LOKASI :
Desa Batu Mbulan I, Kecamatan Babussalam, Kabupaten Aceh
Tenggara, Provinsi Aceh
ReviewBasicDesigndan DetailedEngineeringDesign
PembangkitListrik TenagaMini Hidro (PLTM) LAWE SIKAP 2 x
3.5 kW
PT. BANGUN NUSANTARA ENGINEERING
REVIEWHIDROLOGI
 Analisis Hidrologi (Data Hidro
Klimatologi)
STASIUN KLIMATOLOGI
(Studi Terdahulu)
1. Sta. Blangkejeren
(Rentang Tahun Tidak ada)
STASIUN KLIMATOLOGI
(Studi Review)
1. Sta. Blangkejeren (1994-2006)
STASIUN CURAH HUJAN
(Studi Terdahulu)
1. Sta. Blangkejeren (1980-1990)
2. Sta. BPP. Badar (1973-2000)
3. Sta. DPTPH (2004-2012)
STASIUN CURAH HUJAN
(Studi Review)
1. Sta. BPP. Badar (2002-2013)
2. Sta. Laeaonum (2002-2013)
3. Sta. Lawe Alas (2002-2013)
Hujan representative tdk
ada Analisis Poligon
Theissen
Hujan representative
Dilengkapi dg Analisis
Poligon Theissen
 Poligon
Theissen
 Review
Analisis
 Review Studi
Pada Analisis Poligon
Theissen
DAS PLTM LAWE SIKAP
PLTM Lawe Sikap
No Periode Ulang t
DISTRIBUSI CURAH HUJAN HARIAN MAKSIMUM
(mm)
( T/ Tahun ) DISTRIBUSI NORMAL DISTRIBUSI GUMBEL TP 1
1 2 0.000 58.53 56.76
2 5 0.842 69.22 71.40
3 10 1.282 74.81 81.09
4 15 1.501 77.59 86.56
5 20 1.645 79.42 90.39
6 25 1.751 80.76 93.34
7 50 2.054 84.61 102.42
8 100 2.326 88.07 111.44
Sumber : Hasil Perhitungan
No Periode Ulang t
DISTRIBUSI CURAH HUJAN HARIAN MAKSIMUM
(mm)
( T/ Tahun ) PEARSON TP III LOG PEARSON TP III
1 2 0.000 58.32 57.95
2 5 0.842 69.15 69.26
3 10 1.282 74.93 75.52
4 15 1.501 77.85 78.71
5 20 1.645 79.77 80.83
6 25 1.751 81.19 82.41
7 50 2.054 85.29 86.96
8 100 2.326 89.00 91.11
Sumber : Hasil Perhitungan
 Review Studi &
Design
 Analisa FS
DISTRIBUSI GUMBEL TIPE I
DISTRIBUSI LOG PEARSON TIPE III
 Hujan
Rencana
 Hujan Bulanan
Metode
JAN FEB MAR APR MEI JUN JUL AGS SEP OKT NOV DES Jumlah
2002 8% 9.71 8.14 5.14 8.09 10.45 9.99 7.57 6.39 9.60 9.25 9.54 11.55 105.41
2003 17% 9.34 7.28 4.99 5.52 9.48 5.98 4.66 6.22 8.37 7.65 9.28 11.30 90.06
2004 25% 7.09 7.05 4.86 5.51 8.15 4.69 4.43 5.40 4.66 6.91 9.14 8.98 76.88
2005 33% 5.92 6.47 4.75 4.28 7.79 4.00 4.19 5.30 4.41 6.83 8.65 7.47 70.07
2006 42% 5.62 6.04 4.70 4.06 5.50 3.72 3.31 3.95 4.33 5.94 8.36 6.04 61.56
2007 50% 5.48 5.09 4.52 3.54 4.19 3.32 3.07 3.92 4.29 5.88 8.13 6.04 57.48
2008 58% 5.00 5.03 4.46 3.35 3.60 3.23 2.43 3.62 3.77 4.47 7.61 5.42 51.99
2009 67% 4.60 4.47 3.61 3.31 2.85 2.91 1.80 3.10 3.73 4.01 6.90 4.00 45.28
2010 75% 4.57 4.41 3.31 3.25 2.82 1.75 1.48 2.50 3.36 3.76 6.36 3.92 41.46
2011 83% 4.10 4.32 2.71 2.49 2.53 1.63 1.30 2.19 2.68 3.37 5.71 3.32 36.35
2012 92% 2.95 3.31 2.23 2.08 2.26 1.15 0.83 1.82 2.12 1.97 5.36 3.22 29.29
2013 100% 2.93 3.04 1.90 1.55 1.22 1.03 0.72 1.02 1.60 1.93 3.00 2.96 22.90
5.61 5.39 3.93 3.92 5.07 3.62 2.98 3.79 4.41 5.16 7.34 6.18 57.39
9.71 8.14 5.14 8.09 10.45 9.99 7.57 6.39 9.60 9.25 9.54 11.55 105.41
2.93 3.04 1.90 1.55 1.22 1.03 0.72 1.02 1.60 1.93 3.00 2.96 22.90
4.29 4.36 2.95 2.79 2.65 1.68 1.37 2.31 2.95 3.53 5.97 3.56 38.39
3.18 3.51 2.33 2.16 2.31 1.25 0.92 1.89 2.23 2.25 5.43 3.24 30.70
Sumber : Hasil Perhitungan
GENERATING DEBIT DAS LAWE SIKAP
PLTM
Tahun
Rata-rata
Max
Min
80%
90%
Prob ( % )
LAWE SIKAP Mock
DEBIT ( m3
/dt )
JAN FEB MARET APR MEI JUNI JULI AGS SEPT OKT NOV DES
DebitRata-rata 5.61 5.39 3.93 3.92 5.07 3.62 2.98 3.79 4.41 5.16 7.34 6.18
Q 80% 4.29 4.36 2.95 2.79 2.65 1.68 1.37 2.31 2.95 3.53 5.97 3.56
Q 90% 3.18 3.51 2.33 2.16 2.31 1.25 0.92 1.89 2.23 2.25 5.43 3.24
Q Desain 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2
0.00
2.00
4.00
6.00
8.00
Debit(m3/dt)
 ANALISA DEBIT ANDAL
(Ketersediaan Air)
GENERATING DATA DEBIT
PLTM LAWE SIKAP
Stasiun Metode MOCK Metode NRECA
NO
Prob. QFDC Ecoflow QDesain QFDC Ecoflow QDesain
( % ) (m3
/dt) (m3
/dt) (m3
/dt) (m3
/dt) (m3
/dt) (m3
/dt)
1 5 9.77 0.48 9.29 9.02 0.49 8.54
2 10 8.61 0.48 8.13 8.14 0.49 7.65
3 15 7.67 0.48 7.19 7.37 0.49 6.88
4 20 6.89 0.48 6.41 6.71 0.49 6.22
5 25 6.26 0.48 5.78 6.16 0.49 5.67
6 30 5.73 0.48 5.26 5.72 0.49 5.23
7 35 5.30 0.48 4.82 5.37 0.49 4.88
8 40 4.93 0.48 4.45 5.09 0.49 4.60
9 45 4.61 0.48 4.13 4.87 0.49 4.38
10 50 4.33 0.48 3.85 4.68 0.49 4.19
11 55 4.07 0.48 3.59 4.51 0.49 4.02
12 60 3.82 0.48 3.35 4.32 0.49 3.83
13 65 3.58 0.48 3.11 4.11 0.49 3.62
14 70 3.33 0.48 2.86 3.84 0.49 3.36
15 75 3.06 0.48 2.58 3.52 0.49 3.03
16 80 2.75 0.48 2.28 3.14 0.49 2.65
17 85 2.39 0.48 1.91 2.68 0.49 2.19
18 90 1.95 0.48 1.48 2.15 0.49 1.66
19 95 1.42 0.48 0.94 1.57 0.49 1.08
20 98 1.04 0.48 0.56 1.21 0.49 0.72
Sumber : Hasil Perhitungan
 Analisis Review Studi
& Design
 ANALISIS DEBIT ANDAL
(Ketersediaan Air)
 ANALISA DEBIT ANDAL
(Ketersediaan Air)
 Analisa
Terdahulu
 ANALISA DEBIT ANDAL
(Ketersediaan Air)
Analisis Terdahulu ( Luas DAS =
65 Km2 )
 Debit Banjir
Rencana
Analisis Review Design ( Luas DAS =
79.15 Km2 )
RESUME PERHITUNGAN DEBIT BANJIR RENCANA DAS
LAWE SIKAP
PLTM LAWE SIKAP - PROVINSI ACEH
No DEBIT BANJIR UNIT HIDROGRAF SNYDER UNIT HIDROGRAF NAKAYASU
1 Q 2 57.06 62.13
2 Q 5 71.77 78.16
3 Q 10 81.52 88.77
4 Q 25 93.83 102.17
5 Q 50 102.96 112.11
6 Q 100 112.03 121.99
Sumber : Hasil Perhitungan
REVIEWPOTENSI DAYADANPRODUKSI ENERGI
FESIBILITY STUDY DESIGN
• DEBIT DESIGN (Studi terdahulu)
Berdasarkan FS Debit Design adalah 6 m3/det pada Probabilitas 29.77 %.
• HEAD GROSS DAN HEAD NET
Head gross berdasarkan FS adalah 131.54 (berdasarkan laporan studi terdahulu)
dengan Net Head pada 130.17 jika dan berdasarkan gambar disain gross head
adalah 135.67 m.
• KAPASITAS DAYA
Kapasitas daya berdasarkan FS adalah 7 MW (2x3.5 MW)
Berikut Data Optimasi Daya dan Kelayakan dengan berbagai Debit berdasarkan FS
Grafik Optimasi Daya dan Hasil Studi Terdahulu dengan berbagai Debit
 Berdasarkan Studi Terdahulu dengan debit 6 m3/det dan head net
131.17 maka kapasitas daya yang dihasilkan adalah 7 MW
 Terdapat perbedaan head gross pada gambar desain yang ada dan
data laporan hidrologi sebelumnya.
ANALISA REVIEW DESIGN
• DEBIT DESIGN
Berdasarkan analisa yang telah dilakukan debit design ditentukan adalah
sebesar 6.2 m3/det pada probabilitas 18%
Kenaikan debit menjadi 6.2 m3/det dilakukan untuk mengejar kapasitas
2x3.5 MW, karena dengan debit berdasarkan FS ( 6 m3/det) dan gross head
135.67 (FS) tidak mencukupi kapasitas 7 MW (2x3.5 MW), kapasitas yang
diperoleh hanya 6.76 MW (2x3.38 MW).
• HEAD GROSS DAN HEAD NET
Analisa Head gross yang diperoleh adalah sebesar 136.67 M dengan Head
net 132.37 m
• KAPASITAS DAYA DAN ENERGI
Kapasitas daya terpasang adalah 7 MW (2x3.5 MW) dengan produksi
energi tahunan 34,742.52 MWh
Long section PLTM Lawe Sikap
Dalam hal ini penstock tidak perlu menggunakan surge tank.
