REPAIR LIST
1. DATA SURVEY DAN INSPEKSI;
A. PIHAK DAN KEPENTINGAN
B. REVIEW DAN VERIFIKASI
2. PENYUSUNAN LIST DATA HASIL SURVEY;
A. JENIS PEKERJAAN
B. DETIL PEKERJAAN
INFORMASI LELANG
PESERTA LELANG
PEMENANG LELANG
PEKERJAAN DOCKING & REPARASI
JENIS DOCKING :
LAMA DOCKING :
NAMA KAPAL :
TAHUN ANGGARAN :
TEMPAT DOCKING :
FLOW CHART PEKERJAAN REPARASI
MOBILISASI DAN MANUVER
VOLUME HARGA ( Rp. )
Jumlah Satuan Satuan Total
I MOBILISASI DARI PANGKALAN KE TEMPAT DOCK DAN PENYEBERANGAN KE PANGKALAN KEMBALI :
1 Biaya mobilisasi kapal dari pangkalanmenujugalangan 1 Kali 54,600,000Rp 54,600,000Rp 7.24%
2 Biaya demobilisasi kapal dari galangan kembali menuju ke pangkalan 1 Kali 54,600,000Rp 54,600,000Rp 7.24%
SUB-TOTAL : 109,200,000Rp 14.48%
NO. URAIAN PEKERJAAN BOBOT
PELAYANAN UMUM & DOCKING
II PELAYANAN UMUM DAN PENGEDOCKAN :
1 Pelayanan Tug Boat untuk keluar masuk perairan galangan 2 kali 2,000,000Rp 4,000,000Rp 0.53%
2 Sandar dan lepas kade di dermaga / kade galangan :
- Sandar di kade / dermaga galangan 25 hari 450,000Rp 11,250,000Rp 1.49%
3 Docking Undocking :
a. Docking undocking beserta segala fasilitasnya 1 kali 8,000,000Rp 8,000,000Rp 1.06%
b. Docking untuk inspeksi dan perbaikan under water line 20 hari 1,200,000Rp 24,000,000Rp 3.18%
c. Laporan Docking / Docking Report 1 Ls 2,700,000Rp 2,700,000Rp 0.36%
4 Supply tenaga listrik dari galangan selama kapal repair
a. Sambung dan lepas saluran kabel listrik dari galangan 1 kali 275,000Rp 275,000Rp 0.04%
b. Supply tenaga listrik ( 30 A - 380 V AC - 3 phase ) 45 hari 335,000Rp 15,075,000Rp 2.00%
5 Penjagaan keamanan selama kapal docking/floating (Min. 2 org/ hari) 45 hari 210,000Rp 9,450,000Rp 1.25%
6 Fasilitas dan tenaga pembuangan sampah (± 3 m3) 45 hari 210,000Rp 9,450,000Rp 1.25%
7 Fasilitas tenaga penjaga bahaya kebakaran selama kapal Docking
a. Pelayanan sambung dan lepas selang pemadam dari darat 1 kali 210,000Rp 210,000Rp 0.03%
b. Fasilitas dan tenaga penjaga bahaya kebakaran (Min. 2 org/ hari) 20 hari 175,000Rp 3,500,000Rp 0.46%
8 Pelayanan dan Supply air tawar untuk keperluan ABK
a. Pelayanan sambung dan lepas selang air dari darat 1 kali 210,000Rp 210,000Rp 0.03%
b. Supply air tawar untuk keperluan ABK selama di galangan 45 tons 50,000Rp 2,250,000Rp 0.30%
9 Akomodasi untuk ABK (4 org) selama kapal docking 45 hari 400,000Rp 18,000,000Rp 2.39%
10 Pelayanan Crane ( minimal charge 8 jam ) 8 jam 160,000Rp 1,280,000Rp 0.17%
SUB-TOTAL : 109,650,000Rp 14.54%
SISTEM PROPULSI DAN KEMUDI
III SISTEM PROPULSI DAN KEMUDI :
1 Propeller
a. Bongkar pasang propeller dan dibawa ke bengkel 2 unit 4,800,000Rp 9,600,000Rp 1.27%
b. Rekondisi propeller kalau terdapat keropos / fitting, dipopok las kuningan. 2 unit 5,600,000Rp 11,200,000Rp 1.49%
c. Polishing dan ballancing propeller 2 unit 2,600,000Rp 5,200,000Rp 0.69%
2 Shaft Propeller
a. Chek clearance shaft propeller dengan bantalannya dan dibuatkan record 2 unit 1,200,000Rp 2,400,000Rp 0.32%
b. Cabut shaft propeller, jika hasil Clearance jelek. 2 unit 8,000,000Rp 16,000,000Rp 2.12%
c. Penggantian reamers packing shaft propeller ( supply galangan ) 2 set 1,300,000Rp 2,600,000Rp 0.34%
Penghalang :
- Bongkar pasang skerm shaft propeller 2 unit 800,000Rp 1,600,000Rp 0.21%
3 Kemudi
a. Chek clearance bantalan tongkat kemudi dan dibuatkan record 2 unit 1,150,000Rp 2,300,000Rp 0.30%
b. Bongkar pasang kemudi & tongkat kemudi, jika hasil Clearance melebihi batas toleransi2 unit 12,000,000Rp 24,000,000Rp 3.18%
c. Penggantian reamers packing rudderstock ( supply galangan ) 2 set 1,390,000Rp 2,780,000Rp 0.37%
d. Pengecatan primer jumlah lapis : 6 m² 40,000Rp 240,000Rp 0.03%
e. Pengecatan AC jumlah lapis : 6 m² 40,000Rp 240,000Rp 0.03%
f. Pengecatan AF jumlah lapis : 6 m² 72,000Rp 432,000Rp 0.06%
( material cat supply galangan )
SUB-TOTAL : 78,592,000Rp 10.42%
KONTRUKSI BADAN KAPAL & LAMBUNG
IV KONSTRUKSI BADAN KAPAL :
A. BAWAH GARIS AIR (BGA) :
1 Pembersihan dan pengecatan lambung BGA
Lambung kapal dari lunas sampai batas garis air maximum :
a. Pembersihan dengan scrapping 450 m² 14,000Rp 6,300,000Rp 0.84%
b. Cuci air tawar dengan water jet tekanan rendah 450 m² 11,000Rp 4,950,000Rp 0.66%
c. Sandblasting 450 m² 61,000Rp 27,450,000Rp 3.64%
d. Pengecatan primer jumlah lapis : 450 m² 40,000Rp 18,000,000Rp 2.39%
e. Pengecatan AC jumlah lapis : 450 m² 40,000Rp 18,000,000Rp 2.39%
f. Pengecatan AF jumlah lapis : 450 m² 72,000Rp 32,400,000Rp 4.30%
( material cat supply galangan )
2 Pengecatan draft mark dan plimsoll mark, nama kapal dan pelabuhan ( cat supply galangan ) 1 Ls 1,250,000Rp 1,250,000Rp 0.17%
3 Pengukuran ketebalan plat dengan Ultrasonic Test ( min 100 titik ) pada area 300 titik 25,500Rp 7,650,000Rp 1.01%
