SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
BACHELOR OF SCIENCE (HONOURS) IN ARCHITECTURE
BUILDING SCIENCE II (BLD61303 / ARC3413)
PROJECT:
AN ACOUSTIC CASE STUDY ON CALVARY CONVENTION CENTRE,
KUALA LUMPUR
GROUP MEMBERS:
ANDY HENG WEE XIANG (0327152)
CHAN YI QIN (0315964)
CHIA CHENG WEI (0322091)
KOH SUNG JIE (0318912)
KOOI YONG KAI (0323152)
LEE XIANG LOON (0322090)
NG EE SHIUNG (0314228)
NG YI YANG (0319688)
LECTURER: MR AZIM SULAIMAN
SUBMISSION DATE: 2 MAY 2017
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
2 | Building Science II (BLD61303 / ARC3413)
TABLE OF CONTENTS
Pages
Declaration of Submission 4
Acknowledgment 5
List of Figures and Tables 6 – 7
Abstract 8
1.0 Introduction 9
1.1 Aims and Objectives 10
1.2 Site Introduction 11 – 12
2.0 Literature Review
2.1 Sound 13
2.2 Architecture Acoustic 13
2.3 Sound Pressure Level (SPL) 13 – 14
2.4 Reverberation Time (RT) 14
2.5 Sound Reduction Index (SRI) 15
3.0 Methodology
3.1 Equipment and Specifications
2.1.1 Sound Level Meter 16
2.1.2 Camera 17
2.1.3 Measuring Tape 18
3.2 Data Collection Methods
2.2.1 Site Study 18 – 22
2.2.2 Procedure 23 – 24
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
3 | Building Science II (BLD61303 / ARC3413)
4.0 Findings
4.1 Selection of Site 25 – 27
4.2 Materials and Specifications 28 – 32
4.3 Noise
4.3.1 Outdoor Noise 33 – 35
4.3.2 Indoor Noise 36 – 37
4.4 Fixtures and Specifications 38
4.4.1 Zoning and Tabulation 38 – 39
4.4.2 Audio Systems 40 – 41
4.5 Sound Propagation 42 – 43
4.6 Absorption of Surfaces 44
4.7 Reverberation Time 45
5.0 Conclusion 46 – 47
6.0 References 48
7.0 Appendix 49
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
4 | Building Science II (BLD61303 / ARC3413)
DECLARATION OF SUBMISSION
This is to certify that the submitted paper has not been published previously, nor is it under
consideration for publication elsewhere. We also certify that its publication is approved by all
authors and tacitly or explicitly by the responsible authorities where the work was carried out,
and that, if accepted, it will not be published elsewhere including electronically in the same
form, in English or in any other language, without the written consent of the copyright-holder.
Name Student ID Signature
ANDY HENG WEE XIANG 0327152
CHIA CHENG WEI 0322091
CHAN YI QIN 0315964
KOH SUNG JIE 0318912
KOOI YONG KAI 0323152
LEE XIANG LOON 0322090
NG EE SHIUNG 0314228
NG YI YANG 0319688
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
5 | Building Science II (BLD61303 / ARC3413)
ACKNOWLEDGEMENT
First and foremost, we would like to thank Taylor’s University for giving us the opportunity to
conduct this case study. From this project, we were able to comprehensively learn about how
acoustics work within an actual auditorium space. Also, we would like to express our gratitude
towards our tutor, Mr. Azim Sulaiman, for patiently guiding us throughout this assignment
while providing necessary equipment to conduct our studies. He also helped us understand the
scope of our project so that we would not waste time doing unnecessary work.
Moreover, we would like to thank Ms. Chin Yoke Yee from Calvary Convention Centre for
not only invited us to ‘The Call’, an Easter event held in the Calvary Convention Centre, but
also allowed us access into the auditorium when it was empty. Therefore, we were able to
capture photos and experience the space when in use and not in use. We also want to thank Mr.
David as he brought us into the auditorium during the second visit. Mr. David is the assistant
sound engineer in the centre and he was able to provide us valuable information on the acoustics
of the space. Ms. Chin and Mr. David took the time off from their busy schedule to aid us in
our research and we are grateful for that.
Last but not least, we want to express our special thanks to Ar. Andy Chong from T.R. Hamzah
& Yeang. Ar. Andy was the project director in the design and construction of Calvary
Convention Centre. We were able to acquire the drawings, such as floor plans, sections and
details that were extremely crucial to this case study because of him. Not only that, Ar. Andy
invited us to his office and gave us an insight into his project by carefully explaining the design
intentions of the building and its interior.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
6 | Building Science II (BLD61303 / ARC3413)
LIST OF FIGURES AND TABLES
List of Figures Pages
Figure 1 Exterior of Calvary Convention Centre 11
Figure 2 Sound Level Meter used on site 16
Figure 3 One of the cameras used, Canon EOS 550D 17
Figure 4 Measuring tape used on site 18
Figure 5 Easter performance on stage 19
Figure 6 Speech and the size of the audience during ‘The Call’ 19
Figure 7 Sitting positions during the Easter event 20
Figure 8 Gathering data via the sound level meter at the center of the
auditorium 21
Figure 9 Mr. David explaining about the acoustic design of the hall 21
Figure 10 Group photo with Ar. Andy Chong 22
Figure 11 TEDxKL hosted in the Calvary Convention Centre 25
Figure 12 Panoramic shot of the auditorium when not in used 26
Figure 13 Fan-shaped floor plan of the auditorium 26
Figure 14 Longitudinal section of the auditorium spanning 4-storeys tall 27
Figure 15 Materials indicated on floor plan 31
Figure 16 Materials indicated on section 32
Figure 17 Detailed section of roof showing roof layers 33
Figure 18 Double door volume and fire escape access acting as air gaps
shown on floor plan 34
Figure 19 Section showing sound insulation lining between air-conditioning
duct and carpark ceiling 35
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
7 | Building Science II (BLD61303 / ARC3413)
Figure 20 Air-conditioning transmission flow shown on section 36
Figure 21 Air vents underneath the auditorium seats 37
Figure 22 Detailed section showing the ventilation system under the floor 37
Figure 23 Zoning and sound source shown on floor plan 38
Figure 24 Sound transmission of various types of speakers 40
Figure 25 Sound propagation diagram without the aid of speakers 43
Figure 26 View from stage showing the gaps between the acoustic ceiling
panels 43
Figure 27 Panoramic shot of Calvary Convention Centre’s auditorium
during a performance 47
List of Tables
Table 1 Example of sound sources and their properties 14
Table 2 List of materials and their properties 29
Table 3 Data tabulation from sound level received in every zone 39
Table 4 Types of speakers and specifications 41
Table 5 Total room surface absorption 44
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
8 | Building Science II (BLD61303 / ARC3413)
ABSTRACT
An auditorium is a special room built to enable an audience to hear and watch performances at
venues such as theatres and music halls. A successful design of an auditorium depends on its
layout and absorption materials used in order to enhance desired sound while eliminating noise
and undesired sound. This paper attempts to understand building acoustics in relation to an
auditorium layout design and construction.
The chosen building was Calvary Convention Centre and the area of interest is its auditorium
space. Other areas not related to the auditorium’s acoustical design were not considered. The
research covers the acoustical materials and fixtures used in the building, design strategies used
to counter noise from the outside and inside, sound source and propagation and the
relationships between the aspects stated. With the information gathered, a full scope of its
design intention based on acoustics can be determined.
To assist the validation of research, literature reviews based on various sources such as articles
on the building and site visits were conducted to complete this report. Furthermore, necessary
documents such as the building plans were acquired from the related parties such as the centre
personnel and the architect. With the findings gathered, the data collected were studied
extensively in conjunction to the acoustic design of the building.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
9 | Building Science II (BLD61303 / ARC3413)
1.0 INTRODUCTION
Acoustic design is defined as an audio component which is related to the control of sound in
spaces particularly encased spaces. The necessity shifts in agreement to different functions.
Acoustical requirement varies depending on the function of a place or space. Unwanted sounds
and noise are eliminated in a good acoustic design in order to provide a better auditory
environment for the user. It is imperative as to improve desired sounds and to eliminate
unwanted noise and static sounds.
We have decided to select the Calvary Convention Centre as our case study in our group of
five. The content of the report follows our group's thoughts and observation, data collection
and documentation, as well as the study of the acoustic performances within the famed Calvary
Convention Centre. In order to acquire all the necessary data, multiple visits were required with
the aid of designated electronic measuring equipment, while permission was also granted in
order to acquire measured drawings of the building in question and photographs taken for
referencing purposes.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
10 | Building Science II (BLD61303 / ARC3413)
1.1 Aims and Objectives
The aims and objectives are as followings:
1. To conclude the characteristics and purpose of sound and acoustic within the proposed
space.
2. To critically account for and examine the acoustics of the space.
3. To understand ways to improve the acoustic qualities of that place.
4. To be able to yield a complete papers or documentation on study of space relative to
acoustic requirements.
5. To comprehend how the auditorium design layout can affect the efficiency of the public
address (PA) system in a particular hall.
6. To have the ability to assess and discover creative innovation by applying recent
material technology in accordance to the current construction industry.
By discerning and assessing the form of acoustic design used in Calvary Convention Centre,
we aim to have a better understanding on the features of a space and how it determines different
design approaches for acoustic whilst how different types of acoustic designs and applications
affect the working efficacy and user experience of an acoustic space, as well as recommending
keys to improve the acoustics qualities in the case study.
This project is focused at providing students a foundational understanding and study of acoustic
design layout and arrangements of an actual auditorium. In addition, this project also aims to
provide students a way to explore the methodologies of designing a good acoustic system via
calculations based on readings and measurements.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
11 | Building Science II (BLD61303 / ARC3413)
1.2 Site Introduction
Figure 1: Exterior of Calvary Convention Centre (Source: Calvary Church, 2017)
The Calvary Convention Centre is located on a 4.9 acre piece of land within the identified
International Zone at Bukit Jalil, in the southern part of Wilayah Persekutuan, Kuala Lumpur.
Designed by T.R. Hamzah & Yeang Sdn Bhd, it has facilities that are unique and dedicate to
enhancing the convention and educational requirements. The famed Calvary Convention
Centre has a built-up area measuring 600,000 square feet, spreading across 4.9 acres of prime
land close to the heart of Kuala Lumpur. A 5,000 seat auditorium will play host to world class
conventions, banquets, seminars and creative arts productions.
As for the auditorium, it has a column-free span of 60m. Its roof is supported by 2 main trusses
spanning from the back to the front of the hall on 4 mega columns. The ceiling space is serviced
by a network of servicing catwalks for maintenance of lights and stage rigging. The design of
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
12 | Building Science II (BLD61303 / ARC3413)
the auditorium was thought to be a single-tiered floor that allows the audience in the back row
to walk to the altar area at the front of the stage without exiting the auditorium. Other than that,
the auditorium is designed to be sub-dividable into 3 smaller halls, and has built-in structures
in the ceiling for future installation of foldable ceiling mounted ‘Skyfold’ partitions, up to 10m
in height. The front of the sub-divided halls has retractable seats to convert the space into a
speaker area when needed. As for the stage in the auditorium, it is designed for theatrical and
musical productions, including a fly tower, orchestra pit, stage proscenium, changing rooms,
rehearsal rooms, and green room.
The orchestra pit platform is yet to be operable and is designed to stop at several floor positions.
The stage level is designed to increase the stage size, while mid stage level is designed to bring
the speaker ‘closer to the audience’. The auditorium level floor position enlarges the hall
seating capacity, while below auditorium level as a sunken orchestra pit. The pit platform is
