This Power Point show is an example of my Graphics, Website Wiring
Framing, Flow Chart, Process Engineering and Business Planning.

THIS IS NOT AN ORIGINAL COPY of My work Done for my Employer and
all references to the Employer have been removed.

Dave Ellis
Introduction




                                    Presentation
                                    Topics

Our mission is to
rapidly initiate,
effectively manage
and gracefully                        Project Services
                                      Console
dissolve Projects.


                                 BU Sponsor
                                 Support Portal



                     Knowledge
                     Base
The Project Team Playbook is a dynamic, interactive tool created
 to assist The Company Colleagues in the processes of initiating,
         managing and dissolving Partner Engagements.

     This tool is a single point of access to the information,
instructions, tools and forms required throughout the life cycle
             of a The Company Third Party Project.




          © copyright 2011 The Company Inc., Project Team All Rights Reserved
I.     Playbook Backend Architecture
II.    Project Life Cycle Phases (flow charts)
III.   Secure Network Connectivity Solutions
IV.    Project Team Service Model
V.     Evaluation Tool (demo only)
VI.    Workflow And Areas of Measurement (Development)
VII.   Playbook Project Plan
The Project Team Service Model


                    Community                 Application
                      of Practice                and
                                               Hosting



                           Legal and
                        Compliance                                 Network




   PLAN
                                IT Security                 OS, Client
                                    and                       and
                                  Identity                  Delivery




  START                                                                                 RUN

                                                                             +    +       +     +
                                                                         TOSS    SDCC    MSS   IC&P

             COLLABORATE                                                          MEASURE

                   CONTINUOUS IMPROVEMENT
Request    PC
                   Project
 Portal   Portal
Collaboration       Administrative      Development        Monitoring
    Applications         Applications       Applications       Applications

X SharePoint –          GCE                SharePoint –      NetOps
   Office               Office             Office            Office
   GDMS                 Travel Connect     Putty             ODP

X BioBook           X Reservation          DreamWeaver       SNIFFER
   Secure Mail                             Secure Mail       SNMP RUN
   Alligator                               SQL Navigator     FMC

X LIMS              X                      SharePoint Dsgr

x RADARS            x



                                     EVALUATE
TTD = Time to Deliver       TCO = Total Cost of Ownership


                                     H                                                                TTD       TCO
          Project Apps                 VPN          SSL     MPLS       VDI           Citrix   Web



                         Hover
                                     D                                                               (weight)   (weight)



          SharePoint –                   1   Y       Y         Y            Y          Y       Y        1         0
          BioBook                    2       Y       Y         Y                       Y               3          0
          Secure Mail                4 n/a          n/a      n/a       n/a            n/a     n/a      2           1
          LIMS                       4       Y       Y         Y                       Y                1          1
          RADARS                     3       Y       Y         Y                       Y                1         5
          SOLUTION                   2       4       4         2            1          4        1
          WEIGHT
             Choose Solution                         X                                 X
                                 Hover




                                                 Solution Weight + TTD + (Number of Users * TCO)
                                                                   Actual Weight


Service Desk Plan                                                  Create Request
Done    Application   H          Provisioning Steps
       SharePoint     1   TOOL   AD     APP    CLIENT   NET


       BioBook        2   TOOL   AD     APP    CLIENT   NET


       Secure Mail    4   TOOL   AD     APP    CLIENT   NET


       LIMS           4   TOOL   AD     APP    CLIENT   NET

       RADARS         3   TOOL   AD     APP    CLIENT   NET


       GDMS           0   TOOL   AD     APP    CLIENT   NET
Workflow
                          and Areas of Measurement


         24 hrs               5 days                               SLM                   SLM


                                   Configuration   Configuration         Configuration      Quality
Initial Request   Due Diligence
                                    Research         Proposal              Delivery        Assurance




