliability,
innovation, and budget
management success.
Define the Instrumental
Values to be the desired
behaviors in terms of
standards, respect for
tradition and authority.
Identify team building
opportunities, e.g. Strength
Finder 2.0
Aligning ITD culture with the Balanced Scorecard strategy defines who we get things done
around here. Defining the Cultural Web consists of Stories, Rituals and Routines, Symbols,
Organizational Structure, Control Systems, and Power Structures.
This approach provides a “ways of being” to define the attitudinal aspects of how ITD operates
on a daily, including personal interactions, problem solving approaches, and the situational
analysis needed improve the performance of the organization, using the Katzenbach and Gallup
frameworks for Teams and Employee Engagement Activities. (in the Backup Materials)
Identify the existing
cultural aspects and
behaviors, gaps in these
behaviors, and take
specific action to address
gaps and develop a
measurable response.
Create and maintain a
culture of mutual support,
accountability and shared
outcomes for all ITD
personnel.
L1: Culture
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Select a strategic theme or
project that will enhance the
ITD and take steps toward
to achieving its overall
strategic goal through hands
on leadership of the work
activities.
Define the work processes
of a “project leader” to focus
on the delivery of beneficial
outcomes that meet
stakeholder needs.
Track the few critical
elements of strategy for
three major projects
Focus on short-term view of
leadership to critical areas
that impact stakeholders
Ensure key resources are
deployed to support critical
projects.
The leaders of an organization have the prime responsibility for the quality produced by the
organization, i.e., the success of the mission. The commitment and participation of leaders
have long been recognized as critical factors in successful organizations (Tichy & Devanna,
1990). [2]
Only leaders have the sufficient authority, influence, and access to information to
begin and maintain major organizational change.
Define and deploy a
leadership training,
mentoring, and coaching
process for all members of
the IT Department.
Train, coach, mentor, and
develop leaders in the ITD
department capable of
delivering on the Tech
Plan, Operations Plan and
Master Plan
L2: Leadership
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Align internal support and
service units with the IT
Tech Plan, 6 ITD Goals,
and cross referenced items
in the Master Plan.
Define how leaders become
accountable to the
governance processes,
actions, and performance
through their personal
involvement in planning,
communications, coaching,
vision, actions, and
performance of ITD.
The Balanced Scorecard, when developed as a strategic planning and management system,
helps align an organization behind a shared vision of success, and gets the ITD working on the
right things and focusing on results.
A scorecard is more than a way of keeping score, it is a system, consisting of people, strategy,
processes, and technology. The responsibility for this critical alignment lies with the ITD
leadership.
Define the processes
needed to be aware of why
I am here and what am I
doing to support the
Strategic Initiatives of the
ITD.
Align ITD organization with
the needs of the
stakeholders to assure
delivery of each strategic
initiative on-time, on-
budget, and compliant with
the stakeholder needs
L3: Alignment
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Provide a leadership that
unifies all parts of the ITD’s
staff through a methodology
that turns the eyes of all ITD
members to a single
direction – toward the
stakeholder.
Develop an ongoing team
work engagement process
that provides the
mechanism for Jon
Katzenbach [5] definition of
a team – a group of
individuals who hold each
other mutually accountable
for a shared outcome.
Define the organizational
structure and make that
visible to all ITD members
Define the channels of
communication and ensure
all participants are informed
Deploy Katzenbach’s
principles across ITD
It is often difficult to improve overall organizational performance because the collective goals are
unclear. Employees are often only aware of the aims of their own "team island", and regard
other team islands as having a different job. Individuals are often motivated to "do their bit", but
they lack the overall understanding of where the organization is going or how the various team
islands are supposed to work together for collective good. Whereas a sports team is often
characterized by a focus on goals, results and league tables, businesses are often characterized
by an absence of such a unifying force.
Establish “teams” that are
the first point of contact for
stakeholders. This
includes, call center
support, deep technical
support, and client and
stakeholder requirements
and satisfaction
processes.
Create an organization
that fosters teamwork and
cooperation to improve the
performance of the work of
ITD.
L4: Teamwork
Create a culture of “shared
outcomes,” for all ITD work.
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Create and maintain an up-
to-date resource capacity
plan with defined objectives
reflecting current and future
needs of stakeholders.
Use this plan to forecast
performance of service
requests.
Align resource capacity
management and the
Service Portfolio and
communicate this alignment
to the stakeholders to
confirm their understanding
of what can be
accomplished with the
resource’s capacity.
It is essential to have an analytical understanding of ITD resource’s Capacity for Work. The
capacity must coincide with the current and future needs of the clients and stakeholders of the
BCPS. Any capacity gaps must be understood and communicated to these stakeholders in units
of measure meaningful to the decision making processes.
Provide IT resource
capacity coinciding with
the current and future
needs of stakeholders
against the justifiable costs
of this capacity.
Inform stakeholder of ITD’s
ability to respond to all
non-discretionary demand
for service with predictable
durations and quality of
performance.
L5: Resource Capacity for
Work
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Using the Gallup 12
assessment of business
capabilities survey and
define gaps and closure
strategies for each of the
G12
elements as shown in
the BSC supporting
materials pages.
Discern alignment to the
professional development
initiatives.
Assess capability and
capacity for work using the
G12
profile
Establish a Professional
Development Center for ITD
staff
When there is need for resources to be available to meet strategic objectives, we need to
understand current and future work capability.
The current capability includes an assessment of task focus, self conduct, and interpersonal
perspectives of the performed activities.
The future capability includes an assessment of the needed development levels and
developmental potentials and the risk associated with regressing to lower levels of capability
based on a systems thinking approach to capacity planning.
Identify the capabilities for
the needed services of
Clients and Stakeholders
through an assessment of
these needs in a survey
instrument and direct
“customer contact.”
Provide the needed
technical, operational, and
interpersonal capabilities
to meet the needed
demands of clients and
stakeholders
L6: Resource Capability for
Work
32
Budget Process Perspective
What are our stakeholder and client expectations of our budget management performance?
The budget perspective activities are those necessary to ensure the execution of the ITD strategy in support of the
Mission and Vision.
This activity assigns budget to projects and controls the consumption of that budget in exchange for measurable
value – both tangible and intangible.
33
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Project execution
performance parameters
meaningful to internal
decision making of the ITD
Project business
performance parameters
defined in units meaningful
to the Clients and
Stakeholders for IT
services.
Cost performance
Schedule performance
Project business
performance measures
Customer satisfaction
measures
Technical performance
Project performance management starts with repeatable processes. The “baseline” of a project
includes, cost, schedule, and the measures of physical percent complete. These measures are
defined in units meaningful to the decision makers.
Successful management of projects and the portfolio of projects starts with the Integrated
Master Plan showing what capabilities will be produced for the stakeholders, what significant
accomplishments must be completed, the success criteria for those accomplishments, and the
work efforts (in the form a work package) are needed for complete the Accomplishment Criteria.
These activities are arranged in the Integrated Master Schedule (IMS) and placed on baseline.
The IMS is a resource loaded activity network include schedule and cost margins.
Establish a project
performance management
system using cost,
schedule, and technical
performance measures to
increase the probability of
success for each ITD
project.
Install and operate a
project, program, and
portfolio governance
process to increase the
probability of success of
each project produced by
ITD
B1: Project Performance
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Defines budget
management and submittal,
authorization processes to
maintain the integrity of the
Integrated Master Schedule.
Define and deploy a
Change Management
Process guided by PMBOK
and ITIL processes to
ensure the integrity of the
Integrated Master Schedule.
Financial assets are necessary to support the ownership or use of all assets.
Resources and capabilities form the basis for the value of a service.
Financial management is an integrated element of service management. Budget management
provides vital information needed to ensure effective and efficient service delivery, allowing the
ITD to justify expenditures and allocate funding directly to the services.
Establish budget
management, forecasting,
and performance
management services for
all projects in the ITD
portfolio.
Assure the management of
ITD budget and the assets
are guided by the IT
Governance processes.
B2: Budget Management
Narrative Of The Contents Of This BSC “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
Master ITD Balanced Scorecard
Create a resource pool
management system
starting with the measurable
“capacity for work” that
ensures over commitments
are not made without
explicit approval and the
resulting accountability of
senior management
Provide forecasts of needed
resources using the
Integrated Master Schedule
as the “approved” demand
for work.
Resources and capabilities are types of assets. The management of the ITD resources creates
value in the form of services and IT applications. Management, organization, people, and
knowledge convert these resources into value.
The ITD capacity for work is the starting point for resource management. The capacity for work
of a mix of people, processes, tools, systems, and organizational structures along with intangible
assets of ideas and culture.
The latter – “intangible assets” – is the Critical Success Factor for ITD’s success.
Provide tools, processes,
and leadership needed to
manage resources for all
ITD activities.
Provide tools and
processes needed to
manage ITD resources to
meet the demand of the
Stakeholders
B3: Resource Management
Backup Materials
37
Gallup Q12 elements
G12 Critical Employee Engagement Activities Outcomes for the BSC Leadings and Growth Perspective
I know what is expected of me at work. We have a shared outcome for all work activities
I have the materials and equipment I need to do my work right. In the Master Schedule all needed resources are defined
and available on the planned date
At work, I have the opportunity to do what I do best every day. Work activities are agreed to by the performing element
In the last seven days, I have received recognition or praise for good
work.
Katzenbach’s “teaming” processes are in place and
operational.
My supervisor or the person I report seems to care about me as a
person.
There is someone at work who encourages my development.
In the last six months, someone at work has talked with me about my
progress.
At work, my opinions seem to count.
The mission/purpose of my company makes me feel my job is important. Using the BSC, trace all activities to a strategic initiative
My associates (fellow employees) are committed to doing quality work. Measures of success include measures of effectiveness for
the clients and stakeholders and measures of performance
for the products and services
I have a best friend at work.
The last year, I have had opportunities at work to learn and grow. Provide needed technical, operational, and managerial
mentoring, coaching, and training through senior leaders
38
10 Ways to Build Capability
1. Create a leadership/coaching system that links all business functions.
2. Right Action=Reward the right: people, things, ways, time and reasons.
3. Create the feeling in your organization that people can fail to succeed.
4. Create the necessary infrastructure to connect people with metrics.
5. Become a teaching organization and teach at every level continuously.
6. Enable people with development opportunities to higher levels of function.
7. Understand appreciative coaching and how to build a culture around it.
8. Make it fun to work in your company.
9. Make perfectly clear what should be perfectly clear.
10. Get out of people’s way.
39
References
[1] A Typology of Operational Approaches for Stakeholder Analysis and
Engagement, Dr. Jing (Rebecca) Yang. Deakin University Prof. Ping Qi
(Geoffrey) Shen, Hong Kong Polytechnic University, Dr. Lynda Bourne,
Stakeholder Management Pty Ltd Christabel MF Ho & Dr. Xiaolong Xue.
http://www.stakeholdermapping.com/
[2] Transformational Leader, Tichy and Devanna, 1997
[3] OGC P3M3 (Project, Program, Portfolio Management Maturity Model)
[4] ITIL Foundations V3
[5] Jon Katezenbach, “Unleashing the Power of Teams: From Theory to
Execution, Booz and Company. The Wisdom of Teams: Creating the High-
Performance Organization.
40
41
Chapter 042 Performance-Based Project Management ® is a registered trademark of Niwot Ridge L.L.C.

