STUDY ON NEGLIGENCE OF QUALITY ASSURANCE AND
PROPOSING AN EFFECTIVE FRAMEWORK FOR TOTAL QUALITY
MANAGEMENT
Dharani K1,
Ganapathy Ramasamy N2
1
Student, Construction Engineering and Management, SRM University, Tamil Nadu, India
2
Assistant Professor, Construction Engineering and Management, SRM University, Tamil Nadu, India
Abstract
Quality plays an integral part in the construction industry. Quality assurance is needed because of the involvement of negligence
in a project which deduces the quality of the construction .In order to build customer confidence the quality of its work should be
done according to the developed quality assurance program. This paper focuses on various negligence of quality assurance
practices in the construction industry. The objective of the project is to analyze the various factors that affect quality and quality
assurance and to provide an effective framework for the total quality management which helps to increase the quality
performance of the construction industry. This project includes a set of questionnaires about quality, quality assurance and total
quality management prepared and distributed to various companies and then analyzed. With the help of analyzed data’s a total
quality management framework has been proposed to reduce the negligence of quality assurance in the construction industry.
Keywords: Quality, Quality Assurance, Total Quality Management and construction etc…
--------------------------------------------------------------------***----------------------------------------------------------------------
1. INTRODUCTION
Quality has become one of the essential elements in recent
years due to conceptual changes in the construction industry.
In any industry the product should be manufactured
according to the required standard which provides the worth
of money and satisfaction of the customers. Quality is
nothing but the satisfaction of the customer with the
performance, appearance, and reliability of the project for
the valuable cost range. In all the phases of the project life
cycle quality of construction project is linked with proper
quality management. Because of the poor quality
management systems lots of failures where occurred. This
paper therefore focuses on the total quality management in
all the phases of construction projects.
To support the construction projects many of the
management practices used are being challenged. Quality
management systems and quality assurance are the topics
which have been receiving increasing attention. The quality
of the construction projects as well as the project success
can be regarded as the fulfillment of the expectations of the
project participants. The concept of total quality
management is concerned to make everyone accountable for
their own performance and to get them committed for
attaining the higher quality [2]. Total Quality Management
is the management approach of an organization, which
concentrates on quality based on the participation of its
members and aims at long-term success through satisfaction
and benefits to all members of the organization and the
society[3]. There are different trends and approaches
comprised in contracting firms and clients for the adoption
of total quality management [5]. Total Quality Management
is required because of the fine co-ordination and
constructive framework between the organizations, its
suppliers and customers and also for its employees.
Quality Assurance is important in the engineering and
construction industry because of the risk involved in any
project. The performance of the project is affected because
of the risk involved due to many external factors and also
for not completing the project on time. To avoid any in-
efficiency resulting in the poor products and service which
are delivered to the customer, it is important to develop a
built-in quality assurance system[7]. Internal and external
aspects are involved in the quality systems. Providing
confidence to the management of an organization that the
required quality has to be achieved is the aim of the internal
quality system. And for inspiring the confidence in the client
and to satisfy the client’s quality requirement is the aim for
the external quality systems. This system is called the
Quality Assurance systems [6]. In developing countries, on
relying on the ISO 9000 and 14000 standards the quality
assurance in the construction sector has been in practice for
quite some time as they have been implementing TQM
practices in the building and also in construction industry.
In this study, it will be studied about the identification of
various negligence of the quality assurance systems in the
existing construction projects. A questionnaire is prepared
based on the quality and negligence of quality assurance
systems in construction industry.
2. AIM OF STUDY
The aim of the study is to find out the negligence in quality
assurance and to propose an effective framework for the
Total Quality Management
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 605
2.1 Objectives of the Study
The specific objectives are:
 To understand the importance of quality assurance
in the construction industry
 To identify the effective quality management for the
particular project
 To provide a detailed framework for TQM.
2.2 Scope of Study
This project focuses on the quality assurance and Total
Quality Management in the construction industry. The main
concept of this project is to develop a framework for Total
Quality Management by eliminating the various negligence
in quality assurance which is identified during the
construction of the existing projects.
3. LITERATURE REVIEW
In recent decades, due to the competitiveness in the market
places worldwide companies have realized that a good
product quality is a key area for the commercial success and
its development. Several methods have been emerged under
the Total Quality Management umbrella. However to date,
associated research in the construction sector has received
little attention by comparison to say, manufacturing. Some
approaches have been proposed for use in construction has
limitations with regard to their applicability. A framework
has been developed which includes quality policy, products
and service quality to help quality in projects (David
Joaquin Delgado 2008). TQM inclusion in construction
industry helps to increase the quality of the product which
forces the construction firms to implement the system. The
aspects that where targeted such as quality in the
organization, employee training and organizational culture,
seems appreciable. Lacking of having a concise and exact
definition of quality was also observed. The fragmented
nature of the industry is a big hurdle in TQM application.