                                             Two Weeks
Initiate   Manage   Dissolve




Print Flow Charts
Print Flow Charts
1       2   3   4   5




Print Flow Charts
1   2   3




Print Flow Charts
Initiate     Manage             Dissolve

           Project Life Cycle
Due                              Quality
                Provision
Diligence                          Assurance

        Core Services of the Initiate Phase
View Request and
                                    Schedule Meeting
Initial Request Questionnaire



                                            Due Diligence




                                              Analysis

             Sponsor Completes
             IRQ and Submits to
             Project Team

                                           Proposal




                                  Final
                                  Configuration
   Schedule Meeting Process
       Please complete the Information Request Questionnaire (IRQ)
        linked below. This will allow the Project Team team to gather
        background information relevant to your request
       Once complete, an Project Team team member will review
        your request and set up a time with you to gather any
        remaining relevant information necessary to process your
        request

    The IRQ form can be found here: Complete Questionnaire
   Due Diligence Process
           The Extended IRQ (link below) will be filled out by the Project
            Team representative along with the business sponsor
             This form will gather any remaining information necessary to
              fulfill the requirements of the collaboration
           Once complete this questionnaire will populate the
            SharePoint Collaboration Portal with a record for your
            collaboration (and all of its requirements)
             These requirements will be the basis for the applications/services
              ordered for this collaboration
   Analysis Process
           The Extended IRQ will help determine the services required to
            fulfill your collaboration requirements. These requirements
            include but are not limited to:
             Network
             List of Applications
             Identity types
             Partner contact info
           The Project Team member handling your request will analyze
            the list of requirements, determine the best solution set to
            deliver those requirements, and review this list with you and a
            proposed timeline prior to requesting services
   Proposal Process
     Your Project Team representative will set up a meeting with you
      to discuss the draft proposal including:
         Complete list of necessary services
         Review action items (who will fulfill each service request)
         The timeline to fulfill the complete requirements set
         Review roles and responsibilities of a business sponsor
         Answer any other questions you may have
   Final Configuration Process
     Final configuration takes your list of services and breaks it down
      into 4 main categories to be fulfilled during the Provisioning
      Phase
         Identities
         Network
         Client
         Application and Data
Identities




Final Configuration


                                              Connectivity




   Project Representative
  Coordinates Provisioning
                                              Applications
                  Process                     and Data




                             Deliver
  Global Identity Management (TOOL) is a required process for any user
requiring access to any PFE application. To create a new TOOL/ABCD
account please follow this link.
 The majority of applications within The Company also require an Active
Directory (NT) account. The request form will tell you if the application(s)
you need will require AD. (Note, an AD account cannot be created until a
TOOL identity is created first)
     The IT Onboarding Service is used to create NT accounts as well as the
      following services:
         Email
         Laptop/Desktop
         Remote Access
         Personal File Share
 PC Portal is the tool leveraged to set up network when
requiring SSL VPN, iVPN, MPLS




   RSA SecurID’s can be requested via the Request Portal
 Request Portal is the Company Standard for application
requests; however, not all applications have been migrated to
Request Portal. In the instance where you cannot find an
application, please check the following other resource:

   For applications not in Request Portal use Quick Ticket;

 For applications not in Quick Ticket, please open a service
center ticket
   As each delivery confirmation is received:
       Confirm Business is in receipt
       Mark Complete on Task List
       Send necessary e-mails
       Close open tickets
       Collate and Store documentation

   Repeat as required until all tasks are delivered.
Verify Identities




                                    Verify Connectivity




Project Representative               Verify
       Coordinates the               Applications
           QA Process                and Data




                         Final Sponsor
                         Check Point
 Verify all TOOL (ABCD) accounts are created and properly
assigned to business sponsor

 Ensure all AD accounts (if applicable) have been created and
notifications sent to both end user and business sponsor

   Triage any issues or incomplete requests
   If PC Portal is used for connectivity:
     For collaborations with local IT support verify with IT contact (or end
      user in one off requests) that firewall/Juniper portal access has been
      validated as well as each application URL tested to ensure each
      application is configured in DNS/Juniper portal
     Approve network request in PC Portal so workflow can be completed