( BGA, top deck, boat deck, winch deck, main deck dan under main deck )
4 Dibuatkan gambar bukaan kulit disertai hasil UT dan replating 1 Ls 1,000,000Rp 1,000,000Rp 0.13%
5 Penggantian baru zinc anode ( material ZA supply galangan )
a. S - 8 pada lambung 50 buah 700,000Rp 35,000,000Rp 4.64%
b. S - 4 pada sea chest induk 4 buah 325,000Rp 1,300,000Rp 0.17%
6 Penggantian plat BGA berdasarkan hasil UT dan Rekom BKI ( plat supply galangan ) estimasi :
a. Plat lambung bawah garis air 2000 Kg 29,750Rp 59,500,000Rp 7.89%
b. Plat internal bawah garis air 1500 Kg 30,000Rp 45,000,000Rp 5.97%
B. ATAS GARIS AIR ( AGA ) :
7 Pembersihan dan pengecatan lambung AGA
Lambung kapal dari batas garis air maximum sampai batas main deck :
a. Cuci air tawar dengan water jet tekanan rendah 110 m² 12,500Rp 1,375,000Rp 0.18%
b. Sandblasting 110 m² 58,000Rp 6,380,000Rp 0.85%
c. Pengecatan AC 110 m² 7,000Rp 770,000Rp 0.10%
d. Pengecatan finishing coat 110 m² 7,000Rp 770,000Rp 0.10%
( material cat supply galangan )
8 Pembersihan geladak-geladak cuaca : Main D, F'castle D, D sekoci, D anjungan buritan,
Upper Deck, Top Deck
a. Cuci air tawar dengan water jet tekanan rendah 335 m² 12,500Rp 4,187,500Rp 0.56%
b. Sandblasting 335 m² 58,000Rp 19,430,000Rp 2.58%
c. Pengecatan AC 335 m² 7,000Rp 2,345,000Rp 0.31%
d. Pengecatan finishing coat 335 m² 7,000Rp 2,345,000Rp 0.31%
( material cat supply galangan )
`
SUB-TOTAL : 295,402,500Rp 39.17%
PERALATAN TAMBAT & BONGKAR MUAT
V PERALATAN TAMBAT DAN BONGKAR MUAT KAPAL :
1 Jangkar dan rantai jangkar :
a. Jangkar dan rantai jangkar diturunkan, direntangkan, diketok, disikat dg sikat kawat baja,2 unit 8,350,000Rp 16,700,000Rp 2.21%
dibersihkan diukur diameternya, dicat dg coalter, diberi tanda, diperiksakan Klass
(dibuatkan laporan hasil pengukuran), segel dan swievel dilancarkan ( cat supply galangan )
b. Bak rantai dibersihkan dan dicat bituminous ( cat supply galangan ) 2 unit 4,530,000Rp 9,060,000Rp 1.20%
SUB-TOTAL : 25,760,000Rp 3.42%
SISTEM PIPA & TANGKI
VI SISTEM PERPIPAAN, KRAN, POMPA DAN TANGKI-TANGKI :
1 Sea chest dan sea valves :
a. Sea chest beserta kisi - kisinya dibuka, dibersihkan, kemudian dicat AC & AF 2 unit 1,856,000Rp 3,712,000Rp 0.49%
( cat supply galangan ). Saringan/strainer dibersihkan dan ganti baru packing karet
( material packing ex. galangan )
b. Sea valves dibuka, dibersihkan, disekur, dicat AC dan reamers packing yang rusak diganti baru,2 unit 1,240,000Rp 2,480,000Rp 0.33%
diperiksakan klass. Setelah selesai dipasang kembali. Ukuran sea valve :
- Globe Valve diameter :4"
SUB-TOTAL : 6,192,000Rp 0.82%
LAIN-LAIN
VII LAIN - LAIN :
1 Biaya survey BKI untuk perpanjangan Klass :
a. Survey Perpanjangan Klass 1 kali 46,700,000Rp 46,700,000Rp 6.19%
b. Survey Pengedokan 1 kali 4,500,000Rp 4,500,000Rp 0.60%
c. Survey Load Line 1 kali 3,400,000Rp 3,400,000Rp 0.45%
d. Survey Poros Baling - Baling 1 kali 3,300,000Rp 3,300,000Rp 0.44%
e. Transportasi 1 kali 700,000Rp 700,000Rp 0.09%
2 Biaya Administrasi Kesyahbandaran
a. Pembuatan Surat Ijin Gerak 1 kali 3,150,000Rp 3,150,000Rp 0.42%
b. Pembuatan Surat Ijin Naik Dok 1 kali 3,150,000Rp 3,150,000Rp 0.42%
c. Pembuatan Surat Ijin Sea Trial 1 kali 3,150,000Rp 3,150,000Rp 0.42%
d. Pembuatan Surat Ijin Sea Trial dan Compaseren 1 kali 3,150,000Rp 3,150,000Rp 0.42%
e. Pembuatan Sertifikat Keselamatan Kapal 1 kali 9,500,000Rp 9,500,000Rp 1.26%
f. Pembuatan Surat Clearence In & Out 1 kali 3,150,000Rp 3,150,000Rp 0.42%
3 Biaya Sea Trial dan Compaseren
a. Biaya Sea Trial 1 Ls 27,500,000Rp 27,500,000Rp 3.65%
b. Biaya Compaseren 1 Ls 18,000,000Rp 18,000,000Rp 2.39%
SUB-TOTAL : 129,350,000Rp 17.15%
TOTAL BIAYA PEKERJAAN REPAIR LIST
120,960,000.0PPN 10%
HARGA HASIL LELANG - PPN 1,088,640,000Rp
KEUNTUNGAN : 334,493,500Rp
HARGA HASIL LELANG : 1,209,600,000Rp
% KEUNTUNGAN : 28%
TOTAL I - VII : 754,146,500Rp 100.00%
PROGRES PEKERJAAN REPAIR LIST
DALAM MINGGU
WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%)
1 2 3 4 5 6 7 8 9
22% 35% 48% 61% 73% 78% 81% 84% 100%
SISTEM PERPIPAAN, KRAN, POMPA DAN TANGKI-TANGKI :
TOTAL
VII
91% 100% 100%
MOBILISASI DARI PANGKALAN KETEMPAT DOCK DAN PENYEBERANGAN KE PANGKALAN KEMBALI :
IV KONSTRUKSI BADAN KAPAL : 21% 45%
NO. DESCRIPTION
PROGRESS NOP 2015
54% 67% 79%
I 50% 50% 50%
13% 26% 38%III SISTEM PROPULSI DAN KEMUDI :
89% 100%
50% 50% 50% 50% 50% 100%
II PELAYANAN UMUM DAN PENGEDOCKAN : 8% 26% 32% 49% 57% 70% 79%
100% 100%
100%
67% 82% 100% 100% 100% 100% 100%
V PERALATAN TAMBAT DAN BONGKAR MUAT KAPAL : 17% 34% 53% 69% 85% 100%
50% 50% 50% 50% 100%
23% 43% 76% 100% 100% 100% 100% 100% 100%
I LAIN - LAIN :
20% 20% 20% 20%
OPTIMASI REPARASI KAPAL
OPTIMASI REPARASI KAPAL