Lack of education, negligence and irresponsibility are also
critical issues which should be prevented. Implementing
TQM requires a major transformation in the organization
(Rizwan U 2008).
Even when approved plans exist, the developers/owners
refuse to follow standards and specifications as contained in
the plan and cut corners probably because quality assurance
is not always a cost effective activity though it is essential if
fitness for purpose is the measure of performance and where
the satisfaction of the client or customer is to be placed first
and foremost. Quality assurance is firmly dependent upon
clients knowing their specific needs and communicating
these unambiguously to the designer, upon the designer
accurately representing these requirements in the design
concept, upon the contractor faithfully reproducing these
requirements in the work on site, and taking quality
assurance to its end, upon the occupier using the building
correctly to achieve maximum performance (Griffith, 1990).
After the tsunami disaster and terrorism srilanka
construction industry showed a study growth in their
construction processes. Numerous building construction
projects have been started and some are about to start
because of the sudden rise of economic growth, urbanization
and resettlement. As a result, the demand for building
materials, manpower and machinery requirements have
shown a considerable increase. Poor quality leads to
structural failures. To avoid these type of factors quality
assurance system has been developed (G L Chandrasena,
2008).
To examine the effectiveness of the construction industry,
quality assurance system is developed to address the public
concern, safety, durability and functionality. The identified
major problems where inadequate budgetary allocation for
quality control, non-enforcement of quality control clauses
by authorized agencies, insufficient quality control
laboratories. So addressing these problems will greatly
improve the level of quality assurance in the industry (Y.A.
Abdul Kareem 2006). The factors affecting the quality
performance in construction projects where conflicts among
project participants, hostile socio-economic environment,
bad climatic conditions, project manager’s ignorance, faulty
project conceptualization and aggressive competition during
tendering. So to rectify the factors possible remedial
measures has been suggested to improve the quality (K.N.
Jha 2006).
Recently several organizations have restored to the
application of total quality management with the view to
assessing the level of quality and to improve it. This total
quality management process is considered as a modern
system in the field of quality, after the quality assurance,
quality control and ISO in the construction sector. The
important factors were taken into account relating to the
internal customers of the companies. The finding of the
study is that these organizations generally take into account
the principles of total quality management (Abu Hassan Bin
2011).
4. METHODOLOGY
The first approach, a literature review was done to extract
list of factors affecting quality and also the negligence in the
quality assurance systems from previous study.
 The second approach is to identify the concept of
Total Quality Management and quality assurance.
 The third approach is to prepare an questionnaire
based on the various negligence in quality assurance
and distributed to a set of companies.
 The fourth approach is to collect the relevant data’s
needed for the process and also collects the
distributed questionnaires from the respective
companies.
 The fifth approach is to analyze, evaluate and rank
the collected questionnaires with the help of SPSS
for statistical analysis.
 The sixth approach is to develop a model framework
and implement it in the current construction
projects.
 Based on the knowledge gained on the literature
study the project is carried out with the following
flowchart.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 606
Fig -1: Methodology
5. STUDY ANALYSIS
5.1 Questionnaire Responses
This study compromises professionals in consulting,
contracting, engineers, project managers, quality engineers
has been involved. This resulted in a total questionnaires of
50. Out of 50 questionnaires distributed 40 were returned
and the analysis has been done.
Table -1: No. of respondents
Questionnaire No Percent
Total Distributed
Total Returned
Not Returned
Used for the Study
50
40
10
40
100
90
10
90
Fig -2: No. of respondents chart
The results of the analysis in table 1 shows that ninety
percent of questionnaires administered were duly completed
and returned. This result is regarded as high. Therefore, the
responses got from the organizations of the study to the
questionnaire administered are regarded as encouraging.
Table -2: Percentage of Respondents
Organization No Percent
Project Manager
Site Engineer
Planning Engineer
Contractor
Quality Inspector
8
9
7
6
10
20
22.5
17.5
15
25
Table 2 shows that 20% are project managers, 22.5% are
site managers, 17.5% are planning engineers, and
contractors are 15% and 25% of quality control engineers.
This shows that QC engineers were the highest respondents.
Fig -3: Percentage of Respondents
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 607
5.2 Negligence of Quality Assurance
A variety of authors have provided different categorizations
of quality problems, but there have been few attempt’s to
collect together and identified the major sources of
negligence in quality assurance in a comprehensive manner.
With the help of the reviewed collected literatures the most
notable negligence of quality assurance have been
identified. The questionnaires collected from the companies
are analyzed using SPSS statistical analysis program. The
negligence in quality assurance are inadequate supervision
and verification on site, use of superseded drawings and
specifications, poor workmanship during construction,
Quality Assurance sampling and testing may increase in
workload, cost overrun on projects, inadequate commitment
to service quality by contractors.(Ranked as per SPSS
analysis). Out of 50 questionnaires distributed 40 were
returned and the analysis has been done.
Table –4: Summary of SPSS and rank of negligence of
Quality Assurance
S.No Description Mean Rank
1 Inadequate supervision and
verification on site.
4.675 1
2 Use of superseded drawing
and specification
4.600 2
3 Poor workmanship during
construction
4.450 3
4 Quality assurance sampling
and testing may increase in
workload
4.375 4
5 Cost overrun on projects 4.325 5
6 Inadequate commitment to
service quality by
contractors
4.200 6
7 Misinterpretation of
drawing and specification
4.150 7
8 Poor coordination of