also designed to stop at rehearsal room level and at store room level where stage props and
other equipment are stored.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
13 | Building Science II (BLD61303 / ARC3413)
2.0 LITERATURE REVIEW
2.1 Sound
The sensation stimulated in the hearing organs by mechanical or natural radiant energy
transmitted as longitudinal pressure waves through the air or other mediums.
2.2 Architecture Acoustic
Architecture acoustic is the science and engineering of achieving a good sound within a
building. This may include achieving good speech intelligibility in a theatre, enhancing the
quality of music played through instruments in a concert hall or auditorium, or suppressing
noise to make offices and homes more productive and pleasant places to work and live in.
Design of spaces, structures and mechanical systems must include acoustic consideration to
create a space that is pleasing in sound quality to suit the mood of the space. The acoustic mood
designed for a space is also highly affect by the buffer from the building exterior that blocks
the outdoor noise and building interior design that buffers indoor noise.
2.3 Sound Pressure Level (SPL)
Sound pressure is the local pressure deviation from the ambient atmospheric pressure, caused
by a sound wave, using symbol p or p. The sound pressure is usually measure using a
microphone. Sound pressure level is used in measuring the magnitude of sound in decibel (dB).
SPL = 20 log10
𝑝
𝑝0
where SPL = sound pressure level (dB)
𝑝 = the pressure of the sound being measured
𝑝0 = the pressure of the threshold of intensity taken as 20 x 10-6
Pa
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
14 | Building Science II (BLD61303 / ARC3413)
Sources at 1m Sound Pressure Lp re 20 µPa*
Rifle 200 Pa 140 dB
Threshold of pain 20 Pa 120 dB
Pneumatic hammer 2 Pa 100 dB
6 dB = double the Pa 1 Pa 94 dB
Street traffic 0.2 Pa 80 dB
Talking 0.02 Pa 60 dB
Library 0.002 Pa 40 dB
TV Studio 0.0002 Pa 20 dB
Threshold of hearing 0.00002 Pa 0 dB
* Reference Sound Pressure po in air = 2 x 10-5 Pa = 20 µPa = 0 dB
Table 1: Example of sound sources and their properties (Source: Acoustic Glossary)
2.4 Reverberation Time (RT)
In acoustics, reverberation is the persistence of sound after a sound is produced. Reverberation
or a reverb is created when a sound is reflected causing a large number of reflections to build
up and then decay as the sound is absorbed by the surfaces of objects in the space – which
could include furniture, people, walls and air. This is most noticeable when the source stops
but the reflections continue, decreasing in amplitude, until they reach zero amplitude.
The duration it takes for a sound to drop by 60 dB is the reverberation time. Reverberation time
(RT) is an important index for describing the acoustic quality of a space.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
15 | Building Science II (BLD61303 / ARC3413)
where RT = reverberation time (seconds)
V = volume of room (m3
)
A = total absorption of room surfaces (m2
sabins)
2.5 Sound Reduction Index (SRI)
Sound pressure is the difference, in a given space, between the average local pressure of the
space and the pressure in the sound wave. The Sound Reduction Index (SRI) or Transmission
Loss (TL) of a partition measure the number of decibels lost when a sound of a given frequency
is transmitted through the partition.
SRI = 10 log10 (
1
𝑇𝑎𝑣
)
𝑇𝑎𝑣 = (
𝑆1 𝑇𝑐1 + 𝑆2 𝑇𝑐2+. . 𝑆 𝑛 𝑇𝑐𝑛
𝑇𝑜𝑡𝑎𝑙 𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝐴𝑟𝑒𝑎
)
where SRI = sound reduction index
Tav = transmission coefficient
Tcn = transmission coefficient of material
Sn = the surface area of the material n
RT =
0.16𝑉
𝐴
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
16 | Building Science II (BLD61303 / ARC3413)
3.0 METHODOLOGY
3.1 Equipment and Specifications
3.1.1 Sound Level Meter
Figure 2: Sound Level Meter used on site (Source: C. W. Chia, 2017)
The sound level meter used was the 01dB A-scale Sound Level Meter provided by Taylor’s
University. The A-scale frequency weighting corresponds to the way the human ear responds
to the loudness of sound and the weighted sound level value is read on the meter.
The stated sound level meter is capable of two ranges: 60-120 dBA and 30-90 dBA. It is mainly
used for fast sound pressure level, Lp, measurement and has the option for equivalent
continuous sound level, Leq, measurement.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
17 | Building Science II (BLD61303 / ARC3413)
3.1.2 Camera
Figure 3: One of the cameras used, Canon EOS 550D (Source: Amazon)
The main cameras used for this case study are the Canon EOS 550D, Nikon D90 and Fujifilm
XT-10. The digital cameras were used on site to record and capture pictures of the building,
acoustic conditions as well as the acoustical fixtures present on site. There were secondary
cameras, mainly smartphone cameras, were used when the main cameras were not readily
available. All the photos taken are used as evidence of our study and for reference purposes
when not on site.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
18 | Building Science II (BLD61303 / ARC3413)
3.1.3 Measuring Tape
Figure 4: Measuring tape used on site (Source: Wikimedia)
Although we already obtained the floor plans and sections along with their dimensions, we
brought a few measuring tapes during the site visit. These tools were used to confirm the
measurements on some small-scale details and to acquire missing dimensions not found in the
drawings.
3.2 Data Collection Methods
3.2.1 Site Study
There are two site visits and a meeting conducted over a 5-week period before the submission.
Moreover, we obtained the floor plans and sections from the project architect from T.R.
Hamzah & Yeang Sdn. Bhd.
The first site visit was during an Easter event, ‘The Call’. During the visit, we sat in different
locations in the auditorium to gather information purely from observation and experience. This
is because we were not allowed to conduct any formal analysis during the event.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
19 | Building Science II (BLD61303 / ARC3413)
Figure 5: Easter performance on stage (A. Heng, 2017)
Figure 6: Speech and the size of the audience during ‘The Call’ (A. Heng, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
20 | Building Science II (BLD61303 / ARC3413)
Figure 7: Sitting positions during the Easter event (Source: Y. Q. Chan, 2017)
The second site visit was on the 25th April 2017, when the auditorium was empty. This visit
was applied from the convention centre’s office through emails and phone calls. Without an
event occurring, we were able to conduct a formal analysis as well as to gather acoustical data
and information. Furthermore, Mr. David, the assistant sound engineer of Calvary Convention
Centre was there to supervise the visit and was able to answer most of the questions that we
inquired about the site.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
21 | Building Science II (BLD61303 / ARC3413)
Figure 8: Gathering data via the sound level meter at the center of the auditorium (Source: A. Heng, 2017)
Figure 9: Mr. David explaining about the acoustic design of the hall (Source: X. L. Lee, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
22 | Building Science II (BLD61303 / ARC3413)
In addition, we also met the project director, Ar. Andy Chong on 28th April 2017. He gave us
a complete account on the architectural and acoustic design of the building, interior as well as
the exterior. Ar. Andy explained the requirements given to him from the client in designing
Calvary Convention Centre and the restrictions posed on site. He was also able to answer all
our questions that we prepared beforehand.
Figure 10: Group photo with Ar. Andy Chong (Source: A. Heng, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
23 | Building Science II (BLD61303 / ARC3413)
3.2.2 Procedure
First Site Visit
1. Distribution of seating into three separate locations.
2. Data collection from observation and analysis.
3. Photos of the event taken by allocated team members.
Second Site Visit
1. Photos of materials and fixtures taken in the auditorium.
2. Sound levels of different zones obtained through clapping from source using the
sound meter.
3. Time weightings recorded from sound level meter.
Meeting with Architect
1. Preparation of a list of questions for understanding and confirmation of information
gathered.
Outside of Visit
1. Investigation of photos taken to identify materials and fixtures used.
2. Proper measurements recorded from the floor plans and sections acquired by project
architect.
3. Calculation of volume and surface areas based on measurements taken.
4. Tabulation of data on sound levels and time weightings recorded.
5. Information of fixtures used in auditorium obtained from online sources.
6. Indication of location of materials and fixtures within the site.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
24 | Building Science II (BLD61303 / ARC3413)
7. Tabulation of additional data based on influence of speakers involved.
8. Compilation of data and production of A4 report.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
25 | Building Science II (BLD61303 / ARC3413)
4.0 FINDINGS
4.1 Selection of Site
Calvary Convention Centre is designed to be a world-class intelligent convention centre, built
for the future. The auditorium within hosts international, national and regional conventions,
seminars, musical and creative arts productions, and provides educational and vocational
training and spiritual development. Some of the events hosted include, the recent TEDxKL,
concerts by artists overseas and MiED Awards Ceremony.
Figure 11: TEDxKL hosted in the Calvary Convention Centre (Source: Calvary Convention Centre)
Despite its use, it is lauded as one of the biggest indoor auditoriums in Malaysia due to its
impressive pillarless spacious fan-shaped hall that has the capacity to house up to 5,000 people.
Spanning four levels with multiple entrances, the auditorium is fitted with comfortable theatre
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
26 | Building Science II (BLD61303 / ARC3413)
seats and state-of-the-art acoustic finishings. The stage is equipped with a fly tower, and ample
rehearsal and dressing rooms.
Figure 12: Panoramic shot of the auditorium when not in used (Source: X. L. Lee, 2017)
Figure 13: Fan-shaped floor plan of the auditorium (Source: T.R. Hamzah & Yeang Sdn. Bhd.)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
27 | Building Science II (BLD61303 / ARC3413)
Figure 14: Longitudinal section of the auditorium spanning 4-storeys tall
(Source: T.R. Hamzah & Yeang Sdn. Bhd.)
Not only that, the architectural firm associated to Calvary Convention Centre is the famous
T.R. Hamzah & Yeang, a KL-based architectural firm that has become internationally known
by expanding to China and the United Kingdom. Therefore, all these elements gave us more
than enough reasons to choose Calvary Convention Centre as our subject of study.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
28 | Building Science II (BLD61303 / ARC3413)
4.2 Materials and Specifications
Room acoustics describes how sound behaves in an enclosed space. In designing rooms for
various purposes, the architect will encounter acoustical problems associated with enclosed
spaces. This is because propagation and behaviour of sound in enclosed spaces are more
complex than in open air.
There are three ways to manipulate sound within the room, to reflect, absorb or diffuse it. The
materiality present within the space will play the role of doing either of these, therefore
affecting the acoustic quality of the space.
The whole auditorium is intended to be acoustically treated in a way that every surface area to
be covered with rock wool insulation coupled with acoustic panelling as a secondary layer of
sound absorption. No bare surfaces are seen exposed in the auditorium.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
29 | Building Science II (BLD61303 / ARC3413)
Material Photos Absorption Coefficient (α)
125 Hz 500 Hz 1000 Hz
Carpet,
Heavy, on
Reinforced
Concrete
0.02 0.14 0.37
Timber Floor
on Joists
0.15 0.10 0.07
Hung Curtain,
Heavy
0.14 0.55 0.72
Rockwool
Foam
0.15 0.90 0.90
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
30 | Building Science II (BLD61303 / ARC3413)
Acoustic
Timber
Boards
0.18 0.42 0.59
Solid Timber 0.14 0.06 0.08
Upholstered
Tip-up
Theatre Seat
0.33 0.64 0.71
Timber
Padded
Retractable
Tip-up Seat
0.08 0.15 0.00
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
31 | Building Science II (BLD61303 / ARC3413)
Plaster Board 0.30 0.15 0.05
Pane Glass 0.18 0.04 0.03
Table 2: List of materials and their properties (Source: Mechanical and Electrical Equipment for Buildings)
Figure 15: Materials indicated on floor plan (Source: Y. K. Kooi, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
32 | Building Science II (BLD61303 / ARC3413)