More Related Content

What's hot

Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management, Assignment Studio
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governanceGlen Alleman
 
Sudhir Dhiman Project Manager
Sudhir Dhiman Project Manager Sudhir Dhiman Project Manager
Sudhir Dhiman Project Manager Sudhir Dhiman
 
Successful Digital Transformation starts with a well defined Strategy
Successful Digital Transformation starts with a well defined StrategySuccessful Digital Transformation starts with a well defined Strategy
Successful Digital Transformation starts with a well defined StrategyGlen Alleman
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavanPMI2011
 
Using KPIs for Tracking Strategy and Driver Based Budgeting
Using KPIs for Tracking Strategy and Driver Based BudgetingUsing KPIs for Tracking Strategy and Driver Based Budgeting
Using KPIs for Tracking Strategy and Driver Based Budgetingjarobertson2
 
*Strategic Facility Planning, IFMA World Workplace
*Strategic Facility Planning, IFMA World Workplace *Strategic Facility Planning, IFMA World Workplace
*Strategic Facility Planning, IFMA World Workplace Bob Sawhill, CFM
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governanceGlen Alleman
 
Day 2 1135 - 1220 - pearl 2 - karthik parvathi
Day 2   1135 - 1220 - pearl 2 - karthik parvathiDay 2   1135 - 1220 - pearl 2 - karthik parvathi
Day 2 1135 - 1220 - pearl 2 - karthik parvathiPMI2011
 
Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...journalBEEI
 
Capabilities based planning (v2)
Capabilities based planning (v2)Capabilities based planning (v2)
Capabilities based planning (v2)Glen Alleman
 