 If RSA SecureID is used, verify end user(s) have received
token and can access Citrix/Juniper and can reset passwords

   Triage any issues or incomplete requests
 Check Request Portal workflows for completion (if
applicable)
 Check service center tickets for completion (if
applicable)
 Triage any issues or incomplete requests
   Schedule meeting with sponsor
   Review completed checklist
   Ensure sponsor has all account information for individuals
Manage




Audit   Identity    Network       Client   Application


                   Support Path
Dissolve




Identity           Data                 Network
            Disposition and Terminate
 To dissolve identities you must off board the user in
TOOL. This will automatically terminate all account
access including an NT account if applicable. The
process for off boarding can be found here.
 The data archival process is handled through the The
Company Archive Tool Service Team (FAST)
     FAST provides a "One Service Center" to ensure The Company's
      inactive electronic record assets are classified, stored safely and
      securely, and can be retrieved throughout the remainder of their
      retention period.
     The process begins with going to and clicking on the “Request an
      Archive” button
     From there you will be asked to fill out a template of information
      about the data and where it is currently staged so it can be archived.
     This process can take 4-8 weeks to complete
 To dissolve an external partner connection (iVPN,
SSL VPN, MPLS) a ticket should be opened to the ECS-
OPS queue requesting that the connection be
disconnected. Additional details can be found here.
 Ticket must be opened at least 10 business days
prior to disconnect date.
Proposed IT Support Portal Project UI

More Related Content

What's hot

IBC 2010 press conference
IBC 2010 press conferenceIBC 2010 press conference
IBC 2010 press conferenceQuantel
 
Agile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryAgile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryVijay Brzee
 
Christ Vriens@Agile Community Event - March 19th, 2009
Christ Vriens@Agile Community Event - March 19th, 2009Christ Vriens@Agile Community Event - March 19th, 2009
Christ Vriens@Agile Community Event - March 19th, 2009guest19a937
 
Correlation of simulation_models_using_concept_modeling
Correlation of simulation_models_using_concept_modelingCorrelation of simulation_models_using_concept_modeling
Correlation of simulation_models_using_concept_modelingSalvatore Scalera
 
Shanghai Automotive - Application of Process Automation and Optimisation
Shanghai Automotive - Application of Process Automation and OptimisationShanghai Automotive - Application of Process Automation and Optimisation
Shanghai Automotive - Application of Process Automation and OptimisationAltair ProductDesign
 
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdfNew & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdfInSync2011
 

What's hot (7)

IBC 2010 press conference
IBC 2010 press conferenceIBC 2010 press conference
IBC 2010 press conference
 
Agile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryAgile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical Industry
 
Christ Vriens@Agile Community Event - March 19th, 2009
Christ Vriens@Agile Community Event - March 19th, 2009Christ Vriens@Agile Community Event - March 19th, 2009
Christ Vriens@Agile Community Event - March 19th, 2009
 
Correlation of simulation_models_using_concept_modeling
Correlation of simulation_models_using_concept_modelingCorrelation of simulation_models_using_concept_modeling
Correlation of simulation_models_using_concept_modeling
 
Shanghai Automotive - Application of Process Automation and Optimisation
Shanghai Automotive - Application of Process Automation and OptimisationShanghai Automotive - Application of Process Automation and Optimisation
Shanghai Automotive - Application of Process Automation and Optimisation
 
SiteOps
SiteOpsSiteOps
SiteOps
 
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdfNew & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
 

Viewers also liked

Causation (Webquest)
Causation (Webquest)Causation (Webquest)
Causation (Webquest)jwenlim
 
Berkeley Square Speakers speak in Berkeley Square
Berkeley Square Speakers speak in Berkeley SquareBerkeley Square Speakers speak in Berkeley Square
Berkeley Square Speakers speak in Berkeley Squareberkeleysquarespeakers
 
