SlideShare a Scribd company logo
1 of 5
Download to read offline
Stabilize Energy Production Sites




NEOWEB™
Stabilize Energy Production Sites




Stabilizing an unstable world!
Prs Neoweb™
Stabilize Energy Production
STABILIZE YOUR SITE                                    FAST INSTALLATION AND LONG-LASTING
The construction of infrastructure, roads and          SOLUTIONS
pipelines in the oil, gas and energy fields often      Pipelines face enormous environmental, climatic,
face extreme geotechnical and environmental            geological, operational and safety challenges to
conditions in remote locations. PRS offers unique      ensure that gas and oil flows efficiently and safely.
solutions for pipeline protection and stabilization,   Neoweb 3D cellular confinement technology
service roads, storage facilities and terminals.       offers solutions for each challenge.

Based on the PRS Neoweb™ soil reinforcement            The Neoweb long-term confinement and
technologies, these proven solutions stabilize,        reinforcement of soil substrata maintain the
protect and reinforce soil of all types, including     integrity of pipelines, service roads and base
                                                                                                               Why PRS?
peat bogs, sandy deserts, water channels and           stabilization (for pumping stations, terminals and      ENGINEERING BENEFITS
frozen tundra. Neoweb high performance reduces         depots) even in the most challenging soil, slope        •	 Highest	load	bearing	capability	in	poor	
fill	requirements	up	to	50%	while	fast	installation	   and logistic conditions.                                   soil & subgrades
cuts project schedules by half. The result is a                                                                •	 Reduce	infill	quantity	&	costs	by	50%
sustainable solution that saves time and costs.        The superior geotechnical performance of
                                                                                                               •	 Utilize	local	marginal	infill
                                                       Neoweb not only reduces the amount of infill;
                                                                                                               •	 Easy	&	fast	installation
PRS’ success stems from its dedication to quality      required, but poorly graded, inferior native
                                                                                                               •	 Reduced	maintenance
and unique total customer support philosophy.          soils can be used for infill as well. The reduced
                                                                                                               •	 Longest	term	design	strength
Our	experts	work	hand-in	hand	with	customers	          aggregate requirements are crucial to energy
and project engineers throughout all stage of the      development in remote locations – projects are          ADVANCED RESEARCH
project, from planning and design, through on-         faster and their costs lower.                           •	 Strongest	material	composition	and	strength	
time delivery, to on-site training and installation.                                                              available
                                                       Advanced polymers provide the longest term
                                                                                                               •	 Long	term	investments	in	R&D	materials	
                                                       design strength and dimensional stability that
                                                                                                                  and engineering
                                                       makes piplines and roads with Neoweb more
                                                                                                               •	 Cooperation and testing with leading institutions
                                                       durable than any other geosynthetic solution. The
                                                                                                               •	 Exceeds	industry	standards
                                                       net result is reduced maintenance, a cost-effective
                                                       solution and fast return on investment even over        TOTAL CUSTOMER SATISFACTION
                                                       thousands of kilometers of roads and pipeline.          •	 Guaranteed	end-to-	end	consulting	
                                                                                                                  and support
                                                                                                               •	 Assistance	for	planning,	design	installation	

                                                                                                               MANUFACTURING
                                                                                                               •	 Largest	in	world
                                                                                                               •	 Guaranteed	supply
                                                                                                               •	 ISO-9001	Certified	Quality	Control
Load	Support	For	Roads,	Rails	and	Platforms	
                                                                                                             LOAD SUPPORT FOR ACCESS ROADS                             LOAD SUPPORT FOR PLATFORMS
                                                                                                             Neoweb provides the highest load bearing                  Neoweb technology is ideal for ground
                                                                                                             capacity of any geosynthetic for service and              stabilization of platforms subject to heavy loads
                                                                                                             access roads as well as rails used for extraction         in weak or saturated soils, such as terminals,
                                                                                                             and	transport.	It	strengthens	service	roads	despite	      pumping stations and depots. The unique 3D soil
                                                                                                             difficult soil conditions, topography and water           reinforcement creates a stiff cellular mattress that


