STRAYER BUS 375 Final Exam Part 1 (2 Set) NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/bus-375-
strayer/bus-375-final-exam-part-1-2-set-new
For more classes visit
http://www.assignmentcloud.com
• Question 1 Most of the scheduling methods
available today require the project manager to
classify the project as either _______ constrained or
______ constrained.
• Question 2 In reviewing the status of her project
with top management, Shirley was told that there
are only two programmers that she can use for her
project. Her project is classified as __________
constrained.
• Question 3 Gene is trying to order the concrete
needed to continue his project. However, the
supplier will not be able to deliver it until next
week. This is an example of what kind of resource
constraint?
• Question 4 Resources are adequate, but demand
varies widely over the life of the project. Delaying
noncritical activities to lower peak demand on
resources is known as resource
• Question 5 All resource leveling techniques
involve
• Question 6 When a company will reduce the
number of projects they have to manage internally
to only core projects and send noncritical projects
to contractors and consulting firms this is called
• Question 7 Tony has realized that two activities
in his project cannot be done at the same time
because not enough resources are available.
Activity 3 is critical and has a duration of 5 days.
Activity 4 has 2 days of slack and a duration of 2
days. How will he decide which activity should be
scheduled first?
• Question 8 Which of the following is NOT a
potential consequence of failing to identify limited
resources before project implementation?
• Question 9 In a Project Cost-Duration Graph,
total project costs are a sum of
• Question 1 0 The direct cost for completing an
activity in the shortest time it can realistically be
completed in is called its __________ cost.
• Question 11 Which of the following projects
would be least benefited if additional resources
were added?
• Question 12 It is going to cost $80,000 a day
simply to house and feed a construction crew in
the farthest reaches of northern Alaska. This
would be an example of a situation requiring
reducing the project duration due to
• Question 13 Which of the following is NOT
considered a project indirect cost?
• Question 14 When reducing project duration, the
duration for a project that is optimal is at the point
where
• Question 15 Before crashing, direct costs for an
activity represent normal costs, which typically
mean low-cost, efficient methods for completing
the activity in a(n) ________ amount of time.
• Question 16 The shortest possible time an
activity can be completed realistically is called
___¬¬¬_____ time.
• Question 17 The attempt to recognize and
manage potential and unforeseen trouble spots
that may occur when a project is implemented is
known as
• Question 18 The cost impact of a risk event
occurring as a project proceeds through its life
cycle tends to
• Question 19 An uncertain event or condition
that, if it occurs, has a positive or negative effect on
project objectives is termed a
• Question 20 Organizations use __________ in
conjunction with work breakdown structures to
help management teams identify and eventually
analyze risk.
• Question 21 Which of the following is NOT one of
the steps in the risk management process?
• Question 22 The risk management tool that is
divided into three color-coded zones representing
major, moderate, and minor risks is the risk
• Question 23 _______________ focuses on how to
respond to events that have a positive impact on a
project.
• Question 24 Risks that can result in a system or
process that will not work are known as
• Question 25 Tools such as a risk assessment
form and a risk severity matrix are used to
Set 2
• Question 1 Ed is looking over the actual results
of projects and comparing them to what was
estimated. He notices that the projects that took
six months or longer to complete were noticeably
more off the estimates. Which of the following
factors is he recognizing?
• Question 2 The salary of the project manager
would be an example of what type of cost found in
a project?
• Question 3 Which of the following does NOT help
describe a bottom-up estimating approach?
• Question 4 Which of the following would best
represent direct project costs?
• Question 5 Accounting would be an example of
which of the following costs typically found in a
project?
• Question 6 Which of the following is a good
condition for top-down estimating?
• Question 7 Which of the following methods is
NOT considered a top-down approach to
estimating project time and cost?
• Question 8 Which of the following top-down
methods is used when projects closely follow past
projects in regard to features and costs of those
features, and result in costs being assigned by
percentages to major segments of the project?
• Question 9 What is the relationship between
organizational culture and estimating?
• Question 10 Refining estimates may be
necessary for a number of reasons. For example,
people working on prototype development
needing time to interact with the design engineers
after the design is completed is a good example of
• Question 11 Which of the following describes the
consensus method?
• Question 12 Rob is responsible for estimating a
work package that has a significant amount of
uncertainty associated with the time and cost to
complete. Due to the uncertainty involved he will
be making a low, an average and a high estimate.
Rob is using which estimating approach?
• Question 13 Companies are using which of the
following for improving the estimating process for
future projects?
• Question 14 Tom is responsible for ordering
hardware for a custom home his company is
building. The contractor installing the hardware is
scheduled to start in 5 working days, but the
hardware is on backorder and will not arrive for
another 9 working days. Fortunately, Tom has 10
days of slack; however, he shares this slack with
the hardware installer. He will have to let the
contactor know that the hardware will be ready 4
days later than expected and that the slack for the
installer has been reduced by 4 days. Tom and the
installer share 10 days of
• Question 15 Which of the following correctly
calculates the late start for an activity?
• Question 16 System documentation cannot end
until three days after testing has started. This is an
example of which kind of lag?
• Question 17 If testing cannot be completed any
earlier than four days after the prototype has been
built, what type of lag exists?
• Question 18 Which of the following does NOT
help describe a project network?
• Question 19 Information to develop a project
network is collected from the
• Question 20 ________ activities are to be completed
immediately following a particular activity.
• Question 21 A(n) _________ activity has more than
one dependency arrow flowing from it.
• Question 22 The likelihood the original critical
path(s) will change once the project is initiated is
referred to as
• Question 23 A sequence of connected, dependent
activities is termed a(n)
• Question 24 The critical path in a project
network is the
• Question 25 Which of the following correctly
calculates the early finish for an activity?