Terjadi kenaikan Headpond sebesar 1.36 m, sehingga gross head naik 1.36
m dari gross head sebelumnya menjadi 136.67 .
Perhitungan Produksi Energi Tahunan dan Alternatif Kapasitas Daya
Alternatif 1 : Debit Design 6.2 m3/det
Pada probabilitas 95% dan 100 % karena debit yang ada berada dibawah debit
minimum turbin. Berdasarkan data hidrologi ini diperkirakan terjadi diantara bulan
Juni, Juli dan Agustus dalam 1 Tahun. Dan kondisi ini dapat dimanfaatkan untuk
maintenance ataupun perbaikan.
DEBIT DESAIN: : 6.20 m3/det
JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 3530 kW
DEBIT DESAIN/UNIT : 3.10 m3/det 2 X 3.53 MW
DEBIT MINIMUM : 1.24 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 61841 MWh
TINGGI JATUHAN : 132.37 m 61.841 GWh
QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh
1 5 9.02 0.49 8.54 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01
2 10 8.14 0.49 7.65 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01
3 15 7.37 0.49 6.88 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01
4 20 6.71 0.49 6.22 6.20 3.10 0.92 0.94 1524.79 3.10 0.89 0.94 1475.07
5 25 6.16 0.49 5.67 5.67 2.84 0.88 0.94 1334.81 2.84 0.86 0.94 1304.47
6 30 5.72 0.49 5.23 5.23 2.62 0.85 0.94 1188.88 2.62 0.83 0.94 1160.90
7 35 5.37 0.49 4.88 4.88 2.44 0.82 0.93 1058.62 2.44 0.81 0.93 1045.71
8 40 5.09 0.49 4.60 4.60 2.30 0.80 0.93 974.28 2.30 0.79 0.93 962.10
9 45 4.87 0.49 4.38 4.38 2.19 0.79 0.93 915.74 2.19 0.78 0.93 904.15
10 50 4.68 0.49 4.19 4.19 2.10 0.77 0.93 854.19 2.10 0.77 0.93 854.19
11 55 4.51 0.49 4.02 4.02 2.01 0.76 0.92 798.92 2.01 0.76 0.92 798.92
12 60 4.32 0.49 3.83 3.83 1.92 0.75 0.92 751.89 1.92 0.74 0.92 741.87
13 65 4.11 0.49 3.62 3.62 1.81 0.73 0.92 690.74 1.81 0.73 0.92 690.74
14 70 3.84 0.49 3.36 3.36 1.68 0.71 0.92 623.27 1.68 0.72 0.92 632.05
15 75 3.52 0.49 3.03 3.03 3.03 0.91 0.94 1476.38 - - - -
16 80 3.14 0.49 2.65 2.65 2.65 0.85 0.94 1202.46 - - - -
17 85 2.68 0.49 2.19 2.19 2.19 0.79 0.93 913.88 - - - -
18 90 2.15 0.49 1.66 1.66 1.66 0.71 0.92 617.42 - - - -
19 95 1.57 0.49 1.08 1.08 1.08 - - - - - - -
20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - -
PRODUKSI ENERGI TAHUNAN 19,549.31 15,193.21
PRODUKSI ENERGI TAHUNAN 34,742.52 MWh CF : 0.56
ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh
ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 347.43 MWh
ENERGI TERJUAL KE PLN 33,957.09 MWh
Turbin 1 Turbin 2
NO
%
PROBABILITY
Q PROB
Q
RESIDUAL
Q PROB-Q RES Q OPERASI
Alternatif 2: Debit Design 6 m3/det
 Pada probabilitas 95% dan 100 % karena debit yang ada berada dibawah debit minimum
turbin.
 Berdasarkan Analisa Review data hidrologi ini diperkirakan terjadi pada bulan Juni, Juli
dan Agustus dalam 1 tahun.
DEBIT DESAIN: : 6.00 m3/det
JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 3423 kW
DEBIT DESAIN/UNIT : 3.00 m3/det 2 X 3.423 MW
DEBIT MINIMUM : 1.20 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 59964 MWh
TINGGI JATUHAN : 132.63 m 59.964 GWh
QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh
1 5 9.02 0.49 8.54 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23
2 10 8.14 0.49 7.65 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23
3 15 7.37 0.49 6.88 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23
4 20 6.71 0.49 6.22 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23
5 25 6.16 0.49 5.67 5.67 2.84 0.90 0.95 1382.38 2.84 0.90 0.95 1382.38
6 30 5.72 0.49 5.23 5.23 2.62 0.86 0.95 1218.05 2.62 0.86 0.95 1218.05
7 35 5.37 0.49 4.88 4.88 2.44 0.84 0.94 1098.26 2.44 0.84 0.94 1098.26
8 40 5.09 0.49 4.60 4.60 2.30 0.82 0.94 1011.36 2.30 0.82 0.94 1011.36
9 45 4.87 0.49 4.38 4.38 2.19 0.80 0.94 939.14 2.19 0.80 0.94 939.14
10 50 4.68 0.49 4.19 4.19 2.10 0.78 0.93 866.99 2.10 0.78 0.93 866.99
11 55 4.51 0.49 4.02 4.02 2.01 0.77 0.93 819.84 2.01 0.77 0.93 819.84
12 60 4.32 0.49 3.83 3.83 1.92 0.76 0.93 771.71 1.92 0.76 0.93 771.71
13 65 4.11 0.49 3.62 3.62 1.81 0.74 0.93 709.20 1.81 0.74 0.93 709.20
14 70 3.84 0.49 3.36 3.36 1.68 0.72 0.92 633.29 1.68 0.72 0.92 633.29
15 75 3.52 0.49 3.03 3.03 1.52 0.70 0.92 556.85 1.52 0.70 0.92 556.85
16 80 3.14 0.49 2.65 2.65 2.65 0.87 0.92 1206.93 - - - -
17 85 2.68 0.49 2.19 2.19 2.19 0.80 0.94 937.24 - - - -
18 90 2.15 0.49 1.66 1.66 1.66 0.72 0.92 627.35 - - - -
19 95 1.57 0.49 1.08 1.08 1.08 - - - - - - -
20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - -
PRODUKSI ENERGI TAHUNAN 18,755.50 15,983.98
PRODUKSI ENERGI TAHUNAN 34,739.48 MWh CF : 0.58
ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh
ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 347.39 MWh
ENERGI TERJUAL KE PLN 33,954.09 MWh
Turbin 1 Turbin 2
NO
%
PROBABILITY
Q PROB
Q
RESIDUAL
Q PROB-Q RES Q OPERASI
Alternatif 3: Debit Design 5 m3/det
 Pada debit 0.78, probability 95%, debit berada dibawah debit minimum turbin.
 terjadi sekitar 2 bulan, yaitu pada bulan Juli dan Agustus dalam 1 Tahun, untuk Downtime.
DEBIT DESAIN: : 5.00 m3/det
JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 2822 kW
DEBIT DESAIN/UNIT : 2.50 m3/det 2 X 2.822 MW
DEBIT MINIMUM : 1.00 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 49443 MWh
TINGGI JATUHAN : 131.23 m 49.443 GWh
QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh
1 5 9.02 0.49 8.54 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
2 10 8.14 0.49 7.65 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
3 15 7.37 0.49 6.88 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
4 20 6.71 0.49 6.22 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
5 25 6.16 0.49 5.67 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
6 30 5.72 0.49 5.23 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
7 35 5.37 0.49 4.88 4.88 2.44 0.91 0.94 1177.22 2.44 0.92 0.95 1202.82
8 40 5.09 0.49 4.60 4.60 2.30 0.88 0.94 1073.90 2.30 0.92 0.95 1134.66
9 45 4.87 0.49 4.38 4.38 2.19 0.86 0.94 998.92 2.19 0.92 0.95 1079.98
10 50 4.68 0.49 4.19 4.19 2.10 0.85 0.93 934.82 2.10 0.92 0.95 1033.57
11 55 4.51 0.49 4.02 4.02 2.01 0.83 0.93 874.39 2.01 0.92 0.95 990.05
12 60 4.32 0.49 3.83 3.83 1.92 0.81 0.93 813.80 1.92 0.90 0.94 913.95
13 65 4.11 0.49 3.62 3.62 1.81 0.80 0.93 758.61 1.81 0.88 0.94 843.45
14 70 3.84 0.49 3.36 3.36 1.68 0.77 0.92 670.12 1.68 0.85 0.93 747.79
15 75 3.52 0.49 3.03 3.03 1.52 0.74 0.92 582.46 1.52 0.81 0.94 651.41
16 80 3.14 0.49 2.65 2.65 1.32 0.71 0.92 487.28 1.32 0.77 0.94 539.95
17 85 2.68 0.49 2.19 2.19 2.19 0.86 0.94 998.27 - - - -
18 90 2.15 0.49 1.66 1.66 1.66 0.77 0.92 663.83 - - - -
19 95 1.57 0.49 1.08 1.08 1.08 0.66 0.92 369.77 - - - -