subcontracted work
4.000 8
9 Untimely project Delivery 3.950 9
10 Structural failures leading
to death.
3.775 10
Table -5: Likert scale for analysis
1 Strongly Disagree
2 Disagree
3 Neutral
4 Agree
5 Strongly Agree
Fig -4: Bar chart for the analyzed results
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 608
6. FRAMEWORK REPRESENTATIONS
The essential requirements for the development of
framework as to be identified to create a schematic
representation this framework is developed based on the
TQM model. With the help of the questionnaires received
from the organizations the quality assurance the most
notable negligence factor has been identified and rectified
accordingly.
The factors which affect the most are inadequate supervision
and verification on site, use of superseded drawing and
specifications, poor workmanship during construction,
quality assurance sampling and testing which increases the
workload, cost overrun on projects and inadequate
commitment to service quality by contractors has been
rectified using Total Quality Management system with four
different processes which are quality management program,
improvement suggestions in organizations, top management
support, self-motivation towards continuous improvement.
6.1 Discussions of Findings
The analysis of respondents pursued opinion on who should
be largely responsible for enforcing/ensuring effective
quality assurance practice in construction reveals that
management of companies, professional bodies and even
construction clients all have major rolls to play in quality
assurance in construction.
The advent of total quality management can be seen as
timely in the research for productivity improvement and
customer satisfaction. It is not feasible as a basis for
acceptance that a performance testing would be done in an
construction. Setting up of quality assurance department in
construction firms and providing trainings and seminars on
quality assurance should be provided and penalty for non-
compliance of quality standards should implement. Hence in
quality assurance testing and sampling should be conducted.
Fig -5: Framework for TQM
7. SUMMARY AND CONCLUSION
In conclusion, the top ranking grades in construction
practices the variables and the dimensions of Total quality
management works to some extent. In effectiveness and
significance value in each dimensions and each part there is
a difference which always exist. From the results achieved
the most of the negligence of the quality assurance are
significant and should be practiced.
From this framework process the negligence factors under
quality assurance which are inadequate supervision and
verification on site, use of superseded drawing and
specifications, poor workmanship during construction,
quality assurance sampling and testing which increases the
workload, cost overrun on projects and inadequate
commitment to service quality by contractors have be
solved.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 609
To increase he performance in the quality management in an
organization suggestions should be collected from the
employees contactors also from clients and should get
approval from top management should be successfully
implemented in quality management program so that there
should be a continuous improvement throughout the quality
management program.
REFERENCES
[1]. Abdol R. Chini., & Hector E. Valdez. (2003) “ISO 9000
and the U.S. Construction Industry”, J. Manage. Eng., 19(2),
69-77.
[2]. Abu Hassan Bin Abu Bakar., Khalid Bin Ali & Eziaku
Onyeizu. (2011) “Total Quality Management Practice in
Large Construction Companies: A Case of Oman”, J. World
Applied Sciences., 15(2), 285-296.
[3]. Ashokkumar D. (2014) “Study of Quality Management
in Construction Industry” J. IJIRSET., 2319-8753.
[4]. Teena Joy. (2014) “A Study on Factors Influencing
Quality of Construction Projects” J. IJIRD., 2278-0211.
[5]. Arditi D., & Gunaydin H. M. (1997) “Total Quality
Management in the Construction Process”, J. International
Journal of Project Management., 15(4), 235-243.
[6]. Adenuga., Olumide Afolarin. (2013) “Factors Affecting
Qulaity in the Delivery of Public Housing Projects in Lagos
State, Nigeria”, J. International Journal of Engineering and
Technology., ISSN 2049-3444.
[7]. Bdulaziz A. Bubshait., Member, ASCE., & Tawfiq H.
Al-Atiq. (1999) “ISO 9001 Quality Standards in
Construction”, J. Journal of Management in Engineering.,
41-46.
[8]. Griffith, A (1990). “Quality Assurance in Building”
Macmillan Education.
[9]. Jha K. N., & Iyer K. C.,(2006). “ Critical Factors
affecting Quality Performance in construction projects”.
Total Quality Management, 17(9), 1155-1170.
[10]. Joaquin D., Hernandez D., & Aspinwall E.(2008). “A
framework for building quality into construction projects-
Part I”. Total Quality Management, 79(10), 1013-1028.
[11]. Muhammad Asim., Sohaib uz Zaman & Tayyaba Zarif
(2013). “ Implementation of Total Quality Management in
Construction Industry: A Pakistani Perspective”. J. Journal
of Management and Social sciences, 24-39.
[12]. David Arditi & H Murat Gunydin., (1997).,” Total
quality Management in the construction process”. J.
International Journal of Project Management, 15(4), 235-
245
[13]. John E. Shively.,(1990).” Survey of Quality- assurance
procedures within consultant industry”, J. Management of
Engineering.
[14]. Mohammad Mehdi Mortahed., Yeganeh Amini., Amir
Hosein Younesian., & PeymanSoltani.(2013)., “Impacts of
Engineering Work Quality on Project Success”, Social and
Behavioral Sciences., 74,429-437
[15]. Plutat, B.M.,(1994)., “Total Quality Management: A
framework for application in manufacturing.” The TQM
Magazine, 6(1): 44-49.
[16]. Pheng, L. S. and A.J. Teo,(2004)., “ Implementing
Total Quality Management in Construction Firms. J.
Management in Engineering ASCE.
[17]. Gamsby, S. O., Mize, J. D., and Reid, R.A. (1996). “A
project management focused framework for assuring quality
work process.” J. Project Management Institute., 1010-1016.
[18]. Arditi, D and Gunaydin, H. M. (1998).,”Factors that
affect process quality in the life-cycle of building projects”.
J. Construction Engineering and Management, 15(4), 235-
243.
[19]. Foster, D., & Jonker, J. (2003).,” Third Generation
Quality Management: The role of Stakeholders in
Integrating Business into Society. J. Managerial Auditing
Journal, 18(4), 323-328.
[20]. Yasamis, F., Arditi, D.,and Mohammadi, J.(2002).,”
Assessing contractor quality Performance.,” J. Construction
Management and Economics, 20(3), 211-223.
BIOGRAPHIES
Dharani K, Department of civil
engineering, SRM University,
Kattangulathur, Chennai.
Assistant Prof. Ganapathy Ramasamy N,
Department of civil engineering, SRM
University, Kattangulathur, Chennai.

