The North Shore Drive Sidewalk Improvements project has been Substantially Completed. The overall project scope was to increase pedestrian safety along North Shore Drive . The new pedestrian walkway consists of 2,315 lineal feet of 5-foot wide concrete sidewalk and 224 lineal feet of 6-foot wide asphalt walking path. The project started approximately 500 feet West of Sycamore Valley drive and extended to approximately 400 feet East of Links Drive. Also, along with the improved pedestrian access, upgrades were made to the storm drain system, a new concrete pad was placed for the existing bus shelter and the Eastbound lane of North Shore Drive was milled and new asphalt and striping was installed.
Biology for Computer Engineers Course Handout.pptx
North Shore Sidewalk Improvements
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
North Shore Drive Sidewalk Improvements
Sycamore Valley Court to North Shore Court
Task Order No. 18
Project No. 2G40-088-027
Hunter Mill District
Tax Map No. 17-2 & 17-4
July 16, 2021
3. North Shore Drive Sidewalk Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Hunter Mill District, Tax Map No. 17-2 & 17-4
3
N
BEGINNING
OF PROJECT
END OF
PROJECT
BEGINNING
OF PROJECT
END OF
PROJECT
4. North Shore Drive Sidewalk Improvements
Project Detail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 4
Description:
The North Shore Drive Sidewalk Improvements project has been Substantially Completed. The overall project scope was to increase
pedestrian safety along North Shore Drive . The new pedestrian walkway consists of 2,315 lineal feet of 5-foot wide concrete
sidewalk and 224 lineal feet of 6-foot wide asphalt walking path. The project started approximately 500 feet West of Sycamore
Valley drive and extended to approximately 400 feet East of Links Drive. Also, along with the improved pedestrian access, upgrades
were made to the storm drain system, a new concrete pad was placed for the existing bus shelter and the Eastbound lane of North
Shore Drive was milled and new asphalt and striping was installed.
Project Overview:
• Project Delivery: Finley Annual Contract – Task Order
• Contract: Unit Price
Project Team:
• Contractor
• Finley Asphalt & Sealing, Inc.
• Fairfax County
• Department of Transportation – Seyed Nabavi
• Construction Manager, UDCD– Michael J. Stevens
• Project Inspector, UDCD – Rajan Manandhar
• Land Survey Branch, UDCD – Cody Harp-Taylor & Chris Jensen
• Right of Way Agent, Land Acquisition Division – Jim Strayhorne
5. North Shore Drive Sidewalk Improvements
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 5
6. North Shore Drive Sidewalk Improvements
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 6
7. North Shore Drive Sidewalk Improvements
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 7
8. North Shore Drive Sidewalk Improvements
Storm Drain Construction
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 8
9. North Shore Drive Sidewalk Improvements
Sidewalk and Bus Pad Preparation
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 9
10. North Shore Drive Sidewalk Improvements
Framing of Bus Stop Foundation
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 10
11. North Shore Drive Sidewalk Improvements
Installation of Sidewalk and Pedestrian Ramp
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 11
12. North Shore Drive Sidewalk Improvements
Installation of Asphalt Pavement
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 12
18. Additional Information
For additional information, please contact
www.fairfaxcounty.gov/publicworks
North Shore Drive Sidewalk Improvements
Sharon North or Irene Haske in the
DPWES Public Information Office
703-324-5500, TTY 711
Sharon.North@fairfaxcounty.gov
Irene.Haske@fairfaxcounty.gov
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 18