Multiple	Layers	of	Pipeline	Protection	
                                                                                                             crossings enabling work crews to get wherever             increases load distribution of the subgrade, base
                                                                                                             they	need	to.	In	projects	for	the	Gazprom	energy	         and surface. The Neoweb is non-degradable and
                                                                                                             company in frozen arctic tundra for example,              impervious to petroleum and chemicals.
                                                                                                             Neoweb performance has consistently exceeded
STABILIZE THE SUPPLY LINES                             ENVIRONMENTAL PROTECTION                              customer requirements and expectations.
Multiple threats to pipeline integrity are mitigated   In	regions	with	frozen	tundra,	the	Neoweb	helps	to	
by Neoweb solutions. Neoweb’s exceptional soil         insulate the permafrost soil layer from mechanical    FAST SUPPORT FOR DURABLE ROADS
confinement capabilities stabilize the pipeline,       damage and heat. Neoweb can be covered with           Neoweb provides fast and durable construction of             Advantages of Using
                                                                                                             access, service and haul roads in poor load bearing
anchoring it to the ground. This prevents buckling,    local native soil, which lessens the visual impact
                                                                                                             soils, difficult terrain and harsh environments. The
                                                                                                                                                                          PRS Solution
differential settlement or movement caused             of the pipeline in above ground installations in
by unstable soil conditions, geological tremors        particular and integrates it with the landscape.      Neoweb 3D soil confinement technology improves               SAVE TIME
or	flash	floods.	Independent	seismic	testing	          The Neoweb covering also provides easy passage        stress-bearing capacity, reduces deformation,
                                                                                                                                                                          •	 Simple	and	fast	installation
of Neoweb demonstrated that its flexibility            for wildlife.                                         and significantly extends the lifetime of unpaved
                                                                                                             surfaces, with lower quantity and quality infill.
                                                                                                                                                                          •	 Use	poor	quality,	local	infill
dampens vibrations and ground movement, while
maintaining its structural strength and integrity.     PROTECTION FROM HUMAN RISKS                           Neoweb is easy to transport to and install in remote
                                                       Neoweb above ground implementations also                                                                           DURABLE SLOPE PROTECTION
                                                                                                             drill sites, unaffected by weather or site conditions.
PROTECTION FROM FLOODS AND ICE                         protect the pipeline from accidental or malicious                                                                  •	 Long	term	design	strength
Enhanced stability and drainage properties             human	activities.	In	addition	to	physical	            The resulting stable road surface improves vehicle           •	 Deploys	on	steep	slopes
prevent the erosive impact of storm water runoff.      protection, Neoweb enables construction vehicles      traction, ride comfort and fuel economy. Neoweb
Neoweb reinforced mounds, berms and pipe               to pass over the pipelines. The thick physical        reinforced access roads resist cuts, impacts and             ECOLOGICAL VALUE
passages provide structurally sound pipeline           Neoweb covering also enhances pipeline security       degradation and reduce tire damage. The result is            •	 Increase	drainage
crossings over rivers, streams and flood channels,     by: preventing accidents from hunters or military     more efficient, safe and economic operations.                •	 Allow	interlocking	plant	root	growth
and protection from ice floes in arctic regions.       maneuvers; discouraging wonton vandalism; or                                                                       •	 Enhance	landscape	restoration
                                                                                                             MORE REINFORCEMENT AT LESS COST
Neoweb with gravel or concrete infill provides the     making intentional sabotage by hostile elements
                                                                                                             Neoweb geotechnical capabilities:
same level of flood protection as other traditional    much more difficult. Neoweb protects your                                                                          HIGH LOAD BEARING
                                                                                                             •	 Reduce	logistics	and	installation	(by	50%)
but more expensive solutions. Neoweb also              pipeline and your investments.                                                                                     •	 Year-round	access
                                                                                                             •	 Reduce	infill	quantity	(35-60%)
shields pipelines from damage caused by rock                                                                                                                              •	 Stands	up	to	heaviest	construction	vehicles
                                                                                                             •	 Use	poor	quality	local	infill
falls, avalanches and ice packs.
                                                                                                             •	 Less	haul	and	construction	equipment                      COST EFFECTIVE
IMPERVIOUS PROTECTION                                                                                        •	 Increase	road/rail	life	span	(x6)                         •	 Saves	material,	time,	maintenance
The advanced polymer Neoweb alloy is                                                                         •	 Reduce	long-term	maintenance                              •	 Reduced	haulage,	fuel	costs,	work	crews
non-degrading and impervious to extreme                                                                      •	 Save	construction	time	and	operational	costs	
                                                                                                                                                                          •	 Save	wear	and	tear	on	tires	and	vehicles
temperatures,	UV	radiation,	chemicals	and	
                                                                                                             LOAD SUPPORT FOR RAIL LINES
moisture. Neoweb systems prevent pipeline                                                                                                                                 SUSTAINABLE
                                                                                                             The unique Neoweb 3D confinement provides
exposure from the corrosive effects to the metal                                                                                                                          •	 Environmental	and	engineering	sustainability
                                                                                                             outstanding load distribution and bearing,
piping	of	Hydrogen	Induced	Cracking	(HDC),	as	
                                                                                                             particularly critical for rail lines. Aggregate              •	 Reduces	local	carbon	footprint
well as from extreme weather, including large
                                                                                                             confinement significantly extends the life span of rail
temperature swings (freezing-thawing) or severe                                                                                                                           HIGHEST PERFORMANCE
                                                                                                             ballast and track stability by more than three, thereby
heat or cold.
                                                                                                             reducing expensive maintenance. The result is                •	 Strongest	dimensional	stability
                                                                                                             smoother, safer and economic access and transport            •	 Longest	long	term	design	life
                                                                                                             of heavy loads regardless of problematic terrain.
Srto	–	Torzhok	Pipeline	–	Gazprom	
                                 	