More Related Content

What's hot

PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360Artonline Home
 
175 pmp sample_questions
175 pmp sample_questions175 pmp sample_questions
175 pmp sample_questionsNazakat Hussain
 
Risk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansRisk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansMohamed Saeed
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answersMohamed Saeed
 
Risk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansRisk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansMohamed Saeed
 
Project Management Professional (PMP) | Lesson 02 | Project Management Framework
Project Management Professional (PMP) | Lesson 02 | Project Management FrameworkProject Management Professional (PMP) | Lesson 02 | Project Management Framework
Project Management Professional (PMP) | Lesson 02 | Project Management FrameworkD10iT
 
Project Recovery
Project RecoveryProject Recovery
Project Recoverytrethard
 
Risk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansRisk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansMohamed Saeed
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and consPragnendra Rahevar
 

What's hot (16)

PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360
 
Pmp test 01
Pmp test 01Pmp test 01
Pmp test 01
 
Pmstudy exam 4
Pmstudy exam 4Pmstudy exam 4
Pmstudy exam 4
 
175 pmp sample_questions
175 pmp sample_questions175 pmp sample_questions
175 pmp sample_questions
 
Risk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansRisk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ans
 
Pmp full mock test – 200 questions
Pmp full mock test – 200 questionsPmp full mock test – 200 questions
Pmp full mock test – 200 questions
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answers
 
Risk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansRisk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ans
 
Project Management Professional (PMP) | Lesson 02 | Project Management Framework
Project Management Professional (PMP) | Lesson 02 | Project Management FrameworkProject Management Professional (PMP) | Lesson 02 | Project Management Framework
Project Management Professional (PMP) | Lesson 02 | Project Management Framework
 
Project Recovery
Project RecoveryProject Recovery
Project Recovery
 
Risk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansRisk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ans
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and cons
 
Pmp6
Pmp6Pmp6
Pmp6
 
Pmp test 04
Pmp test 04Pmp test 04
Pmp test 04
 
Pmp exam q&a
Pmp exam q&aPmp exam q&a
Pmp exam q&a
 

Similar to Strayer bus 375 final exam part 1

Strayer bus 375 midterm exam part 2
Strayer bus 375 midterm exam part 2Strayer bus 375 midterm exam part 2
Strayer bus 375 midterm exam part 2eyavagal
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2nikig6806
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2eyavagal
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2eyavagal
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1nikig6806
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1eyavagal
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1eyavagal
 
Liberty university busi 313 quiz 2 complete solutions correct answers slideshare
Liberty university busi 313 quiz 2 complete solutions correct answers slideshareLiberty university busi 313 quiz 2 complete solutions correct answers slideshare
Liberty university busi 313 quiz 2 complete solutions correct answers slideshareSong Love
 