More Related Content

What's hot

A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projects
eSAT Journals
 
Journal Ready - Production Operations Manual
Journal Ready - Production Operations ManualJournal Ready - Production Operations Manual
Journal Ready - Production Operations Manual
Calvin Karl Garganta
 
Factors Influencing the Efficacy of Agile Usage
Factors Influencing the Efficacy of Agile UsageFactors Influencing the Efficacy of Agile Usage
Factors Influencing the Efficacy of Agile Usage
Dr. Amarjeet Singh
 
HIDDEN COSTS OF QUALITY: MEASUREMENT & ANALYSIS
HIDDEN COSTS OF QUALITY: MEASUREMENT & ANALYSIS HIDDEN COSTS OF QUALITY: MEASUREMENT & ANALYSIS
HIDDEN COSTS OF QUALITY: MEASUREMENT & ANALYSIS
ijmvsc
 

What's hot (20)

IRJET- Application of BIM as a Model for Quality Management
IRJET- Application of BIM as a Model for Quality ManagementIRJET- Application of BIM as a Model for Quality Management
IRJET- Application of BIM as a Model for Quality Management
 
Application of Quality Tools to Reduce Failure Identification in an Automotiv...
Application of Quality Tools to Reduce Failure Identification in an Automotiv...Application of Quality Tools to Reduce Failure Identification in an Automotiv...
Application of Quality Tools to Reduce Failure Identification in an Automotiv...
 
Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptsEnhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm concepts
 
Enhancement of the performance of an industry by the
Enhancement of the performance of an industry by theEnhancement of the performance of an industry by the
Enhancement of the performance of an industry by the
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
Aj vm pdf
Aj vm pdfAj vm pdf
Aj vm pdf
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & Sustainability
 
Ijmet 10 01_164
Ijmet 10 01_164Ijmet 10 01_164
Ijmet 10 01_164
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projects
 
E0354033038
E0354033038E0354033038
E0354033038
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
An Application of Green Quality Function Deployment to Designing an Air Condi...
An Application of Green Quality Function Deployment to Designing an Air Condi...An Application of Green Quality Function Deployment to Designing an Air Condi...
An Application of Green Quality Function Deployment to Designing an Air Condi...
 
Journal Ready - Production Operations Manual
Journal Ready - Production Operations ManualJournal Ready - Production Operations Manual
Journal Ready - Production Operations Manual
 
Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...
 
Factors Influencing the Efficacy of Agile Usage
Factors Influencing the Efficacy of Agile UsageFactors Influencing the Efficacy of Agile Usage
Factors Influencing the Efficacy of Agile Usage
 
IRJET- Application of Quality Function Deployment (QFD) in Aluminium Pot Manu...
IRJET- Application of Quality Function Deployment (QFD) in Aluminium Pot Manu...IRJET- Application of Quality Function Deployment (QFD) in Aluminium Pot Manu...
IRJET- Application of Quality Function Deployment (QFD) in Aluminium Pot Manu...
 