GAS	FROM	SIBERIA	TO	EUROPE                               CUSTOMER	SATISFACTION
Petroleum	exploration	by	Gazprom,	Russia’s	largest	      Neoweb has maintained its dimensional stability
energy company spans the continents. PRS, the            through	5	years	of	Siberian	winter	freeze-thaw	
Gazprom	preferred	supplier	of	soil	reinforcement	        cycles and will continue to do so in the future.
solutions, has supplied them with millions of            Gazprom	engineers	were	pleasantly	surprised	
square	meters	of	Neoweb.	Its	recent	project	             by the Neoweb durability and sustainability;
involved access roads and pipeline protection along      their finance department valued the fast return
the	2000+	km	SRTO-Torzhok	gas	line.                      on investment and savings; and the field crews
                                                         appreciate	travelling	at	80	instead	of	20	km/h!
HARSH	AND	CHALLENGING
Pipeline construction and maintenance in Siberia
is possible only during the summer when the
top soil layer (sand, silt and peat bogs) is not
frozen.	However,	melting	snows	in	spring	fill	
                                                         Sustainable Solution
the tundra with marshes, lakes and overflowing           Neoweb is a green solution that makes energy
rivers. Conventional “roadways” were made from           exploration and production more sustainable. By
continuous 14 cm thick, reinforced 6x2 m concrete        reducing the amount and type of infill needed to
plates. Subject to severe heaving and buckling           reinforce soil, the usage of haul and earthmoving
from yearly thaws, a “road” that was passable for        equipment is reduced. This in turn decreases fuel
more than one season was considered successful.          use, pollution and the carbon footprint, and at the
In	addition,	large	ice	flows	carried	by	spring	floods	   same time minimizes on-site disruption from dust,
threatened the pipelines and required protection.        erosion and runoff.

FROM	SEASONAL	TO	SUSTAINABLE	DURABILITY                  The perforated Neoweb also facilitates landscape
Gazprom	turned	to	PRS	for	the	solution.	Easily	          restoration, as the 3D cells provide excellent soil
transported and quickly deployed in remote               protection, water drainage and growth stratum
terrain in 3 months, Neoweb sections were infilled       for plants, which further enhances carbon
with	local	sandy	soil.	Imported	aggregate	was	           sequestration. The long-term design life of Neoweb
unnecessary.	Impervious	to	freezing,	thawing	            technology means that maintenance and the
and moisture, Neoweb also provides excellent             associated environmental costs are significantly
drainage. The 3D soil-cell interlock significantly       reduced, as are long-term economic costs.
increased the strength of the unpaved road
structure.