More Related Content

Viewers also liked

PSY 475 Week 3 Individual Assignment Attitude Survey1 2015 version
PSY 475 Week 3 Individual Assignment Attitude Survey1 2015 versionPSY 475 Week 3 Individual Assignment Attitude Survey1 2015 version
PSY 475 Week 3 Individual Assignment Attitude Survey1 2015 versionbailieshiramizu
 
journal.pone.0133500
journal.pone.0133500journal.pone.0133500
journal.pone.0133500Caitlyn Getty
 
How to win customers' List
How to win customers' ListHow to win customers' List
How to win customers' ListMamxiang Peng
 
7 tips to improve your relationship
7 tips to improve your relationship7 tips to improve your relationship
7 tips to improve your relationshipSo Cial
 
Puntos notables
Puntos notablesPuntos notables
Puntos notablesEberth RE
 
Teknologi garis gawang
Teknologi garis gawangTeknologi garis gawang
Teknologi garis gawangdeddy aries
 
Kelompok iv proteksi katodik
Kelompok iv proteksi katodikKelompok iv proteksi katodik
Kelompok iv proteksi katodikdeddy aries
 
Aspen Tivoli Brief from IBM
Aspen Tivoli Brief from IBMAspen Tivoli Brief from IBM
Aspen Tivoli Brief from IBMStewart Booden
 