HIDDEN COSTS OF QUALITY: MEASUREMENT & ANALYSIS
HIDDEN COSTS OF QUALITY: MEASUREMENT & ANALYSIS HIDDEN COSTS OF QUALITY: MEASUREMENT & ANALYSIS
HIDDEN COSTS OF QUALITY: MEASUREMENT & ANALYSIS
 
Integrating Scrum development process with UX design flow
Integrating Scrum development process with UX design flowIntegrating Scrum development process with UX design flow
Integrating Scrum development process with UX design flow
 
A Literature Review on Lean Implementations – A comprehensive summary
A Literature Review on Lean Implementations – A comprehensive summaryA Literature Review on Lean Implementations – A comprehensive summary
A Literature Review on Lean Implementations – A comprehensive summary
 
DEVELOPING A HIGHER-CYCLED PRODUCT DESIGN CAE MODEL: THE EVOLUTION OF AUTOMOT...
DEVELOPING A HIGHER-CYCLED PRODUCT DESIGN CAE MODEL: THE EVOLUTION OF AUTOMOT...DEVELOPING A HIGHER-CYCLED PRODUCT DESIGN CAE MODEL: THE EVOLUTION OF AUTOMOT...
DEVELOPING A HIGHER-CYCLED PRODUCT DESIGN CAE MODEL: THE EVOLUTION OF AUTOMOT...
 

Similar to Study on negligence of quality assurance and proposing an effective framework for total quality management

TQM in Construction Management A Review
TQM in Construction Management A ReviewTQM in Construction Management A Review
TQM in Construction Management A Review
ijtsrd
 
Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...
Ali Salah
 
A Study of Implementation and Impact of Total Quality Management on Construct...
A Study of Implementation and Impact of Total Quality Management on Construct...A Study of Implementation and Impact of Total Quality Management on Construct...
A Study of Implementation and Impact of Total Quality Management on Construct...
YogeshIJTSRD
 

Similar to Study on negligence of quality assurance and proposing an effective framework for total quality management (20)

17 1st review
17 1st review17 1st review
17 1st review
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
TQM in Construction Management A Review
TQM in Construction Management A ReviewTQM in Construction Management A Review
TQM in Construction Management A Review
 
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERY
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERYQUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERY
QUALITY MANAGEMENT PRACTICES OF CONTRACTING FIRMS IN BUILDING PROJECT DELIVERY
 
H012125765
H012125765H012125765
H012125765
 
Evaluation of Total Quality Management Implementation as Engineering Practice...
Evaluation of Total Quality Management Implementation as Engineering Practice...Evaluation of Total Quality Management Implementation as Engineering Practice...
Evaluation of Total Quality Management Implementation as Engineering Practice...
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
 
Research paper on TQM
Research paper on TQM Research paper on TQM
Research paper on TQM
 
Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...
 
Total quality management practices in construction companies kerala
Total quality management practices in  construction companies keralaTotal quality management practices in  construction companies kerala
Total quality management practices in construction companies kerala
 
Study on the Impact of ISO Certification on the Quality Culture of Constructi...
Study on the Impact of ISO Certification on the Quality Culture of Constructi...Study on the Impact of ISO Certification on the Quality Culture of Constructi...
Study on the Impact of ISO Certification on the Quality Culture of Constructi...
 
ESTABLISHING QUALITY STANDARDS IN HIGH RISE BUILDING IN ACCORDANCE TO PRE, DU...
ESTABLISHING QUALITY STANDARDS IN HIGH RISE BUILDING IN ACCORDANCE TO PRE, DU...ESTABLISHING QUALITY STANDARDS IN HIGH RISE BUILDING IN ACCORDANCE TO PRE, DU...
ESTABLISHING QUALITY STANDARDS IN HIGH RISE BUILDING IN ACCORDANCE TO PRE, DU...
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
 
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
 
A Study of Implementation and Impact of Total Quality Management on Construct...
A Study of Implementation and Impact of Total Quality Management on Construct...A Study of Implementation and Impact of Total Quality Management on Construct...
A Study of Implementation and Impact of Total Quality Management on Construct...
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
 
G037036048
G037036048G037036048
G037036048
 
Research proposal implementation of project management
Research proposal implementation of project managementResearch proposal implementation of project management
Research proposal implementation of project management
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business Decisions
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 

More from eSAT Journals

Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
eSAT Journals
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
eSAT Journals
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
eSAT Journals
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
eSAT Journals
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
eSAT Journals
 

More from eSAT Journals (20)

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case study
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangalore
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizer
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concrete
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabs
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Estimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniquesEstimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniques
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...
 

Recently uploaded

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

Study on negligence of quality assurance and proposing an effective framework for total quality management