13 Reasons Why Your Organization Needs Project Portfolio Management
13 Reasons Why Your Organization Needs Project Portfolio Management 13 Reasons Why Your Organization Needs Project Portfolio Management
13 Reasons Why Your Organization Needs Project Portfolio Management BrightWork
 
The Project Management Process - Week 11 Contemporary Issues
The Project Management Process - Week 11   Contemporary IssuesThe Project Management Process - Week 11   Contemporary Issues
The Project Management Process - Week 11 Contemporary IssuesCraig Brown
 
Project management
Project managementProject management
Project managementErankajKumar
 
MA Sample Available Consultants
MA Sample Available ConsultantsMA Sample Available Consultants
MA Sample Available ConsultantsMicroAgility
 
The Project Management Process - Week 2
The Project Management Process - Week 2The Project Management Process - Week 2
The Project Management Process - Week 2Craig Brown
 
MA Sample of Available Consultants
MA Sample of Available ConsultantsMA Sample of Available Consultants
MA Sample of Available ConsultantsMicroAgility
 
Getting it Done: Project Management Theory
Getting it Done: Project Management TheoryGetting it Done: Project Management Theory
Getting it Done: Project Management TheoryConverge Consulting
 
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
Day 1   1620 - 1705 - pearl 1 - deep kamal singhDay 1   1620 - 1705 - pearl 1 - deep kamal singh
Day 1 1620 - 1705 - pearl 1 - deep kamal singhPMI2011
 

What's hot (20)

Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management,
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governance
 
Sudhir Dhiman Project Manager
Sudhir Dhiman Project Manager Sudhir Dhiman Project Manager
Sudhir Dhiman Project Manager
 
Successful Digital Transformation starts with a well defined Strategy
Successful Digital Transformation starts with a well defined StrategySuccessful Digital Transformation starts with a well defined Strategy
Successful Digital Transformation starts with a well defined Strategy
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavan
 
Using KPIs for Tracking Strategy and Driver Based Budgeting
Using KPIs for Tracking Strategy and Driver Based BudgetingUsing KPIs for Tracking Strategy and Driver Based Budgeting
Using KPIs for Tracking Strategy and Driver Based Budgeting
 
*Strategic Facility Planning, IFMA World Workplace
*Strategic Facility Planning, IFMA World Workplace *Strategic Facility Planning, IFMA World Workplace
*Strategic Facility Planning, IFMA World Workplace
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governance
 
Day 2 1135 - 1220 - pearl 2 - karthik parvathi
Day 2   1135 - 1220 - pearl 2 - karthik parvathiDay 2   1135 - 1220 - pearl 2 - karthik parvathi
Day 2 1135 - 1220 - pearl 2 - karthik parvathi
 
Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...
 
Capabilities based planning (v2)
Capabilities based planning (v2)Capabilities based planning (v2)
Capabilities based planning (v2)
 
13 Reasons Why Your Organization Needs Project Portfolio Management
13 Reasons Why Your Organization Needs Project Portfolio Management 13 Reasons Why Your Organization Needs Project Portfolio Management
13 Reasons Why Your Organization Needs Project Portfolio Management
 
The Project Management Process - Week 11 Contemporary Issues
The Project Management Process - Week 11   Contemporary IssuesThe Project Management Process - Week 11   Contemporary Issues
The Project Management Process - Week 11 Contemporary Issues
 
Project management
Project managementProject management
Project management
 
MA Sample Available Consultants
MA Sample Available ConsultantsMA Sample Available Consultants
MA Sample Available Consultants
 
The Project Management Process - Week 2
The Project Management Process - Week 2The Project Management Process - Week 2
The Project Management Process - Week 2
 
MA Sample of Available Consultants
MA Sample of Available ConsultantsMA Sample of Available Consultants
MA Sample of Available Consultants
 
Getting it Done: Project Management Theory
Getting it Done: Project Management TheoryGetting it Done: Project Management Theory
Getting it Done: Project Management Theory
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
Day 1   1620 - 1705 - pearl 1 - deep kamal singhDay 1   1620 - 1705 - pearl 1 - deep kamal singh
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
 

Similar to Master it balanced scorecard (final)

Master IT Balanced Scorecard
Master IT Balanced ScorecardMaster IT Balanced Scorecard
Master IT Balanced ScorecardGlen Alleman
 
IT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance MetricIT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance MetricPECB
 
BI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilBI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilThomas Danford
 
Organizational Performance framework-
Organizational Performance framework-Organizational Performance framework-
Organizational Performance framework-Dr. Johan Louw
 
jbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
jbptunikompp-gdl-sintyasuka-19565-8-pert8.pptjbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
jbptunikompp-gdl-sintyasuka-19565-8-pert8.pptLunaAnindyaHerlinaPu
 
Crafting a winning ICT Strategy .pptx
Crafting a winning ICT Strategy .pptxCrafting a winning ICT Strategy .pptx
Crafting a winning ICT Strategy .pptxPeterOwenje1
 
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...OnePlan Solutions
 
Gaining and Maintaining IT & Business Alignment.pptx
Gaining and Maintaining IT & Business Alignment.pptxGaining and Maintaining IT & Business Alignment.pptx
Gaining and Maintaining IT & Business Alignment.pptxRobert Sheesley, CBA, CPHIMS
 
Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714strategicforty2
 
Building a Strategy Focused IT Organization using Balanced Scorecard
Building a Strategy Focused IT Organization using Balanced ScorecardBuilding a Strategy Focused IT Organization using Balanced Scorecard
Building a Strategy Focused IT Organization using Balanced ScorecardGlen Alleman
 
E-Service Planning and Enterprise Architecture
E-Service Planning and Enterprise ArchitectureE-Service Planning and Enterprise Architecture
E-Service Planning and Enterprise ArchitectureJohn Macasio
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...UMT
 
Understanding IT Governance and Risk Management
Understanding IT Governance and Risk ManagementUnderstanding IT Governance and Risk Management
Understanding IT Governance and Risk Managementjiricejka
 
SNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralSNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralJeff Kubacki
 
IT Capabilty Assessment 150713
IT Capabilty Assessment 150713IT Capabilty Assessment 150713
IT Capabilty Assessment 150713Peter Maddigan
 
Resume Eileen Jankord - Jan 2016 - BPA
Resume Eileen Jankord - Jan 2016 - BPA Resume Eileen Jankord - Jan 2016 - BPA
Resume Eileen Jankord - Jan 2016 - BPA Eileen Jankord
 