20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - -
PRODUKSI ENERGI TAHUNAN 17,795.69 16,529.91
PRODUKSI ENERGI TAHUNAN 34,325.59 MWh CF : 0.69
ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh
ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 343.26 MWh
ENERGI TERJUAL KE PLN 33,544.34 MWh
Turbin 1 Turbin 2
NO
%
PROBABILITY
Q PROB
Q
RESIDUAL
Q PROB-Q RES Q OPERASI
Alternatif 4: Debit Design 4 m3/det
 Turbin mati pada debit 0.78, probability 95%, debit berada dibawah debit minimum turbin.
 Kedua unit turbin akan mati selama sekitar 2 bulan, yaitu pada bulan juli dan Agustus.
DEBIT DESAIN: : 4.00 m3/det
JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 2261 kW
DEBIT DESAIN/UNIT : 2.00 m3/det 2 X 2.261 MW
DEBIT MINIMUM : 0.80 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 39617 MWh
TINGGI JATUHAN : 131.44 m 39.617 GWh
QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh
1 5 9.02 0.49 8.54 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
2 10 8.14 0.49 7.65 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
3 15 7.37 0.49 6.88 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
4 20 6.71 0.49 6.22 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
5 25 6.16 0.49 5.67 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
6 30 5.72 0.49 5.23 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
7 35 5.37 0.49 4.88 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
8 40 5.09 0.49 4.60 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
9 45 4.87 0.49 4.38 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
10 50 4.68 0.49 4.19 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
11 55 4.51 0.49 4.02 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
12 60 4.32 0.49 3.83 3.83 1.92 0.90 0.94 915.41 1.92 0.90 0.94 915.41
13 65 4.11 0.49 3.62 3.62 1.81 0.88 0.94 844.80 1.81 0.88 0.94 844.80
14 70 3.84 0.49 3.36 3.36 1.68 0.85 0.93 748.98 1.68 0.85 0.93 748.98
15 75 3.52 0.49 3.03 3.03 1.52 0.81 0.94 652.46 1.52 0.81 0.94 652.46
16 80 3.14 0.49 2.65 2.65 1.32 0.77 0.94 540.82 1.32 0.77 0.94 540.82
17 85 2.68 0.49 2.19 2.19 1.09 0.72 0.93 413.53 1.09 0.72 0.93 413.53
18 90 2.15 0.49 1.66 1.66 1.66 0.84 0.94 741.10 - - - -
19 95 1.57 0.49 1.08 1.08 1.08 0.71 0.92 398.42 - - - -
20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - -
PRODUKSI ENERGI TAHUNAN 16,114.88 14,975.36
PRODUKSI ENERGI TAHUNAN 31,090.24 MWh CF : 0.78
ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh
ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 310.90 MWh
ENERGI TERJUAL KE PLN 30,341.34 MWh
Turbin 1 Turbin 2
NO
%
PROBABILITY
Q PROB
Q
RESIDUAL
Q PROB-Q RES Q OPERASI
Kesimpulan
Terjadi perbedaan gross head antara Gambar desain dengan data laporan
hidrologi. Ada kenaikan headpond sebesar 1.36 m diakibatkan oleh tailrace
terendam banjir 50 Tahun (Q 50) sehingga gross head naik menjadi 136.67.
No. Uraian Simbol Fesibility Studi
Debit 6.2 m3
/det Debit 6 m3/det Debit 5 m3/det Debit 4 m3/det
1 Net head Hnet 132.37 m 132.63 m 131.23 m 131.44 m 130.17 m
2 Debit desain Qm 6.2 m3
/dtk 6 m3
/dtk 5 m3
/dtk 4 m3
/dtk 6 m3
/dtk
3 Debit minimum Qd 1.24 m3
/dtk 1.2 m3
/dtk 1 m3
/dtk 0.8 m3
/dtk -
4 Jumlah turbin 2 unit 2 unit 2 unit 2 unit 2 unit
 Debit desain setiap unit Qd1 3.1 m3
/dtk 3 m3
/dtk 2.5 m3
/dtk 2 m3
/dtk 3 m3
/dtk
 Efisiensi turbin hT 0.92 0.92 0.92 0.92 -
5
Efisiensi generator dan
Efisiensi gear box
hG 0.95 0.95 0.95 0.95 -
6
Kapasitas daya listrik
terbangkit
Pel1 2 x 3.5 MW 2x 3.4 MW 2x 2.8 MW 2x 2 MW
2x3.5 MW (7
MW)
7 Kapasitas Produksi tahunan KE 61.84 GWh 59.96 GWh 49.44 Gwh 39.61 GWh -
8 Produksi Energi tahunan E 34742.52 MWh 34739.48 MWh 34325.59 MWh 31090.24 MWh -
9 Energi Terjual ke PLN Esold 33957.09 MWh 33954.08 MWh 33544.34 MWh 30341.34 MWh -
10 Capacity Factor CF 0.56 0.58 0.69 0.78 -
Revie Design
reviewgeoteknik
Berdasarkan uji laboratorium hasil kegiatan Soil Investigation diperoleh nilai
Engineering Properties sebagai berikut:
RINGKASAN HASIL PENGUJIAN LABORATORIUM MEKANIKA TANAH
PEKERJAAN REVIEW BASIC DESAIN
pltm lawe sikap
No. Lokasi Posisi Nama Kedalaman Natural Specivic Sample Unit
Bangunan Titik (m) Water Gravity Description Weight
Content Gs gm F C
(%) (gr/cm3
) (gr/cm3
) (O
) (kg/cm2
)
1 kiri bendung BI-1 sandy gravelly boulder
2 apron bendung BI-2 sandy gravelly boulder
3 olak bendung BI-3 sandy gravelly boulder
4 sandtrap BI-4 sandy gravelly boulder
5 waterway HBH-1 1.00 - 1.50 29.35 2.56 gravelly clay 1.61 7.00 0.10
6 waterway HBH-2 1.00 - 1.50 28.74 2.57 gravelly clay 1.62 8.00 0.11
7 waterway HBH-3 gravelly fine sand
3.00 - 3.50 38.51 2.58 sandy clay 1.57 6.00 0.11
6.00 - 6.50 35.92 2.58 silty clay 1.61 7.00 0.12
9.00 - 9.50 34.86 2.57 silty clay 1.62 9.00 0.12
9 penstock BI-6 clayes sandy gravell
LAWE SIKAP
8
Triaxial
UU
headpond BI-5
Dari tabel di atas, dapat disimpulkan bahwa sebagian besar jenis tanah di
lokasi rencana proyek adalah clay/ lempung.
Dengan data engineering properties di atas, maka stabilitas lereng galian
dapat dihitung dengan menggunakan metoda irisan Bishop dengan hasil:
1 m
5 m
2
1
Slice 1 - Bishop Method
1.8121
5.3043
1.8073
11.084
Sehingga perubahan kemiringan lereng galian terhadap desain semula adalah
seperti gambar di bawah ini:
Galian desain semula
Galian review desain
Dimensi bangunan juga turut mengalami perubahan, seperti pada dimensi
dinding sandtrap spillway:
dimensi desain semula
dimensi review desain
C
reviewkegempaan
Berdasarkan Peta Zona Gempa Indonesia yang diterbitkan oleh Puslitbang
Sumber Daya Air, Balitbang Pekerjaan Umum (2004), lokasi rencana proyek
masuk ke dalam zona E :
Besarnya koefisien gempa di lokasi penyelidikan dapat dihitung dengan rumus
sebagai berikut :
k = ad / g
ad = Z x ac x v
diperoleh: ad = z x ac x v = 239.478393
K = ad / g = 0.244365707
ad = percepatan gempa rencana, cm/dt2
v = faktor koreksi jenis tanah setempat = 1.375
ac = percepatan gempa dasar, (g) = 0.148
K = koefisien gempa
g = persepatan gravitasi, cm/dt2
= 980
z = faktor yang bergantung pada faktor geografis= 1.2
Besaran koefisien gempa berpengaruh langsung terhadap stabilitas bangunan
Bendung, Angkur Blok Pipa Pesat, Power House dan Jembatan Akses.
Hasil review stabilitas bendung terhadap gaya akibat gempa:
dimensi desain semula
dimensi review desain
KESIMPULAN :
• Area Kebutuhan Pembebasan Lahan bertambah Besar Akibat Perubahan
Kemiringan Lereng Galian
• Volume Galian Tanah Bertambah Besar
• Adanya Perubahan Dimensi Bangunan yang Cenderung Semakin Gemuk
Go Green Indonesia !Green Energy, Energy Future
30
Thank you for Your Attention
PT. BANGUN NUSANTARA ENGINEERING