Filosofos de la historia
Filosofos de la historiaFilosofos de la historia
Filosofos de la historiaelizavane
 
La mujer en la historia
La mujer en la historiaLa mujer en la historia
La mujer en la historiaPía y Caro
 
Entrevista a miguel pereira e ana poupino jornal o compromisso s.-sebastião
Entrevista a miguel pereira e ana poupino  jornal o compromisso s.-sebastiãoEntrevista a miguel pereira e ana poupino  jornal o compromisso s.-sebastião
Entrevista a miguel pereira e ana poupino jornal o compromisso s.-sebastiãobolukakuazua
 
Pastoral da Aids - Sobradinho - RS
Pastoral da Aids - Sobradinho - RSPastoral da Aids - Sobradinho - RS
Pastoral da Aids - Sobradinho - RSMarcelo Monti Bica
 
ตำราเภสัชกรรมไทย
ตำราเภสัชกรรมไทย ตำราเภสัชกรรมไทย
ตำราเภสัชกรรมไทย sucheera Leethochawalit
 
Molecular Mysteries Of The Plant Periwinkle
Molecular Mysteries Of The Plant PeriwinkleMolecular Mysteries Of The Plant Periwinkle
Molecular Mysteries Of The Plant Periwinklekimberpaige
 
Don´t let them die
Don´t let them dieDon´t let them die
Don´t let them dieGala189
 
Globalización
GlobalizaciónGlobalización
GlobalizaciónARHAKABY
 
Derive 2 (op-basicas)
Derive 2 (op-basicas)Derive 2 (op-basicas)
Derive 2 (op-basicas)jalidf
 

Viewers also liked (20)

Al Final Del Arco Iris (Cmp)
Al Final Del Arco Iris (Cmp)Al Final Del Arco Iris (Cmp)
Al Final Del Arco Iris (Cmp)
 
Causation (Webquest)
Causation (Webquest)Causation (Webquest)
Causation (Webquest)
 
Berkeley Square Speakers speak in Berkeley Square
Berkeley Square Speakers speak in Berkeley SquareBerkeley Square Speakers speak in Berkeley Square
Berkeley Square Speakers speak in Berkeley Square
 
Filosofos de la historia
Filosofos de la historiaFilosofos de la historia
Filosofos de la historia
 
La mujer en la historia
La mujer en la historiaLa mujer en la historia
La mujer en la historia
 
Chedraui
ChedrauiChedraui
Chedraui
 
5
55
5
 
Entrevista a miguel pereira e ana poupino jornal o compromisso s.-sebastião
Entrevista a miguel pereira e ana poupino  jornal o compromisso s.-sebastiãoEntrevista a miguel pereira e ana poupino  jornal o compromisso s.-sebastião
Entrevista a miguel pereira e ana poupino jornal o compromisso s.-sebastião
 
Trabajo555
Trabajo555Trabajo555
Trabajo555
 
Pastoral da Aids - Sobradinho - RS
Pastoral da Aids - Sobradinho - RSPastoral da Aids - Sobradinho - RS
Pastoral da Aids - Sobradinho - RS
 
Salitre
SalitreSalitre
Salitre
 
Nietzsche
NietzscheNietzsche
Nietzsche
 
T 272-05
T 272-05T 272-05
T 272-05
 
ตำราเภสัชกรรมไทย
ตำราเภสัชกรรมไทย ตำราเภสัชกรรมไทย
ตำราเภสัชกรรมไทย
 
Biologi
BiologiBiologi
Biologi
 
Molecular Mysteries Of The Plant Periwinkle
Molecular Mysteries Of The Plant PeriwinkleMolecular Mysteries Of The Plant Periwinkle
Molecular Mysteries Of The Plant Periwinkle
 
