• Question 1 Most of the scheduling methods
available today require the project manager to
classify the project as either _______ constrained or
______ constrained.
• Question 2 In reviewing the status of her project
with top management, Shirley was told that there
are only two programmers that she can use for her
project. Her project is classified as __________
constrained.
• Question 3 Gene is trying to order the concrete
needed to continue his project. However, the
supplier will not be able to deliver it until next
week. This is an example of what kind of resource
constraint?
• Question 4 Resources are adequate, but demand
varies widely over the life of the project. Delaying
noncritical activities to lower peak demand on
resources is known as resource
• Question 5 All resource leveling techniques
involve
• Question 6 When a company will reduce the
number of projects they have to manage internally
to only core projects and send noncritical projects
to contractors and consulting firms this is called
• Question 7 Tony has realized that two activities
in his project cannot be done at the same time
because not enough resources are available.
Activity 3 is critical and has a duration of 5 days.
Activity 4 has 2 days of slack and a duration of 2
days. How will he decide which activity should be
scheduled first?
• Question 8 Which of the following is NOT a
potential consequence of failing to identify limited
resources before project implementation?
• Question 9 In a Project Cost-Duration Graph,
total project costs are a sum of
• Question 1 0 The direct cost for completing an
activity in the shortest time it can realistically be
completed in is called its __________ cost.
• Question 11 Which of the following projects
would be least benefited if additional resources
were added?
• Question 12 It is going to cost $80,000 a day
simply to house and feed a construction crew in
the farthest reaches of northern Alaska. This
would be an example of a situation requiring
reducing the project duration due to
• Question 13 Which of the following is NOT
considered a project indirect cost?
• Question 14 When reducing project duration, the
duration for a project that is optimal is at the point
where
• Question 15 Before crashing, direct costs for an
activity represent normal costs, which typically
mean low-cost, efficient methods for completing
the activity in a(n) ________ amount of time.
• Question 16 The shortest possible time an
activity can be completed realistically is called
___¬¬¬_____ time.
• Question 17 The attempt to recognize and
manage potential and unforeseen trouble spots
that may occur when a project is implemented is
known as
• Question 18 The cost impact of a risk event
occurring as a project proceeds through its life
cycle tends to
• Question 19 An uncertain event or condition
that, if it occurs, has a positive or negative effect on
project objectives is termed a
• Question 20 Organizations use __________ in
conjunction with work breakdown structures to
help management teams identify and eventually
analyze risk.
• Question 21 Which of the following is NOT one of
the steps in the risk management process?
• Question 22 The risk management tool that is
divided into three color-coded zones representing
major, moderate, and minor risks is the risk
• Question 23 _______________ focuses on how to
respond to events that have a positive impact on a
project.
• Question 24 Risks that can result in a system or
process that will not work are known as
• Question 25 Tools such as a risk assessment
form and a risk severity matrix are used to
Set 2
• Question 1 Ed is looking over the actual results
of projects and comparing them to what was
estimated. He notices that the projects that took
six months or longer to complete were noticeably
more off the estimates. Which of the following
factors is he recognizing?
• Question 2 The salary of the project manager
would be an example of what type of cost found in
a project?
• Question 3 Which of the following does NOT help
describe a bottom-up estimating approach?
• Question 4 Which of the following would best
represent direct project costs?
• Question 5 Accounting would be an example of
which of the following costs typically found in a
project?
• Question 6 Which of the following is a good
condition for top-down estimating?
• Question 7 Which of the following methods is
NOT considered a top-down approach to
estimating project time and cost?
• Question 8 Which of the following top-down
methods is used when projects closely follow past
projects in regard to features and costs of those
features, and result in costs being assigned by
percentages to major segments of the project?
• Question 9 What is the relationship between
organizational culture and estimating?
• Question 10 Refining estimates may be
necessary for a number of reasons. For example,
people working on prototype development
needing time to interact with the design engineers
after the design is completed is a good example of
• Question 11 Which of the following describes the
consensus method?
• Question 12 Rob is responsible for estimating a
work package that has a significant amount of
uncertainty associated with the time and cost to
complete. Due to the uncertainty involved he will
be making a low, an average and a high estimate.
Rob is using which estimating approach?
• Question 13 Companies are using which of the
following for improving the estimating process for
future projects?
• Question 14 Tom is responsible for ordering
hardware for a custom home his company is
building. The contractor installing the hardware is
scheduled to start in 5 working days, but the
hardware is on backorder and will not arrive for
another 9 working days. Fortunately, Tom has 10
days of slack; however, he shares this slack with
the hardware installer. He will have to let the
contactor know that the hardware will be ready 4
days later than expected and that the slack for the
installer has been reduced by 4 days. Tom and the
installer share 10 days of
• Question 15 Which of the following correctly
calculates the late start for an activity?
• Question 16 System documentation cannot end
until three days after testing has started. This is an
example of which kind of lag?
• Question 17 If testing cannot be completed any
earlier than four days after the prototype has been
built, what type of lag exists?
• Question 18 Which of the following does NOT
help describe a project network?
• Question 19 Information to develop a project
network is collected from the
• Question 20 ________ activities are to be completed
immediately following a particular activity.
• Question 21 A(n) _________ activity has more than
one dependency arrow flowing from it.
• Question 22 The likelihood the original critical
path(s) will change once the project is initiated is
referred to as
• Question 23 A sequence of connected, dependent
activities is termed a(n)
• Question 24 The critical path in a project
network is the
• Question 25 Which of the following correctly
calculates the early finish for an activity?