The result was smooth and stable road surfaces
that maintain their integrity in frozen and
saturated conditions. Roads are contiguous, easier
to	travel	and	reduce	tire	and	vehicle	damage.	In	
addition, Neoweb was used to reinforce earth
berms that support the pipeline in areas subject
to breakaway ice floes. These protect the pipeline
and help channel the floodwaters. Neoweb also
                                                                                                               Additional Containment, Protection & Retention Applications
minimizes environmental damage to the tundra                                                                   Landfills	and	Waste	Ponds	–	integrated	with	geomembranes	Neoweb	creates	impermeable,	durable	
and protects the permafrost layer.                                                                             impoundment berms for industry waste containment and treatment, and filled with concrete is an
                                                                                                               environmentally safe and non-corrosive solution for chemicals, slurry and sludge.
                                                                                                               Slopes and Embankments – Easy, quick and effective soil containment enables the stabilization of
                                                                                                               slopes and prevention of erosion. Perforated Neoweb provides excellent drainage, soil lock-up and
                                                                                                               landscape rehabilitation potential.
                                                                                                               Retaining	Walls	-	For	gradients	up	to	80%	and	to	prevent	erosion	in	water	channel	diversions,	
                                                                                                               retaining walls erected from the Neoweb system maintain structural stability, even in wet,
                                                                                                               compressible or unstable subgrades.
About PRS
PRS is the world’s leading supplier of cost-effective soil stabilization solutions. Combining unique, proprietary technology
with specialized engineering expertise, PRS delivers proven solutions for load support, slope and channel protection,
earth retention, reservoir and landfill applications. With a global network of fully owned subsidiaries and independent
                                                                                                                                                                                                     EN-CB-1006




local distributors, PRS provides a full range of end-to-end support services. Since its establishment in 1996, PRS has
implemented thousands of successful projects in over 40 countries worldwide.
                                                                    1488CPD0099




                                                                                                                                               Stabilizing an unstable world!
                                                                                                 Environmentally Aware
                                                                                                   PRS Soil Retention                               www.prs-med.com
Copyright © PRS 2008. All Rights Reserved. Reproduction or distribution other than for intended purposes is prohibited, without the prior written consent of PRS. PRS reserves the right to revise this
document and to make changes in the content from time to time without notice. PRS may make improvements and/or changes to the product(s) and/or programs described in this document at any time.

More Related Content

What's hot

Rio Cobre Riverbank Assessment in White Marl,St. Catherine, Jamaica W.I.
Rio Cobre Riverbank Assessment in White Marl,St. Catherine, Jamaica W.I.Rio Cobre Riverbank Assessment in White Marl,St. Catherine, Jamaica W.I.
Rio Cobre Riverbank Assessment in White Marl,St. Catherine, Jamaica W.I.Osbert Grey PE
 
Aqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams LiteratureAqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams LiteratureDarren Miller
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CVKen Edgar
 
QuayQuip PEM Fender catalogue (English, US Units, Letter)
QuayQuip PEM Fender catalogue (English, US Units, Letter)QuayQuip PEM Fender catalogue (English, US Units, Letter)
QuayQuip PEM Fender catalogue (English, US Units, Letter)QuayQuip
 
Does Australia really need a pipeline repair club.... or are we the lucky cou...
Does Australia really need a pipeline repair club.... or are we the lucky cou...Does Australia really need a pipeline repair club.... or are we the lucky cou...
Does Australia really need a pipeline repair club.... or are we the lucky cou...Engineers Australia
 
Georgia DOT Drivable Grass 3 27-14
Georgia DOT Drivable Grass 3 27-14Georgia DOT Drivable Grass 3 27-14
Georgia DOT Drivable Grass 3 27-14Soil Retention
 
Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Terry Aylward
 
ZephIR 300
ZephIR 300ZephIR 300
ZephIR 300jerndt
 
3 Fold Brochure New
3 Fold Brochure New3 Fold Brochure New
3 Fold Brochure Newmklein5156
 
Low-Impact Development Case Study Examples
Low-Impact Development Case Study ExamplesLow-Impact Development Case Study Examples
Low-Impact Development Case Study ExamplesToronto 2030 District
 

What's hot (17)

Rio Cobre Riverbank Assessment in White Marl,St. Catherine, Jamaica W.I.
Rio Cobre Riverbank Assessment in White Marl,St. Catherine, Jamaica W.I.Rio Cobre Riverbank Assessment in White Marl,St. Catherine, Jamaica W.I.
Rio Cobre Riverbank Assessment in White Marl,St. Catherine, Jamaica W.I.
 
Aqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams LiteratureAqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams Literature
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CV
 
QuayQuip PEM Fender catalogue (English, US Units, Letter)
QuayQuip PEM Fender catalogue (English, US Units, Letter)QuayQuip PEM Fender catalogue (English, US Units, Letter)
QuayQuip PEM Fender catalogue (English, US Units, Letter)
 
Does Australia really need a pipeline repair club.... or are we the lucky cou...
Does Australia really need a pipeline repair club.... or are we the lucky cou...Does Australia really need a pipeline repair club.... or are we the lucky cou...
Does Australia really need a pipeline repair club.... or are we the lucky cou...
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
CHC Heavy 2011
CHC Heavy 2011CHC Heavy 2011
CHC Heavy 2011
 
Georgia DOT Drivable Grass 3 27-14
Georgia DOT Drivable Grass 3 27-14Georgia DOT Drivable Grass 3 27-14
Georgia DOT Drivable Grass 3 27-14
 
Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015
 
311576 DD Inserts
311576 DD Inserts311576 DD Inserts
311576 DD Inserts
 
Green Building
Green BuildingGreen Building
Green Building
 
ZephIR 300
ZephIR 300ZephIR 300
ZephIR 300
 
3 Fold Brochure New
3 Fold Brochure New3 Fold Brochure New
3 Fold Brochure New
 
Low-Impact Development Case Study Examples
Low-Impact Development Case Study ExamplesLow-Impact Development Case Study Examples
Low-Impact Development Case Study Examples
 
Session5 leo van druenen bam international
Session5 leo van druenen bam internationalSession5 leo van druenen bam international
Session5 leo van druenen bam international
 
Caravanesi
CaravanesiCaravanesi
Caravanesi
 
Nykilde geoweb slope design package
Nykilde geoweb slope design packageNykilde geoweb slope design package
Nykilde geoweb slope design package
 

Similar to Stabilize Energy Production Sites

RoaDrain Brochure Web spreads
RoaDrain Brochure Web spreadsRoaDrain Brochure Web spreads
RoaDrain Brochure Web spreadsRobin Vodenlic
 
Offshore Substation Design Brochure
Offshore Substation Design BrochureOffshore Substation Design Brochure
Offshore Substation Design Brochurepbnrambollcom
 
Nuprecon Soq
Nuprecon SoqNuprecon Soq
Nuprecon Soqdignagni
 
Dengeleyici finler
Dengeleyici finlerDengeleyici finler
Dengeleyici finlerSevilay Can
 
Offshore_Operations_Insert
Offshore_Operations_InsertOffshore_Operations_Insert
Offshore_Operations_InsertNina Doiron
 
Cables Brochure Web
Cables Brochure WebCables Brochure Web
Cables Brochure Webgm330
 
Development of Tight Gas Fields
Development of Tight Gas FieldsDevelopment of Tight Gas Fields
Development of Tight Gas FieldsNeil Barnard
 
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsP07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsHabibie Razak, ACPE., AE
 
Specification Guide: Remember Its Waterproof (RIW Ltd)
Specification Guide: Remember Its Waterproof (RIW Ltd) Specification Guide: Remember Its Waterproof (RIW Ltd)
Specification Guide: Remember Its Waterproof (RIW Ltd) RIW Ltd
 
Future Offshore Foundations Web
Future Offshore Foundations WebFuture Offshore Foundations Web
Future Offshore Foundations Webgm330
 
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOBTECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOBCSUGulfCoast
 
Jos Linkedin Pres
Jos Linkedin PresJos Linkedin Pres
Jos Linkedin Presjlaw123
 

Similar to Stabilize Energy Production Sites (20)

RoaDrain Brochure Web spreads
RoaDrain Brochure Web spreadsRoaDrain Brochure Web spreads
RoaDrain Brochure Web spreads
 
Corporate Folder Rigmesh
Corporate Folder RigmeshCorporate Folder Rigmesh
Corporate Folder Rigmesh
 
Nykilde geoweb mining design and contruction ebinder
Nykilde geoweb mining design and contruction ebinderNykilde geoweb mining design and contruction ebinder
Nykilde geoweb mining design and contruction ebinder
 
EMIN SG - Tensar Petroleo Gas Brochure
EMIN SG - Tensar Petroleo Gas BrochureEMIN SG - Tensar Petroleo Gas Brochure
EMIN SG - Tensar Petroleo Gas Brochure
 
Offshore Substation Design Brochure
Offshore Substation Design BrochureOffshore Substation Design Brochure
Offshore Substation Design Brochure
 
Nuprecon Soq
Nuprecon SoqNuprecon Soq
Nuprecon Soq
 
Dengeleyici finler
Dengeleyici finlerDengeleyici finler
Dengeleyici finler
 
Offshore_Operations_Insert
Offshore_Operations_InsertOffshore_Operations_Insert
Offshore_Operations_Insert
 