More Related Content

Similar to 01_PPT Lawe Sikap rev04

Praktikum-VII-Pengukuran-Debit-Air.pdf
Praktikum-VII-Pengukuran-Debit-Air.pdfPraktikum-VII-Pengukuran-Debit-Air.pdf
Praktikum-VII-Pengukuran-Debit-Air.pdfwildan hoerul
 
Analysis Vortex Generator
Analysis Vortex GeneratorAnalysis Vortex Generator
Analysis Vortex GeneratorRobbi Hamdika
 
7. Alrafizra Muhaya_Bab 1.pdf
7. Alrafizra Muhaya_Bab 1.pdf7. Alrafizra Muhaya_Bab 1.pdf
7. Alrafizra Muhaya_Bab 1.pdfAlrafizraMuhaya1
 
RANCANGAN PIT LIMIT PENAMBANGAN BIJIH NIKEL MENGGUNAKAN METODE.pptx
RANCANGAN PIT LIMIT PENAMBANGAN BIJIH NIKEL MENGGUNAKAN METODE.pptxRANCANGAN PIT LIMIT PENAMBANGAN BIJIH NIKEL MENGGUNAKAN METODE.pptx
RANCANGAN PIT LIMIT PENAMBANGAN BIJIH NIKEL MENGGUNAKAN METODE.pptxANDRYMULIADY1
 
Reduce Liquid Natural Gas Consumption Rate at Ladle Preheating Process
Reduce Liquid Natural Gas Consumption Rate at Ladle Preheating ProcessReduce Liquid Natural Gas Consumption Rate at Ladle Preheating Process
Reduce Liquid Natural Gas Consumption Rate at Ladle Preheating ProcessDeanMardilan
 
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri huluPRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulucvadsakonsultan9
 
Installation ACCC INA_Rev20.1.doc
Installation ACCC INA_Rev20.1.docInstallation ACCC INA_Rev20.1.doc
Installation ACCC INA_Rev20.1.docpstjatengdua
 
Qcc cakram tmc xxvi '12 jurlap rev. 01-10-12
Qcc cakram tmc xxvi '12 jurlap rev. 01-10-12Qcc cakram tmc xxvi '12 jurlap rev. 01-10-12
Qcc cakram tmc xxvi '12 jurlap rev. 01-10-12jallyjunkiez
 
3.8 perhitungan debit rencana
3.8 perhitungan debit rencana3.8 perhitungan debit rencana
3.8 perhitungan debit rencanavieta_ressang
 
Studi kasus drainase
Studi kasus drainaseStudi kasus drainase
Studi kasus drainaseinfosanitasi
 
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBERLAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBERBagus ardian
 
PPT PENDAHULUAN TRITIS.pptx
PPT PENDAHULUAN TRITIS.pptxPPT PENDAHULUAN TRITIS.pptx
PPT PENDAHULUAN TRITIS.pptxssuser6b795e
 
KAJIAN ESTIMASI STOK KARBON PADANG LAMUN MENGGUNAKAN CITRA - pendadaran2
KAJIAN ESTIMASI STOK KARBON PADANG LAMUN MENGGUNAKAN CITRA - pendadaran2KAJIAN ESTIMASI STOK KARBON PADANG LAMUN MENGGUNAKAN CITRA - pendadaran2
KAJIAN ESTIMASI STOK KARBON PADANG LAMUN MENGGUNAKAN CITRA - pendadaran2Muhammad Hafizt
 
PLAN OF DEVELOPMENT - OIL
PLAN OF DEVELOPMENT - OILPLAN OF DEVELOPMENT - OIL
PLAN OF DEVELOPMENT - OILAndhika Hakiki
 
Analisis kinerja turbin francis unit 3
Analisis kinerja turbin francis unit 3Analisis kinerja turbin francis unit 3
Analisis kinerja turbin francis unit 3Fhail Mechanical
 
Shreenshot isi laporan Pratikum Perkerasan Jalan Raya
Shreenshot isi laporan Pratikum Perkerasan Jalan RayaShreenshot isi laporan Pratikum Perkerasan Jalan Raya
Shreenshot isi laporan Pratikum Perkerasan Jalan RayaSahno Hilhami
 
Dasar perancangan struktur bangunan gedung beton bertulang dengan sni 1726 20...
Dasar perancangan struktur bangunan gedung beton bertulang dengan sni 1726 20...Dasar perancangan struktur bangunan gedung beton bertulang dengan sni 1726 20...
Dasar perancangan struktur bangunan gedung beton bertulang dengan sni 1726 20...Jas Hujan Axio
 

Similar to 01_PPT Lawe Sikap rev04 (20)