Viewers also liked (13)

PSY 475 Week 3 Individual Assignment Attitude Survey1 2015 version
PSY 475 Week 3 Individual Assignment Attitude Survey1 2015 versionPSY 475 Week 3 Individual Assignment Attitude Survey1 2015 version
PSY 475 Week 3 Individual Assignment Attitude Survey1 2015 version
 
journal.pone.0133500
journal.pone.0133500journal.pone.0133500
journal.pone.0133500
 
Giving Gracefully Sponsorship Deck
Giving Gracefully Sponsorship DeckGiving Gracefully Sponsorship Deck
Giving Gracefully Sponsorship Deck
 
How to win customers' List
How to win customers' ListHow to win customers' List
How to win customers' List
 
7 tips to improve your relationship
7 tips to improve your relationship7 tips to improve your relationship
7 tips to improve your relationship
 
CV-Sven Petersen
CV-Sven PetersenCV-Sven Petersen
CV-Sven Petersen
 
RaspberryJonkoping151102
RaspberryJonkoping151102RaspberryJonkoping151102
RaspberryJonkoping151102
 
Puntos notables
Puntos notablesPuntos notables
Puntos notables
 
Teknologi garis gawang
Teknologi garis gawangTeknologi garis gawang
Teknologi garis gawang
 
Global IT Experts
Global IT ExpertsGlobal IT Experts
Global IT Experts
 
Kelompok iv proteksi katodik
Kelompok iv proteksi katodikKelompok iv proteksi katodik
Kelompok iv proteksi katodik
 
IKLIN
IKLINIKLIN
IKLIN
 
Aspen Tivoli Brief from IBM
Aspen Tivoli Brief from IBMAspen Tivoli Brief from IBM
Aspen Tivoli Brief from IBM
 

Similar to OPTIMASI REPARASI KAPAL

PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri huluPRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulucvadsakonsultan9
 
Cashflow tambang
Cashflow tambangCashflow tambang
Cashflow tambangyannick99
 
Penerimaan dana yang masuk di giro intan berlian sejati
Penerimaan dana yang masuk di giro intan berlian sejatiPenerimaan dana yang masuk di giro intan berlian sejati
Penerimaan dana yang masuk di giro intan berlian sejatiOperator Warnet Vast Raha
 
PLAN OF DEVELOPMENT - OIL
PLAN OF DEVELOPMENT - OILPLAN OF DEVELOPMENT - OIL
PLAN OF DEVELOPMENT - OILAndhika Hakiki
 
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Vempi Satriya
 
PIT39 HATHI persentasi teknologi pembangkit tenaga listrik
PIT39 HATHI persentasi  teknologi pembangkit tenaga listrikPIT39 HATHI persentasi  teknologi pembangkit tenaga listrik
PIT39 HATHI persentasi teknologi pembangkit tenaga listrikspoytv23
 
PERTEK LC.pptx
PERTEK LC.pptxPERTEK LC.pptx
PERTEK LC.pptxFreeMason2
 
Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...
Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...
Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...R. Ferro Aviyanto
 
03 daftar kuantitas dan harga dll
03 daftar kuantitas dan harga dll03 daftar kuantitas dan harga dll
03 daftar kuantitas dan harga dllsamiyati
 
PPT NATUNA (1).pptx
PPT NATUNA (1).pptxPPT NATUNA (1).pptx
PPT NATUNA (1).pptxFadliST
 
power point jalan dan jembatannnnnnnnnnn
power point jalan dan jembatannnnnnnnnnnpower point jalan dan jembatannnnnnnnnnn
power point jalan dan jembatannnnnnnnnnnHeri Susanto
 
01_PPT Lawe Sikap rev04
01_PPT Lawe Sikap rev0401_PPT Lawe Sikap rev04
01_PPT Lawe Sikap rev04Putri Hidayati
 
Profil Kotaku kabupaten blitar
Profil Kotaku kabupaten blitarProfil Kotaku kabupaten blitar
Profil Kotaku kabupaten blitarkomunikasiosp
 
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...MuhammadAzkaBintangA
 

Similar to OPTIMASI REPARASI KAPAL (20)

PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri huluPRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
 
4312100026 - Presentasi
4312100026 - Presentasi4312100026 - Presentasi
4312100026 - Presentasi
 
Cashflow tambang
Cashflow tambangCashflow tambang
Cashflow tambang
 
Penerimaan dana yang masuk di giro intan berlian sejati
Penerimaan dana yang masuk di giro intan berlian sejatiPenerimaan dana yang masuk di giro intan berlian sejati
Penerimaan dana yang masuk di giro intan berlian sejati
 
PLAN OF DEVELOPMENT - OIL
PLAN OF DEVELOPMENT - OILPLAN OF DEVELOPMENT - OIL
PLAN OF DEVELOPMENT - OIL
 
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
 
PIT39 HATHI persentasi teknologi pembangkit tenaga listrik
PIT39 HATHI persentasi  teknologi pembangkit tenaga listrikPIT39 HATHI persentasi  teknologi pembangkit tenaga listrik
PIT39 HATHI persentasi teknologi pembangkit tenaga listrik
 