Aligning Business and Technology for Competitive Advantage
Aligning Business and Technology for Competitive AdvantageAligning Business and Technology for Competitive Advantage
Aligning Business and Technology for Competitive AdvantageDijitle
 
Define an IT Strategy and Roadmap
Define an IT Strategy and RoadmapDefine an IT Strategy and Roadmap
Define an IT Strategy and RoadmapAndrew Byers
 
IT Portfolio Management Whitepaper FINAL
IT Portfolio Management Whitepaper FINALIT Portfolio Management Whitepaper FINAL
IT Portfolio Management Whitepaper FINALSteven Palmer
 

Similar to Master it balanced scorecard (final) (20)

Master IT Balanced Scorecard
Master IT Balanced ScorecardMaster IT Balanced Scorecard
Master IT Balanced Scorecard
 
IT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance MetricIT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance Metric
 
BI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilBI Presentation Nashville CIO Council
BI Presentation Nashville CIO Council
 
Organizational Performance framework-
Organizational Performance framework-Organizational Performance framework-
Organizational Performance framework-
 
jbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
jbptunikompp-gdl-sintyasuka-19565-8-pert8.pptjbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
jbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
 
Crafting a winning ICT Strategy .pptx
Crafting a winning ICT Strategy .pptxCrafting a winning ICT Strategy .pptx
Crafting a winning ICT Strategy .pptx
 
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
 
Gaining and Maintaining IT & Business Alignment.pptx
Gaining and Maintaining IT & Business Alignment.pptxGaining and Maintaining IT & Business Alignment.pptx
Gaining and Maintaining IT & Business Alignment.pptx
 
Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714
 
Building a Strategy Focused IT Organization using Balanced Scorecard
Building a Strategy Focused IT Organization using Balanced ScorecardBuilding a Strategy Focused IT Organization using Balanced Scorecard
Building a Strategy Focused IT Organization using Balanced Scorecard
 
E-Service Planning and Enterprise Architecture
E-Service Planning and Enterprise ArchitectureE-Service Planning and Enterprise Architecture
E-Service Planning and Enterprise Architecture
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
 
Understanding IT Governance and Risk Management
Understanding IT Governance and Risk ManagementUnderstanding IT Governance and Risk Management
Understanding IT Governance and Risk Management
 
SNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralSNW Spring 10 Presentation General
SNW Spring 10 Presentation General
 
IT Capabilty Assessment 150713
IT Capabilty Assessment 150713IT Capabilty Assessment 150713
IT Capabilty Assessment 150713
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
Resume Eileen Jankord - Jan 2016 - BPA
Resume Eileen Jankord - Jan 2016 - BPA Resume Eileen Jankord - Jan 2016 - BPA
Resume Eileen Jankord - Jan 2016 - BPA
 
Aligning Business and Technology for Competitive Advantage
Aligning Business and Technology for Competitive AdvantageAligning Business and Technology for Competitive Advantage
Aligning Business and Technology for Competitive Advantage
 
Define an IT Strategy and Roadmap
Define an IT Strategy and RoadmapDefine an IT Strategy and Roadmap
Define an IT Strategy and Roadmap
 
IT Portfolio Management Whitepaper FINAL
IT Portfolio Management Whitepaper FINALIT Portfolio Management Whitepaper FINAL
IT Portfolio Management Whitepaper FINAL
 

More from Glen Alleman

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planningGlen Alleman
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSGlen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project SuccessGlen Alleman
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMGlen Alleman
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk managementGlen Alleman
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk ManagementGlen Alleman
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Glen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringGlen Alleman
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideGlen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineGlen Alleman
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Glen Alleman
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by StepGlen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)Glen Alleman
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possibleGlen Alleman
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic AbundanceGlen Alleman
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planningGlen Alleman
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for AgileGlen Alleman
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement BaselineGlen Alleman
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaGlen Alleman
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure RolloutGlen Alleman
 

More from Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 

Recently uploaded

08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 

Recently uploaded (20)

08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 

Master it balanced scorecard (final)