Bus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questionsBus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questionsHomework Help Online
 
Bus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questionsBus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questionsHomework Help Online
 
Liberty university busi 313 quiz 2 complete solutions correct answers key
Liberty university busi 313 quiz 2 complete solutions correct answers keyLiberty university busi 313 quiz 2 complete solutions correct answers key
Liberty university busi 313 quiz 2 complete solutions correct answers keyMatt Smith
 
Question 1 A project manager has received the following probab.docx
Question 1 A project manager has received the following probab.docxQuestion 1 A project manager has received the following probab.docx
Question 1 A project manager has received the following probab.docxIRESH3
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studiesmeritweb
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxIRESH3
 
req engg (1).ppt
req engg (1).pptreq engg (1).ppt
req engg (1).pptWaniHBisen
 

Similar to Strayer bus 375 final exam part 1 (20)

Strayer bus 375 midterm exam part 2
Strayer bus 375 midterm exam part 2Strayer bus 375 midterm exam part 2
Strayer bus 375 midterm exam part 2
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2
 
Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2Strayer bus 375 final exam part 2
Strayer bus 375 final exam part 2
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1
 
Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1Strayer bus 375 midterm exam part 1
Strayer bus 375 midterm exam part 1
 
Bus 517 midterm
Bus 517 midtermBus 517 midterm
Bus 517 midterm
 
Liberty university busi 313 quiz 2 complete solutions correct answers slideshare
Liberty university busi 313 quiz 2 complete solutions correct answers slideshareLiberty university busi 313 quiz 2 complete solutions correct answers slideshare
Liberty university busi 313 quiz 2 complete solutions correct answers slideshare
 
Bus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questionsBus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questions
 
Bus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questionsBus 517 midterm exam 1 2 all possible questions
Bus 517 midterm exam 1 2 all possible questions
 
Bus 517 midterm exam 1 2
Bus 517 midterm exam 1 2Bus 517 midterm exam 1 2
Bus 517 midterm exam 1 2
 
Liberty university busi 313 quiz 2 complete solutions correct answers key
Liberty university busi 313 quiz 2 complete solutions correct answers keyLiberty university busi 313 quiz 2 complete solutions correct answers key
Liberty university busi 313 quiz 2 complete solutions correct answers key
 
Question 1 A project manager has received the following probab.docx
Question 1 A project manager has received the following probab.docxQuestion 1 A project manager has received the following probab.docx
Question 1 A project manager has received the following probab.docx
 
Training presentation .pptx
Training presentation .pptxTraining presentation .pptx
Training presentation .pptx
 
1587310189-week6.pptx
1587310189-week6.pptx1587310189-week6.pptx
1587310189-week6.pptx
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
 
req engg (1).ppt
req engg (1).pptreq engg (1).ppt
req engg (1).ppt
 
15 Free PMP Exam Questions
15 Free PMP Exam Questions15 Free PMP Exam Questions
15 Free PMP Exam Questions
 

More from nikig6806

Stayer cis 443 week 10 term paper
Stayer cis 443 week 10 term paperStayer cis 443 week 10 term paper
Stayer cis 443 week 10 term papernikig6806
 
Stayer cis 443 week 9 case study 2
Stayer cis 443 week 9 case study 2Stayer cis 443 week 9 case study 2
Stayer cis 443 week 9 case study 2nikig6806
 
Stayer cis 443 week 8 assignment 4
Stayer cis 443 week 8 assignment 4Stayer cis 443 week 8 assignment 4
Stayer cis 443 week 8 assignment 4nikig6806
 
Stayer cis 443 week 7 assignment 3
Stayer cis 443 week 7 assignment 3Stayer cis 443 week 7 assignment 3
Stayer cis 443 week 7 assignment 3nikig6806
 
Stayer cis 443 week 6 assignment 2
Stayer cis 443 week 6 assignment 2Stayer cis 443 week 6 assignment 2
Stayer cis 443 week 6 assignment 2nikig6806
 
Uop bus 599 assignment 3 part 1
Uop bus 599 assignment 3 part 1Uop bus 599 assignment 3 part 1
Uop bus 599 assignment 3 part 1nikig6806
 