RAB PLTMH
RAB PLTMHRAB PLTMH
RAB PLTMH
 
Laporan tm 1 adnin pras (2-10-14)
Laporan tm 1 adnin pras (2-10-14)Laporan tm 1 adnin pras (2-10-14)
Laporan tm 1 adnin pras (2-10-14)
 
Laporan tm 1 adnin pras (2-10-14) (1)
Laporan tm 1 adnin pras (2-10-14) (1)Laporan tm 1 adnin pras (2-10-14) (1)
Laporan tm 1 adnin pras (2-10-14) (1)
 
PERTEK LC.pptx
PERTEK LC.pptxPERTEK LC.pptx
PERTEK LC.pptx
 
Tugas Perencanaan Pelabuhan Kelompok 2
Tugas Perencanaan Pelabuhan Kelompok 2Tugas Perencanaan Pelabuhan Kelompok 2
Tugas Perencanaan Pelabuhan Kelompok 2
 
Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...
Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...
Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...
 
03 daftar kuantitas dan harga dll
03 daftar kuantitas dan harga dll03 daftar kuantitas dan harga dll
03 daftar kuantitas dan harga dll
 
PPT NATUNA (1).pptx
PPT NATUNA (1).pptxPPT NATUNA (1).pptx
PPT NATUNA (1).pptx
 
power point jalan dan jembatannnnnnnnnnn
power point jalan dan jembatannnnnnnnnnnpower point jalan dan jembatannnnnnnnnnn
power point jalan dan jembatannnnnnnnnnn
 
Desa sukaratu
Desa sukaratuDesa sukaratu
Desa sukaratu
 
01_PPT Lawe Sikap rev04
01_PPT Lawe Sikap rev0401_PPT Lawe Sikap rev04
01_PPT Lawe Sikap rev04
 
Profil Kotaku kabupaten blitar
Profil Kotaku kabupaten blitarProfil Kotaku kabupaten blitar
Profil Kotaku kabupaten blitar
 
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
 

Recently uploaded

Sistem operasi adalah program yang bertindak sebagai perantara antara user de...
Sistem operasi adalah program yang bertindak sebagai perantara antara user de...Sistem operasi adalah program yang bertindak sebagai perantara antara user de...
Sistem operasi adalah program yang bertindak sebagai perantara antara user de...Shary Armonitha
 
UKURAN PENTYEBARAN DATA PPT KELOMPOK 2.pptx
UKURAN PENTYEBARAN DATA PPT KELOMPOK 2.pptxUKURAN PENTYEBARAN DATA PPT KELOMPOK 2.pptx
UKURAN PENTYEBARAN DATA PPT KELOMPOK 2.pptxzidanlbs25
 
MARIA NOVILIA BOISALA FASILITATOR PMM.pptx
MARIA NOVILIA BOISALA FASILITATOR PMM.pptxMARIA NOVILIA BOISALA FASILITATOR PMM.pptx
MARIA NOVILIA BOISALA FASILITATOR PMM.pptxmariaboisala21
 
Geologi Jawa Timur-Madura Kelompok 6.pdf
Geologi Jawa Timur-Madura Kelompok 6.pdfGeologi Jawa Timur-Madura Kelompok 6.pdf
Geologi Jawa Timur-Madura Kelompok 6.pdfAuliaAulia63
 
PENGENDALIAN MUTU prodi Blitar penting untuk dimiliki oleh masyarakat .pptx
PENGENDALIAN MUTU prodi Blitar penting untuk dimiliki oleh masyarakat .pptxPENGENDALIAN MUTU prodi Blitar penting untuk dimiliki oleh masyarakat .pptx
PENGENDALIAN MUTU prodi Blitar penting untuk dimiliki oleh masyarakat .pptxheru687292
 
MATERI SESI 2 KONSEP ETIKA KOMUNIKASI.pptx
MATERI SESI 2 KONSEP ETIKA KOMUNIKASI.pptxMATERI SESI 2 KONSEP ETIKA KOMUNIKASI.pptx
MATERI SESI 2 KONSEP ETIKA KOMUNIKASI.pptxrikosyahputra0173
 
Menggunakan Data matematika kelas 7.pptx
Menggunakan Data matematika kelas 7.pptxMenggunakan Data matematika kelas 7.pptx
Menggunakan Data matematika kelas 7.pptxImahMagwa
 

Recently uploaded (7)

Sistem operasi adalah program yang bertindak sebagai perantara antara user de...
Sistem operasi adalah program yang bertindak sebagai perantara antara user de...Sistem operasi adalah program yang bertindak sebagai perantara antara user de...
Sistem operasi adalah program yang bertindak sebagai perantara antara user de...
 