Figure 16: Materials indicated on section (Source: Y. K. Kooi, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
33 | Building Science II (BLD61303 / ARC3413)
4.3 Noise
4.3.1 Outdoor Noise
One of the most prevalent noise that occur in Malaysia is the rain. The sound caused from the
impact of rain hitting the roof must be absorbed so that an event can be held regardless of the
weather outside. The layers of material used for roofing as shown in Figure 16 is crucial so that
the noise is therefore isolated from the interior.
Figure 17: Detailed section of roof showing roof layers (Source: E. S. Ng, 2017)
To isolate noise from outdoor activities and from other rooms, the architect used double doors
to prevent noise from the entrance to enter the auditorium space. Moreover, the fire escape
access lined at the side of the auditorium doubles as an air barrier to isolate noise from the
outside from coming into the auditorium space.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
34 | Building Science II (BLD61303 / ARC3413)
Figure 18: Double door volume and fire escape access acting as air gaps shown on floor plan
(Source: Y. Y. Ng, 2017)
The basement carpark of Calvary Convention Centre is located right beneath the auditorium.
This basement carpark would potentially cause unwanted noise from cars moving about, thus
a thick layer of insulation as shown in Figure 18 is applied between the ceiling of the carpark
and the air ducts beneath the auditorium (refer item 4.3.2).
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
35 | Building Science II (BLD61303 / ARC3413)
Figure 19: Section showing sound insulation lining between air-conditioning duct and carpark ceiling
(Source: Y. Y. Ng, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
36 | Building Science II (BLD61303 / ARC3413)
4.3.2 Indoor Noise
The main concern for indoor noise is the noise caused by mechanical ventilation, the air-
conditioning system. If a ceiling mounted air-conditioning system was employed, the energy
needed to transmit cool air to the seats would be enormous, thus causing more noise by
vibrations from the air ducts. This is due to the ceiling height of the auditorium being at around
20 meters.
Figure 20: Air-conditioning transmission flow shown on section (Source: Y. Y. Ng, 2017)
Thus, the solution is to invert the air-conditioning system by transmitting cool air upwards
rather than downwards as shown in Figure 19. The front 2/3 of the auditorium employs this
system while the back 1/3 of the auditorium uses ceiling mounted system. This not only
reduced the noise posed from air-conditioning, but also reduced the energy usage of the
building, making the building more sustainable.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
37 | Building Science II (BLD61303 / ARC3413)
Figure 21: Air vents underneath the auditorium seats (Source: A. Heng, 2017)
Figure 22: Detailed section showing the ventilation system under the floor
(Source: Y. Y. Ng, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
38 | Building Science II (BLD61303 / ARC3413)
4.4 Fixtures and Specifications
A perfect auditorium is able to project sound in a manner that the same level of sound is
received by each person. Due to its immense scale, this is not realistically possible for Calvary
Convention Centre. Hence, it uses its audio system consisting several types of speakers to
achieve this.
4.4.1 Zoning and Tabulation
During our site visit, we conducted an analysis on the sound received from the source at various
areas of the auditorium. The auditorium is separated into 9 zones while the sound source is at
the center of the stage.
Figure 23: Zoning and sound source shown on floor plan (Source: C. W. Chia, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
39 | Building Science II (BLD61303 / ARC3413)
We positioned one of our members on the stage to produce sound by claps. Each clap is
recorded on every zone and its average is determined.
Zones
Sound Level (dB)
1 2 3 Average
1 60 56 59 61
2 57 66 59 60.67
3 58 60 62 60
4 53 60 54 55.67
5 56 59 60 58.33
6 52 59 54 55
7 54 50 50 51.33
8 56 53 50 53
9 55 46 54 51.67
Table 3: Data tabulation from sound level received in every zone (Source: C. W. Chia, 2017)
We have concluded that the middle zones generally receive a higher sound level than the side
zones. Also, the sound level received lowers gradually when it goes to the back end of the
auditorium.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
40 | Building Science II (BLD61303 / ARC3413)
4.4.2 Audio Systems
There are three types of speakers used in the auditorium and all of them are under a same brand,
L-Acoustics.
The ARC Focus is a line array loudspeaker system that is purposed to project sound to the back
of the auditorium. To ensure the back of the auditorium receives sound the same time as the
front, the sound from the bottommost speaker projecting towards the frontmost audience is
delayed by a split-second. Next, the P-Series 108P is used to project sound towards the front 4
seating rows. This is because the ARC Focus sets are unable to reach the 4 rows stated, thus
the 108P is used to compensate for that matter. Lastly, the four P-Series 112P located on the
stage are used as stage monitors. Stage monitors are used whereby the performers are able to
listen to other instruments as well as their own voices so that they could make vocal adjustments
during the performance.
Figure 24: Sound transmission of various types of speakers (Source: C. W. Chia, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
41 | Building Science II (BLD61303 / ARC3413)
Type of Speakers Dimension Weight Sound Specifications
L-Acoustics P-Series 112P 540 mm height
x 410 mm
width x 390
mm depth
32 kg - Usable system
bandwidth of 50Hz to
20 kHz (-10 dB).
Generates conical
directivity (-6 dB
points) of 90°.
- Maximum SPL (Sound
Pressure Level),
measured at 1m under
free field conditions is
133 dB.
- Wedge-shaped design
with a fixed angle
setting of 30°.
L-Acoustics ARCS Focus 365 mm width
at the front x
252 mm width
at the rear x 759
mm height x
444 mm depth.
38 kg - Usable system
bandwidth of 55Hz to
20 kHz (-10 dB).
Generates a
symmetrical horizontal
directivity of 15° and a
symmetrical vertical
coverage angle of 90°
(-6 dB).
- Maximum peak SPL,
measured at 1m under
free field conditions is
139 dB.
L-Acoustics P-Series 108P 421mm x
height, 250mm
width x 299mm
depth
13 kg - Usable system
bandwidth of 55 Hz to
20 kHz (-10 dB).
Generates a conical
directivity (-6 dB) of
100°.
- Maximum peak SPL,
measured at 1m under
free field conditions is
125 dB.
Table 4: Types of speakers and specifications (Source: C. W. Chia, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
42 | Building Science II (BLD61303 / ARC3413)
4.5 Sound Propagation
The auditorium is designed in way that the levels are descending towards the stage. This
arrangement allows the audience at the back to have a clear view towards the stage. However,
this affects the propagation of sound coming from the stage. Therefore, ceiling panels attached
above play a role in reinforcing the propagation of sound.
Firstly, sound travelling forward towards the audience is known as direct sound. Due to the
nature of the auditorium, there are no obstructions within and thus the furthest audience is able
to receive direct sound. However, as the auditorium is mostly covered with acoustic foam,
direct sound hitting the walls is absorbed.
Next, sound travelling upwards is either reflected or absorbed. There are two ceiling surfaces,
the upper ceiling surface that is heavily insulated and the lower ceiling surface consisting of
acoustic panels. The panelling system is arranged in a manner that there are openings
occupying 30% the lower ceiling surface. The sound travelling between the gaps is absorbed
by the upper ceiling surface.
The remaining sound travelling upwards is reflected downward by the acoustic panels towards
the audience and this sound is known as indirect sound. The indirect sound is much softer than
direct sound, however this reinforces the direct sound, making it clear for audience near and
far.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
43 | Building Science II (BLD61303 / ARC3413)
Figure 25: Sound propagation diagram without the aid of speakers (Source: C. W. Chia, 2017)
Figure 26: View from stage showing the gaps between the acoustic ceiling panels
(Source: A. Heng, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
44 | Building Science II (BLD61303 / ARC3413)
4.6 Absorption of Surfaces
Based on the materials identified on site and the measurements obtained from the drawings,
we were able to calculate the absorption of each surface and determine the total room
absorption of the auditorium, tabulated in Table 5.
Material Area (m2
)
Absorption
Coefficient, α (sabins)
Absorption of
Surface, AS
(m2
sabins)
Carpet, Heavy, on
Reinforced Concrete
3291.95 0.14 460.87
Timber Floor on Joists 112.98 0.10 11.30
Hung Curtain, heavy 464.13 0.55 255.27
Rockwool Foam 1673.4 0.90 2634.98
Acoustic Timber Board 2482.43 0.42 1042.62
Solid Timber 223.65 0.06 13.42
Upholstered Tip-up
Theatre Seat
2964.95 0.64 1897.57
Timber Padded
Retractable Tip-up Seat
417.88 0.15 62.68
Plaster Board 2482.43 0.15 372.36
Pane Glass 99.84 0.04 3.99
Total Room Absorption, AT (m2
sabins) 6715.06
Table 5: Total room surface absorption (Source: Y. K. Kooi, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
45 | Building Science II (BLD61303 / ARC3413)
4.7 Reverberation Time
During the meeting with the architect, we asked Ar. Andy Chong about the reverberation time
of Calvary Convention Centre. He stated the reverberation time is 0.9s.
V = Volume, m3
= 39136.60 m3
AT = Total Room Absorption, m2
sabins = 6715.06 m2
sabins
𝑅𝑇 =
0.16𝑉
𝐴 𝑇
=
0.16 × 39136.60 𝑚3
6715.06 𝑚2 𝑠𝑎𝑏𝑖𝑛𝑠
= 0.93𝑠 ≈ 0.9𝑠
∴ Thus, the reverberation time calculated is the same as the reverberation time stated.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
46 | Building Science II (BLD61303 / ARC3413)
5.0 CONCLUSION
We are very grateful that we could perform a case study in this module as we could only learn
so much from lectures and books. When we experienced the space for itself and talked to people
who designed the space, we were able to truly understand and appreciate a full scope on
acoustics.
Calvary Convention Centre had many challenges when it was being designed. Its sheer scale
of having around 5,000 occupants for its maximum capacity, its location being on a
disproportionate land area, the tropical climate as well as the requirements given by the client
to be multipurpose.
Smart and efficient design strategies such as isolation by air gaps and restructuring of systems
had to be employed to counter noise emanating from outside and the inside. Material choice is
essential as to not only cut down excess sound, but also to make the space comfortable and
welcoming for visitors. Application of sound systems helps reinforce sound transmission when
necessary. Also, consideration of the type and position of loudspeakers used is crucial so that
every audience can receive sound at the same time. To us, it is rather impressive that the
auditorium managed to keep the reverberation time to 0.9 seconds, an optimal number for
speech-based rooms.
We are glad that we picked Calvary Convention Centre as our case study topic. The flexibility
of the auditorium makes us understand both the demands for speeches and music performances.
Ultimately, this assignment has, in a short period of time, enabled us to be aware of how sound
behaves in various conditions and how to manipulate sound levels to our advantage.
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
47 | Building Science II (BLD61303 / ARC3413)
Figure 27: Panoramic shot of Calvary Convention Centre’s auditorium during a performance
(Source: X. L. Lee, 2017)
An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur
48 | Building Science II (BLD61303 / ARC3413)
6.0 REFERENCES
Grondzik, W. T., & Kwok, A. G. (2015). Mechanical and electrical equipment for buildings
(12th ed.). Hoboken, NJ: Wiley.
Hardy, H. (2006). Building Type Basics for Performing Arts Facilities. Hoboken, N.J. : J.
Wiley.
McMullan, R. (2012). Environmental science in building (5th ed.). Houndmills, Basingstoke,
England: Palgrave Macmillan.
Moore, J. (1961). Design for Good Acoustics. London: Architectural Press.
Schmolke, B. (2011). Theatres and Concert Halls: Construction and Design Manual.
Singapore: Page One.
Shuai, Y. (2011). Green Office Building: Acoustic Installation, Natural Ventilation, Green
Roof, Sustainable Architecture. Hong Kong: Hong Kong Polytechnic International Pub. Ltd.
Sound Absorption Coefficients. (n.d.). Retrieved April 25, 2017, from
https://www.acousticalsurfaces.com/acoustic_IOI/101_13.htm
Sound Pressure: Definitions, Terms, Units and Measurement. (n.d.). Retrieved April 25, 2017,
from http://www.acoustic-glossary.co.uk/sound-pressure.htm
Trevor, J., & Peter, D. (2009). Acoustic Absorbers and Diffusers: Theory, Design and
Application. London: Taylor & Francis.