  • 2. The pursuit of operational effectiveness is seductive because it is concrete and actionable. Caught up in the race for operational effectiveness, many managers simply do not understand the need to have a strategy. – Dr. Michael E. Porter – Professor of Business Administration, Harvard Business School In our balanced scorecard-based approach to planning and performance management, we always start with strategy. We are not innovating in the ITD for the sake of innovating. Rather we are building a core capability that allows us to provide measureable value to the districts clients and stakeholders defined through our Value Proposition. 2
  • 3. Vision IT Tech Plan ITD Balanced Scorecard Technical Measures 5 Goals of the Tech Plan and 6 CIO Goals connected to the Master Plan Strategic Initiatives defined in a Strategy Map with cause and effect connections. Numeric measures for each KPI with baseline value with variance values. ü Why We Exist ü What We Do To Deliver Value To Our Stakeholders ü What We Strive To Be For Our Stakeholders ü What Our Stakeholders Want Us To Be ü Implementation Framework For Turning Strategy Into Execution. Mission Vision GQ(I)M Master Plan Mission and Vision of as the starting point for IT Initiatives and their connections to the Master Plan IT Operating Plan IT operational activities based on BSC for each operational outcome using ITIL V3. GQ(I)M Goal, Question, (Indicator), Measure, to capture CSFs, KPIs, and connections to projects through a Strategy Map.
  • 4. Elements of the Balanced Scorecard Strategy Map, with four perspectives. § Stakeholder perspective – describes the initiatives that directly impact the stakeholders of the IT Department in pursuit of their mission and vision. § Internal Process Perspective – describes the activities undertaken by ITD to deliver the stakeholder initiatives. § Learning and Growth Perspective – the activities if ITD develop and maintain the skills, knowledge, and experience needed to implement the Strategic Initiatives. § Budget Perspective – the management initiatives needed to operate the ITD in a responsible manner while delivering value to the BCSP Stakeholders. Score Card § Vision – what the future should look like for ITD § Narrative – an elevator pitch for this Strategic Initiative telling what the desired outcome will be in the future (the Vision). § Strategic Initiative – a statement of the work to be undertaken to fulfill the Vision § Performance Goals – a stated measureable goal from the work effort to deliver the Strategic Initiative that fulfills the Vision § Critical Success Factors – for each goal, what are the Critical Success Factors that must be in place for completion of the Performance Goal § Key Performance Indicators – the units of measure and the upper and lower limits of these measures to satisfy the Critical Success Factor 4
  • 5. Cascading The Balanced Scorecard § Cascading the scorecard means translating the “corporate” (ITD – Tier 1) scorecard down to the “business units” (ITD Departments – Tier 2), and then to a team of individuals (Department individuals – Tier 3). § The current BSC is cascaded to Tier 2. § The result is “line of sight” visibility from top to bottom and back again for each top level strategic initiative. § With the strategy map, goals, performance measures and targets are connected to the top level Mission and Vision of ITD. 5
  • 6. Benefits of Cascading the Scorecard § Top level Goals - Master Plan and ITD Tech Plan – remain focused on the Race to the Top initiatives at the strategy level. § Individual department managers can connect these strategies to their individual technical and operational performance goals. § The department scorecards can then be used to connect ITD CIO goals with Critical Success Factors and Key Performance Indicators in the vernacular of Balanced Scorecard. 6
  • 7. Connecting the Dots From Tier 1 to Tier 2 7 The scorecard initiative is expanded in the performance description “card” The “theme,” and the Initiative are flowed down the Tier 2 scorecard to establish the basis for the performance of the ITD department. This answers the question - “what is the department doing to support the top level ITD strategy?” The Tier 2 Goals, CSF’s, and KPI’s answer the question “what does the department do in support of the ITD Master Initiatives. This connects the dots between department level strategic activities, and the top level ITD strategic activities.
  • 8. ITD Balanced Scorecard § The Strategy Map and performance scorecards show how ITD directly enables the initiatives of the Master Plan § The Master ITD scorecard is augmented with individual department scorecards for the 8 ITD department leaders 8 Office of the CIO (PMO) Human Resource Management Systems Business Support Systems Call Center Services Technical Support Services Teacher Support Services (TSS) Student Information Systems (SIS) Security and Data Center
  • 9. Budget Perspective B2: Budget Management B3: Resource Management Internal Processes Perspective Stakeholder Perspective S1: Be the Preferred Provider S2: Use ITIL to Manage Services S3: Provide Needed Systems and Applications S5: Manage Stakeholder Relations S4: Ensure Recognition of Value Service Attributes Relationships P1: Use ITIL for Op Excellence P2: Manage Stakeholder Relations P3: Develop Continuous Improvement Processes P4: Assure Security and Privacy Organizational Capabilities and Capacities Learnings & Growth Perspective Image B1: Project Performance L1: Culture L2: Leadership L3: Alignment L4: Teamwork ITD Strategy Map For L5: Resource Capacity for Work L6: Resource Capabilities for Work StakeholderITDepartmentOperations 9
  • 10. CIO ITD Goals IT Tech Plan IT Department Balanced Scorecard Perspective 1:AlignAndExecute 2:Operational Execution 3:DesignAndDevelop Systems 4:PMO,PPM,AndITIL ImproveQuality 5:ProcessDesignTo SupportG&O’s 6:ITGovernanceAnd RiskManagement 1:ImproveLearning 2:ProfessionalDev 3:TechnicalEfficiency 4:EquitableAccess 5:Improved Infrastructure S1: Preferred Provider S2: ITIL Service Management S3: Needed Applications S4: Ensure Value Recognition S5: Stakeholder Relations (External) P1: Operational Excellence P2: Stakeholder Relations (Internal) P3: Develop Continuous Improvement Process P4: Security and Privacy L1: Culture L2: Leadership L3: Alignment L4: Teamwork L5: Capacity for Work L6: Capability for Work B1: Project Performance B2: Budget Management B3: Resource Management 10
  • 11. Person Balanced Score Initiative Stakeholder Internal Learnings & Growth Budget James ü Server operations ü Network ü Telecom ü Security ü Business Continuity ü CISSP ü Cisco VOIP ü Basic Routing and Switching ü VM ü Linux ü Connect systems with budget Chuck ü SMS Operations ü Tier 3 Help Desk ü SMS operations ü Connect systems with budget Shashi ü Oracle Learning Management (S3) ü Oracle R12 Upgrade ü Oracle performance Management ü Connect systems with budget Jessica ü Provide services for IT Mgmt and CIO ü Improve PM Methods ü Project Risk ü Align IT budgets David ü O1: P3 ü O2: P3, P1 ü O3: P3 ü O4: P3 ü O5: P1 ü O6: P3 ü O7: P3 ü Connect systems with budget Bert ü Provide support for instructional technology ü Provide support for administrative application ü Provide requirements for administrative and instructional applications ü Understand applications to deliver training to stakeholders ü Use budget for PDC facility ü Field support staff equipped with tools and expenses ü Consultant budget for changes and improvements Ann ü Use technology to improve management and operations (3)(P1) ü Ensure access to equitable access (4)(S2) ü ITIL training and certification (L3) ü (B1), (B2), (B3) Connect budget with activities FTE and some capital equipment Tyrone ü Empower the stakeholder to be self sufficient as much as possible on the student technical. ü Processes and procedures applied to all devices – computers, peripherals, AV (projectors, smart) – 47 types ü Rights based training and support through the PDC activities ü Identify train the trainer opportunity ü Connect systems with budget 11
  • 12. 12
  • 13. Stakeholder Perspective To reach our objectives, how do we create value for our stakeholders? ITD stakeholders are the “customers” of the services provided by ITD. These are all the people who have an interest in the ITD Organization, projects managed by ITD, the activities of ITD, the resources, and deliverables produced by the resources. The forms a complex network of impacted clients and stakeholders who exercise influence on ITD’s funding, direction, and ability to fulfill its mission. The strategic initiatives in this perspective address how ITD will satisfy the needs of these stakeholders and clients, while maintaining the operational, security, privacy obligations to Master Plan and other governance processes 13