UKURAN PENTYEBARAN DATA PPT KELOMPOK 2.pptx
UKURAN PENTYEBARAN DATA PPT KELOMPOK 2.pptxUKURAN PENTYEBARAN DATA PPT KELOMPOK 2.pptx
UKURAN PENTYEBARAN DATA PPT KELOMPOK 2.pptx
 
MARIA NOVILIA BOISALA FASILITATOR PMM.pptx
MARIA NOVILIA BOISALA FASILITATOR PMM.pptxMARIA NOVILIA BOISALA FASILITATOR PMM.pptx
MARIA NOVILIA BOISALA FASILITATOR PMM.pptx
 
Geologi Jawa Timur-Madura Kelompok 6.pdf
Geologi Jawa Timur-Madura Kelompok 6.pdfGeologi Jawa Timur-Madura Kelompok 6.pdf
Geologi Jawa Timur-Madura Kelompok 6.pdf
 
PENGENDALIAN MUTU prodi Blitar penting untuk dimiliki oleh masyarakat .pptx
PENGENDALIAN MUTU prodi Blitar penting untuk dimiliki oleh masyarakat .pptxPENGENDALIAN MUTU prodi Blitar penting untuk dimiliki oleh masyarakat .pptx
PENGENDALIAN MUTU prodi Blitar penting untuk dimiliki oleh masyarakat .pptx
 
MATERI SESI 2 KONSEP ETIKA KOMUNIKASI.pptx
MATERI SESI 2 KONSEP ETIKA KOMUNIKASI.pptxMATERI SESI 2 KONSEP ETIKA KOMUNIKASI.pptx
MATERI SESI 2 KONSEP ETIKA KOMUNIKASI.pptx
 
Menggunakan Data matematika kelas 7.pptx
Menggunakan Data matematika kelas 7.pptxMenggunakan Data matematika kelas 7.pptx
Menggunakan Data matematika kelas 7.pptx
 