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 604 STUDY ON NEGLIGENCE OF QUALITY ASSURANCE AND PROPOSING AN EFFECTIVE FRAMEWORK FOR TOTAL QUALITY MANAGEMENT Dharani K1, Ganapathy Ramasamy N2 1 Student, Construction Engineering and Management, SRM University, Tamil Nadu, India 2 Assistant Professor, Construction Engineering and Management, SRM University, Tamil Nadu, India Abstract Quality plays an integral part in the construction industry. Quality assurance is needed because of the involvement of negligence in a project which deduces the quality of the construction .In order to build customer confidence the quality of its work should be done according to the developed quality assurance program. This paper focuses on various negligence of quality assurance practices in the construction industry. The objective of the project is to analyze the various factors that affect quality and quality assurance and to provide an effective framework for the total quality management which helps to increase the quality performance of the construction industry. This project includes a set of questionnaires about quality, quality assurance and total quality management prepared and distributed to various companies and then analyzed. With the help of analyzed data’s a total quality management framework has been proposed to reduce the negligence of quality assurance in the construction industry. Keywords: Quality, Quality Assurance, Total Quality Management and construction etc… --------------------------------------------------------------------***---------------------------------------------------------------------- 1. INTRODUCTION Quality has become one of the essential elements in recent years due to conceptual changes in the construction industry. In any industry the product should be manufactured according to the required standard which provides the worth of money and satisfaction of the customers. Quality is nothing but the satisfaction of the customer with the performance, appearance, and reliability of the project for the valuable cost range. In all the phases of the project life cycle quality of construction project is linked with proper quality management. Because of the poor quality management systems lots of failures where occurred. This paper therefore focuses on the total quality management in all the phases of construction projects. To support the construction projects many of the management practices used are being challenged. Quality management systems and quality assurance are the topics which have been receiving increasing attention. The quality of the construction projects as well as the project success can be regarded as the fulfillment of the expectations of the project participants. The concept of total quality management is concerned to make everyone accountable for their own performance and to get them committed for attaining the higher quality [2]. Total Quality Management is the management approach of an organization, which concentrates on quality based on the participation of its members and aims at long-term success through satisfaction and benefits to all members of the organization and the society[3]. There are different trends and approaches comprised in contracting firms and clients for the adoption of total quality management [5]. Total Quality Management is required because of the fine co-ordination and constructive framework between the organizations, its suppliers and customers and also for its employees. Quality Assurance is important in the engineering and construction industry because of the risk involved in any project. The performance of the project is affected because of the risk involved due to many external factors and also for not completing the project on time. To avoid any in- efficiency resulting in the poor products and service which are delivered to the customer, it is important to develop a built-in quality assurance system[7]. Internal and external aspects are involved in the quality systems. Providing confidence to the management of an organization that the required quality has to be achieved is the aim of the internal quality system. And for inspiring the confidence in the client and to satisfy the client’s quality requirement is the aim for the external quality systems. This system is called the Quality Assurance systems [6]. In developing countries, on relying on the ISO 9000 and 14000 standards the quality assurance in the construction sector has been in practice for quite some time as they have been implementing TQM practices in the building and also in construction industry. In this study, it will be studied about the identification of various negligence of the quality assurance systems in the existing construction projects. A questionnaire is prepared based on the quality and negligence of quality assurance systems in construction industry. 2. AIM OF STUDY The aim of the study is to find out the negligence in quality assurance and to propose an effective framework for the Total Quality Management
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 605 2.1 Objectives of the Study The specific objectives are:  To understand the importance of quality assurance in the construction industry  To identify the effective quality management for the particular project  To provide a detailed framework for TQM. 2.2 Scope of Study This project focuses on the quality assurance and Total Quality Management in the construction industry. The main concept of this project is to develop a framework for Total Quality Management by eliminating the various negligence in quality assurance which is identified during the construction of the existing projects. 3. LITERATURE REVIEW In recent decades, due to the competitiveness in the market places worldwide companies have realized that a good product quality is a key area for the commercial success and its development. Several methods have been emerged under the Total Quality Management umbrella. However to date, associated research in the construction sector has received little attention by comparison to say, manufacturing. Some approaches have been proposed for use in construction has limitations with regard to their applicability. A framework has been developed which includes quality policy, products and service quality to help quality in projects (David Joaquin Delgado 2008). TQM inclusion in construction industry helps to increase the quality of the product which forces the construction firms to implement the system. The aspects that where targeted such as quality in the organization, employee training and organizational culture, seems appreciable. Lacking of having a concise and exact definition of quality was also observed. The fragmented nature of the