Cables Brochure Web
Cables Brochure WebCables Brochure Web
Cables Brochure Web
 
Development of Tight Gas Fields
Development of Tight Gas FieldsDevelopment of Tight Gas Fields
Development of Tight Gas Fields
 
Tensar mining brochure
Tensar mining brochureTensar mining brochure
Tensar mining brochure
 
Amberg Rail
Amberg RailAmberg Rail
Amberg Rail
 
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsP07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
 
Specification Guide: Remember Its Waterproof (RIW Ltd)
Specification Guide: Remember Its Waterproof (RIW Ltd) Specification Guide: Remember Its Waterproof (RIW Ltd)
Specification Guide: Remember Its Waterproof (RIW Ltd)
 
Future Offshore Foundations Web
Future Offshore Foundations WebFuture Offshore Foundations Web
Future Offshore Foundations Web
 
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOBTECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
 
Jos Linkedin Pres
Jos Linkedin PresJos Linkedin Pres
Jos Linkedin Pres
 
Geoweb løsninger til diger damme afløb
Geoweb løsninger til diger damme afløbGeoweb løsninger til diger damme afløb
Geoweb løsninger til diger damme afløb
 
Geoweb solutions-for-dikes-dams-spillways
Geoweb solutions-for-dikes-dams-spillwaysGeoweb solutions-for-dikes-dams-spillways
Geoweb solutions-for-dikes-dams-spillways
 