More Related Content

What's hot

What's hot (16)

Pmp2
Pmp2Pmp2
Pmp2
 
Pmp test 01
Pmp test 01Pmp test 01
Pmp test 01
 
Pmp full mock test – 200 questions
Pmp full mock test – 200 questionsPmp full mock test – 200 questions
Pmp full mock test – 200 questions
 
Risk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansRisk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ans
 
Pmstudy exam 4
Pmstudy exam 4Pmstudy exam 4
Pmstudy exam 4
 
175 pmp sample_questions
175 pmp sample_questions175 pmp sample_questions
175 pmp sample_questions
 
Project Recovery
Project RecoveryProject Recovery
Project Recovery
 
Risk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansRisk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ans
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answers
 
Project Management Professional (PMP) | Lesson 02 | Project Management Framework
Project Management Professional (PMP) | Lesson 02 | Project Management FrameworkProject Management Professional (PMP) | Lesson 02 | Project Management Framework
Project Management Professional (PMP) | Lesson 02 | Project Management Framework
 
Risk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansRisk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ans
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and cons
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
Pmp6
Pmp6Pmp6
Pmp6
 
Андрій Татчин "Software Project Estimation: Theory and Reality"
Андрій Татчин "Software Project Estimation: Theory and Reality" Андрій Татчин "Software Project Estimation: Theory and Reality"
Андрій Татчин "Software Project Estimation: Theory and Reality"
 
Pmp test 04
Pmp test 04Pmp test 04
Pmp test 04
 

Similar to Strayer bus 375 final exam part 1

Question 1 A project manager has received the following probab.docx
Question 1 A project manager has received the following probab.docxQuestion 1 A project manager has received the following probab.docx
Question 1 A project manager has received the following probab.docx
IRESH3
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
IRESH3
 

Similar to Strayer bus 375 final exam part 1 (20)

Strayer bus 375 midterm exam part 2
Strayer bus 375 midterm exam part 2Strayer bus 375 midterm exam part 2
Strayer bus 375 midterm exam part 2
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1
 
Bus 517 midterm
Bus 517 midtermBus 517 midterm
Bus 517 midterm
 
Bus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questionsBus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questions
 
Bus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questionsBus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questions
 
Liberty university busi 313 quiz 2 complete solutions correct answers slideshare
Liberty university busi 313 quiz 2 complete solutions correct answers slideshareLiberty university busi 313 quiz 2 complete solutions correct answers slideshare
Liberty university busi 313 quiz 2 complete solutions correct answers slideshare
 
Bus 517 midterm exam 1 2
Bus 517 midterm exam 1 2Bus 517 midterm exam 1 2
Bus 517 midterm exam 1 2
 
Liberty university busi 313 quiz 2 complete solutions correct answers key
Liberty university busi 313 quiz 2 complete solutions correct answers keyLiberty university busi 313 quiz 2 complete solutions correct answers key
Liberty university busi 313 quiz 2 complete solutions correct answers key
 
1587310189-week6.pptx
1587310189-week6.pptx1587310189-week6.pptx
1587310189-week6.pptx
 
Question 1 A project manager has received the following probab.docx
Question 1 A project manager has received the following probab.docxQuestion 1 A project manager has received the following probab.docx
Question 1 A project manager has received the following probab.docx
 
Training presentation .pptx
Training presentation .pptxTraining presentation .pptx
Training presentation .pptx
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
15 Free PMP Exam Questions
15 Free PMP Exam Questions15 Free PMP Exam Questions
15 Free PMP Exam Questions
 
req engg (1).ppt
req engg (1).pptreq engg (1).ppt
req engg (1).ppt
 

More from eyavagal

More from eyavagal (20)

Hcr 230 week 3 check point working with medicaid
Hcr 230 week 3 check point working with medicaidHcr 230 week 3 check point working with medicaid
Hcr 230 week 3 check point working with medicaid
 
Hcr 230 complete class
Hcr 230 complete classHcr 230 complete class
Hcr 230 complete class
 