  • 14. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Have a measurable contribution to all IT supported initiatives in the using the 6 CIO Goals and the ITD Tech-Plan 5 Goals. Provide proactive two way communication of stakeholder needs and prompt response and resolution of customer concerns for all supported systems and requests for IT services. Implement service improvement plan per ITIL [4] Involve and develop ITD staff to implement service improvement plans To be the preferred technology partner in the achievement of the Master Plan and other mandated initiatives using Information Technology. These actions are defined in the Information Technology Department (ITD) Technology Plan (Tech Plan) through 5 Goals and the ITD CIO’s six (6) goals. Provide IT products and services traceable to each Initiative as defined in a variety of documents, from the Master Plan to the Race To The Top (RTTT). When there is a choice, be the preferred technology partner to BCPSs. When systems are mandated, assure customer satisfaction exceeds expectations to maintain preference S1: Be The Preferred Provider of IT Services
  • 15. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Select from the 5 ITIL components, which are applicable for the current strategy deployment Develop operational performance measures for each of the ITD departments at the execution level guided by the selected ITIL Service Management Framework elements The ITIL Service Management Framework V3 defines the attributes and measures of the Fit Purpose (Utility) and Fit for Use (Warranty). Utility is the increase for the possible “benefit” to the BCPS. Warranty is the availability and reliability in continuity and security of the services provided by ITD. There are five (5) components: (1) Service, (2) Design, (3) Transition, (4) Operations, and (5) Continuous Improvement as applied to the Stakeholder. ITD will select which of these to implement over what periods of time to support the improvement processes. Implement selected components of ITIL Service Foundation V3. (1) Service, (2) Design, (3) Transition, (4) Operations, and (5) Continuous Improvement as applied to the Stakeholder. Deploy IT Service Management best practices guided by ITIL Foundations V3. S2: Use ITIL To Manage Services
  • 16. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Identify, implement, and operate the applications and systems of ITD to ensure the Mission and Vision of the is being met. For each goal of the ITD Technical Plan define an operational plan to maintain or increase the performance of each critical application and system. Deliberate design of processes to support BCPS Understand existing services and the needs of the stakeholders Define technical capabilities inventory and rank those against Mstr Plan Model the capabilities and capacities of critical systems Model the infrastructure needs to meet stakeholder demand Customer survey of needs and satisfaction assessment Gap analysis of current systems against critical stakeholder needs Skills, capabilities, and capacity for work assessment Measureable contributed value to Mstr Plan and IT Technical Plan Capacity, and “..ilities” model for all infrastructure with monetized value. Capacity of services in users, throughput or volume. Application and system strategy is about planning deliberate acts that increase shareholder value. IT is run as an independent business and is therefore regarded as a supplier/outsourcer. This mindset allows for provisioning services internally or externally, depending upon business conditions and opportunities. IT services are viewed as strategic business assets critical to an organization’s survival and success. A formal business planning process must be designed to complement the strategic planning process. The planning process includes a market definition step — determining need and estimating revenue. Take actions to identify critical assets and increase the measurable value of ITD’s offerings to and assure ITD is the provider of choice for these IT Services by operating and providing applications that meet the needs of schools and administration. Assure the ITD critical assets directly contribute to the success of and its Mission and Vision in units of measure meaningful to the decision makers. S3: Provide Needed Systems and Applications Assess ITD staff’s ability to deliver value to stakeholders
  • 17. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Define and implement the feedback processes and their execution that will connect the offerings of ITD with the needs of the stakeholders in units of measure meaningful to those stakeholders Define and implement the work processes needed to close any gaps from feedback from clients and stakeholders to increase the delivered value and the recognition of this value. Use business process measures for meaningful units Periodic feedback capture processes based in ITIL Service measures The value of the products and services produced by ITD must be recognized as having value. ITD cannot declare there is value in the absence of consensus with the clients and stakeholders. This recognized value comes from the measurable benefits to the stakeholders in units meaningful to them. Define the service catalog, the service performance, and connect this performance to the measures of value agreed to by the stakeholders. Have ITD stakeholders acknowledge the value of the products and services provided to the consumers S4: Recognized Value
  • 18. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard For the external stakeholders, define the processes needed to asses the needs of the Stakeholder to determine what should be in the Service Portfolio and the Stakeholder Portfolio. For the Internal Stakeholders, define the organizational maturity of ITD and the processes used to manage those stakeholders and their project and programs using the OGC P3M3 Framework [3] Increase the service potential of capabilities and resources Increase the performance potential that creates value for the stakeholders Identifying stakeholders – using a matrix of stakeholders and their affinity to projects, processes or domain areas. Understanding their expectations – by interviewing, surveys (least preferred) and face to face interactions asking direct questions. Managing those expectations – in the same way as managing projects or processes, through defined outcomes. Monitoring the effectiveness of stakeholder engagement activities – by defining units of measure for this management. Continuous review of the stakeholder community – through frequent and periodic meetings through the Stakeholder Circle® (http://www.stakeholder-management.com/) Install a relationship management process and identify staff needed to ensure stakeholders are satisfied with ITD products and services. Relations with the Stakeholders are defined and measurable to ensure continued success of ITD through a Value Network of tangible and intangible value producing exchanges. S5: Stakeholder Relations
  • 19. Internal Process Perspective What processes must we excel at to satisfy our stakeholders and clients? Processes are structured activities, designed to accomplish a defined objective. Processes result in a goal- oriented change, utilizing feedback for self-enhancing and self-corrective actions. Processes are: ü Measureable because they are performance oriented ü Have specific results ü Provide these results to stakeholders ü Respond to a specific event – either continually or iteratively – originating from that event. 19
  • 20. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Measure alignment with schools using traceability to paragraphs and sections in the Master Plan to the portfolio of projects managed in ITD. Organize ITD around the management of Projects, Programs, and Portfolio of projects with units of measure meaningful to the decision makers. Line of sight traceability of projects to the Master Plan Monetized investment analysis of this work Develop a portfolio management process using P3M3 guidance Use PPM to select and prioritize projects in the portfolio Select project based on “real options” decision making Operational excellence metrics met Monetized performance metrics met within variance bands Performance measures for the 7 P3M3 perspectives. To be operationally excellent requires leadership, teamwork and problem solving resulting in continuous improvement throughout the IT Department by focusing on the needs of the customer, empowering employees, and optimizing existing activities in the process. Once aligned with the Master Plan and IT Plan, the execution activities must be performed in the context of operational excellence. Operational aspects of ITD will be guided by the ITIL Foundations of IT Service Management V3. Seven activities from the P3M3 provided during the delivery of this Operational Excellence are: (1) Management Control; (2) Benefits Management; (3) Budget Management; (4) Stakeholder Management; (5) Risk Management; (6) Organizational Governance; and (7) Resource Management. Focus IT activities on systems and application integration to enable people, processes, and technology to be traceable to IT Tech Plan and Master Plan, guided by ITIL Foundations V3 and OGC P3M3 processes. Develop, align and execute ITD initiatives with the IT Technology Plan and Master Plan P1: Use ITIL for Operational Excellence Provide Operational Excellence ITIL V3 guidance