GeoStorm Cells
GeoStorm CellsGeoStorm Cells
GeoStorm Cells
 

Recently uploaded

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 

Recently uploaded (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 

Stabilize Energy Production Sites

  • 1. Stabilize Energy Production Sites NEOWEB™ Stabilize Energy Production Sites Stabilizing an unstable world!
  • 2. Prs Neoweb™ Stabilize Energy Production STABILIZE YOUR SITE FAST INSTALLATION AND LONG-LASTING The construction of infrastructure, roads and SOLUTIONS pipelines in the oil, gas and energy fields often Pipelines face enormous environmental, climatic, face extreme geotechnical and environmental geological, operational and safety challenges to conditions in remote locations. PRS offers unique ensure that gas and oil flows efficiently and safely. solutions for pipeline protection and stabilization, Neoweb 3D cellular confinement technology service roads, storage facilities and terminals. offers solutions for each challenge. Based on the PRS Neoweb™ soil reinforcement The Neoweb long-term confinement and technologies, these proven solutions stabilize, reinforcement of soil substrata maintain the protect and reinforce soil of all types, including integrity of pipelines, service roads and base Why PRS? peat bogs, sandy deserts, water channels and stabilization (for pumping stations, terminals and ENGINEERING BENEFITS frozen tundra. Neoweb high performance reduces depots) even in the most challenging soil, slope • Highest load bearing capability in poor fill requirements up to 50% while fast installation and logistic conditions. soil & subgrades cuts project schedules by half. The result is a • Reduce infill quantity & costs by 50% sustainable solution that saves time and costs. The superior geotechnical performance of • Utilize local marginal infill Neoweb not only reduces the amount of infill; • Easy & fast installation PRS’ success stems from its dedication to quality required, but poorly graded, inferior native • Reduced maintenance and unique total customer support philosophy. soils can be used for infill as well. The reduced • Longest term design strength Our experts work hand-in hand with customers aggregate requirements are crucial to energy and project engineers throughout all stage of the development in remote locations – projects are ADVANCED RESEARCH project, from planning and design, through on- faster and their costs lower. • Strongest material composition and strength time delivery, to on-site training and installation. available Advanced polymers provide the longest term • Long term investments in R&D materials design strength and dimensional stability that and engineering makes piplines and roads with Neoweb more • Cooperation and testing with leading institutions durable than any other geosynthetic solution. The • Exceeds industry standards net result is reduced maintenance, a cost-effective solution and fast return on investment even over TOTAL CUSTOMER SATISFACTION thousands of kilometers of roads and pipeline. • Guaranteed end-to- end consulting and support • Assistance for planning, design installation MANUFACTURING • Largest in world • Guaranteed supply • ISO-9001 Certified Quality Control
  • 3. Load Support For Roads, Rails and Platforms LOAD SUPPORT FOR ACCESS ROADS LOAD SUPPORT FOR PLATFORMS Neoweb provides the highest load bearing Neoweb technology is ideal for ground capacity of any geosynthetic for service and stabilization of platforms subject to heavy loads access roads as well as rails used for extraction in weak or saturated soils, such as terminals, and transport. It strengthens service roads despite pumping stations and depots. The unique 3D soil difficult soil conditions, topography and water reinforcement creates a stiff cellular mattress that Multiple Layers of Pipeline Protection crossings enabling work crews to get wherever increases load distribution of the subgrade, base they need to. In projects for the Gazprom energy and surface. The Neoweb is non-degradable and company in frozen arctic tundra for example, impervious to petroleum and chemicals. Neoweb performance has consistently exceeded STABILIZE THE SUPPLY LINES ENVIRONMENTAL PROTECTION customer requirements and expectations. Multiple threats to pipeline integrity are mitigated In regions with frozen tundra, the Neoweb helps to by Neoweb solutions. Neoweb’s exceptional soil insulate the permafrost soil layer from mechanical FAST SUPPORT FOR DURABLE ROADS confinement capabilities stabilize the pipeline, damage and heat. Neoweb can be covered with Neoweb provides fast and durable construction of Advantages of Using access, service and haul roads in poor load bearing anchoring it to the ground. This prevents buckling, local native soil, which lessens the visual impact soils, difficult terrain and harsh environments. The PRS Solution differential settlement or movement caused of the pipeline in above ground installations in by unstable soil conditions, geological tremors particular and integrates it with the landscape. Neoweb 3D soil confinement technology improves SAVE TIME or flash floods. Independent seismic testing The Neoweb covering also provides easy passage stress-bearing capacity, reduces deformation, • Simple and fast installation of Neoweb demonstrated that its flexibility for wildlife. and significantly extends the lifetime of unpaved surfaces, with lower quantity and quality infill. • Use poor quality, local infill dampens vibrations and ground movement, while maintaining its structural strength and integrity. PROTECTION FROM HUMAN RISKS Neoweb is easy to transport to and install in remote Neoweb above ground implementations also DURABLE SLOPE PROTECTION drill sites, unaffected by weather or site conditions. PROTECTION FROM FLOODS AND ICE protect the pipeline from accidental or malicious • Long term design strength Enhanced stability and drainage properties human activities. In addition to physical The resulting stable road surface improves vehicle • Deploys on steep slopes prevent the erosive impact of storm water runoff. protection, Neoweb enables construction vehicles traction, ride comfort and fuel economy. Neoweb Neoweb reinforced mounds, berms and pipe to pass over the pipelines. The thick physical reinforced access roads resist cuts, impacts and ECOLOGICAL VALUE passages provide structurally sound pipeline Neoweb covering also enhances pipeline security degradation and reduce tire damage. The result is • Increase drainage crossings over rivers, streams and flood channels, by: preventing accidents from hunters or military more efficient, safe and economic operations. • Allow interlocking plant root growth and protection from ice floes in arctic regions. maneuvers; discouraging wonton vandalism; or • Enhance