Hcr 220 complete class
Hcr 220 complete classHcr 220 complete class
Hcr 220 complete class
 
Uop mpa 573 week 5 city council advisement part iii recent
Uop mpa 573 week 5 city council advisement part iii recentUop mpa 573 week 5 city council advisement part iii recent
Uop mpa 573 week 5 city council advisement part iii recent
 
Uop mpa 573 week 2 policy presentation (forecasting) recent
Uop mpa 573 week 2 policy presentation (forecasting) recentUop mpa 573 week 2 policy presentation (forecasting) recent
Uop mpa 573 week 2 policy presentation (forecasting) recent
 
Mktg 522 week 8 final exam guide
Mktg 522 week 8 final exam guideMktg 522 week 8 final exam guide
Mktg 522 week 8 final exam guide
 
Strayer mis 535 week 6 course project proposal paper
Strayer mis 535 week 6 course project proposal paperStrayer mis 535 week 6 course project proposal paper
Strayer mis 535 week 6 course project proposal paper
 
Strayer mis 535 week 6 course project proposal
Strayer mis 535 week 6 course project proposalStrayer mis 535 week 6 course project proposal
Strayer mis 535 week 6 course project proposal
 
Strayer mis 535 week 6 course project proposal paper (certify for employees)
Strayer mis 535 week 6 course project proposal paper (certify for employees)Strayer mis 535 week 6 course project proposal paper (certify for employees)
Strayer mis 535 week 6 course project proposal paper (certify for employees)
 
Ash ece 405 week 3 assignment 1 e
Ash ece 405 week 3 assignment 1 eAsh ece 405 week 3 assignment 1 e
Ash ece 405 week 3 assignment 1 e
 
Ash ece 353 week 5 discussions 1 cognitive development and learning new
Ash ece 353 week 5 discussions 1 cognitive development and learning newAsh ece 353 week 5 discussions 1 cognitive development and learning new
Ash ece 353 week 5 discussions 1 cognitive development and learning new
 
Ash ece 353 week 4 discussions 2 relationships between cognitive
Ash ece 353 week 4 discussions 2 relationships between cognitiveAsh ece 353 week 4 discussions 2 relationships between cognitive
Ash ece 353 week 4 discussions 2 relationships between cognitive
 
Msu ece 345 week 5 final paper new
Msu ece 345 week 5 final paper newMsu ece 345 week 5 final paper new
Msu ece 345 week 5 final paper new
 
Ese 633 week 5 dq 1 discussion on co teaching
Ese 633 week 5 dq 1 discussion on co teachingEse 633 week 5 dq 1 discussion on co teaching
Ese 633 week 5 dq 1 discussion on co teaching
 
Ese 633 week 5 assignment collaborative problem solving
Ese 633 week 5 assignment collaborative problem solvingEse 633 week 5 assignment collaborative problem solving
Ese 633 week 5 assignment collaborative problem solving
 
Ese 633 week 4 dq 1 transition planning
Ese 633 week 4 dq 1 transition planningEse 633 week 4 dq 1 transition planning
Ese 633 week 4 dq 1 transition planning
 
Ese 633 week 4 assignment helping parents promote independence
Ese 633 week 4 assignment helping parents promote independenceEse 633 week 4 assignment helping parents promote independence
Ese 633 week 4 assignment helping parents promote independence
 
Ese 633 week 3 dq 2 collaborative consultation model
Ese 633 week 3 dq 2 collaborative consultation modelEse 633 week 3 dq 2 collaborative consultation model
Ese 633 week 3 dq 2 collaborative consultation model
 
Ese 633 week 2 assignment developing curriculum design
Ese 633 week 2 assignment developing curriculum designEse 633 week 2 assignment developing curriculum design
Ese 633 week 2 assignment developing curriculum design
 
Ese 633 week 1 assignment assessing conflict styles
Ese 633 week 1 assignment assessing conflict stylesEse 633 week 1 assignment assessing conflict styles
Ese 633 week 1 assignment assessing conflict styles
 

Recently uploaded

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Recently uploaded (20)