Don´t let them die
Don´t let them dieDon´t let them die
Don´t let them die
 
Hogwarts map
Hogwarts mapHogwarts map
Hogwarts map
 
Globalización
GlobalizaciónGlobalización
Globalización
 
Derive 2 (op-basicas)
Derive 2 (op-basicas)Derive 2 (op-basicas)
Derive 2 (op-basicas)
 

Similar to Default

Documentation 121206223200-phpapp02(1)
Documentation 121206223200-phpapp02(1)Documentation 121206223200-phpapp02(1)
Documentation 121206223200-phpapp02(1)Murugesan Arumugam
 
Pulse Design & Delivery Panel
Pulse Design & Delivery PanelPulse Design & Delivery Panel
Pulse Design & Delivery PanelMauricio Godoy
 
Sukumar Nayak-Agile-DevOps-Cloud Management
Sukumar Nayak-Agile-DevOps-Cloud ManagementSukumar Nayak-Agile-DevOps-Cloud Management
Sukumar Nayak-Agile-DevOps-Cloud ManagementSukumar Nayak
 
OpenSpan - A Better Way to Work, A Better Way to Manage
OpenSpan - A Better Way to Work, A Better Way to ManageOpenSpan - A Better Way to Work, A Better Way to Manage
OpenSpan - A Better Way to Work, A Better Way to ManageFrank Wagman
 
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...Vedanta Barooah
 
Omnikron Services 2009
Omnikron Services 2009Omnikron Services 2009
Omnikron Services 2009Robin Borough
 
Eci Service Architecture Evolution 1
Eci Service Architecture Evolution 1Eci Service Architecture Evolution 1
Eci Service Architecture Evolution 1David Sprott
 
Ssc cloud computing vision afac dec17 12 final english
Ssc cloud computing vision  afac dec17 12 final englishSsc cloud computing vision  afac dec17 12 final english
Ssc cloud computing vision afac dec17 12 final englishKBIZEAU
 
Timelytrendsin appdelivery
Timelytrendsin appdeliveryTimelytrendsin appdelivery
Timelytrendsin appdeliveryKelly Emo
 
Cloud security and cyber security v 3.1
Cloud security and cyber security v 3.1Cloud security and cyber security v 3.1
Cloud security and cyber security v 3.1CloudExpoEurope
 
Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13gaborvodics
 
[Christopher Ngo] Intro DevOPS XP Day 2015
[Christopher Ngo] Intro DevOPS XP Day 2015[Christopher Ngo] Intro DevOPS XP Day 2015
[Christopher Ngo] Intro DevOPS XP Day 2015Agile đây Vietnam
 
Introduction to Triton Webcast Metrics for NPR Member Stations - 3/8/12
Introduction to Triton Webcast Metrics for NPR Member Stations - 3/8/12Introduction to Triton Webcast Metrics for NPR Member Stations - 3/8/12
Introduction to Triton Webcast Metrics for NPR Member Stations - 3/8/12Eric Athas
 
Project management - kickoff - opensource erp
Project management - kickoff - opensource erpProject management - kickoff - opensource erp
Project management - kickoff - opensource erpThanh Nguyen
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceTKMG, Inc.
 
Mission Possible: How VMware's Private Cloud Migrated to Jira Service Desk
Mission Possible: How VMware's Private Cloud Migrated to Jira Service DeskMission Possible: How VMware's Private Cloud Migrated to Jira Service Desk
Mission Possible: How VMware's Private Cloud Migrated to Jira Service DeskAtlassian
 
Cloud Computing by Dindo Fernando
Cloud Computing by Dindo FernandoCloud Computing by Dindo Fernando
Cloud Computing by Dindo Fernandokristine1018
 
Cloud Computing - Jan 2011 - Chandna
Cloud Computing - Jan 2011 - ChandnaCloud Computing - Jan 2011 - Chandna
Cloud Computing - Jan 2011 - ChandnaAsheem Chandna
 

Similar to Default (20)

Documentation 121206223200-phpapp02(1)
Documentation 121206223200-phpapp02(1)Documentation 121206223200-phpapp02(1)
Documentation 121206223200-phpapp02(1)
 