Stayer cis 359 week 10 term paper
Stayer cis 359 week 10 term paperStayer cis 359 week 10 term paper
Stayer cis 359 week 10 term papernikig6806
 
Stayer cis 359 week 8 assignment 4
Stayer cis 359 week 8 assignment 4Stayer cis 359 week 8 assignment 4
Stayer cis 359 week 8 assignment 4nikig6806
 
Stayer cis 359 week 7 case study 2
Stayer cis 359 week 7 case study 2Stayer cis 359 week 7 case study 2
Stayer cis 359 week 7 case study 2nikig6806
 
Stayer cis 359 week 4 assignment 2
Stayer cis 359 week 4 assignment 2Stayer cis 359 week 4 assignment 2
Stayer cis 359 week 4 assignment 2nikig6806
 
Stayer cis 359 week 3 case study 1
Stayer cis 359 week 3 case study 1Stayer cis 359 week 3 case study 1
Stayer cis 359 week 3 case study 1nikig6806
 
Stayer cis 359 midterm exam set 3 new
Stayer cis 359 midterm exam set 3 newStayer cis 359 midterm exam set 3 new
Stayer cis 359 midterm exam set 3 newnikig6806
 
Uop bus 599 assignment 5 business plan final new
Uop bus 599 assignment 5 business plan final newUop bus 599 assignment 5 business plan final new
Uop bus 599 assignment 5 business plan final newnikig6806
 
Uop bus 599 assignment 2 marketing plan new
Uop bus 599 assignment 2 marketing plan newUop bus 599 assignment 2 marketing plan new
Uop bus 599 assignment 2 marketing plan newnikig6806
 
Uop acc 556 crooked scenario 2 part 1 new
Uop acc 556 crooked scenario 2 part 1 newUop acc 556 crooked scenario 2 part 1 new
Uop acc 556 crooked scenario 2 part 1 newnikig6806
 
Ash com 200 week 5 final paper letter of advice paper
Ash com 200 week 5 final paper letter of advice paperAsh com 200 week 5 final paper letter of advice paper
Ash com 200 week 5 final paper letter of advice papernikig6806
 
Gcu hlt 205 week 6 assignment benchmark assignment
Gcu hlt 205 week 6 assignment benchmark assignmentGcu hlt 205 week 6 assignment benchmark assignment
Gcu hlt 205 week 6 assignment benchmark assignmentnikig6806
 
Strayer cis 333 week 6 case study 2
Strayer cis 333 week 6 case study 2Strayer cis 333 week 6 case study 2
Strayer cis 333 week 6 case study 2nikig6806
 
Strayer cis 273 week 2 lab assignment 2 three web pages with hyperlinks new
Strayer cis 273 week 2 lab assignment 2 three web pages with hyperlinks newStrayer cis 273 week 2 lab assignment 2 three web pages with hyperlinks new
Strayer cis 273 week 2 lab assignment 2 three web pages with hyperlinks newnikig6806
 

More from nikig6806 (20)

Stayer cis 443 week 10 term paper
Stayer cis 443 week 10 term paperStayer cis 443 week 10 term paper
Stayer cis 443 week 10 term paper
 
Stayer cis 443 week 9 case study 2
Stayer cis 443 week 9 case study 2Stayer cis 443 week 9 case study 2
Stayer cis 443 week 9 case study 2
 
Stayer cis 443 week 8 assignment 4
Stayer cis 443 week 8 assignment 4Stayer cis 443 week 8 assignment 4
Stayer cis 443 week 8 assignment 4
 
Stayer cis 443 week 7 assignment 3
Stayer cis 443 week 7 assignment 3Stayer cis 443 week 7 assignment 3
Stayer cis 443 week 7 assignment 3
 
Stayer cis 443 week 6 assignment 2
Stayer cis 443 week 6 assignment 2Stayer cis 443 week 6 assignment 2
Stayer cis 443 week 6 assignment 2
 
Uop bus 599 assignment 3 part 1
Uop bus 599 assignment 3 part 1Uop bus 599 assignment 3 part 1
Uop bus 599 assignment 3 part 1
 