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 

Strayer bus 375 final exam part 1

  • 1. STRAYER BUS 375 Final Exam Part 1 (2 Set) NEW Check this A+ tutorial guideline at http://www.uopassignments.com/bus-375- strayer/bus-375-final-exam-part-1-2-set- recent For more classes visit http://www.uopassignments.com • Question 1 Most of the scheduling methods available today require the project manager to classify the project as either _______ constrained or ______ constrained. • Question 2 In reviewing the status of her project with top management, Shirley was told that there are only two programmers that she can use for her project. Her project is classified as __________ constrained. • Question 3 Gene is trying to order the concrete needed to continue his project. However, the supplier will not be able to deliver it until next week. This is an example of what kind of resource constraint? • Question 4 Resources are adequate, but demand varies widely over the life of the project. Delaying
  • 2. noncritical activities to lower peak demand on resources is known as resource • Question 5 All resource leveling techniques involve • Question 6 When a company will reduce the number of projects they have to manage internally to only core projects and send noncritical projects to contractors and consulting firms this is called • Question 7 Tony has realized that two activities in his project cannot be done at the same time because not enough resources are available. Activity 3 is critical and has a duration of 5 days. Activity 4 has 2 days of slack and a duration of 2 days. How will he decide which activity should be scheduled first? • Question 8 Which of the following is NOT a potential consequence of failing to identify limited resources before project implementation? • Question 9 In a Project Cost-Duration Graph, total project costs are a sum of • Question 1 0 The direct cost for completing an activity in the shortest time it can realistically be completed in is called its __________ cost. • Question 11 Which of the following projects would be least benefited if additional resources were added? • Question 12 It is going to cost $80,000 a day
  • 3. simply to house and feed a construction crew in the farthest reaches of northern Alaska. This would be an example of a situation requiring reducing the project duration due to • Question 13 Which of the following is NOT considered a project indirect cost? • Question 14 When reducing project duration, the duration for a project that is optimal is at the point where • Question 15 Before crashing, direct costs for an activity represent normal costs, which typically mean low-cost, efficient methods for completing the activity in a(n) ________ amount of time. • Question 16 The shortest possible time an activity can be completed realistically is called ___¬¬¬_____ time. • Question 17 The attempt to recognize and manage potential and unforeseen trouble spots that may occur when a project is implemented is known as • Question 18 The cost impact of a risk event occurring as a project proceeds through its life cycle tends to • Question 19 An uncertain event or condition that, if it occurs, has a positive or negative effect on project objectives is termed a • Question 20 Organizations use __________ in
  • 4. conjunction with work breakdown structures to help management teams identify and eventually analyze risk. • Question 21 Which of the following is NOT one of the steps in the risk management process? • Question 22 The risk management tool that is divided into three color-coded zones representing major, moderate, and minor risks is the risk • Question 23 _______________ focuses on how to respond to events that have a positive impact on a project. • Question 24 Risks that can result in a system or process that will not work are known as • Question 25 Tools such as a risk assessment form and a risk severity matrix are used to Set 2 • Question 1 Ed is looking over the actual results of projects and comparing them to what was estimated. He notices that the projects that took six months or longer to complete were noticeably more off the estimates. Which of the following factors is he recognizing? • Question 2 The salary of the project manager would be an example of what type of cost found in a project? • Question 3 Which of the following does NOT help
  • 5. describe a bottom-up estimating approach? • Question 4 Which of the following would best represent direct project costs? • Question 5 Accounting would be an example of which of the following costs typically found in a project? • Question 6 Which of the following is a good condition for top-down estimating? • Question 7 Which of the following methods is NOT considered a top-down approach to estimating project time and cost? • Question 8 Which of the following top-down methods is used when projects closely follow past projects in regard to features and costs of those features, and result in costs being assigned by percentages to major segments of the project? • Question 9 What is the relationship between organizational culture and estimating? • Question 10 Refining estimates may be necessary for a number of reasons. For example, people working on prototype development needing time to interact with the design engineers after the design is completed is a good example of • Question 11 Which of the following describes the consensus method? • Question 12 Rob is responsible for estimating a work package that has a significant amount of
  • 6. uncertainty associated with the time and cost to complete. Due to the uncertainty involved he will be making a low, an average and a high estimate. Rob is using which estimating approach? • Question 13 Companies are using which of the following for improving the estimating process for future projects? • Question 14 Tom is responsible for ordering hardware for a custom home his company is building. The contractor installing the hardware is scheduled to start in 5 working days, but the hardware is on backorder and will not arrive for another 9 working days. Fortunately, Tom has 10 days of slack; however, he shares this slack with the hardware installer. He will have to let the contactor know that the hardware will be ready 4 days later than expected and that the slack for the installer has been reduced by 4 days. Tom and the installer share 10 days of • Question 15 Which of the following correctly calculates the late start for an activity? • Question 16 System documentation cannot end until three days after testing has started. This is an example of which kind of lag? • Question 17 If testing cannot be completed any earlier than four days after the prototype has been built, what type of lag exists?
  • 7. • Question 18 Which of the following does NOT help describe a project network? • Question 19 Information to develop a project network is collected from the • Question 20 ________ activities are to be completed immediately following a particular activity. • Question 21 A(n) _________ activity has more than one dependency arrow flowing from it. • Question 22 The likelihood the original critical path(s) will change once the project is initiated is referred to as • Question 23 A sequence of connected, dependent activities is termed a(n) • Question 24 The critical path in a project network is the • Question 25 Which of the following correctly calculates the early finish for an activity?