Pulse Design & Delivery Panel
Pulse Design & Delivery PanelPulse Design & Delivery Panel
Pulse Design & Delivery Panel
 
Sukumar Nayak-Agile-DevOps-Cloud Management
Sukumar Nayak-Agile-DevOps-Cloud ManagementSukumar Nayak-Agile-DevOps-Cloud Management
Sukumar Nayak-Agile-DevOps-Cloud Management
 
OpenSpan - A Better Way to Work, A Better Way to Manage
OpenSpan - A Better Way to Work, A Better Way to ManageOpenSpan - A Better Way to Work, A Better Way to Manage
OpenSpan - A Better Way to Work, A Better Way to Manage
 
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
Accelerating It Migration Success With A Rock Solid Hp And Red Hat Enterprise...
 
Omnikron Services 2009
Omnikron Services 2009Omnikron Services 2009
Omnikron Services 2009
 
Eci Service Architecture Evolution 1
Eci Service Architecture Evolution 1Eci Service Architecture Evolution 1
Eci Service Architecture Evolution 1
 
Ssc cloud computing vision afac dec17 12 final english
Ssc cloud computing vision  afac dec17 12 final englishSsc cloud computing vision  afac dec17 12 final english
Ssc cloud computing vision afac dec17 12 final english
 
Timelytrendsin appdelivery
Timelytrendsin appdeliveryTimelytrendsin appdelivery
Timelytrendsin appdelivery
 
Keynote Day 1 2009
Keynote Day 1 2009Keynote Day 1 2009
Keynote Day 1 2009
 
Cloud security and cyber security v 3.1
Cloud security and cyber security v 3.1Cloud security and cyber security v 3.1
Cloud security and cyber security v 3.1
 
Camo
CamoCamo
Camo
 
Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13
 
[Christopher Ngo] Intro DevOPS XP Day 2015
[Christopher Ngo] Intro DevOPS XP Day 2015[Christopher Ngo] Intro DevOPS XP Day 2015
[Christopher Ngo] Intro DevOPS XP Day 2015
 
Introduction to Triton Webcast Metrics for NPR Member Stations - 3/8/12
Introduction to Triton Webcast Metrics for NPR Member Stations - 3/8/12Introduction to Triton Webcast Metrics for NPR Member Stations - 3/8/12
Introduction to Triton Webcast Metrics for NPR Member Stations - 3/8/12
 
Project management - kickoff - opensource erp
Project management - kickoff - opensource erpProject management - kickoff - opensource erp
Project management - kickoff - opensource erp
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and Service
 
Mission Possible: How VMware's Private Cloud Migrated to Jira Service Desk
Mission Possible: How VMware's Private Cloud Migrated to Jira Service DeskMission Possible: How VMware's Private Cloud Migrated to Jira Service Desk
Mission Possible: How VMware's Private Cloud Migrated to Jira Service Desk
 
Cloud Computing by Dindo Fernando
Cloud Computing by Dindo FernandoCloud Computing by Dindo Fernando
Cloud Computing by Dindo Fernando
 
Cloud Computing - Jan 2011 - Chandna
Cloud Computing - Jan 2011 - ChandnaCloud Computing - Jan 2011 - Chandna
Cloud Computing - Jan 2011 - Chandna
 