Praktikum-VII-Pengukuran-Debit-Air.pdf
Praktikum-VII-Pengukuran-Debit-Air.pdfPraktikum-VII-Pengukuran-Debit-Air.pdf
Praktikum-VII-Pengukuran-Debit-Air.pdf
 
Analysis Vortex Generator
Analysis Vortex GeneratorAnalysis Vortex Generator
Analysis Vortex Generator
 
presentasi TA
presentasi TApresentasi TA
presentasi TA
 
7. Alrafizra Muhaya_Bab 1.pdf
7. Alrafizra Muhaya_Bab 1.pdf7. Alrafizra Muhaya_Bab 1.pdf
7. Alrafizra Muhaya_Bab 1.pdf
 
RANCANGAN PIT LIMIT PENAMBANGAN BIJIH NIKEL MENGGUNAKAN METODE.pptx
RANCANGAN PIT LIMIT PENAMBANGAN BIJIH NIKEL MENGGUNAKAN METODE.pptxRANCANGAN PIT LIMIT PENAMBANGAN BIJIH NIKEL MENGGUNAKAN METODE.pptx
RANCANGAN PIT LIMIT PENAMBANGAN BIJIH NIKEL MENGGUNAKAN METODE.pptx
 
Reduce Liquid Natural Gas Consumption Rate at Ladle Preheating Process
Reduce Liquid Natural Gas Consumption Rate at Ladle Preheating ProcessReduce Liquid Natural Gas Consumption Rate at Ladle Preheating Process
Reduce Liquid Natural Gas Consumption Rate at Ladle Preheating Process
 
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri huluPRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
PRESENTASI TANGGUL D.I. KELAYANG + kabupaten ibdragiri hulu
 
Installation ACCC INA_Rev20.1.doc
Installation ACCC INA_Rev20.1.docInstallation ACCC INA_Rev20.1.doc
Installation ACCC INA_Rev20.1.doc
 
Qcc cakram tmc xxvi '12 jurlap rev. 01-10-12
Qcc cakram tmc xxvi '12 jurlap rev. 01-10-12Qcc cakram tmc xxvi '12 jurlap rev. 01-10-12
Qcc cakram tmc xxvi '12 jurlap rev. 01-10-12
 
3.8 perhitungan debit rencana
3.8 perhitungan debit rencana3.8 perhitungan debit rencana
3.8 perhitungan debit rencana
 
Studi kasus drainase
Studi kasus drainaseStudi kasus drainase
Studi kasus drainase
 
PULP IRADIASI SEBAGAI BAHAN RAYON VISKOSA YANG RAMAH LINGKUNGAN
PULP IRADIASI SEBAGAI BAHAN RAYON VISKOSA YANG RAMAH LINGKUNGAN PULP IRADIASI SEBAGAI BAHAN RAYON VISKOSA YANG RAMAH LINGKUNGAN
PULP IRADIASI SEBAGAI BAHAN RAYON VISKOSA YANG RAMAH LINGKUNGAN
 
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBERLAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
 
PPT PENDAHULUAN TRITIS.pptx
PPT PENDAHULUAN TRITIS.pptxPPT PENDAHULUAN TRITIS.pptx
PPT PENDAHULUAN TRITIS.pptx
 
KAJIAN ESTIMASI STOK KARBON PADANG LAMUN MENGGUNAKAN CITRA - pendadaran2
KAJIAN ESTIMASI STOK KARBON PADANG LAMUN MENGGUNAKAN CITRA - pendadaran2KAJIAN ESTIMASI STOK KARBON PADANG LAMUN MENGGUNAKAN CITRA - pendadaran2
KAJIAN ESTIMASI STOK KARBON PADANG LAMUN MENGGUNAKAN CITRA - pendadaran2
 
PLAN OF DEVELOPMENT - OIL
PLAN OF DEVELOPMENT - OILPLAN OF DEVELOPMENT - OIL
PLAN OF DEVELOPMENT - OIL
 
Analisis kinerja turbin francis unit 3
Analisis kinerja turbin francis unit 3Analisis kinerja turbin francis unit 3
Analisis kinerja turbin francis unit 3
 
Seminar Hasil_WP.pptx
Seminar Hasil_WP.pptxSeminar Hasil_WP.pptx
Seminar Hasil_WP.pptx
 
Shreenshot isi laporan Pratikum Perkerasan Jalan Raya
Shreenshot isi laporan Pratikum Perkerasan Jalan RayaShreenshot isi laporan Pratikum Perkerasan Jalan Raya
Shreenshot isi laporan Pratikum Perkerasan Jalan Raya
 
Dasar perancangan struktur bangunan gedung beton bertulang dengan sni 1726 20...
Dasar perancangan struktur bangunan gedung beton bertulang dengan sni 1726 20...Dasar perancangan struktur bangunan gedung beton bertulang dengan sni 1726 20...
Dasar perancangan struktur bangunan gedung beton bertulang dengan sni 1726 20...
 