More Related Content

What's hot

Intro to auditorium design
Intro to auditorium designIntro to auditorium design
Intro to auditorium designDivya Kothari
 
Building Science 2 : A Case Study on Acoustic Design
Building Science 2 : A Case Study on Acoustic DesignBuilding Science 2 : A Case Study on Acoustic Design
Building Science 2 : A Case Study on Acoustic DesignNicole Foo
 
Auditorium: A Case Study on Acoustic Design Report
Auditorium: A Case Study on Acoustic Design ReportAuditorium: A Case Study on Acoustic Design Report
Auditorium: A Case Study on Acoustic Design Reportjisunfoo
 
Litrature review on auditorium
Litrature review on auditoriumLitrature review on auditorium
Litrature review on auditoriummogesberhanu
 
Convention hall interior acoustics
Convention hall  interior acoustics Convention hall  interior acoustics
Convention hall interior acoustics Shourya Puri
 
Dr. Bhim Rao Ambedkar Auditorium
Dr. Bhim Rao Ambedkar AuditoriumDr. Bhim Rao Ambedkar Auditorium
Dr. Bhim Rao Ambedkar AuditoriumAmir Azhar
 
Project 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignProject 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignBryan Yeoh
 
Auditorium Architecture planning
Auditorium Architecture planningAuditorium Architecture planning
Auditorium Architecture planningDanishPathan7
 
Case study about auditorium
Case study about auditoriumCase study about auditorium
Case study about auditoriumNilanjana Pal
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention centerKiruthika Selvi K J
 
convention center litrature
convention center litratureconvention center litrature
convention center litratureSrujanaReddy41
 
Data collection convention center
Data collection convention center  Data collection convention center
Data collection convention center SIJOMONACHAN
 
literature review in museum and art gallery design
literature review in museum and art gallery designliterature review in museum and art gallery design
literature review in museum and art gallery designritikchaudhary15
 
Kuala Lumpur Convention Centre
Kuala Lumpur Convention CentreKuala Lumpur Convention Centre
Kuala Lumpur Convention CentreBarsha
 
Hyderabad International Convention Centre (H.I.C.C)
Hyderabad International Convention Centre (H.I.C.C)Hyderabad International Convention Centre (H.I.C.C)
Hyderabad International Convention Centre (H.I.C.C)Manish Agarwal
 
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAIShanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAIDijo Mathews
 
litrature study convention center
litrature study convention centerlitrature study convention center
litrature study convention centerSrujanaReddy41
 
A Case Study On Room Acoustic
A Case Study On Room AcousticA Case Study On Room Acoustic
A Case Study On Room AcousticKalvin Bong
 

What's hot (20)

Intro to auditorium design
Intro to auditorium designIntro to auditorium design
Intro to auditorium design
 
Building Science 2 : A Case Study on Acoustic Design
Building Science 2 : A Case Study on Acoustic DesignBuilding Science 2 : A Case Study on Acoustic Design
Building Science 2 : A Case Study on Acoustic Design
 
Auditorium: A Case Study on Acoustic Design Report
Auditorium: A Case Study on Acoustic Design ReportAuditorium: A Case Study on Acoustic Design Report
Auditorium: A Case Study on Acoustic Design Report
 
Litrature review on auditorium
Litrature review on auditoriumLitrature review on auditorium
Litrature review on auditorium
 
Convention hall interior acoustics
Convention hall  interior acoustics Convention hall  interior acoustics
Convention hall interior acoustics
 
Dr. Bhim Rao Ambedkar Auditorium
Dr. Bhim Rao Ambedkar AuditoriumDr. Bhim Rao Ambedkar Auditorium
Dr. Bhim Rao Ambedkar Auditorium
 
Auditorium case study 1
Auditorium case study 1Auditorium case study 1
Auditorium case study 1
 
Project 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignProject 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic Design
 
Auditorium Architecture planning
Auditorium Architecture planningAuditorium Architecture planning
Auditorium Architecture planning
 
Case study about auditorium
Case study about auditoriumCase study about auditorium
Case study about auditorium
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention center
 
convention center litrature
convention center litratureconvention center litrature
convention center litrature
 
Data collection convention center
Data collection convention center  Data collection convention center
Data collection convention center
 
literature review in museum and art gallery design
literature review in museum and art gallery designliterature review in museum and art gallery design
literature review in museum and art gallery design
 
Kuala Lumpur Convention Centre
Kuala Lumpur Convention CentreKuala Lumpur Convention Centre
Kuala Lumpur Convention Centre
 
NCPA , MUMBAI
  NCPA , MUMBAI   NCPA , MUMBAI
NCPA , MUMBAI
 
Hyderabad International Convention Centre (H.I.C.C)
Hyderabad International Convention Centre (H.I.C.C)Hyderabad International Convention Centre (H.I.C.C)
Hyderabad International Convention Centre (H.I.C.C)
 
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAIShanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
 
litrature study convention center
litrature study convention centerlitrature study convention center
litrature study convention center
 
A Case Study On Room Acoustic
A Case Study On Room AcousticA Case Study On Room Acoustic
A Case Study On Room Acoustic
 

Similar to An Acoustic Case Study on Calvary Convention Centre Report

Building Science ll Project 1 Report
Building Science ll Project 1 ReportBuilding Science ll Project 1 Report
Building Science ll Project 1 ReportNatalie Yunxian
 
Bscience project 1 (report)
Bscience project 1 (report)Bscience project 1 (report)
Bscience project 1 (report)Afiq Knick
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2Darshiini Vig
 
Building Science II Report
Building Science II ReportBuilding Science II Report
Building Science II ReportVansC
 
Building science ii report
Building science ii reportBuilding science ii report
Building science ii reportWeng Chuan
 
Acoustic Analysis Project 1
Acoustic Analysis Project 1Acoustic Analysis Project 1
Acoustic Analysis Project 1J-Sern Phua
 
Architectural conservation arc3413 king street penang
Architectural conservation arc3413 king street penangArchitectural conservation arc3413 king street penang
Architectural conservation arc3413 king street penangGary Yeow
 
Bsc final report
Bsc final reportBsc final report
Bsc final reportKC Wong
 
B.science 2 Report
B.science 2 ReportB.science 2 Report
B.science 2 ReportYung Kai
 
Bsc final report
Bsc final reportBsc final report
Bsc final reporthongbinng
 
Building Science final report
Building Science final report Building Science final report
Building Science final report Sheau Hui Tan
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 reportHarwinder Girn
 
Building science 2 PJT 1 report
Building science 2 PJT 1 reportBuilding science 2 PJT 1 report
Building science 2 PJT 1 reportForestedTiger
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 reportChong Yi Hui
 

Similar to An Acoustic Case Study on Calvary Convention Centre Report (20)

Building Science ll Project 1 Report
Building Science ll Project 1 ReportBuilding Science ll Project 1 Report
Building Science ll Project 1 Report
 
Bscience project 1 (report)
Bscience project 1 (report)Bscience project 1 (report)
Bscience project 1 (report)
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
 
Building Science II Report
Building Science II ReportBuilding Science II Report
Building Science II Report
 
Building science ii report
Building science ii reportBuilding science ii report
Building science ii report
 
B.science 2 project 1
B.science 2   project 1B.science 2   project 1
B.science 2 project 1
 
Acoustic Analysis Project 1
Acoustic Analysis Project 1Acoustic Analysis Project 1
Acoustic Analysis Project 1
 
ACOUSTIC
ACOUSTICACOUSTIC
ACOUSTIC
 
Architectural conservation arc3413 king street penang
Architectural conservation arc3413 king street penangArchitectural conservation arc3413 king street penang
Architectural conservation arc3413 king street penang
 
Final report
Final reportFinal report
Final report
 
Compilationd
CompilationdCompilationd
Compilationd
 
Compilation
CompilationCompilation
Compilation
 
Bsc final report
Bsc final reportBsc final report
Bsc final report
 
B.science 2 Report
B.science 2 ReportB.science 2 Report
B.science 2 Report
 
Bsc final report
Bsc final reportBsc final report
Bsc final report
 
Building Science final report
Building Science final report Building Science final report
Building Science final report
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
 
