The project consists of the design and construction of a half-mile long, eight-foot-wide asphalt trail connecting Magarity Road to Chain Bridge Road (previously Colshire Meadow Drive) and provides the residential communities safe access to the McLean Metro Station. The project includes two pedestrian bridges (50 feet and 90 feet long) over Scotts Run, stormwater drainage, asphalt paving, trail lighting, handrail, pavement markings and related signage.
Scotts Run Trail to McLean Metro Station January 2021
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Contract No. CN19102050
Project No. AA1400107-2013
Providence District
Tax Map No. 29-4 and 30-3
January 26, 2021
SCOTTS RUN TRAIL
3. Project Details
Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Description:
The Scotts Run Trail was substantially completed on December 24, 2020. This project consists of
the design and construction of a half-mile long, 8-foot-wide asphalt trail connecting Magarity
Road to Chain Bridge Road (previously Colshire Meadow Drive) and provides the residential
communities safe access to the McLean Metro Station. The project includes two (2) pedestrian
bridges (50 feet and 90 feet long) over Scotts Run, storm drainage, asphalt paving, trail lighting,
handrail, pavement markings and related signage.
Project Team:
• Department of Transportation – John Dresser
• Utilities Design and Construction Division (UDCD) – Deepak Bhinge
• Land Survey Branch – Chris Jensen, Greg Harper, Mike Perry and Cody Harp-Taylor
• Land Acquisition Division – Clyde Monahan
• Engineer –Whitman Requardt & Associates (WRA)
• Contractor – Sagres Construction Corporation
• Inspection and Testing Agency - Rummel, Klepper, and Kahl (RKK) and DMY Engineering
Consultants (DMYEC)
4. Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Providence District, Tax Map 29-4, 30-3
Project
Location
5. Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions – School Parking Area
6. Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions – Grassy Trail Area
7. Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Trail Excavation
8. Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Bridge Abutment Concrete & Rebar Placement
9. Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Installation of Pedestrian Bridge
10. Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Bridge Deck Rebar and Concrete Placement
11. Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Asphalt Placement of Trail and Parking Area
19. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Scotts Run Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Irene Haske, Public Information Officer