01_PPT Lawe Sikap rev04

  • 1. LOKASI : Desa Batu Mbulan I, Kecamatan Babussalam, Kabupaten Aceh Tenggara, Provinsi Aceh ReviewBasicDesigndan DetailedEngineeringDesign PembangkitListrik TenagaMini Hidro (PLTM) LAWE SIKAP 2 x 3.5 kW PT. BANGUN NUSANTARA ENGINEERING
  • 3.  Analisis Hidrologi (Data Hidro Klimatologi) STASIUN KLIMATOLOGI (Studi Terdahulu) 1. Sta. Blangkejeren (Rentang Tahun Tidak ada) STASIUN KLIMATOLOGI (Studi Review) 1. Sta. Blangkejeren (1994-2006) STASIUN CURAH HUJAN (Studi Terdahulu) 1. Sta. Blangkejeren (1980-1990) 2. Sta. BPP. Badar (1973-2000) 3. Sta. DPTPH (2004-2012) STASIUN CURAH HUJAN (Studi Review) 1. Sta. BPP. Badar (2002-2013) 2. Sta. Laeaonum (2002-2013) 3. Sta. Lawe Alas (2002-2013) Hujan representative tdk ada Analisis Poligon Theissen Hujan representative Dilengkapi dg Analisis Poligon Theissen
  • 4.  Poligon Theissen  Review Analisis  Review Studi Pada Analisis Poligon Theissen
  • 6. PLTM Lawe Sikap No Periode Ulang t DISTRIBUSI CURAH HUJAN HARIAN MAKSIMUM (mm) ( T/ Tahun ) DISTRIBUSI NORMAL DISTRIBUSI GUMBEL TP 1 1 2 0.000 58.53 56.76 2 5 0.842 69.22 71.40 3 10 1.282 74.81 81.09 4 15 1.501 77.59 86.56 5 20 1.645 79.42 90.39 6 25 1.751 80.76 93.34 7 50 2.054 84.61 102.42 8 100 2.326 88.07 111.44 Sumber : Hasil Perhitungan No Periode Ulang t DISTRIBUSI CURAH HUJAN HARIAN MAKSIMUM (mm) ( T/ Tahun ) PEARSON TP III LOG PEARSON TP III 1 2 0.000 58.32 57.95 2 5 0.842 69.15 69.26 3 10 1.282 74.93 75.52 4 15 1.501 77.85 78.71 5 20 1.645 79.77 80.83 6 25 1.751 81.19 82.41 7 50 2.054 85.29 86.96 8 100 2.326 89.00 91.11 Sumber : Hasil Perhitungan  Review Studi & Design  Analisa FS DISTRIBUSI GUMBEL TIPE I DISTRIBUSI LOG PEARSON TIPE III  Hujan Rencana
  • 8. Metode JAN FEB MAR APR MEI JUN JUL AGS SEP OKT NOV DES Jumlah 2002 8% 9.71 8.14 5.14 8.09 10.45 9.99 7.57 6.39 9.60 9.25 9.54 11.55 105.41 2003 17% 9.34 7.28 4.99 5.52 9.48 5.98 4.66 6.22 8.37 7.65 9.28 11.30 90.06 2004 25% 7.09 7.05 4.86 5.51 8.15 4.69 4.43 5.40 4.66 6.91 9.14 8.98 76.88 2005 33% 5.92 6.47 4.75 4.28 7.79 4.00 4.19 5.30 4.41 6.83 8.65 7.47 70.07 2006 42% 5.62 6.04 4.70 4.06 5.50 3.72 3.31 3.95 4.33 5.94 8.36 6.04 61.56 2007 50% 5.48 5.09 4.52 3.54 4.19 3.32 3.07 3.92 4.29 5.88 8.13 6.04 57.48 2008 58% 5.00 5.03 4.46 3.35 3.60 3.23 2.43 3.62 3.77 4.47 7.61 5.42 51.99 2009 67% 4.60 4.47 3.61 3.31 2.85 2.91 1.80 3.10 3.73 4.01 6.90 4.00 45.28 2010 75% 4.57 4.41 3.31 3.25 2.82 1.75 1.48 2.50 3.36 3.76 6.36 3.92 41.46 2011 83% 4.10 4.32 2.71 2.49 2.53 1.63 1.30 2.19 2.68 3.37 5.71 3.32 36.35 2012 92% 2.95 3.31 2.23 2.08 2.26 1.15 0.83 1.82 2.12 1.97 5.36 3.22 29.29 2013 100% 2.93 3.04 1.90 1.55 1.22 1.03 0.72 1.02 1.60 1.93 3.00 2.96 22.90 5.61 5.39 3.93 3.92 5.07 3.62 2.98 3.79 4.41 5.16 7.34 6.18 57.39 9.71 8.14 5.14 8.09 10.45 9.99 7.57 6.39 9.60 9.25 9.54 11.55 105.41 2.93 3.04 1.90 1.55 1.22 1.03 0.72 1.02 1.60 1.93 3.00 2.96 22.90 4.29 4.36 2.95 2.79 2.65 1.68 1.37 2.31 2.95 3.53 5.97 3.56 38.39 3.18 3.51 2.33 2.16 2.31 1.25 0.92 1.89 2.23 2.25 5.43 3.24 30.70 Sumber : Hasil Perhitungan GENERATING DEBIT DAS LAWE SIKAP PLTM Tahun Rata-rata Max Min 80% 90% Prob ( % ) LAWE SIKAP Mock DEBIT ( m3 /dt ) JAN FEB MARET APR MEI JUNI JULI AGS SEPT OKT NOV DES DebitRata-rata 5.61 5.39 3.93 3.92 5.07 3.62 2.98 3.79 4.41 5.16 7.34 6.18 Q 80% 4.29 4.36 2.95 2.79 2.65 1.68 1.37 2.31 2.95 3.53 5.97 3.56 Q 90% 3.18 3.51 2.33 2.16 2.31 1.25 0.92 1.89 2.23 2.25 5.43 3.24 Q Desain 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 0.00 2.00 4.00 6.00 8.00 Debit(m3/dt)
  • 9.  ANALISA DEBIT ANDAL (Ketersediaan Air) GENERATING DATA DEBIT PLTM LAWE SIKAP Stasiun Metode MOCK Metode NRECA NO Prob. QFDC Ecoflow QDesain QFDC Ecoflow QDesain ( % ) (m3 /dt) (m3 /dt) (m3 /dt) (m3 /dt) (m3 /dt) (m3 /dt) 1 5 9.77 0.48 9.29 9.02 0.49 8.54 2 10 8.61 0.48 8.13 8.14 0.49 7.65 3 15 7.67 0.48 7.19 7.37 0.49 6.88 4 20 6.89 0.48 6.41 6.71 0.49 6.22 5 25 6.26 0.48 5.78 6.16 0.49 5.67 6 30 5.73 0.48 5.26 5.72 0.49 5.23 7 35 5.30 0.48 4.82 5.37 0.49 4.88 8 40 4.93 0.48 4.45 5.09 0.49 4.60 9 45 4.61 0.48 4.13 4.87 0.49 4.38 10 50 4.33 0.48 3.85 4.68 0.49 4.19 11 55 4.07 0.48 3.59 4.51 0.49 4.02 12 60 3.82 0.48 3.35 4.32 0.49 3.83 13 65 3.58 0.48 3.11 4.11 0.49 3.62 14 70 3.33 0.48 2.86 3.84 0.49 3.36 15 75 3.06 0.48 2.58 3.52 0.49 3.03 16 80 2.75 0.48 2.28 3.14 0.49 2.65 17 85 2.39 0.48 1.91 2.68 0.49 2.19 18 90 1.95 0.48 1.48 2.15 0.49 1.66 19 95 1.42 0.48 0.94 1.57 0.49 1.08 20 98 1.04 0.48 0.56 1.21 0.49 0.72 Sumber : Hasil Perhitungan  Analisis Review Studi & Design  ANALISIS DEBIT ANDAL (Ketersediaan Air)
  • 10.  ANALISA DEBIT ANDAL (Ketersediaan Air)  Analisa Terdahulu  ANALISA DEBIT ANDAL (Ketersediaan Air)
  • 11. Analisis Terdahulu ( Luas DAS = 65 Km2 )  Debit Banjir Rencana Analisis Review Design ( Luas DAS = 79.15 Km2 ) RESUME PERHITUNGAN DEBIT BANJIR RENCANA DAS LAWE SIKAP PLTM LAWE SIKAP - PROVINSI ACEH No DEBIT BANJIR UNIT HIDROGRAF SNYDER UNIT HIDROGRAF NAKAYASU 1 Q 2 57.06 62.13 2 Q 5 71.77 78.16 3 Q 10 81.52 88.77 4 Q 25 93.83 102.17 5 Q 50 102.96 112.11 6 Q 100 112.03 121.99 Sumber : Hasil Perhitungan
  • 12. REVIEWPOTENSI DAYADANPRODUKSI ENERGI FESIBILITY STUDY DESIGN • DEBIT DESIGN (Studi terdahulu) Berdasarkan FS Debit Design adalah 6 m3/det pada Probabilitas 29.77 %. • HEAD GROSS DAN HEAD NET Head gross berdasarkan FS adalah 131.54 (berdasarkan laporan studi terdahulu) dengan Net Head pada 130.17 jika dan berdasarkan gambar disain gross head adalah 135.67 m. • KAPASITAS DAYA Kapasitas daya berdasarkan FS adalah 7 MW (2x3.5 MW) Berikut Data Optimasi Daya dan Kelayakan dengan berbagai Debit berdasarkan FS
  • 13. Grafik Optimasi Daya dan Hasil Studi Terdahulu dengan berbagai Debit  Berdasarkan Studi Terdahulu dengan debit 6 m3/det dan head net 131.17 maka kapasitas daya yang dihasilkan adalah 7 MW  Terdapat perbedaan head gross pada gambar desain yang ada dan data laporan hidrologi sebelumnya.
  • 14. ANALISA REVIEW DESIGN • DEBIT DESIGN Berdasarkan analisa yang telah dilakukan debit design ditentukan adalah sebesar 6.2 m3/det pada probabilitas 18% Kenaikan debit menjadi 6.2 m3/det dilakukan untuk mengejar kapasitas 2x3.5 MW, karena dengan debit berdasarkan FS ( 6 m3/det) dan gross head 135.67 (FS) tidak mencukupi kapasitas 7 MW (2x3.5 MW), kapasitas yang diperoleh hanya 6.76 MW (2x3.38 MW). • HEAD GROSS DAN HEAD NET Analisa Head gross yang diperoleh adalah sebesar 136.67 M dengan Head net 132.37 m • KAPASITAS DAYA DAN ENERGI Kapasitas daya terpasang adalah 7 MW (2x3.5 MW) dengan produksi energi tahunan 34,742.52 MWh