Building science 2 report (1)
Building science 2 report (1)Building science 2 report (1)
Building science 2 report (1)
 
Building science 2 PJT 1 report
Building science 2 PJT 1 reportBuilding science 2 PJT 1 report
Building science 2 PJT 1 report
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
 

More from douglasloon

Architecture Design Project Presentation Slides
Architecture Design Project Presentation SlidesArchitecture Design Project Presentation Slides
Architecture Design Project Presentation Slidesdouglasloon
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project Reportdouglasloon
 
Titiwangsa Cultural Centre Project Management Report
Titiwangsa Cultural Centre Project Management ReportTitiwangsa Cultural Centre Project Management Report
Titiwangsa Cultural Centre Project Management Reportdouglasloon
 
Recreation Blocks Project Management Report
Recreation Blocks Project Management ReportRecreation Blocks Project Management Report
Recreation Blocks Project Management Reportdouglasloon
 
Theories of Architecture and Urbanism Comparative Analysis Essay
Theories of Architecture and Urbanism Comparative Analysis EssayTheories of Architecture and Urbanism Comparative Analysis Essay
Theories of Architecture and Urbanism Comparative Analysis Essaydouglasloon
 
Theories of Architecture and Urbanism Reaction Papers
Theories of Architecture and Urbanism Reaction PapersTheories of Architecture and Urbanism Reaction Papers
Theories of Architecture and Urbanism Reaction Papersdouglasloon
 
Building Technology 1 Industralised Building System (IBS) Report
Building Technology 1 Industralised Building System (IBS) ReportBuilding Technology 1 Industralised Building System (IBS) Report
Building Technology 1 Industralised Building System (IBS) Reportdouglasloon
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Reportdouglasloon
 
Building Science II Integration Project Report
Building Science II Integration Project ReportBuilding Science II Integration Project Report
Building Science II Integration Project Reportdouglasloon
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Reportdouglasloon
 
Roof Truss System (Truss Analysis)
Roof Truss System (Truss Analysis)Roof Truss System (Truss Analysis)
Roof Truss System (Truss Analysis)douglasloon
 
Asian Architecture: 8D House Paper Presentation
Asian Architecture: 8D House Paper PresentationAsian Architecture: 8D House Paper Presentation
Asian Architecture: 8D House Paper Presentationdouglasloon
 
Asian Architecture: 8D House Topic Proposal
Asian Architecture: 8D House Topic ProposalAsian Architecture: 8D House Topic Proposal
Asian Architecture: 8D House Topic Proposaldouglasloon
 
Asian Architecture: 8D House Case Study Paper
Asian Architecture: 8D House Case Study PaperAsian Architecture: 8D House Case Study Paper
Asian Architecture: 8D House Case Study Paperdouglasloon
 
Building Services in Public Buildings Report
Building Services in Public Buildings ReportBuilding Services in Public Buildings Report
Building Services in Public Buildings Reportdouglasloon
 
Mapping the Townscape (Petaling Street & Central Market) Presentation Slides
Mapping the Townscape (Petaling Street & Central Market) Presentation SlidesMapping the Townscape (Petaling Street & Central Market) Presentation Slides
Mapping the Townscape (Petaling Street & Central Market) Presentation Slidesdouglasloon
 
Tropical Cities: George Town, Penang Presentation Slides
Tropical Cities: George Town, Penang Presentation SlidesTropical Cities: George Town, Penang Presentation Slides
Tropical Cities: George Town, Penang Presentation Slidesdouglasloon
 
Sun Yat Sen Museum Penang Report
Sun Yat Sen Museum Penang ReportSun Yat Sen Museum Penang Report
Sun Yat Sen Museum Penang Reportdouglasloon
 
Sun Yat Sen Museum Penang Measured Drawings
Sun Yat Sen Museum Penang Measured DrawingsSun Yat Sen Museum Penang Measured Drawings
Sun Yat Sen Museum Penang Measured Drawingsdouglasloon
 
Sun Yat Sen Museum Penang Presentation Slides
Sun Yat Sen Museum Penang Presentation SlidesSun Yat Sen Museum Penang Presentation Slides
Sun Yat Sen Museum Penang Presentation Slidesdouglasloon
 

More from douglasloon (20)

Architecture Design Project Presentation Slides
Architecture Design Project Presentation SlidesArchitecture Design Project Presentation Slides
Architecture Design Project Presentation Slides
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project Report
 
Titiwangsa Cultural Centre Project Management Report
Titiwangsa Cultural Centre Project Management ReportTitiwangsa Cultural Centre Project Management Report
Titiwangsa Cultural Centre Project Management Report
 
Recreation Blocks Project Management Report
Recreation Blocks Project Management ReportRecreation Blocks Project Management Report
Recreation Blocks Project Management Report
 
Theories of Architecture and Urbanism Comparative Analysis Essay
Theories of Architecture and Urbanism Comparative Analysis EssayTheories of Architecture and Urbanism Comparative Analysis Essay
Theories of Architecture and Urbanism Comparative Analysis Essay
 
Theories of Architecture and Urbanism Reaction Papers
Theories of Architecture and Urbanism Reaction PapersTheories of Architecture and Urbanism Reaction Papers
Theories of Architecture and Urbanism Reaction Papers
 
Building Technology 1 Industralised Building System (IBS) Report
Building Technology 1 Industralised Building System (IBS) ReportBuilding Technology 1 Industralised Building System (IBS) Report
Building Technology 1 Industralised Building System (IBS) Report
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
 
Building Science II Integration Project Report
Building Science II Integration Project ReportBuilding Science II Integration Project Report
Building Science II Integration Project Report
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
 
Roof Truss System (Truss Analysis)
Roof Truss System (Truss Analysis)Roof Truss System (Truss Analysis)
Roof Truss System (Truss Analysis)
 
Asian Architecture: 8D House Paper Presentation
Asian Architecture: 8D House Paper PresentationAsian Architecture: 8D House Paper Presentation
Asian Architecture: 8D House Paper Presentation
 
Asian Architecture: 8D House Topic Proposal
Asian Architecture: 8D House Topic ProposalAsian Architecture: 8D House Topic Proposal
Asian Architecture: 8D House Topic Proposal
 
Asian Architecture: 8D House Case Study Paper
Asian Architecture: 8D House Case Study PaperAsian Architecture: 8D House Case Study Paper
Asian Architecture: 8D House Case Study Paper
 
Building Services in Public Buildings Report
Building Services in Public Buildings ReportBuilding Services in Public Buildings Report
Building Services in Public Buildings Report
 
Mapping the Townscape (Petaling Street & Central Market) Presentation Slides
Mapping the Townscape (Petaling Street & Central Market) Presentation SlidesMapping the Townscape (Petaling Street & Central Market) Presentation Slides
Mapping the Townscape (Petaling Street & Central Market) Presentation Slides
 
Tropical Cities: George Town, Penang Presentation Slides
Tropical Cities: George Town, Penang Presentation SlidesTropical Cities: George Town, Penang Presentation Slides
Tropical Cities: George Town, Penang Presentation Slides
 
Sun Yat Sen Museum Penang Report
Sun Yat Sen Museum Penang ReportSun Yat Sen Museum Penang Report
Sun Yat Sen Museum Penang Report
 
Sun Yat Sen Museum Penang Measured Drawings
Sun Yat Sen Museum Penang Measured DrawingsSun Yat Sen Museum Penang Measured Drawings
Sun Yat Sen Museum Penang Measured Drawings
 
Sun Yat Sen Museum Penang Presentation Slides
Sun Yat Sen Museum Penang Presentation SlidesSun Yat Sen Museum Penang Presentation Slides
Sun Yat Sen Museum Penang Presentation Slides
 

Recently uploaded

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...EADTU
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17Celine George
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Celine George
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111GangaMaiya1
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonhttgc7rh9c
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxCeline George
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 

Recently uploaded (20)

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptx
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 