OPTIMASI REPARASI KAPAL

  • 2. KELOMPOK 5 RANDY ARIE BASTIAN (20151334029) RIFQI FARIZAL FAHRUR ROZI (20151334034) BUNADI (20151334035) DEDDY ARIES SETIAWAN (20151334036)
  • 3. REPAIR LIST 1. DATA SURVEY DAN INSPEKSI; A. PIHAK DAN KEPENTINGAN B. REVIEW DAN VERIFIKASI 2. PENYUSUNAN LIST DATA HASIL SURVEY; A. JENIS PEKERJAAN B. DETIL PEKERJAAN
  • 7. PEKERJAAN DOCKING & REPARASI JENIS DOCKING : LAMA DOCKING : NAMA KAPAL : TAHUN ANGGARAN : TEMPAT DOCKING :
  • 9. MOBILISASI DAN MANUVER VOLUME HARGA ( Rp. ) Jumlah Satuan Satuan Total I MOBILISASI DARI PANGKALAN KE TEMPAT DOCK DAN PENYEBERANGAN KE PANGKALAN KEMBALI : 1 Biaya mobilisasi kapal dari pangkalanmenujugalangan 1 Kali 54,600,000Rp 54,600,000Rp 7.24% 2 Biaya demobilisasi kapal dari galangan kembali menuju ke pangkalan 1 Kali 54,600,000Rp 54,600,000Rp 7.24% SUB-TOTAL : 109,200,000Rp 14.48% NO. URAIAN PEKERJAAN BOBOT
  • 10. PELAYANAN UMUM & DOCKING II PELAYANAN UMUM DAN PENGEDOCKAN : 1 Pelayanan Tug Boat untuk keluar masuk perairan galangan 2 kali 2,000,000Rp 4,000,000Rp 0.53% 2 Sandar dan lepas kade di dermaga / kade galangan : - Sandar di kade / dermaga galangan 25 hari 450,000Rp 11,250,000Rp 1.49% 3 Docking Undocking : a. Docking undocking beserta segala fasilitasnya 1 kali 8,000,000Rp 8,000,000Rp 1.06% b. Docking untuk inspeksi dan perbaikan under water line 20 hari 1,200,000Rp 24,000,000Rp 3.18% c. Laporan Docking / Docking Report 1 Ls 2,700,000Rp 2,700,000Rp 0.36% 4 Supply tenaga listrik dari galangan selama kapal repair a. Sambung dan lepas saluran kabel listrik dari galangan 1 kali 275,000Rp 275,000Rp 0.04% b. Supply tenaga listrik ( 30 A - 380 V AC - 3 phase ) 45 hari 335,000Rp 15,075,000Rp 2.00% 5 Penjagaan keamanan selama kapal docking/floating (Min. 2 org/ hari) 45 hari 210,000Rp 9,450,000Rp 1.25% 6 Fasilitas dan tenaga pembuangan sampah (± 3 m3) 45 hari 210,000Rp 9,450,000Rp 1.25% 7 Fasilitas tenaga penjaga bahaya kebakaran selama kapal Docking a. Pelayanan sambung dan lepas selang pemadam dari darat 1 kali 210,000Rp 210,000Rp 0.03% b. Fasilitas dan tenaga penjaga bahaya kebakaran (Min. 2 org/ hari) 20 hari 175,000Rp 3,500,000Rp 0.46% 8 Pelayanan dan Supply air tawar untuk keperluan ABK a. Pelayanan sambung dan lepas selang air dari darat 1 kali 210,000Rp 210,000Rp 0.03% b. Supply air tawar untuk keperluan ABK selama di galangan 45 tons 50,000Rp 2,250,000Rp 0.30% 9 Akomodasi untuk ABK (4 org) selama kapal docking 45 hari 400,000Rp 18,000,000Rp 2.39% 10 Pelayanan Crane ( minimal charge 8 jam ) 8 jam 160,000Rp 1,280,000Rp 0.17% SUB-TOTAL : 109,650,000Rp 14.54%
  • 11. SISTEM PROPULSI DAN KEMUDI III SISTEM PROPULSI DAN KEMUDI : 1 Propeller a. Bongkar pasang propeller dan dibawa ke bengkel 2 unit 4,800,000Rp 9,600,000Rp 1.27% b. Rekondisi propeller kalau terdapat keropos / fitting, dipopok las kuningan. 2 unit 5,600,000Rp 11,200,000Rp 1.49% c. Polishing dan ballancing propeller 2 unit 2,600,000Rp 5,200,000Rp 0.69% 2 Shaft Propeller a. Chek clearance shaft propeller dengan bantalannya dan dibuatkan record 2 unit 1,200,000Rp 2,400,000Rp 0.32% b. Cabut shaft propeller, jika hasil Clearance jelek. 2 unit 8,000,000Rp 16,000,000Rp 2.12% c. Penggantian reamers packing shaft propeller ( supply galangan ) 2 set 1,300,000Rp 2,600,000Rp 0.34% Penghalang : - Bongkar pasang skerm shaft propeller 2 unit 800,000Rp 1,600,000Rp 0.21% 3 Kemudi a. Chek clearance bantalan tongkat kemudi dan dibuatkan record 2 unit 1,150,000Rp 2,300,000Rp 0.30% b. Bongkar pasang kemudi & tongkat kemudi, jika hasil Clearance melebihi batas toleransi2 unit 12,000,000Rp 24,000,000Rp 3.18% c. Penggantian reamers packing rudderstock ( supply galangan ) 2 set 1,390,000Rp 2,780,000Rp 0.37% d. Pengecatan primer jumlah lapis : 6 m² 40,000Rp 240,000Rp 0.03% e. Pengecatan AC jumlah lapis : 6 m² 40,000Rp 240,000Rp 0.03% f. Pengecatan AF jumlah lapis : 6 m² 72,000Rp 432,000Rp 0.06% ( material cat supply galangan ) SUB-TOTAL : 78,592,000Rp 10.42%
  • 12. KONTRUKSI BADAN KAPAL & LAMBUNG IV KONSTRUKSI BADAN KAPAL : A. BAWAH GARIS AIR (BGA) : 1 Pembersihan dan pengecatan lambung BGA Lambung kapal dari lunas sampai batas garis air maximum : a. Pembersihan dengan scrapping 450 m² 14,000Rp 6,300,000Rp 0.84% b. Cuci air tawar dengan water jet tekanan rendah 450 m² 11,000Rp 4,950,000Rp 0.66% c. Sandblasting 450 m² 61,000Rp 27,450,000Rp 3.64% d. Pengecatan primer jumlah lapis : 450 m² 40,000Rp 18,000,000Rp 2.39% e. Pengecatan AC jumlah lapis : 450 m² 40,000Rp 18,000,000Rp 2.39% f. Pengecatan AF jumlah lapis : 450 m² 72,000Rp 32,400,000Rp 4.30% ( material cat supply galangan ) 2 Pengecatan draft mark dan plimsoll mark, nama kapal dan pelabuhan ( cat supply galangan ) 1 Ls 1,250,000Rp 1,250,000Rp 0.17% 3 Pengukuran ketebalan plat dengan