RDU Terminal 2 construction window cleaning
1. Initial construction window cleaning of the new
terminal at
RDU
Yes it is true, The Glass Cleaners were
the team picked to do the construction
window cleaning for terminal 2
2. News Facts
October 27, 2008
Raleigh-Durham International Airport’s Terminal 2 Opens
RDU Airport, NC — Raleigh-Durham International Airport's Terminal 2 officially opened for business yesterday
when the first flight departed just before 6 a.m. The new terminal features a modern design that guides
passengers easily from the curb to the gate. Passenger amenities include a variety of specialty retail shops
and restaurants, including local favorites, and a new processing area for international travelers.
The following airlines are operating from Terminal 2: Air Canada, American, American Eagle and United. Delta
Airlines will move into Terminal 2 on November 9.
“Terminal 2 is a facility that reflects the dynamic region RDU serves and supports our passengers' travel
needs,” said Teresa Damiano, Raleigh-Durham Airport Authority's director of marketing. “Architecture and art
combine to introduce visitors to the Research Triangle Region of North Carolina. Customer amenities include
40 electronic kiosks, a large security checkpoint and shops and restaurants that cater to leisure and business
travelers.”
RDU's Terminal 2 has been in the making for more than 15 years. In the 1990s, central North Carolina
experienced tremendous growth. With new jobs and new residents came an increased demand for air travel.
Terminal 2 is designed to support the travel needs of the Research Triangle Region and also positions the
airport for future growth. When completed in Winter 2011, Terminal 2 will accommodate 11.4 million
passengers per year.
8. Phase 1 finished and the glass is clean
• Terminal 2 Facts
Major Elements
• Two concourses featuring 32 gates
• Large security checkpoint with 10 lanes
• Three island-style airline check-in counters to ease congestion in the lobby
Two Phase Project
• Phase One opened: October 26, 2008
• Phase Two opens: Winter 2011
Fast Facts
• Total Cost: $570 million
• At 920,000 square feet, Terminal 2 will be nearly three times larger than Terminal C.
• Terminal 2 will accommodate up to 11.4 million passengers a year.
Now Open
• Square footage: 550,000
• Airlines: American, American Eagle, Delta, United, Air Canada
• Concourse C (North Concourse)
• Gates: 19
• Restaurants and shops: 26
• Two ticketing islands
• Seven security checkpoint lanes available for operation by the TSA
• Federal Inspection Services facility for arriving international travelers
• Three baggage claim carousels
Phase Two
• Square footage: 370,000
• Airlines: Continental, Northwest, US Airways
• Concourse D (South concourse)
• Shops and Restaurants: 14
• One ticketing island
• Three security checkpoint lanes available for operation by the TSA
• Two baggage claim carousels