An Acoustic Case Study on Calvary Convention Centre Report

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN BACHELOR OF SCIENCE (HONOURS) IN ARCHITECTURE BUILDING SCIENCE II (BLD61303 / ARC3413) PROJECT: AN ACOUSTIC CASE STUDY ON CALVARY CONVENTION CENTRE, KUALA LUMPUR GROUP MEMBERS: ANDY HENG WEE XIANG (0327152) CHAN YI QIN (0315964) CHIA CHENG WEI (0322091) KOH SUNG JIE (0318912) KOOI YONG KAI (0323152) LEE XIANG LOON (0322090) NG EE SHIUNG (0314228) NG YI YANG (0319688) LECTURER: MR AZIM SULAIMAN SUBMISSION DATE: 2 MAY 2017
  • 2. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 2 | Building Science II (BLD61303 / ARC3413) TABLE OF CONTENTS Pages Declaration of Submission 4 Acknowledgment 5 List of Figures and Tables 6 – 7 Abstract 8 1.0 Introduction 9 1.1 Aims and Objectives 10 1.2 Site Introduction 11 – 12 2.0 Literature Review 2.1 Sound 13 2.2 Architecture Acoustic 13 2.3 Sound Pressure Level (SPL) 13 – 14 2.4 Reverberation Time (RT) 14 2.5 Sound Reduction Index (SRI) 15 3.0 Methodology 3.1 Equipment and Specifications 2.1.1 Sound Level Meter 16 2.1.2 Camera 17 2.1.3 Measuring Tape 18 3.2 Data Collection Methods 2.2.1 Site Study 18 – 22 2.2.2 Procedure 23 – 24
  • 3. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 3 | Building Science II (BLD61303 / ARC3413) 4.0 Findings 4.1 Selection of Site 25 – 27 4.2 Materials and Specifications 28 – 32 4.3 Noise 4.3.1 Outdoor Noise 33 – 35 4.3.2 Indoor Noise 36 – 37 4.4 Fixtures and Specifications 38 4.4.1 Zoning and Tabulation 38 – 39 4.4.2 Audio Systems 40 – 41 4.5 Sound Propagation 42 – 43 4.6 Absorption of Surfaces 44 4.7 Reverberation Time 45 5.0 Conclusion 46 – 47 6.0 References 48 7.0 Appendix 49
  • 4. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 4 | Building Science II (BLD61303 / ARC3413) DECLARATION OF SUBMISSION This is to certify that the submitted paper has not been published previously, nor is it under consideration for publication elsewhere. We also certify that its publication is approved by all authors and tacitly or explicitly by the responsible authorities where the work was carried out, and that, if accepted, it will not be published elsewhere including electronically in the same form, in English or in any other language, without the written consent of the copyright-holder. Name Student ID Signature ANDY HENG WEE XIANG 0327152 CHIA CHENG WEI 0322091 CHAN YI QIN 0315964 KOH SUNG JIE 0318912 KOOI YONG KAI 0323152 LEE XIANG LOON 0322090 NG EE SHIUNG 0314228 NG YI YANG 0319688
  • 5. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 5 | Building Science II (BLD61303 / ARC3413) ACKNOWLEDGEMENT First and foremost, we would like to thank Taylor’s University for giving us the opportunity to conduct this case study. From this project, we were able to comprehensively learn about how acoustics work within an actual auditorium space. Also, we would like to express our gratitude towards our tutor, Mr. Azim Sulaiman, for patiently guiding us throughout this assignment while providing necessary equipment to conduct our studies. He also helped us understand the scope of our project so that we would not waste time doing unnecessary work. Moreover, we would like to thank Ms. Chin Yoke Yee from Calvary Convention Centre for not only invited us to ‘The Call’, an Easter event held in the Calvary Convention Centre, but also allowed us access into the auditorium when it was empty. Therefore, we were able to capture photos and experience the space when in use and not in use. We also want to thank Mr. David as he brought us into the auditorium during the second visit. Mr. David is the assistant sound engineer in the centre and he was able to provide us valuable information on the acoustics of the space. Ms. Chin and Mr. David took the time off from their busy schedule to aid us in our research and we are grateful for that. Last but not least, we want to express our special thanks to Ar. Andy Chong from T.R. Hamzah & Yeang. Ar. Andy was the project director in the design and construction of Calvary Convention Centre. We were able to acquire the drawings, such as floor plans, sections and details that were extremely crucial to this case study because of him. Not only that, Ar. Andy invited us to his office and gave us an insight into his project by carefully explaining the design intentions of the building and its interior.
  • 6. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 6 | Building Science II (BLD61303 / ARC3413) LIST OF FIGURES AND TABLES List of Figures Pages Figure 1 Exterior of Calvary Convention Centre 11 Figure 2 Sound Level Meter used on site 16 Figure 3 One of the cameras used, Canon EOS 550D 17 Figure 4 Measuring tape used on site 18 Figure 5 Easter performance on stage 19 Figure 6 Speech and the size of the audience during ‘The Call’ 19 Figure 7 Sitting positions during the Easter event 20 Figure 8 Gathering data via the sound level meter at the center of the auditorium 21 Figure 9 Mr. David explaining about the acoustic design of the hall 21 Figure 10 Group photo with Ar. Andy Chong 22 Figure 11 TEDxKL hosted in the Calvary Convention Centre 25 Figure 12 Panoramic shot of the auditorium when not in used 26 Figure 13 Fan-shaped floor plan of the auditorium 26 Figure 14 Longitudinal section of the auditorium spanning 4-storeys tall 27 Figure 15 Materials indicated on floor plan 31 Figure 16 Materials indicated on section 32 Figure 17 Detailed section of roof showing roof layers 33 Figure 18 Double door volume and fire escape access acting as air gaps shown on floor plan 34 Figure 19 Section showing sound insulation lining between air-conditioning duct and carpark ceiling 35
  • 7. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 7 | Building Science II (BLD61303 / ARC3413) Figure 20 Air-conditioning transmission flow shown on section 36 Figure 21 Air vents underneath the auditorium seats 37 Figure 22 Detailed section showing the ventilation system under the floor 37 Figure 23 Zoning and sound source shown on floor plan 38 Figure 24 Sound transmission of various types of speakers 40 Figure 25 Sound propagation diagram without the aid of speakers 43 Figure 26 View from stage showing the gaps between the acoustic ceiling panels 43 Figure 27 Panoramic shot of Calvary Convention Centre’s auditorium during a performance 47 List of Tables Table 1 Example of sound sources and their properties 14 Table 2 List of materials and their properties 29 Table 3 Data tabulation from sound level received in every zone 39 Table 4 Types of speakers and specifications 41 Table 5 Total room surface absorption 44
  • 8. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 8 | Building Science II (BLD61303 / ARC3413) ABSTRACT An auditorium is a special room built to enable an audience to hear and watch performances at venues such as theatres and music halls. A successful design of an auditorium depends on its layout and absorption materials used in order to enhance desired sound while eliminating noise and undesired sound. This paper attempts to understand building acoustics in relation to an auditorium layout design and construction. The chosen building was Calvary Convention Centre and the area of interest is its auditorium space. Other areas not related to the auditorium’s acoustical design were not considered. The research covers the acoustical materials and fixtures used in the building, design strategies used to counter noise from the outside and inside, sound source and propagation and the relationships between the aspects stated. With the information gathered, a full scope of its design intention based on acoustics can be determined. To assist the validation of research, literature reviews based on various sources such as articles on the building and site visits were conducted to complete this report. Furthermore, necessary documents such as the building plans were acquired from the related parties such as the centre personnel and the architect. With the findings gathered, the data collected were studied extensively in conjunction to the acoustic design of the building.
  • 9. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 9 | Building Science II (BLD61303 / ARC3413) 1.0 INTRODUCTION Acoustic design is defined as an audio component which is related to the control of sound in spaces particularly encased spaces. The necessity shifts in agreement to different functions. Acoustical requirement varies depending on the function of a place or space. Unwanted sounds and noise are eliminated in a good acoustic design in order to provide a better auditory environment for the user. It is imperative as to improve desired sounds and to eliminate unwanted noise and static sounds. We have decided to select the Calvary Convention Centre as our case study in our group of five. The content of the report follows our group's thoughts and observation, data collection and documentation, as well as the study of the acoustic performances within the famed Calvary Convention Centre. In order to acquire all the necessary data, multiple visits were required with the aid of designated electronic measuring equipment, while permission was also granted in order to acquire measured drawings of the building in question and photographs taken for referencing purposes.
  • 10. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 10 | Building Science II (BLD61303 / ARC3413) 1.1 Aims and Objectives The aims and objectives are as followings: 1. To conclude the characteristics and purpose of sound and acoustic within the proposed space. 2. To critically account for and examine the acoustics of the space. 3. To understand ways to improve the acoustic qualities of that place. 4. To be able to yield a complete papers or documentation on study of space relative to acoustic requirements. 5. To comprehend how the auditorium design layout can affect the efficiency of the public address (PA) system in a particular hall. 6. To have the ability to assess and discover creative innovation by applying recent material technology in accordance to the current construction industry. By discerning and assessing the form of acoustic design used in Calvary Convention Centre, we aim to have a better understanding on the features of a space and how it determines different design approaches for acoustic whilst how different types of acoustic designs and applications affect the working efficacy and user experience of an acoustic space, as well as recommending keys to improve the acoustics qualities in the case study. This project is focused at providing students a foundational understanding and study of acoustic design layout and arrangements of an actual auditorium. In addition, this project also aims to provide students a way to explore the methodologies of designing a good acoustic system via calculations based on readings and measurements.
  • 11. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 11 | Building Science II (BLD61303 / ARC3413) 1.2 Site Introduction Figure 1: Exterior of Calvary Convention Centre (Source: Calvary Church, 2017) The Calvary Convention Centre is located on a 4.9 acre piece of land within the identified International Zone at Bukit Jalil, in the southern part of Wilayah Persekutuan, Kuala Lumpur. Designed by T.R. Hamzah & Yeang Sdn Bhd, it has facilities that are unique and dedicate to enhancing the convention and educational requirements. The famed Calvary Convention Centre has a built-up area measuring 600,000 square feet, spreading across 4.9 acres of prime land close to the heart of Kuala Lumpur. A 5,000 seat auditorium will play host to world class conventions, banquets, seminars and creative arts productions. As for the auditorium, it has a column-free span of 60m. Its roof is supported by 2 main trusses spanning from the back to the front of the hall on 4 mega columns. The ceiling space is serviced by a network of servicing catwalks for maintenance of lights and stage rigging. The design of
  • 12. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 12 | Building Science II (BLD61303 / ARC3413) the auditorium was thought to be a single-tiered floor that allows the audience in the back row to walk to the altar area at the front of the stage without exiting the auditorium. Other than that, the auditorium is designed to be sub-dividable into 3 smaller halls, and has built-in structures in the ceiling for future installation of foldable ceiling mounted ‘Skyfold’ partitions, up to 10m in height. The front of the sub-divided halls has retractable seats to convert the space into a speaker area when needed. As for the stage in the auditorium, it is designed for theatrical and musical productions, including a fly tower, orchestra pit, stage proscenium, changing rooms, rehearsal rooms, and green room. The orchestra pit platform is yet to be operable and is designed to stop at several floor positions. The stage level is designed to increase the stage size, while mid stage level is designed to bring the speaker ‘closer to the audience’. The auditorium level floor position enlarges the hall seating capacity, while below auditorium level as a sunken orchestra pit. The pit platform is also designed to stop at rehearsal room level and at store room level where stage props and other equipment are stored.