  • 21. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Define and oversee measures connected to customer facing performance of all initiatives. Define and oversee measures connected to all internal operations in support of external initiatives. Identify stakeholders and their specific needs Use Stakeholder Typography to classify and engage stakeholders [1] Identify stakeholders and their specific needs Define risk, value, and relationship interactions Stakeholder management is the process of managing the expectations of anyone that has an interest in a project or will be effected by its deliverables or outputs. Managing stakeholders means knowing what stakeholders want, defining what products and services ITD is capable of providing, and confirming that the Stakeholders agree with and acknowledge that ITD has the capabilities to provide those products and services. This starts with identifying the Stakeholders and their attributes. Stakeholder management is embedded in the overall risk management of projects and portfolios of projects managed by ITD. Starting with the Race To The Top (RTTT) initiative and others, provide measureable operational excellence for all activities performance by ITD around stakeholder management. Define and deploy management process to provide operational excellence for the Race to the Top Initiative to the external and internal stakeholders. P2: Stakeholder Management
  • 22. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Create a service improvement plan based on the seven step improvement process defined by ITIL. Create an organization that includes a CSI Management and Service Management role in ITD Perform CSI audits and take corrective actions Processes are the internal affairs of the ITD as a service provider. The first step is the activities that focus on gaining control of the systems that provide internally focused services. Until this control is established, external focus will be difficult. Create a Continual Service Improvement (CSI) process to support the needs of the Stakeholder. Apply a repeating pattern of improvement efforts that allow ITD to better meet internal and external stakeholder needs. P3: Continual Improvement
  • 23. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Develop of an Information Security policy and governance (Controls) process. Develop an Information Security Management Systems (ISMS) to plan, implement, evaluate and maintain the information management policy and governance processes Information security is aligned with IT and business security is managed effectively in all services and service management operations . This includes: Information is available and useable when necessary (availability) Information is available exclusively to authorized persons (confidentially) The information is complete, accurate, and programs against unauthorized changes (integrity) Information and information exchanges between other systems re reliable (authenticity) Develop a security management framework in alignment with the ITD governance process. Align IT and business security to ensure effective management of services. P4: Security and Privacy
  • 24. 24
  • 25. Learning & Growth Perspective How do we align our intangible assets – people, systems, and culture – to improve critical processes? Learning-and-growth metrics is a framework for quantitatively assessing stakeholder satisfaction, productivity, and retention in the framework of the balanced scorecard (BSC). These Goals, Critical Success Factors, and Key Performance Indicators of the learning-and-growth perspective is “the foundation for all strategy” (Kaplan & Norton, 2001, p. 93). These metrics are not just behavioral and statistical but “developmental.” 25
  • 26. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Define the End Values to be delivered through the culture in terms of quality, excellence, reliability, innovation, and budget management success. Define the Instrumental Values to be the desired behaviors in terms of standards, respect for tradition and authority. Identify team building opportunities, e.g. Strength Finder 2.0 Aligning ITD culture with the Balanced Scorecard strategy defines who we get things done around here. Defining the Cultural Web consists of Stories, Rituals and Routines, Symbols, Organizational Structure, Control Systems, and Power Structures. This approach provides a “ways of being” to define the attitudinal aspects of how ITD operates on a daily, including personal interactions, problem solving approaches, and the situational analysis needed improve the performance of the organization, using the Katzenbach and Gallup frameworks for Teams and Employee Engagement Activities. (in the Backup Materials) Identify the existing cultural aspects and behaviors, gaps in these behaviors, and take specific action to address gaps and develop a measurable response. Create and maintain a culture of mutual support, accountability and shared outcomes for all ITD personnel. L1: Culture
  • 27. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Select a strategic theme or project that will enhance the ITD and take steps toward to achieving its overall strategic goal through hands on leadership of the work activities. Define the work processes of a “project leader” to focus on the delivery of beneficial outcomes that meet stakeholder needs. Track the few critical elements of strategy for three major projects Focus on short-term view of leadership to critical areas that impact stakeholders Ensure key resources are deployed to support critical projects. The leaders of an organization have the prime responsibility for the quality produced by the organization, i.e., the success of the mission. The commitment and participation of leaders have long been recognized as critical factors in successful organizations (Tichy & Devanna, 1990). [2] Only leaders have the sufficient authority, influence, and access to information to begin and maintain major organizational change. Define and deploy a leadership training, mentoring, and coaching process for all members of the IT Department. Train, coach, mentor, and develop leaders in the ITD department capable of delivering on the Tech Plan, Operations Plan and Master Plan L2: Leadership
  • 28. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Align internal support and service units with the IT Tech Plan, 6 ITD Goals, and cross referenced items in the Master Plan. Define how leaders become accountable to the governance processes, actions, and performance through their personal involvement in planning, communications, coaching, vision, actions, and performance of ITD. The Balanced Scorecard, when developed as a strategic planning and management system, helps align an organization behind a shared vision of success, and gets the ITD working on the right things and focusing on results. A scorecard is more than a way of keeping score, it is a system, consisting of people, strategy, processes, and technology. The responsibility for this critical alignment lies with the ITD leadership. Define the processes needed to be aware of why I am here and what am I doing to support the Strategic Initiatives of the ITD. Align ITD organization with the needs of the stakeholders to assure delivery of each strategic initiative on-time, on- budget, and compliant with the stakeholder needs L3: Alignment
  • 29. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Provide a leadership that unifies all parts of the ITD’s staff through a methodology that turns the eyes of all ITD members to a single direction – toward the stakeholder. Develop an ongoing team work engagement process that provides the mechanism for Jon Katzenbach [5] definition of a team – a group of individuals who hold each other mutually accountable for a shared outcome. Define the organizational structure and make that visible to all ITD members Define the channels of communication and ensure all participants are informed Deploy Katzenbach’s principles across ITD It is often difficult to improve overall organizational performance because the collective goals are unclear. Employees are often only aware of the aims of their own "team island", and regard other team islands as having a different job. Individuals are often motivated to "do their bit", but they lack the overall understanding of where the organization is going or how the various team islands are supposed to work together for collective good. Whereas a sports team is often characterized by a focus on goals, results and league tables, businesses are often characterized by an absence of such a unifying force. Establish “teams” that are the first point of contact for stakeholders. This includes, call center support, deep technical support, and client and stakeholder requirements and satisfaction processes. Create an organization that fosters teamwork and cooperation to improve the performance of the work of ITD. L4: Teamwork Create a culture of “shared outcomes,” for all ITD work.