Default

  • 1. This Power Point show is an example of my Graphics, Website Wiring Framing, Flow Chart, Process Engineering and Business Planning. THIS IS NOT AN ORIGINAL COPY of My work Done for my Employer and all references to the Employer have been removed. Dave Ellis
  • 2. Introduction Presentation Topics Our mission is to rapidly initiate, effectively manage and gracefully Project Services Console dissolve Projects. BU Sponsor Support Portal Knowledge Base
  • 3. The Project Team Playbook is a dynamic, interactive tool created to assist The Company Colleagues in the processes of initiating, managing and dissolving Partner Engagements. This tool is a single point of access to the information, instructions, tools and forms required throughout the life cycle of a The Company Third Party Project. © copyright 2011 The Company Inc., Project Team All Rights Reserved
  • 4. I. Playbook Backend Architecture II. Project Life Cycle Phases (flow charts) III. Secure Network Connectivity Solutions IV. Project Team Service Model V. Evaluation Tool (demo only) VI. Workflow And Areas of Measurement (Development) VII. Playbook Project Plan
  • 5.
  • 6. The Project Team Service Model Community Application of Practice and Hosting Legal and Compliance Network PLAN IT Security OS, Client and and Identity Delivery START RUN + + + + TOSS SDCC MSS IC&P COLLABORATE MEASURE CONTINUOUS IMPROVEMENT
  • 7. Request PC Project Portal Portal
  • 8. Collaboration Administrative Development Monitoring Applications Applications Applications Applications X SharePoint – GCE SharePoint – NetOps Office Office Office Office GDMS Travel Connect Putty ODP X BioBook X Reservation DreamWeaver SNIFFER Secure Mail Secure Mail SNMP RUN Alligator SQL Navigator FMC X LIMS X SharePoint Dsgr x RADARS x EVALUATE
  • 9. TTD = Time to Deliver TCO = Total Cost of Ownership H TTD TCO Project Apps VPN SSL MPLS VDI Citrix Web Hover D (weight) (weight) SharePoint – 1 Y Y Y Y Y Y 1 0 BioBook 2 Y Y Y Y 3 0 Secure Mail 4 n/a n/a n/a n/a n/a n/a 2 1 LIMS 4 Y Y Y Y 1 1 RADARS 3 Y Y Y Y 1 5 SOLUTION 2 4 4 2 1 4 1 WEIGHT Choose Solution X X Hover Solution Weight + TTD + (Number of Users * TCO) Actual Weight Service Desk Plan Create Request
  • 10. Done Application H Provisioning Steps SharePoint 1 TOOL AD APP CLIENT NET BioBook 2 TOOL AD APP CLIENT NET Secure Mail 4 TOOL AD APP CLIENT NET LIMS 4 TOOL AD APP CLIENT NET RADARS 3 TOOL AD APP CLIENT NET GDMS 0 TOOL AD APP CLIENT NET
  • 11. Workflow and Areas of Measurement 24 hrs 5 days SLM SLM Configuration Configuration Configuration Quality Initial Request Due Diligence Research Proposal Delivery Assurance Two Weeks
  • 12. Initiate Manage Dissolve Print Flow Charts
  • 14.
  • 15.
  • 16.
  • 17. 1 2 3 4 5 Print Flow Charts
  • 18. 1 2 3 Print Flow Charts
  • 19. Initiate Manage Dissolve Project Life Cycle
  • 20. Due Quality Provision Diligence Assurance Core Services of the Initiate Phase
  • 21. View Request and Schedule Meeting Initial Request Questionnaire Due Diligence Analysis Sponsor Completes IRQ and Submits to Project Team Proposal Final Configuration
  • 22. Schedule Meeting Process  Please complete the Information Request Questionnaire (IRQ) linked below. This will allow the Project Team team to gather background information relevant to your request  Once complete, an Project Team team member will review your request and set up a time with you to gather any remaining relevant information necessary to process your request The IRQ form can be found here: Complete Questionnaire
  • 23. Due Diligence Process  The Extended IRQ (link below) will be filled out by the Project Team representative along with the business sponsor  This form will gather any remaining information necessary to fulfill the requirements of the collaboration  Once complete this questionnaire will populate the SharePoint Collaboration Portal with a record for your collaboration (and all of its requirements)  These requirements will be the basis for the applications/services ordered for this collaboration
  • 24. Analysis Process  The Extended IRQ will help determine the services required to fulfill your collaboration requirements. These requirements include but are not limited to:  Network  List of Applications  Identity types  Partner contact info  The Project Team member handling your request will analyze the list of requirements, determine the best solution set to deliver those requirements, and review this list with you and a proposed timeline prior to requesting services