industry is a big hurdle in TQM application. Lack of education, negligence and irresponsibility are also critical issues which should be prevented. Implementing TQM requires a major transformation in the organization (Rizwan U 2008). Even when approved plans exist, the developers/owners refuse to follow standards and specifications as contained in the plan and cut corners probably because quality assurance is not always a cost effective activity though it is essential if fitness for purpose is the measure of performance and where the satisfaction of the client or customer is to be placed first and foremost. Quality assurance is firmly dependent upon clients knowing their specific needs and communicating these unambiguously to the designer, upon the designer accurately representing these requirements in the design concept, upon the contractor faithfully reproducing these requirements in the work on site, and taking quality assurance to its end, upon the occupier using the building correctly to achieve maximum performance (Griffith, 1990). After the tsunami disaster and terrorism srilanka construction industry showed a study growth in their construction processes. Numerous building construction projects have been started and some are about to start because of the sudden rise of economic growth, urbanization and resettlement. As a result, the demand for building materials, manpower and machinery requirements have shown a considerable increase. Poor quality leads to structural failures. To avoid these type of factors quality assurance system has been developed (G L Chandrasena, 2008). To examine the effectiveness of the construction industry, quality assurance system is developed to address the public concern, safety, durability and functionality. The identified major problems where inadequate budgetary allocation for quality control, non-enforcement of quality control clauses by authorized agencies, insufficient quality control laboratories. So addressing these problems will greatly improve the level of quality assurance in the industry (Y.A. Abdul Kareem 2006). The factors affecting the quality performance in construction projects where conflicts among project participants, hostile socio-economic environment, bad climatic conditions, project manager’s ignorance, faulty project conceptualization and aggressive competition during tendering. So to rectify the factors possible remedial measures has been suggested to improve the quality (K.N. Jha 2006). Recently several organizations have restored to the application of total quality management with the view to assessing the level of quality and to improve it. This total quality management process is considered as a modern system in the field of quality, after the quality assurance, quality control and ISO in the construction sector. The important factors were taken into account relating to the internal customers of the companies. The finding of the study is that these organizations generally take into account the principles of total quality management (Abu Hassan Bin 2011). 4. METHODOLOGY The first approach, a literature review was done to extract list of factors affecting quality and also the negligence in the quality assurance systems from previous study.  The second approach is to identify the concept of Total Quality Management and quality assurance.  The third approach is to prepare an questionnaire based on the various negligence in quality assurance and distributed to a set of companies.  The fourth approach is to collect the relevant data’s needed for the process and also collects the distributed questionnaires from the respective companies.  The fifth approach is to analyze, evaluate and rank the collected questionnaires with the help of SPSS for statistical analysis.  The sixth approach is to develop a model framework and implement it in the current construction projects.  Based on the knowledge gained on the literature study the project is carried out with the following flowchart.
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 606 Fig -1: Methodology 5. STUDY ANALYSIS 5.1 Questionnaire Responses This study compromises professionals in consulting, contracting, engineers, project managers, quality engineers has been involved. This resulted in a total questionnaires of 50. Out of 50 questionnaires distributed 40 were returned and the analysis has been done. Table -1: No. of respondents Questionnaire No Percent Total Distributed Total Returned Not Returned Used for the Study 50 40 10 40 100 90 10 90 Fig -2: No. of respondents chart The results of the analysis in table 1 shows that ninety percent of questionnaires administered were duly completed and returned. This result is regarded as high. Therefore, the responses got from the organizations of the study to the questionnaire administered are regarded as encouraging. Table -2: Percentage of Respondents Organization No Percent Project Manager Site Engineer Planning Engineer Contractor Quality Inspector 8 9 7 6 10 20 22.5 17.5 15 25 Table 2 shows that 20% are project managers, 22.5% are site managers, 17.5% are planning engineers, and contractors are 15% and 25% of quality control engineers. This shows that QC engineers were the highest respondents. Fig -3: Percentage of Respondents
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 607 5.2 Negligence of Quality Assurance A variety of authors have provided different categorizations of quality problems, but there have been few attempt’s to collect together and identified the major sources of negligence in quality assurance in a comprehensive manner. With the help of the reviewed collected literatures the most notable negligence of quality assurance have been identified. The questionnaires collected from the companies are analyzed using SPSS statistical analysis program. The negligence in quality assurance are inadequate supervision and verification on site, use of superseded drawings and specifications, poor workmanship during construction, Quality Assurance sampling and testing may increase in workload, cost overrun on projects, inadequate commitment to service quality by contractors.(Ranked as per SPSS analysis). Out of 50 questionnaires distributed 40 were returned and the analysis has been done. Table –4: Summary of SPSS and rank of negligence of Quality Assurance S.No Description Mean Rank 1 Inadequate supervision and verification on site. 4.675 1 2 Use of superseded drawing and specification 4.600 2 3 Poor workmanship during construction 4.450 3 4 Quality assurance sampling and testing may increase in workload 4.375 4 5 Cost overrun on projects 4.325 5 6 Inadequate commitment to service quality by contractors 4.200 6 7 Misinterpretation of drawing and specification 4.150 7 8 Poor coordination of subcontracted work 4.000 8 9 Untimely project Delivery 3.950 9 10 Structural failures leading to death. 3.775 10 Table -5: Likert scale for analysis 1 Strongly Disagree 2 Disagree 3 Neutral 4 Agree 5 Strongly Agree Fig -4: Bar chart for the analyzed results