Stayer cis 359 week 10 term paper
Stayer cis 359 week 10 term paperStayer cis 359 week 10 term paper
Stayer cis 359 week 10 term paper
 
Stayer cis 359 week 8 assignment 4
Stayer cis 359 week 8 assignment 4Stayer cis 359 week 8 assignment 4
Stayer cis 359 week 8 assignment 4
 
Stayer cis 359 week 7 case study 2
Stayer cis 359 week 7 case study 2Stayer cis 359 week 7 case study 2
Stayer cis 359 week 7 case study 2
 
Stayer cis 359 week 4 assignment 2
Stayer cis 359 week 4 assignment 2Stayer cis 359 week 4 assignment 2
Stayer cis 359 week 4 assignment 2
 
Stayer cis 359 week 3 case study 1
Stayer cis 359 week 3 case study 1Stayer cis 359 week 3 case study 1
Stayer cis 359 week 3 case study 1
 
Stayer cis 359 midterm exam set 3 new
Stayer cis 359 midterm exam set 3 newStayer cis 359 midterm exam set 3 new
Stayer cis 359 midterm exam set 3 new
 
Uop bus 599 assignment 5 business plan final new
Uop bus 599 assignment 5 business plan final newUop bus 599 assignment 5 business plan final new
Uop bus 599 assignment 5 business plan final new
 
Uop bus 599 assignment 2 marketing plan new
Uop bus 599 assignment 2 marketing plan newUop bus 599 assignment 2 marketing plan new
Uop bus 599 assignment 2 marketing plan new
 
Uop acc 556 crooked scenario 2 part 1 new
Uop acc 556 crooked scenario 2 part 1 newUop acc 556 crooked scenario 2 part 1 new
Uop acc 556 crooked scenario 2 part 1 new
 
Ash com 200 week 5 final paper letter of advice paper
Ash com 200 week 5 final paper letter of advice paperAsh com 200 week 5 final paper letter of advice paper
Ash com 200 week 5 final paper letter of advice paper
 
Gcu hlt 205
Gcu hlt 205Gcu hlt 205
Gcu hlt 205
 
Gcu hlt 205 week 6 assignment benchmark assignment
Gcu hlt 205 week 6 assignment benchmark assignmentGcu hlt 205 week 6 assignment benchmark assignment
Gcu hlt 205 week 6 assignment benchmark assignment
 
Strayer cis 333 week 6 case study 2
Strayer cis 333 week 6 case study 2Strayer cis 333 week 6 case study 2
Strayer cis 333 week 6 case study 2
 
Strayer cis 273 week 2 lab assignment 2 three web pages with hyperlinks new
Strayer cis 273 week 2 lab assignment 2 three web pages with hyperlinks newStrayer cis 273 week 2 lab assignment 2 three web pages with hyperlinks new
Strayer cis 273 week 2 lab assignment 2 three web pages with hyperlinks new
 

Recently uploaded

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 

Recently uploaded (20)