  • 13. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 13 | Building Science II (BLD61303 / ARC3413) 2.0 LITERATURE REVIEW 2.1 Sound The sensation stimulated in the hearing organs by mechanical or natural radiant energy transmitted as longitudinal pressure waves through the air or other mediums. 2.2 Architecture Acoustic Architecture acoustic is the science and engineering of achieving a good sound within a building. This may include achieving good speech intelligibility in a theatre, enhancing the quality of music played through instruments in a concert hall or auditorium, or suppressing noise to make offices and homes more productive and pleasant places to work and live in. Design of spaces, structures and mechanical systems must include acoustic consideration to create a space that is pleasing in sound quality to suit the mood of the space. The acoustic mood designed for a space is also highly affect by the buffer from the building exterior that blocks the outdoor noise and building interior design that buffers indoor noise. 2.3 Sound Pressure Level (SPL) Sound pressure is the local pressure deviation from the ambient atmospheric pressure, caused by a sound wave, using symbol p or p. The sound pressure is usually measure using a microphone. Sound pressure level is used in measuring the magnitude of sound in decibel (dB). SPL = 20 log10 𝑝 𝑝0 where SPL = sound pressure level (dB) 𝑝 = the pressure of the sound being measured 𝑝0 = the pressure of the threshold of intensity taken as 20 x 10-6 Pa
  • 14. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 14 | Building Science II (BLD61303 / ARC3413) Sources at 1m Sound Pressure Lp re 20 µPa* Rifle 200 Pa 140 dB Threshold of pain 20 Pa 120 dB Pneumatic hammer 2 Pa 100 dB 6 dB = double the Pa 1 Pa 94 dB Street traffic 0.2 Pa 80 dB Talking 0.02 Pa 60 dB Library 0.002 Pa 40 dB TV Studio 0.0002 Pa 20 dB Threshold of hearing 0.00002 Pa 0 dB * Reference Sound Pressure po in air = 2 x 10-5 Pa = 20 µPa = 0 dB Table 1: Example of sound sources and their properties (Source: Acoustic Glossary) 2.4 Reverberation Time (RT) In acoustics, reverberation is the persistence of sound after a sound is produced. Reverberation or a reverb is created when a sound is reflected causing a large number of reflections to build up and then decay as the sound is absorbed by the surfaces of objects in the space – which could include furniture, people, walls and air. This is most noticeable when the source stops but the reflections continue, decreasing in amplitude, until they reach zero amplitude. The duration it takes for a sound to drop by 60 dB is the reverberation time. Reverberation time (RT) is an important index for describing the acoustic quality of a space.
  • 15. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 15 | Building Science II (BLD61303 / ARC3413) where RT = reverberation time (seconds) V = volume of room (m3 ) A = total absorption of room surfaces (m2 sabins) 2.5 Sound Reduction Index (SRI) Sound pressure is the difference, in a given space, between the average local pressure of the space and the pressure in the sound wave. The Sound Reduction Index (SRI) or Transmission Loss (TL) of a partition measure the number of decibels lost when a sound of a given frequency is transmitted through the partition. SRI = 10 log10 ( 1 𝑇𝑎𝑣 ) 𝑇𝑎𝑣 = ( 𝑆1 𝑇𝑐1 + 𝑆2 𝑇𝑐2+. . 𝑆 𝑛 𝑇𝑐𝑛 𝑇𝑜𝑡𝑎𝑙 𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝐴𝑟𝑒𝑎 ) where SRI = sound reduction index Tav = transmission coefficient Tcn = transmission coefficient of material Sn = the surface area of the material n RT = 0.16𝑉 𝐴
  • 16. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 16 | Building Science II (BLD61303 / ARC3413) 3.0 METHODOLOGY 3.1 Equipment and Specifications 3.1.1 Sound Level Meter Figure 2: Sound Level Meter used on site (Source: C. W. Chia, 2017) The sound level meter used was the 01dB A-scale Sound Level Meter provided by Taylor’s University. The A-scale frequency weighting corresponds to the way the human ear responds to the loudness of sound and the weighted sound level value is read on the meter. The stated sound level meter is capable of two ranges: 60-120 dBA and 30-90 dBA. It is mainly used for fast sound pressure level, Lp, measurement and has the option for equivalent continuous sound level, Leq, measurement.
  • 17. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 17 | Building Science II (BLD61303 / ARC3413) 3.1.2 Camera Figure 3: One of the cameras used, Canon EOS 550D (Source: Amazon) The main cameras used for this case study are the Canon EOS 550D, Nikon D90 and Fujifilm XT-10. The digital cameras were used on site to record and capture pictures of the building, acoustic conditions as well as the acoustical fixtures present on site. There were secondary cameras, mainly smartphone cameras, were used when the main cameras were not readily available. All the photos taken are used as evidence of our study and for reference purposes when not on site.
  • 18. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 18 | Building Science II (BLD61303 / ARC3413) 3.1.3 Measuring Tape Figure 4: Measuring tape used on site (Source: Wikimedia) Although we already obtained the floor plans and sections along with their dimensions, we brought a few measuring tapes during the site visit. These tools were used to confirm the measurements on some small-scale details and to acquire missing dimensions not found in the drawings. 3.2 Data Collection Methods 3.2.1 Site Study There are two site visits and a meeting conducted over a 5-week period before the submission. Moreover, we obtained the floor plans and sections from the project architect from T.R. Hamzah & Yeang Sdn. Bhd. The first site visit was during an Easter event, ‘The Call’. During the visit, we sat in different locations in the auditorium to gather information purely from observation and experience. This is because we were not allowed to conduct any formal analysis during the event.
  • 19. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 19 | Building Science II (BLD61303 / ARC3413) Figure 5: Easter performance on stage (A. Heng, 2017) Figure 6: Speech and the size of the audience during ‘The Call’ (A. Heng, 2017)
  • 20. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 20 | Building Science II (BLD61303 / ARC3413) Figure 7: Sitting positions during the Easter event (Source: Y. Q. Chan, 2017) The second site visit was on the 25th April 2017, when the auditorium was empty. This visit was applied from the convention centre’s office through emails and phone calls. Without an event occurring, we were able to conduct a formal analysis as well as to gather acoustical data and information. Furthermore, Mr. David, the assistant sound engineer of Calvary Convention Centre was there to supervise the visit and was able to answer most of the questions that we inquired about the site.
  • 21. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 21 | Building Science II (BLD61303 / ARC3413) Figure 8: Gathering data via the sound level meter at the center of the auditorium (Source: A. Heng, 2017) Figure 9: Mr. David explaining about the acoustic design of the hall (Source: X. L. Lee, 2017)
  • 22. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 22 | Building Science II (BLD61303 / ARC3413) In addition, we also met the project director, Ar. Andy Chong on 28th April 2017. He gave us a complete account on the architectural and acoustic design of the building, interior as well as the exterior. Ar. Andy explained the requirements given to him from the client in designing Calvary Convention Centre and the restrictions posed on site. He was also able to answer all our questions that we prepared beforehand. Figure 10: Group photo with Ar. Andy Chong (Source: A. Heng, 2017)
  • 23. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 23 | Building Science II (BLD61303 / ARC3413) 3.2.2 Procedure First Site Visit 1. Distribution of seating into three separate locations. 2. Data collection from observation and analysis. 3. Photos of the event taken by allocated team members. Second Site Visit 1. Photos of materials and fixtures taken in the auditorium. 2. Sound levels of different zones obtained through clapping from source using the sound meter. 3. Time weightings recorded from sound level meter. Meeting with Architect 1. Preparation of a list of questions for understanding and confirmation of information gathered. Outside of Visit 1. Investigation of photos taken to identify materials and fixtures used. 2. Proper measurements recorded from the floor plans and sections acquired by project architect. 3. Calculation of volume and surface areas based on measurements taken. 4. Tabulation of data on sound levels and time weightings recorded. 5. Information of fixtures used in auditorium obtained from online sources. 6. Indication of location of materials and fixtures within the site.
  • 24. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 24 | Building Science II (BLD61303 / ARC3413) 7. Tabulation of additional data based on influence of speakers involved. 8. Compilation of data and production of A4 report.
  • 25. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 25 | Building Science II (BLD61303 / ARC3413) 4.0 FINDINGS 4.1 Selection of Site Calvary Convention Centre is designed to be a world-class intelligent convention centre, built for the future. The auditorium within hosts international, national and regional conventions, seminars, musical and creative arts productions, and provides educational and vocational training and spiritual development. Some of the events hosted include, the recent TEDxKL, concerts by artists overseas and MiED Awards Ceremony. Figure 11: TEDxKL hosted in the Calvary Convention Centre (Source: Calvary Convention Centre) Despite its use, it is lauded as one of the biggest indoor auditoriums in Malaysia due to its impressive pillarless spacious fan-shaped hall that has the capacity to house up to 5,000 people. Spanning four levels with multiple entrances, the auditorium is fitted with comfortable theatre
  • 26. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 26 | Building Science II (BLD61303 / ARC3413) seats and state-of-the-art acoustic finishings. The stage is equipped with a fly tower, and ample rehearsal and dressing rooms. Figure 12: Panoramic shot of the auditorium when not in used (Source: X. L. Lee, 2017) Figure 13: Fan-shaped floor plan of the auditorium (Source: T.R. Hamzah & Yeang Sdn. Bhd.)
  • 27. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 27 | Building Science II (BLD61303 / ARC3413) Figure 14: Longitudinal section of the auditorium spanning 4-storeys tall (Source: T.R. Hamzah & Yeang Sdn. Bhd.) Not only that, the architectural firm associated to Calvary Convention Centre is the famous T.R. Hamzah & Yeang, a KL-based architectural firm that has become internationally known by expanding to China and the United Kingdom. Therefore, all these elements gave us more than enough reasons to choose Calvary Convention Centre as our subject of study.
  • 28. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 28 | Building Science II (BLD61303 / ARC3413) 4.2 Materials and Specifications Room acoustics describes how sound behaves in an enclosed space. In designing rooms for various purposes, the architect will encounter acoustical problems associated with enclosed spaces. This is because propagation and behaviour of sound in enclosed spaces are more complex than in open air. There are three ways to manipulate sound within the room, to reflect, absorb or diffuse it. The materiality present within the space will play the role of doing either of these, therefore affecting the acoustic quality of the space. The whole auditorium is intended to be acoustically treated in a way that every surface area to be covered with rock wool insulation coupled with acoustic panelling as a secondary layer of sound absorption. No bare surfaces are seen exposed in the auditorium.
  • 29. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 29 | Building Science II (BLD61303 / ARC3413) Material Photos Absorption Coefficient (α) 125 Hz 500 Hz 1000 Hz Carpet, Heavy, on Reinforced Concrete 0.02 0.14 0.37 Timber Floor on Joists 0.15 0.10 0.07 Hung Curtain, Heavy 0.14 0.55 0.72 Rockwool Foam 0.15 0.90 0.90
  • 30. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 30 | Building Science II (BLD61303 / ARC3413) Acoustic Timber Boards 0.18 0.42 0.59 Solid Timber 0.14 0.06 0.08 Upholstered Tip-up Theatre Seat 0.33 0.64 0.71 Timber Padded Retractable Tip-up Seat 0.08 0.15 0.00
  • 31. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 31 | Building Science II (BLD61303 / ARC3413) Plaster Board 0.30 0.15 0.05 Pane Glass 0.18 0.04 0.03 Table 2: List of materials and their properties (Source: Mechanical and Electrical Equipment for Buildings) Figure 15: Materials indicated on floor plan (Source: Y. K. Kooi, 2017)
  • 32. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 32 | Building Science II (BLD61303 / ARC3413) Figure 16: Materials indicated on section (Source: Y. K. Kooi, 2017)