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 608 6. FRAMEWORK REPRESENTATIONS The essential requirements for the development of framework as to be identified to create a schematic representation this framework is developed based on the TQM model. With the help of the questionnaires received from the organizations the quality assurance the most notable negligence factor has been identified and rectified accordingly. The factors which affect the most are inadequate supervision and verification on site, use of superseded drawing and specifications, poor workmanship during construction, quality assurance sampling and testing which increases the workload, cost overrun on projects and inadequate commitment to service quality by contractors has been rectified using Total Quality Management system with four different processes which are quality management program, improvement suggestions in organizations, top management support, self-motivation towards continuous improvement. 6.1 Discussions of Findings The analysis of respondents pursued opinion on who should be largely responsible for enforcing/ensuring effective quality assurance practice in construction reveals that management of companies, professional bodies and even construction clients all have major rolls to play in quality assurance in construction. The advent of total quality management can be seen as timely in the research for productivity improvement and customer satisfaction. It is not feasible as a basis for acceptance that a performance testing would be done in an construction. Setting up of quality assurance department in construction firms and providing trainings and seminars on quality assurance should be provided and penalty for non- compliance of quality standards should implement. Hence in quality assurance testing and sampling should be conducted. Fig -5: Framework for TQM 7. SUMMARY AND CONCLUSION In conclusion, the top ranking grades in construction practices the variables and the dimensions of Total quality management works to some extent. In effectiveness and significance value in each dimensions and each part there is a difference which always exist. From the results achieved the most of the negligence of the quality assurance are significant and should be practiced. From this framework process the negligence factors under quality assurance which are inadequate supervision and verification on site, use of superseded drawing and specifications, poor workmanship during construction, quality assurance sampling and testing which increases the workload, cost overrun on projects and inadequate commitment to service quality by contractors have be solved.
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 609 To increase he performance in the quality management in an organization suggestions should be collected from the employees contactors also from clients and should get approval from top management should be successfully implemented in quality management program so that there should be a continuous improvement throughout the quality management program. REFERENCES [1]. Abdol R. Chini., & Hector E. Valdez. (2003) “ISO 9000 and the U.S. Construction Industry”, J. Manage. Eng., 19(2), 69-77. [2]. Abu Hassan Bin Abu Bakar., Khalid Bin Ali & Eziaku Onyeizu. (2011) “Total Quality Management Practice in Large Construction Companies: A Case of Oman”, J. World Applied Sciences., 15(2), 285-296. [3]. Ashokkumar D. (2014) “Study of Quality Management in Construction Industry” J. IJIRSET., 2319-8753. [4]. Teena Joy. (2014) “A Study on Factors Influencing Quality of Construction Projects” J. IJIRD., 2278-0211. [5]. Arditi D., & Gunaydin H. M. (1997) “Total Quality Management in the Construction Process”, J. International Journal of Project Management., 15(4), 235-243. [6]. Adenuga., Olumide Afolarin. (2013) “Factors Affecting Qulaity in the Delivery of Public Housing Projects in Lagos State, Nigeria”, J. International Journal of Engineering and Technology., ISSN 2049-3444. [7]. Bdulaziz A. Bubshait., Member, ASCE., & Tawfiq H. Al-Atiq. (1999) “ISO 9001 Quality Standards in Construction”, J. Journal of Management in Engineering., 41-46. [8]. Griffith, A (1990). “Quality Assurance in Building” Macmillan Education. [9]. Jha K. N., & Iyer K. C.,(2006). “ Critical Factors affecting Quality Performance in construction projects”. Total Quality Management, 17(9), 1155-1170. [10]. Joaquin D., Hernandez D., & Aspinwall E.(2008). “A framework for building quality into construction projects- Part I”. Total Quality Management, 79(10), 1013-1028. [11]. Muhammad Asim., Sohaib uz Zaman & Tayyaba Zarif (2013). “ Implementation of Total Quality Management in Construction Industry: A Pakistani Perspective”. J. Journal of Management and Social sciences, 24-39. [12]. David Arditi & H Murat Gunydin., (1997).,” Total quality Management in the construction process”. J. International Journal of Project Management, 15(4), 235- 245 [13]. John E. Shively.,(1990).” Survey of Quality- assurance procedures within consultant industry”, J. Management of Engineering. [14]. Mohammad Mehdi Mortahed., Yeganeh Amini., Amir Hosein Younesian., & PeymanSoltani.(2013)., “Impacts of Engineering Work Quality on Project Success”, Social and Behavioral Sciences., 74,429-437 [15]. Plutat, B.M.,(1994)., “Total Quality Management: A framework for application in manufacturing.” The TQM Magazine, 6(1): 44-49. [16]. Pheng, L. S. and A.J. Teo,(2004)., “ Implementing Total Quality Management in Construction Firms. J. Management in Engineering ASCE. [17]. Gamsby, S. O., Mize, J. D., and Reid, R.A. (1996). “A project management focused framework for assuring quality work process.” J. Project Management Institute., 1010-1016. [18]. Arditi, D and Gunaydin, H. M. (1998).,”Factors that affect process quality in the life-cycle of building projects”. J. Construction Engineering and Management, 15(4), 235- 243. [19]. Foster, D., & Jonker, J. (2003).,” Third Generation Quality Management: The role of Stakeholders in Integrating Business into Society. J. Managerial Auditing Journal, 18(4), 323-328. [20]. Yasamis, F., Arditi, D.,and Mohammadi, J.(2002).,” Assessing contractor quality Performance.,” J. Construction Management and Economics, 20(3), 211-223. BIOGRAPHIES Dharani K, Department of civil engineering, SRM University, Kattangulathur, Chennai. Assistant Prof. Ganapathy Ramasamy N, Department of civil engineering, SRM University, Kattangulathur, Chennai.