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 

Strayer bus 375 final exam part 1

  • 1. STRAYER BUS 375 Final Exam Part 1 (2 Set) NEW Check this A+ tutorial guideline at http://www.assignmentcloud.com/bus-375- strayer/bus-375-final-exam-part-1-2-set-new For more classes visit http://www.assignmentcloud.com • Question 1 Most of the scheduling methods available today require the project manager to classify the project as either _______ constrained or ______ constrained. • Question 2 In reviewing the status of her project with top management, Shirley was told that there are only two programmers that she can use for her project. Her project is classified as __________ constrained. • Question 3 Gene is trying to order the concrete needed to continue his project. However, the supplier will not be able to deliver it until next week. This is an example of what kind of resource constraint? • Question 4 Resources are adequate, but demand varies widely over the life of the project. Delaying noncritical activities to lower peak demand on
  • 2. resources is known as resource • Question 5 All resource leveling techniques involve • Question 6 When a company will reduce the number of projects they have to manage internally to only core projects and send noncritical projects to contractors and consulting firms this is called • Question 7 Tony has realized that two activities in his project cannot be done at the same time because not enough resources are available. Activity 3 is critical and has a duration of 5 days. Activity 4 has 2 days of slack and a duration of 2 days. How will he decide which activity should be scheduled first? • Question 8 Which of the following is NOT a potential consequence of failing to identify limited resources before project implementation? • Question 9 In a Project Cost-Duration Graph, total project costs are a sum of • Question 1 0 The direct cost for completing an activity in the shortest time it can realistically be completed in is called its __________ cost. • Question 11 Which of the following projects would be least benefited if additional resources were added? • Question 12 It is going to cost $80,000 a day simply to house and feed a construction crew in
  • 3. the farthest reaches of northern Alaska. This would be an example of a situation requiring reducing the project duration due to • Question 13 Which of the following is NOT considered a project indirect cost? • Question 14 When reducing project duration, the duration for a project that is optimal is at the point where • Question 15 Before crashing, direct costs for an activity represent normal costs, which typically mean low-cost, efficient methods for completing the activity in a(n) ________ amount of time. • Question 16 The shortest possible time an activity can be completed realistically is called ___¬¬¬_____ time. • Question 17 The attempt to recognize and manage potential and unforeseen trouble spots that may occur when a project is implemented is known as • Question 18 The cost impact of a risk event occurring as a project proceeds through its life cycle tends to • Question 19 An uncertain event or condition that, if it occurs, has a positive or negative effect on project objectives is termed a • Question 20 Organizations use __________ in conjunction with work breakdown structures to
  • 4. help management teams identify and eventually analyze risk. • Question 21 Which of the following is NOT one of the steps in the risk management process? • Question 22 The risk management tool that is divided into three color-coded zones representing major, moderate, and minor risks is the risk • Question 23 _______________ focuses on how to respond to events that have a positive impact on a project. • Question 24 Risks that can result in a system or process that will not work are known as • Question 25 Tools such as a risk assessment form and a risk severity matrix are used to Set 2 • Question 1 Ed is looking over the actual results of projects and comparing them to what was estimated. He notices that the projects that took six months or longer to complete were noticeably more off the estimates. Which of the following factors is he recognizing? • Question 2 The salary of the project manager would be an example of what type of cost found in a project? • Question 3 Which of the following does NOT help describe a bottom-up estimating approach?
  • 5. • Question 4 Which of the following would best represent direct project costs? • Question 5 Accounting would be an example of which of the following costs typically found in a project? • Question 6 Which of the following is a good condition for top-down estimating? • Question 7 Which of the following methods is NOT considered a top-down approach to estimating project time and cost? • Question 8 Which of the following top-down methods is used when projects closely follow past projects in regard to features and costs of those features, and result in costs being assigned by percentages to major segments of the project? • Question 9 What is the relationship between organizational culture and estimating? • Question 10 Refining estimates may be necessary for a number of reasons. For example, people working on prototype development needing time to interact with the design engineers after the design is completed is a good example of • Question 11 Which of the following describes the consensus method? • Question 12 Rob is responsible for estimating a work package that has a significant amount of uncertainty associated with the time and cost to
  • 6. complete. Due to the uncertainty involved he will be making a low, an average and a high estimate. Rob is using which estimating approach? • Question 13 Companies are using which of the following for improving the estimating process for future projects? • Question 14 Tom is responsible for ordering hardware for a custom home his company is building. The contractor installing the hardware is scheduled to start in 5 working days, but the hardware is on backorder and will not arrive for another 9 working days. Fortunately, Tom has 10 days of slack; however, he shares this slack with the hardware installer. He will have to let the contactor know that the hardware will be ready 4 days later than expected and that the slack for the installer has been reduced by 4 days. Tom and the installer share 10 days of • Question 15 Which of the following correctly calculates the late start for an activity? • Question 16 System documentation cannot end until three days after testing has started. This is an example of which kind of lag? • Question 17 If testing cannot be completed any earlier than four days after the prototype has been built, what type of lag exists? • Question 18 Which of the following does NOT
  • 7. help describe a project network? • Question 19 Information to develop a project network is collected from the • Question 20 ________ activities are to be completed immediately following a particular activity. • Question 21 A(n) _________ activity has more than one dependency arrow flowing from it. • Question 22 The likelihood the original critical path(s) will change once the project is initiated is referred to as • Question 23 A sequence of connected, dependent activities is termed a(n) • Question 24 The critical path in a project network is the • Question 25 Which of the following correctly calculates the early finish for an activity?