  • 33. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 33 | Building Science II (BLD61303 / ARC3413) 4.3 Noise 4.3.1 Outdoor Noise One of the most prevalent noise that occur in Malaysia is the rain. The sound caused from the impact of rain hitting the roof must be absorbed so that an event can be held regardless of the weather outside. The layers of material used for roofing as shown in Figure 16 is crucial so that the noise is therefore isolated from the interior. Figure 17: Detailed section of roof showing roof layers (Source: E. S. Ng, 2017) To isolate noise from outdoor activities and from other rooms, the architect used double doors to prevent noise from the entrance to enter the auditorium space. Moreover, the fire escape access lined at the side of the auditorium doubles as an air barrier to isolate noise from the outside from coming into the auditorium space.
  • 34. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 34 | Building Science II (BLD61303 / ARC3413) Figure 18: Double door volume and fire escape access acting as air gaps shown on floor plan (Source: Y. Y. Ng, 2017) The basement carpark of Calvary Convention Centre is located right beneath the auditorium. This basement carpark would potentially cause unwanted noise from cars moving about, thus a thick layer of insulation as shown in Figure 18 is applied between the ceiling of the carpark and the air ducts beneath the auditorium (refer item 4.3.2).
  • 35. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 35 | Building Science II (BLD61303 / ARC3413) Figure 19: Section showing sound insulation lining between air-conditioning duct and carpark ceiling (Source: Y. Y. Ng, 2017)
  • 36. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 36 | Building Science II (BLD61303 / ARC3413) 4.3.2 Indoor Noise The main concern for indoor noise is the noise caused by mechanical ventilation, the air- conditioning system. If a ceiling mounted air-conditioning system was employed, the energy needed to transmit cool air to the seats would be enormous, thus causing more noise by vibrations from the air ducts. This is due to the ceiling height of the auditorium being at around 20 meters. Figure 20: Air-conditioning transmission flow shown on section (Source: Y. Y. Ng, 2017) Thus, the solution is to invert the air-conditioning system by transmitting cool air upwards rather than downwards as shown in Figure 19. The front 2/3 of the auditorium employs this system while the back 1/3 of the auditorium uses ceiling mounted system. This not only reduced the noise posed from air-conditioning, but also reduced the energy usage of the building, making the building more sustainable.
  • 37. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 37 | Building Science II (BLD61303 / ARC3413) Figure 21: Air vents underneath the auditorium seats (Source: A. Heng, 2017) Figure 22: Detailed section showing the ventilation system under the floor (Source: Y. Y. Ng, 2017)
  • 38. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 38 | Building Science II (BLD61303 / ARC3413) 4.4 Fixtures and Specifications A perfect auditorium is able to project sound in a manner that the same level of sound is received by each person. Due to its immense scale, this is not realistically possible for Calvary Convention Centre. Hence, it uses its audio system consisting several types of speakers to achieve this. 4.4.1 Zoning and Tabulation During our site visit, we conducted an analysis on the sound received from the source at various areas of the auditorium. The auditorium is separated into 9 zones while the sound source is at the center of the stage. Figure 23: Zoning and sound source shown on floor plan (Source: C. W. Chia, 2017)
  • 39. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 39 | Building Science II (BLD61303 / ARC3413) We positioned one of our members on the stage to produce sound by claps. Each clap is recorded on every zone and its average is determined. Zones Sound Level (dB) 1 2 3 Average 1 60 56 59 61 2 57 66 59 60.67 3 58 60 62 60 4 53 60 54 55.67 5 56 59 60 58.33 6 52 59 54 55 7 54 50 50 51.33 8 56 53 50 53 9 55 46 54 51.67 Table 3: Data tabulation from sound level received in every zone (Source: C. W. Chia, 2017) We have concluded that the middle zones generally receive a higher sound level than the side zones. Also, the sound level received lowers gradually when it goes to the back end of the auditorium.
  • 40. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 40 | Building Science II (BLD61303 / ARC3413) 4.4.2 Audio Systems There are three types of speakers used in the auditorium and all of them are under a same brand, L-Acoustics. The ARC Focus is a line array loudspeaker system that is purposed to project sound to the back of the auditorium. To ensure the back of the auditorium receives sound the same time as the front, the sound from the bottommost speaker projecting towards the frontmost audience is delayed by a split-second. Next, the P-Series 108P is used to project sound towards the front 4 seating rows. This is because the ARC Focus sets are unable to reach the 4 rows stated, thus the 108P is used to compensate for that matter. Lastly, the four P-Series 112P located on the stage are used as stage monitors. Stage monitors are used whereby the performers are able to listen to other instruments as well as their own voices so that they could make vocal adjustments during the performance. Figure 24: Sound transmission of various types of speakers (Source: C. W. Chia, 2017)
  • 41. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 41 | Building Science II (BLD61303 / ARC3413) Type of Speakers Dimension Weight Sound Specifications L-Acoustics P-Series 112P 540 mm height x 410 mm width x 390 mm depth 32 kg - Usable system bandwidth of 50Hz to 20 kHz (-10 dB). Generates conical directivity (-6 dB points) of 90°. - Maximum SPL (Sound Pressure Level), measured at 1m under free field conditions is 133 dB. - Wedge-shaped design with a fixed angle setting of 30°. L-Acoustics ARCS Focus 365 mm width at the front x 252 mm width at the rear x 759 mm height x 444 mm depth. 38 kg - Usable system bandwidth of 55Hz to 20 kHz (-10 dB). Generates a symmetrical horizontal directivity of 15° and a symmetrical vertical coverage angle of 90° (-6 dB). - Maximum peak SPL, measured at 1m under free field conditions is 139 dB. L-Acoustics P-Series 108P 421mm x height, 250mm width x 299mm depth 13 kg - Usable system bandwidth of 55 Hz to 20 kHz (-10 dB). Generates a conical directivity (-6 dB) of 100°. - Maximum peak SPL, measured at 1m under free field conditions is 125 dB. Table 4: Types of speakers and specifications (Source: C. W. Chia, 2017)
  • 42. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 42 | Building Science II (BLD61303 / ARC3413) 4.5 Sound Propagation The auditorium is designed in way that the levels are descending towards the stage. This arrangement allows the audience at the back to have a clear view towards the stage. However, this affects the propagation of sound coming from the stage. Therefore, ceiling panels attached above play a role in reinforcing the propagation of sound. Firstly, sound travelling forward towards the audience is known as direct sound. Due to the nature of the auditorium, there are no obstructions within and thus the furthest audience is able to receive direct sound. However, as the auditorium is mostly covered with acoustic foam, direct sound hitting the walls is absorbed. Next, sound travelling upwards is either reflected or absorbed. There are two ceiling surfaces, the upper ceiling surface that is heavily insulated and the lower ceiling surface consisting of acoustic panels. The panelling system is arranged in a manner that there are openings occupying 30% the lower ceiling surface. The sound travelling between the gaps is absorbed by the upper ceiling surface. The remaining sound travelling upwards is reflected downward by the acoustic panels towards the audience and this sound is known as indirect sound. The indirect sound is much softer than direct sound, however this reinforces the direct sound, making it clear for audience near and far.
  • 43. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 43 | Building Science II (BLD61303 / ARC3413) Figure 25: Sound propagation diagram without the aid of speakers (Source: C. W. Chia, 2017) Figure 26: View from stage showing the gaps between the acoustic ceiling panels (Source: A. Heng, 2017)
  • 44. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 44 | Building Science II (BLD61303 / ARC3413) 4.6 Absorption of Surfaces Based on the materials identified on site and the measurements obtained from the drawings, we were able to calculate the absorption of each surface and determine the total room absorption of the auditorium, tabulated in Table 5. Material Area (m2 ) Absorption Coefficient, α (sabins) Absorption of Surface, AS (m2 sabins) Carpet, Heavy, on Reinforced Concrete 3291.95 0.14 460.87 Timber Floor on Joists 112.98 0.10 11.30 Hung Curtain, heavy 464.13 0.55 255.27 Rockwool Foam 1673.4 0.90 2634.98 Acoustic Timber Board 2482.43 0.42 1042.62 Solid Timber 223.65 0.06 13.42 Upholstered Tip-up Theatre Seat 2964.95 0.64 1897.57 Timber Padded Retractable Tip-up Seat 417.88 0.15 62.68 Plaster Board 2482.43 0.15 372.36 Pane Glass 99.84 0.04 3.99 Total Room Absorption, AT (m2 sabins) 6715.06 Table 5: Total room surface absorption (Source: Y. K. Kooi, 2017)
  • 45. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 45 | Building Science II (BLD61303 / ARC3413) 4.7 Reverberation Time During the meeting with the architect, we asked Ar. Andy Chong about the reverberation time of Calvary Convention Centre. He stated the reverberation time is 0.9s. V = Volume, m3 = 39136.60 m3 AT = Total Room Absorption, m2 sabins = 6715.06 m2 sabins 𝑅𝑇 = 0.16𝑉 𝐴 𝑇 = 0.16 × 39136.60 𝑚3 6715.06 𝑚2 𝑠𝑎𝑏𝑖𝑛𝑠 = 0.93𝑠 ≈ 0.9𝑠 ∴ Thus, the reverberation time calculated is the same as the reverberation time stated.
  • 46. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 46 | Building Science II (BLD61303 / ARC3413) 5.0 CONCLUSION We are very grateful that we could perform a case study in this module as we could only learn so much from lectures and books. When we experienced the space for itself and talked to people who designed the space, we were able to truly understand and appreciate a full scope on acoustics. Calvary Convention Centre had many challenges when it was being designed. Its sheer scale of having around 5,000 occupants for its maximum capacity, its location being on a disproportionate land area, the tropical climate as well as the requirements given by the client to be multipurpose. Smart and efficient design strategies such as isolation by air gaps and restructuring of systems had to be employed to counter noise emanating from outside and the inside. Material choice is essential as to not only cut down excess sound, but also to make the space comfortable and welcoming for visitors. Application of sound systems helps reinforce sound transmission when necessary. Also, consideration of the type and position of loudspeakers used is crucial so that every audience can receive sound at the same time. To us, it is rather impressive that the auditorium managed to keep the reverberation time to 0.9 seconds, an optimal number for speech-based rooms. We are glad that we picked Calvary Convention Centre as our case study topic. The flexibility of the auditorium makes us understand both the demands for speeches and music performances. Ultimately, this assignment has, in a short period of time, enabled us to be aware of how sound behaves in various conditions and how to manipulate sound levels to our advantage.
  • 47. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 47 | Building Science II (BLD61303 / ARC3413) Figure 27: Panoramic shot of Calvary Convention Centre’s auditorium during a performance (Source: X. L. Lee, 2017)
  • 48. An Acoustic Design Case Study On Calvary Convention Centre, Kuala Lumpur 48 | Building Science II (BLD61303 / ARC3413) 6.0 REFERENCES Grondzik, W. T., & Kwok, A. G. (2015). Mechanical and electrical equipment for buildings (12th ed.). Hoboken, NJ: Wiley. Hardy, H. (2006). Building Type Basics for Performing Arts Facilities. Hoboken, N.J. : J. Wiley. McMullan, R. (2012). Environmental science in building (5th ed.). Houndmills, Basingstoke, England: Palgrave Macmillan. Moore, J. (1961). Design for Good Acoustics. London: Architectural Press. Schmolke, B. (2011). Theatres and Concert Halls: Construction and Design Manual. Singapore: Page One. Shuai, Y. (2011). Green Office Building: Acoustic Installation, Natural Ventilation, Green Roof, Sustainable Architecture. Hong Kong: Hong Kong Polytechnic International Pub. Ltd. Sound Absorption Coefficients. (n.d.). Retrieved April 25, 2017, from https://www.acousticalsurfaces.com/acoustic_IOI/101_13.htm Sound Pressure: Definitions, Terms, Units and Measurement. (n.d.). Retrieved April 25, 2017, from http://www.acoustic-glossary.co.uk/sound-pressure.htm Trevor, J., & Peter, D. (2009). Acoustic Absorbers and Diffusers: Theory, Design and Application. London: Taylor & Francis.