  • 25. Proposal Process  Your Project Team representative will set up a meeting with you to discuss the draft proposal including:  Complete list of necessary services  Review action items (who will fulfill each service request)  The timeline to fulfill the complete requirements set  Review roles and responsibilities of a business sponsor  Answer any other questions you may have
  • 26. Final Configuration Process  Final configuration takes your list of services and breaks it down into 4 main categories to be fulfilled during the Provisioning Phase  Identities  Network  Client  Application and Data
  • 27. Identities Final Configuration Connectivity Project Representative Coordinates Provisioning Applications Process and Data Deliver
  • 28.  Global Identity Management (TOOL) is a required process for any user requiring access to any PFE application. To create a new TOOL/ABCD account please follow this link.  The majority of applications within The Company also require an Active Directory (NT) account. The request form will tell you if the application(s) you need will require AD. (Note, an AD account cannot be created until a TOOL identity is created first)  The IT Onboarding Service is used to create NT accounts as well as the following services:  Email  Laptop/Desktop  Remote Access  Personal File Share
  • 29.  PC Portal is the tool leveraged to set up network when requiring SSL VPN, iVPN, MPLS  RSA SecurID’s can be requested via the Request Portal
  • 30.  Request Portal is the Company Standard for application requests; however, not all applications have been migrated to Request Portal. In the instance where you cannot find an application, please check the following other resource:  For applications not in Request Portal use Quick Ticket;  For applications not in Quick Ticket, please open a service center ticket
  • 31. As each delivery confirmation is received:  Confirm Business is in receipt  Mark Complete on Task List  Send necessary e-mails  Close open tickets  Collate and Store documentation  Repeat as required until all tasks are delivered.
  • 32. Verify Identities Verify Connectivity Project Representative Verify Coordinates the Applications QA Process and Data Final Sponsor Check Point
  • 33.  Verify all TOOL (ABCD) accounts are created and properly assigned to business sponsor  Ensure all AD accounts (if applicable) have been created and notifications sent to both end user and business sponsor  Triage any issues or incomplete requests
  • 34. If PC Portal is used for connectivity:  For collaborations with local IT support verify with IT contact (or end user in one off requests) that firewall/Juniper portal access has been validated as well as each application URL tested to ensure each application is configured in DNS/Juniper portal  Approve network request in PC Portal so workflow can be completed  If RSA SecureID is used, verify end user(s) have received token and can access Citrix/Juniper and can reset passwords  Triage any issues or incomplete requests
  • 35.  Check Request Portal workflows for completion (if applicable)  Check service center tickets for completion (if applicable)  Triage any issues or incomplete requests
  • 36. Schedule meeting with sponsor  Review completed checklist  Ensure sponsor has all account information for individuals
  • 37. Manage Audit Identity Network Client Application Support Path
  • 38. Dissolve Identity Data Network Disposition and Terminate
  • 39.  To dissolve identities you must off board the user in TOOL. This will automatically terminate all account access including an NT account if applicable. The process for off boarding can be found here.
  • 40.  The data archival process is handled through the The Company Archive Tool Service Team (FAST)  FAST provides a "One Service Center" to ensure The Company's inactive electronic record assets are classified, stored safely and securely, and can be retrieved throughout the remainder of their retention period.  The process begins with going to and clicking on the “Request an Archive” button  From there you will be asked to fill out a template of information about the data and where it is currently staged so it can be archived.  This process can take 4-8 weeks to complete
  • 41.  To dissolve an external partner connection (iVPN, SSL VPN, MPLS) a ticket should be opened to the ECS- OPS queue requesting that the connection be disconnected. Additional details can be found here.  Ticket must be opened at least 10 business days prior to disconnect date.
  • 42. Proposed IT Support Portal Project UI