landscape restoration MORE REINFORCEMENT AT LESS COST Neoweb with gravel or concrete infill provides the making intentional sabotage by hostile elements Neoweb geotechnical capabilities: same level of flood protection as other traditional much more difficult. Neoweb protects your HIGH LOAD BEARING • Reduce logistics and installation (by 50%) but more expensive solutions. Neoweb also pipeline and your investments. • Year-round access • Reduce infill quantity (35-60%) shields pipelines from damage caused by rock • Stands up to heaviest construction vehicles • Use poor quality local infill falls, avalanches and ice packs. • Less haul and construction equipment COST EFFECTIVE IMPERVIOUS PROTECTION • Increase road/rail life span (x6) • Saves material, time, maintenance The advanced polymer Neoweb alloy is • Reduce long-term maintenance • Reduced haulage, fuel costs, work crews non-degrading and impervious to extreme • Save construction time and operational costs • Save wear and tear on tires and vehicles temperatures, UV radiation, chemicals and LOAD SUPPORT FOR RAIL LINES moisture. Neoweb systems prevent pipeline SUSTAINABLE The unique Neoweb 3D confinement provides exposure from the corrosive effects to the metal • Environmental and engineering sustainability outstanding load distribution and bearing, piping of Hydrogen Induced Cracking (HDC), as particularly critical for rail lines. Aggregate • Reduces local carbon footprint well as from extreme weather, including large confinement significantly extends the life span of rail temperature swings (freezing-thawing) or severe HIGHEST PERFORMANCE ballast and track stability by more than three, thereby heat or cold. reducing expensive maintenance. The result is • Strongest dimensional stability smoother, safer and economic access and transport • Longest long term design life of heavy loads regardless of problematic terrain.
  • 4. Srto – Torzhok Pipeline – Gazprom GAS FROM SIBERIA TO EUROPE CUSTOMER SATISFACTION Petroleum exploration by Gazprom, Russia’s largest Neoweb has maintained its dimensional stability energy company spans the continents. PRS, the through 5 years of Siberian winter freeze-thaw Gazprom preferred supplier of soil reinforcement cycles and will continue to do so in the future. solutions, has supplied them with millions of Gazprom engineers were pleasantly surprised square meters of Neoweb. Its recent project by the Neoweb durability and sustainability; involved access roads and pipeline protection along their finance department valued the fast return the 2000+ km SRTO-Torzhok gas line. on investment and savings; and the field crews appreciate travelling at 80 instead of 20 km/h! HARSH AND CHALLENGING Pipeline construction and maintenance in Siberia is possible only during the summer when the top soil layer (sand, silt and peat bogs) is not frozen. However, melting snows in spring fill Sustainable Solution the tundra with marshes, lakes and overflowing Neoweb is a green solution that makes energy rivers. Conventional “roadways” were made from exploration and production more sustainable. By continuous 14 cm thick, reinforced 6x2 m concrete reducing the amount and type of infill needed to plates. Subject to severe heaving and buckling reinforce soil, the usage of haul and earthmoving from yearly thaws, a “road” that was passable for equipment is reduced. This in turn decreases fuel more than one season was considered successful. use, pollution and the carbon footprint, and at the In addition, large ice flows carried by spring floods same time minimizes on-site disruption from dust, threatened the pipelines and required protection. erosion and runoff. FROM SEASONAL TO SUSTAINABLE DURABILITY The perforated Neoweb also facilitates landscape Gazprom turned to PRS for the solution. Easily restoration, as the 3D cells provide excellent soil transported and quickly deployed in remote protection, water drainage and growth stratum terrain in 3 months, Neoweb sections were infilled for plants, which further enhances carbon with local sandy soil. Imported aggregate was sequestration. The long-term design life of Neoweb unnecessary. Impervious to freezing, thawing technology means that maintenance and the and moisture, Neoweb also provides excellent associated environmental costs are significantly drainage. The 3D soil-cell interlock significantly reduced, as are long-term economic costs. increased the strength of the unpaved road structure. The result was smooth and stable road surfaces that maintain their integrity in frozen and saturated conditions. Roads are contiguous, easier to travel and reduce tire and vehicle damage. In addition, Neoweb was used to reinforce earth berms that support the pipeline in areas subject to breakaway ice floes. These protect the pipeline and help channel the floodwaters. Neoweb also Additional Containment, Protection & Retention Applications minimizes environmental damage to the tundra Landfills and Waste Ponds – integrated with geomembranes Neoweb creates impermeable, durable and protects the permafrost layer. impoundment berms for industry waste containment and treatment, and filled with concrete is an environmentally safe and non-corrosive solution for chemicals, slurry and sludge. Slopes and Embankments – Easy, quick and effective soil containment enables the stabilization of slopes and prevention of erosion. Perforated Neoweb provides excellent drainage, soil lock-up and landscape rehabilitation potential. Retaining Walls - For gradients up to 80% and to prevent erosion in water channel diversions, retaining walls erected from the Neoweb system maintain structural stability, even in wet, compressible or unstable subgrades.
  • 5. About PRS PRS is the world’s leading supplier of cost-effective soil stabilization solutions. Combining unique, proprietary technology with specialized engineering expertise, PRS delivers proven solutions for load support, slope and channel protection, earth retention, reservoir and landfill applications. With a global network of fully owned subsidiaries and independent EN-CB-1006 local distributors, PRS provides a full range of end-to-end support services. Since its establishment in 1996, PRS has implemented thousands of successful projects in over 40 countries worldwide. 1488CPD0099 Stabilizing an unstable world! Environmentally Aware PRS Soil Retention www.prs-med.com Copyright © PRS 2008. All Rights Reserved. Reproduction or distribution other than for intended purposes is prohibited, without the prior written consent of PRS. PRS reserves the right to revise this document and to make changes in the content from time to time without notice. PRS may make improvements and/or changes to the product(s) and/or programs described in this document at any time.