  • 30. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Create and maintain an up- to-date resource capacity plan with defined objectives reflecting current and future needs of stakeholders. Use this plan to forecast performance of service requests. Align resource capacity management and the Service Portfolio and communicate this alignment to the stakeholders to confirm their understanding of what can be accomplished with the resource’s capacity. It is essential to have an analytical understanding of ITD resource’s Capacity for Work. The capacity must coincide with the current and future needs of the clients and stakeholders of the BCPS. Any capacity gaps must be understood and communicated to these stakeholders in units of measure meaningful to the decision making processes. Provide IT resource capacity coinciding with the current and future needs of stakeholders against the justifiable costs of this capacity. Inform stakeholder of ITD’s ability to respond to all non-discretionary demand for service with predictable durations and quality of performance. L5: Resource Capacity for Work
  • 31. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Using the Gallup 12 assessment of business capabilities survey and define gaps and closure strategies for each of the G12 elements as shown in the BSC supporting materials pages. Discern alignment to the professional development initiatives. Assess capability and capacity for work using the G12 profile Establish a Professional Development Center for ITD staff When there is need for resources to be available to meet strategic objectives, we need to understand current and future work capability. The current capability includes an assessment of task focus, self conduct, and interpersonal perspectives of the performed activities. The future capability includes an assessment of the needed development levels and developmental potentials and the risk associated with regressing to lower levels of capability based on a systems thinking approach to capacity planning. Identify the capabilities for the needed services of Clients and Stakeholders through an assessment of these needs in a survey instrument and direct “customer contact.” Provide the needed technical, operational, and interpersonal capabilities to meet the needed demands of clients and stakeholders L6: Resource Capability for Work
  • 32. 32
  • 33. Budget Process Perspective What are our stakeholder and client expectations of our budget management performance? The budget perspective activities are those necessary to ensure the execution of the ITD strategy in support of the Mission and Vision. This activity assigns budget to projects and controls the consumption of that budget in exchange for measurable value – both tangible and intangible. 33
  • 34. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Project execution performance parameters meaningful to internal decision making of the ITD Project business performance parameters defined in units meaningful to the Clients and Stakeholders for IT services. Cost performance Schedule performance Project business performance measures Customer satisfaction measures Technical performance Project performance management starts with repeatable processes. The “baseline” of a project includes, cost, schedule, and the measures of physical percent complete. These measures are defined in units meaningful to the decision makers. Successful management of projects and the portfolio of projects starts with the Integrated Master Plan showing what capabilities will be produced for the stakeholders, what significant accomplishments must be completed, the success criteria for those accomplishments, and the work efforts (in the form a work package) are needed for complete the Accomplishment Criteria. These activities are arranged in the Integrated Master Schedule (IMS) and placed on baseline. The IMS is a resource loaded activity network include schedule and cost margins. Establish a project performance management system using cost, schedule, and technical performance measures to increase the probability of success for each ITD project. Install and operate a project, program, and portfolio governance process to increase the probability of success of each project produced by ITD B1: Project Performance
  • 35. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Defines budget management and submittal, authorization processes to maintain the integrity of the Integrated Master Schedule. Define and deploy a Change Management Process guided by PMBOK and ITIL processes to ensure the integrity of the Integrated Master Schedule. Financial assets are necessary to support the ownership or use of all assets. Resources and capabilities form the basis for the value of a service. Financial management is an integrated element of service management. Budget management provides vital information needed to ensure effective and efficient service delivery, allowing the ITD to justify expenditures and allocate funding directly to the services. Establish budget management, forecasting, and performance management services for all projects in the ITD portfolio. Assure the management of ITD budget and the assets are guided by the IT Governance processes. B2: Budget Management
  • 36. Narrative Of The Contents Of This BSC “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme Master ITD Balanced Scorecard Create a resource pool management system starting with the measurable “capacity for work” that ensures over commitments are not made without explicit approval and the resulting accountability of senior management Provide forecasts of needed resources using the Integrated Master Schedule as the “approved” demand for work. Resources and capabilities are types of assets. The management of the ITD resources creates value in the form of services and IT applications. Management, organization, people, and knowledge convert these resources into value. The ITD capacity for work is the starting point for resource management. The capacity for work of a mix of people, processes, tools, systems, and organizational structures along with intangible assets of ideas and culture. The latter – “intangible assets” – is the Critical Success Factor for ITD’s success. Provide tools, processes, and leadership needed to manage resources for all ITD activities. Provide tools and processes needed to manage ITD resources to meet the demand of the Stakeholders B3: Resource Management
  • 38. Gallup Q12 elements G12 Critical Employee Engagement Activities Outcomes for the BSC Leadings and Growth Perspective I know what is expected of me at work. We have a shared outcome for all work activities I have the materials and equipment I need to do my work right. In the Master Schedule all needed resources are defined and available on the planned date At work, I have the opportunity to do what I do best every day. Work activities are agreed to by the performing element In the last seven days, I have received recognition or praise for good work. Katzenbach’s “teaming” processes are in place and operational. My supervisor or the person I report seems to care about me as a person. There is someone at work who encourages my development. In the last six months, someone at work has talked with me about my progress. At work, my opinions seem to count. The mission/purpose of my company makes me feel my job is important. Using the BSC, trace all activities to a strategic initiative My associates (fellow employees) are committed to doing quality work. Measures of success include measures of effectiveness for the clients and stakeholders and measures of performance for the products and services I have a best friend at work. The last year, I have had opportunities at work to learn and grow. Provide needed technical, operational, and managerial mentoring, coaching, and training through senior leaders 38
  • 39. 10 Ways to Build Capability 1. Create a leadership/coaching system that links all business functions. 2. Right Action=Reward the right: people, things, ways, time and reasons. 3. Create the feeling in your organization that people can fail to succeed. 4. Create the necessary infrastructure to connect people with metrics. 5. Become a teaching organization and teach at every level continuously. 6. Enable people with development opportunities to higher levels of function. 7. Understand appreciative coaching and how to build a culture around it. 8. Make it fun to work in your company. 9. Make perfectly clear what should be perfectly clear. 10. Get out of people’s way. 39
  • 40. References [1] A Typology of Operational Approaches for Stakeholder Analysis and Engagement, Dr. Jing (Rebecca) Yang. Deakin University Prof. Ping Qi (Geoffrey) Shen, Hong Kong Polytechnic University, Dr. Lynda Bourne, Stakeholder Management Pty Ltd Christabel MF Ho & Dr. Xiaolong Xue. http://www.stakeholdermapping.com/ [2] Transformational Leader, Tichy and Devanna, 1997 [3] OGC P3M3 (Project, Program, Portfolio Management Maturity Model) [4] ITIL Foundations V3 [5] Jon Katezenbach, “Unleashing the Power of Teams: From Theory to Execution, Booz and Company. The Wisdom of Teams: Creating the High- Performance Organization. 40
  • 41. 41
  • 42. Chapter 042 Performance-Based Project Management ® is a registered trademark of Niwot Ridge L.L.C.