  • 15. Long section PLTM Lawe Sikap Dalam hal ini penstock tidak perlu menggunakan surge tank.
  • 16. Terjadi kenaikan Headpond sebesar 1.36 m, sehingga gross head naik 1.36 m dari gross head sebelumnya menjadi 136.67 .
  • 17. Perhitungan Produksi Energi Tahunan dan Alternatif Kapasitas Daya Alternatif 1 : Debit Design 6.2 m3/det Pada probabilitas 95% dan 100 % karena debit yang ada berada dibawah debit minimum turbin. Berdasarkan data hidrologi ini diperkirakan terjadi diantara bulan Juni, Juli dan Agustus dalam 1 Tahun. Dan kondisi ini dapat dimanfaatkan untuk maintenance ataupun perbaikan. DEBIT DESAIN: : 6.20 m3/det JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 3530 kW DEBIT DESAIN/UNIT : 3.10 m3/det 2 X 3.53 MW DEBIT MINIMUM : 1.24 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 61841 MWh TINGGI JATUHAN : 132.37 m 61.841 GWh QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh 1 5 9.02 0.49 8.54 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01 2 10 8.14 0.49 7.65 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01 3 15 7.37 0.49 6.88 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01 4 20 6.71 0.49 6.22 6.20 3.10 0.92 0.94 1524.79 3.10 0.89 0.94 1475.07 5 25 6.16 0.49 5.67 5.67 2.84 0.88 0.94 1334.81 2.84 0.86 0.94 1304.47 6 30 5.72 0.49 5.23 5.23 2.62 0.85 0.94 1188.88 2.62 0.83 0.94 1160.90 7 35 5.37 0.49 4.88 4.88 2.44 0.82 0.93 1058.62 2.44 0.81 0.93 1045.71 8 40 5.09 0.49 4.60 4.60 2.30 0.80 0.93 974.28 2.30 0.79 0.93 962.10 9 45 4.87 0.49 4.38 4.38 2.19 0.79 0.93 915.74 2.19 0.78 0.93 904.15 10 50 4.68 0.49 4.19 4.19 2.10 0.77 0.93 854.19 2.10 0.77 0.93 854.19 11 55 4.51 0.49 4.02 4.02 2.01 0.76 0.92 798.92 2.01 0.76 0.92 798.92 12 60 4.32 0.49 3.83 3.83 1.92 0.75 0.92 751.89 1.92 0.74 0.92 741.87 13 65 4.11 0.49 3.62 3.62 1.81 0.73 0.92 690.74 1.81 0.73 0.92 690.74 14 70 3.84 0.49 3.36 3.36 1.68 0.71 0.92 623.27 1.68 0.72 0.92 632.05 15 75 3.52 0.49 3.03 3.03 3.03 0.91 0.94 1476.38 - - - - 16 80 3.14 0.49 2.65 2.65 2.65 0.85 0.94 1202.46 - - - - 17 85 2.68 0.49 2.19 2.19 2.19 0.79 0.93 913.88 - - - - 18 90 2.15 0.49 1.66 1.66 1.66 0.71 0.92 617.42 - - - - 19 95 1.57 0.49 1.08 1.08 1.08 - - - - - - - 20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - - PRODUKSI ENERGI TAHUNAN 19,549.31 15,193.21 PRODUKSI ENERGI TAHUNAN 34,742.52 MWh CF : 0.56 ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 347.43 MWh ENERGI TERJUAL KE PLN 33,957.09 MWh Turbin 1 Turbin 2 NO % PROBABILITY Q PROB Q RESIDUAL Q PROB-Q RES Q OPERASI
  • 18. Alternatif 2: Debit Design 6 m3/det  Pada probabilitas 95% dan 100 % karena debit yang ada berada dibawah debit minimum turbin.  Berdasarkan Analisa Review data hidrologi ini diperkirakan terjadi pada bulan Juni, Juli dan Agustus dalam 1 tahun. DEBIT DESAIN: : 6.00 m3/det JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 3423 kW DEBIT DESAIN/UNIT : 3.00 m3/det 2 X 3.423 MW DEBIT MINIMUM : 1.20 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 59964 MWh TINGGI JATUHAN : 132.63 m 59.964 GWh QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh 1 5 9.02 0.49 8.54 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23 2 10 8.14 0.49 7.65 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23 3 15 7.37 0.49 6.88 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23 4 20 6.71 0.49 6.22 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23 5 25 6.16 0.49 5.67 5.67 2.84 0.90 0.95 1382.38 2.84 0.90 0.95 1382.38 6 30 5.72 0.49 5.23 5.23 2.62 0.86 0.95 1218.05 2.62 0.86 0.95 1218.05 7 35 5.37 0.49 4.88 4.88 2.44 0.84 0.94 1098.26 2.44 0.84 0.94 1098.26 8 40 5.09 0.49 4.60 4.60 2.30 0.82 0.94 1011.36 2.30 0.82 0.94 1011.36 9 45 4.87 0.49 4.38 4.38 2.19 0.80 0.94 939.14 2.19 0.80 0.94 939.14 10 50 4.68 0.49 4.19 4.19 2.10 0.78 0.93 866.99 2.10 0.78 0.93 866.99 11 55 4.51 0.49 4.02 4.02 2.01 0.77 0.93 819.84 2.01 0.77 0.93 819.84 12 60 4.32 0.49 3.83 3.83 1.92 0.76 0.93 771.71 1.92 0.76 0.93 771.71 13 65 4.11 0.49 3.62 3.62 1.81 0.74 0.93 709.20 1.81 0.74 0.93 709.20 14 70 3.84 0.49 3.36 3.36 1.68 0.72 0.92 633.29 1.68 0.72 0.92 633.29 15 75 3.52 0.49 3.03 3.03 1.52 0.70 0.92 556.85 1.52 0.70 0.92 556.85 16 80 3.14 0.49 2.65 2.65 2.65 0.87 0.92 1206.93 - - - - 17 85 2.68 0.49 2.19 2.19 2.19 0.80 0.94 937.24 - - - - 18 90 2.15 0.49 1.66 1.66 1.66 0.72 0.92 627.35 - - - - 19 95 1.57 0.49 1.08 1.08 1.08 - - - - - - - 20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - - PRODUKSI ENERGI TAHUNAN 18,755.50 15,983.98 PRODUKSI ENERGI TAHUNAN 34,739.48 MWh CF : 0.58 ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 347.39 MWh ENERGI TERJUAL KE PLN 33,954.09 MWh Turbin 1 Turbin 2 NO % PROBABILITY Q PROB Q RESIDUAL Q PROB-Q RES Q OPERASI
  • 19. Alternatif 3: Debit Design 5 m3/det  Pada debit 0.78, probability 95%, debit berada dibawah debit minimum turbin.  terjadi sekitar 2 bulan, yaitu pada bulan Juli dan Agustus dalam 1 Tahun, untuk Downtime. DEBIT DESAIN: : 5.00 m3/det JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 2822 kW DEBIT DESAIN/UNIT : 2.50 m3/det 2 X 2.822 MW DEBIT MINIMUM : 1.00 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 49443 MWh TINGGI JATUHAN : 131.23 m 49.443 GWh QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh 1 5 9.02 0.49 8.54 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05 2 10 8.14 0.49 7.65 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05 3 15 7.37 0.49 6.88 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05 4 20 6.71 0.49 6.22 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05 5 25 6.16 0.49 5.67 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05 6 30 5.72 0.49 5.23 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05 7 35 5.37 0.49 4.88 4.88 2.44 0.91 0.94 1177.22 2.44 0.92 0.95 1202.82 8 40 5.09 0.49 4.60 4.60 2.30 0.88 0.94 1073.90 2.30 0.92 0.95 1134.66 9 45 4.87 0.49 4.38 4.38 2.19 0.86 0.94 998.92 2.19 0.92 0.95 1079.98 10 50 4.68 0.49 4.19 4.19 2.10 0.85 0.93 934.82 2.10 0.92 0.95 1033.57 11 55 4.51 0.49 4.02 4.02 2.01 0.83 0.93 874.39 2.01 0.92 0.95 990.05 12 60 4.32 0.49 3.83 3.83 1.92 0.81 0.93 813.80 1.92 0.90 0.94 913.95 13 65 4.11 0.49 3.62 3.62 1.81 0.80 0.93 758.61 1.81 0.88 0.94 843.45 14 70 3.84 0.49 3.36 3.36 1.68 0.77 0.92 670.12 1.68 0.85 0.93 747.79 15 75 3.52 0.49 3.03 3.03 1.52 0.74 0.92 582.46 1.52 0.81 0.94 651.41 16 80 3.14 0.49 2.65 2.65 1.32 0.71 0.92 487.28 1.32 0.77 0.94 539.95 17 85 2.68 0.49 2.19 2.19 2.19 0.86 0.94 998.27 - - - - 18 90 2.15 0.49 1.66 1.66 1.66 0.77 0.92 663.83 - - - - 19 95 1.57 0.49 1.08 1.08 1.08 0.66 0.92 369.77 - - - - 20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - - PRODUKSI ENERGI TAHUNAN 17,795.69 16,529.91 PRODUKSI ENERGI TAHUNAN 34,325.59 MWh CF : 0.69 ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 343.26 MWh ENERGI TERJUAL KE PLN 33,544.34 MWh Turbin 1 Turbin 2 NO % PROBABILITY Q PROB Q RESIDUAL Q PROB-Q RES Q OPERASI