Ultrasonic Test ( min 100 titik ) pada area 300 titik 25,500Rp 7,650,000Rp 1.01% ( BGA, top deck, boat deck, winch deck, main deck dan under main deck ) 4 Dibuatkan gambar bukaan kulit disertai hasil UT dan replating 1 Ls 1,000,000Rp 1,000,000Rp 0.13% 5 Penggantian baru zinc anode ( material ZA supply galangan ) a. S - 8 pada lambung 50 buah 700,000Rp 35,000,000Rp 4.64% b. S - 4 pada sea chest induk 4 buah 325,000Rp 1,300,000Rp 0.17% 6 Penggantian plat BGA berdasarkan hasil UT dan Rekom BKI ( plat supply galangan ) estimasi : a. Plat lambung bawah garis air 2000 Kg 29,750Rp 59,500,000Rp 7.89% b. Plat internal bawah garis air 1500 Kg 30,000Rp 45,000,000Rp 5.97% B. ATAS GARIS AIR ( AGA ) : 7 Pembersihan dan pengecatan lambung AGA Lambung kapal dari batas garis air maximum sampai batas main deck : a. Cuci air tawar dengan water jet tekanan rendah 110 m² 12,500Rp 1,375,000Rp 0.18% b. Sandblasting 110 m² 58,000Rp 6,380,000Rp 0.85% c. Pengecatan AC 110 m² 7,000Rp 770,000Rp 0.10% d. Pengecatan finishing coat 110 m² 7,000Rp 770,000Rp 0.10% ( material cat supply galangan ) 8 Pembersihan geladak-geladak cuaca : Main D, F'castle D, D sekoci, D anjungan buritan, Upper Deck, Top Deck a. Cuci air tawar dengan water jet tekanan rendah 335 m² 12,500Rp 4,187,500Rp 0.56% b. Sandblasting 335 m² 58,000Rp 19,430,000Rp 2.58% c. Pengecatan AC 335 m² 7,000Rp 2,345,000Rp 0.31% d. Pengecatan finishing coat 335 m² 7,000Rp 2,345,000Rp 0.31% ( material cat supply galangan ) ` SUB-TOTAL : 295,402,500Rp 39.17%
  • 13. PERALATAN TAMBAT & BONGKAR MUAT V PERALATAN TAMBAT DAN BONGKAR MUAT KAPAL : 1 Jangkar dan rantai jangkar : a. Jangkar dan rantai jangkar diturunkan, direntangkan, diketok, disikat dg sikat kawat baja,2 unit 8,350,000Rp 16,700,000Rp 2.21% dibersihkan diukur diameternya, dicat dg coalter, diberi tanda, diperiksakan Klass (dibuatkan laporan hasil pengukuran), segel dan swievel dilancarkan ( cat supply galangan ) b. Bak rantai dibersihkan dan dicat bituminous ( cat supply galangan ) 2 unit 4,530,000Rp 9,060,000Rp 1.20% SUB-TOTAL : 25,760,000Rp 3.42%
  • 14. SISTEM PIPA & TANGKI VI SISTEM PERPIPAAN, KRAN, POMPA DAN TANGKI-TANGKI : 1 Sea chest dan sea valves : a. Sea chest beserta kisi - kisinya dibuka, dibersihkan, kemudian dicat AC & AF 2 unit 1,856,000Rp 3,712,000Rp 0.49% ( cat supply galangan ). Saringan/strainer dibersihkan dan ganti baru packing karet ( material packing ex. galangan ) b. Sea valves dibuka, dibersihkan, disekur, dicat AC dan reamers packing yang rusak diganti baru,2 unit 1,240,000Rp 2,480,000Rp 0.33% diperiksakan klass. Setelah selesai dipasang kembali. Ukuran sea valve : - Globe Valve diameter :4" SUB-TOTAL : 6,192,000Rp 0.82%
  • 15. LAIN-LAIN VII LAIN - LAIN : 1 Biaya survey BKI untuk perpanjangan Klass : a. Survey Perpanjangan Klass 1 kali 46,700,000Rp 46,700,000Rp 6.19% b. Survey Pengedokan 1 kali 4,500,000Rp 4,500,000Rp 0.60% c. Survey Load Line 1 kali 3,400,000Rp 3,400,000Rp 0.45% d. Survey Poros Baling - Baling 1 kali 3,300,000Rp 3,300,000Rp 0.44% e. Transportasi 1 kali 700,000Rp 700,000Rp 0.09% 2 Biaya Administrasi Kesyahbandaran a. Pembuatan Surat Ijin Gerak 1 kali 3,150,000Rp 3,150,000Rp 0.42% b. Pembuatan Surat Ijin Naik Dok 1 kali 3,150,000Rp 3,150,000Rp 0.42% c. Pembuatan Surat Ijin Sea Trial 1 kali 3,150,000Rp 3,150,000Rp 0.42% d. Pembuatan Surat Ijin Sea Trial dan Compaseren 1 kali 3,150,000Rp 3,150,000Rp 0.42% e. Pembuatan Sertifikat Keselamatan Kapal 1 kali 9,500,000Rp 9,500,000Rp 1.26% f. Pembuatan Surat Clearence In & Out 1 kali 3,150,000Rp 3,150,000Rp 0.42% 3 Biaya Sea Trial dan Compaseren a. Biaya Sea Trial 1 Ls 27,500,000Rp 27,500,000Rp 3.65% b. Biaya Compaseren 1 Ls 18,000,000Rp 18,000,000Rp 2.39% SUB-TOTAL : 129,350,000Rp 17.15%
  • 16.
  • 17. TOTAL BIAYA PEKERJAAN REPAIR LIST 120,960,000.0PPN 10% HARGA HASIL LELANG - PPN 1,088,640,000Rp KEUNTUNGAN : 334,493,500Rp HARGA HASIL LELANG : 1,209,600,000Rp % KEUNTUNGAN : 28% TOTAL I - VII : 754,146,500Rp 100.00%
  • 18.
  • 19.
  • 20. PROGRES PEKERJAAN REPAIR LIST DALAM MINGGU WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) 1 2 3 4 5 6 7 8 9 22% 35% 48% 61% 73% 78% 81% 84% 100% SISTEM PERPIPAAN, KRAN, POMPA DAN TANGKI-TANGKI : TOTAL VII 91% 100% 100% MOBILISASI DARI PANGKALAN KETEMPAT DOCK DAN PENYEBERANGAN KE PANGKALAN KEMBALI : IV KONSTRUKSI BADAN KAPAL : 21% 45% NO. DESCRIPTION PROGRESS NOP 2015 54% 67% 79% I 50% 50% 50% 13% 26% 38%III SISTEM PROPULSI DAN KEMUDI : 89% 100% 50% 50% 50% 50% 50% 100% II PELAYANAN UMUM DAN PENGEDOCKAN : 8% 26% 32% 49% 57% 70% 79% 100% 100% 100% 67% 82% 100% 100% 100% 100% 100% V PERALATAN TAMBAT DAN BONGKAR MUAT KAPAL : 17% 34% 53% 69% 85% 100% 50% 50% 50% 50% 100% 23% 43% 76% 100% 100% 100% 100% 100% 100% I LAIN - LAIN : 20% 20% 20% 20%