  • 20. Alternatif 4: Debit Design 4 m3/det  Turbin mati pada debit 0.78, probability 95%, debit berada dibawah debit minimum turbin.  Kedua unit turbin akan mati selama sekitar 2 bulan, yaitu pada bulan juli dan Agustus. DEBIT DESAIN: : 4.00 m3/det JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 2261 kW DEBIT DESAIN/UNIT : 2.00 m3/det 2 X 2.261 MW DEBIT MINIMUM : 0.80 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 39617 MWh TINGGI JATUHAN : 131.44 m 39.617 GWh QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh 1 5 9.02 0.49 8.54 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 2 10 8.14 0.49 7.65 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 3 15 7.37 0.49 6.88 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 4 20 6.71 0.49 6.22 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 5 25 6.16 0.49 5.67 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 6 30 5.72 0.49 5.23 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 7 35 5.37 0.49 4.88 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 8 40 5.09 0.49 4.60 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 9 45 4.87 0.49 4.38 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 10 50 4.68 0.49 4.19 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 11 55 4.51 0.49 4.02 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22 12 60 4.32 0.49 3.83 3.83 1.92 0.90 0.94 915.41 1.92 0.90 0.94 915.41 13 65 4.11 0.49 3.62 3.62 1.81 0.88 0.94 844.80 1.81 0.88 0.94 844.80 14 70 3.84 0.49 3.36 3.36 1.68 0.85 0.93 748.98 1.68 0.85 0.93 748.98 15 75 3.52 0.49 3.03 3.03 1.52 0.81 0.94 652.46 1.52 0.81 0.94 652.46 16 80 3.14 0.49 2.65 2.65 1.32 0.77 0.94 540.82 1.32 0.77 0.94 540.82 17 85 2.68 0.49 2.19 2.19 1.09 0.72 0.93 413.53 1.09 0.72 0.93 413.53 18 90 2.15 0.49 1.66 1.66 1.66 0.84 0.94 741.10 - - - - 19 95 1.57 0.49 1.08 1.08 1.08 0.71 0.92 398.42 - - - - 20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - - PRODUKSI ENERGI TAHUNAN 16,114.88 14,975.36 PRODUKSI ENERGI TAHUNAN 31,090.24 MWh CF : 0.78 ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 310.90 MWh ENERGI TERJUAL KE PLN 30,341.34 MWh Turbin 1 Turbin 2 NO % PROBABILITY Q PROB Q RESIDUAL Q PROB-Q RES Q OPERASI
  • 21. Kesimpulan Terjadi perbedaan gross head antara Gambar desain dengan data laporan hidrologi. Ada kenaikan headpond sebesar 1.36 m diakibatkan oleh tailrace terendam banjir 50 Tahun (Q 50) sehingga gross head naik menjadi 136.67. No. Uraian Simbol Fesibility Studi Debit 6.2 m3 /det Debit 6 m3/det Debit 5 m3/det Debit 4 m3/det 1 Net head Hnet 132.37 m 132.63 m 131.23 m 131.44 m 130.17 m 2 Debit desain Qm 6.2 m3 /dtk 6 m3 /dtk 5 m3 /dtk 4 m3 /dtk 6 m3 /dtk 3 Debit minimum Qd 1.24 m3 /dtk 1.2 m3 /dtk 1 m3 /dtk 0.8 m3 /dtk - 4 Jumlah turbin 2 unit 2 unit 2 unit 2 unit 2 unit  Debit desain setiap unit Qd1 3.1 m3 /dtk 3 m3 /dtk 2.5 m3 /dtk 2 m3 /dtk 3 m3 /dtk  Efisiensi turbin hT 0.92 0.92 0.92 0.92 - 5 Efisiensi generator dan Efisiensi gear box hG 0.95 0.95 0.95 0.95 - 6 Kapasitas daya listrik terbangkit Pel1 2 x 3.5 MW 2x 3.4 MW 2x 2.8 MW 2x 2 MW 2x3.5 MW (7 MW) 7 Kapasitas Produksi tahunan KE 61.84 GWh 59.96 GWh 49.44 Gwh 39.61 GWh - 8 Produksi Energi tahunan E 34742.52 MWh 34739.48 MWh 34325.59 MWh 31090.24 MWh - 9 Energi Terjual ke PLN Esold 33957.09 MWh 33954.08 MWh 33544.34 MWh 30341.34 MWh - 10 Capacity Factor CF 0.56 0.58 0.69 0.78 - Revie Design
  • 22. reviewgeoteknik Berdasarkan uji laboratorium hasil kegiatan Soil Investigation diperoleh nilai Engineering Properties sebagai berikut: RINGKASAN HASIL PENGUJIAN LABORATORIUM MEKANIKA TANAH PEKERJAAN REVIEW BASIC DESAIN pltm lawe sikap No. Lokasi Posisi Nama Kedalaman Natural Specivic Sample Unit Bangunan Titik (m) Water Gravity Description Weight Content Gs gm F C (%) (gr/cm3 ) (gr/cm3 ) (O ) (kg/cm2 ) 1 kiri bendung BI-1 sandy gravelly boulder 2 apron bendung BI-2 sandy gravelly boulder 3 olak bendung BI-3 sandy gravelly boulder 4 sandtrap BI-4 sandy gravelly boulder 5 waterway HBH-1 1.00 - 1.50 29.35 2.56 gravelly clay 1.61 7.00 0.10 6 waterway HBH-2 1.00 - 1.50 28.74 2.57 gravelly clay 1.62 8.00 0.11 7 waterway HBH-3 gravelly fine sand 3.00 - 3.50 38.51 2.58 sandy clay 1.57 6.00 0.11 6.00 - 6.50 35.92 2.58 silty clay 1.61 7.00 0.12 9.00 - 9.50 34.86 2.57 silty clay 1.62 9.00 0.12 9 penstock BI-6 clayes sandy gravell LAWE SIKAP 8 Triaxial UU headpond BI-5 Dari tabel di atas, dapat disimpulkan bahwa sebagian besar jenis tanah di lokasi rencana proyek adalah clay/ lempung.
  • 23. Dengan data engineering properties di atas, maka stabilitas lereng galian dapat dihitung dengan menggunakan metoda irisan Bishop dengan hasil: 1 m 5 m 2 1 Slice 1 - Bishop Method 1.8121 5.3043 1.8073 11.084
  • 24. Sehingga perubahan kemiringan lereng galian terhadap desain semula adalah seperti gambar di bawah ini: Galian desain semula Galian review desain
  • 25. Dimensi bangunan juga turut mengalami perubahan, seperti pada dimensi dinding sandtrap spillway: dimensi desain semula dimensi review desain C
  • 26. reviewkegempaan Berdasarkan Peta Zona Gempa Indonesia yang diterbitkan oleh Puslitbang Sumber Daya Air, Balitbang Pekerjaan Umum (2004), lokasi rencana proyek masuk ke dalam zona E :
  • 27. Besarnya koefisien gempa di lokasi penyelidikan dapat dihitung dengan rumus sebagai berikut : k = ad / g ad = Z x ac x v diperoleh: ad = z x ac x v = 239.478393 K = ad / g = 0.244365707 ad = percepatan gempa rencana, cm/dt2 v = faktor koreksi jenis tanah setempat = 1.375 ac = percepatan gempa dasar, (g) = 0.148 K = koefisien gempa g = persepatan gravitasi, cm/dt2 = 980 z = faktor yang bergantung pada faktor geografis= 1.2 Besaran koefisien gempa berpengaruh langsung terhadap stabilitas bangunan Bendung, Angkur Blok Pipa Pesat, Power House dan Jembatan Akses.
  • 28. Hasil review stabilitas bendung terhadap gaya akibat gempa: dimensi desain semula dimensi review desain
  • 29. KESIMPULAN : • Area Kebutuhan Pembebasan Lahan bertambah Besar Akibat Perubahan Kemiringan Lereng Galian • Volume Galian Tanah Bertambah Besar • Adanya Perubahan Dimensi Bangunan yang Cenderung Semakin Gemuk
  • 30. Go Green Indonesia !Green Energy, Energy Future 30 Thank you for Your Attention PT. BANGUN NUSANTARA ENGINEERING

Editor's Notes

  1. Assalamualaikum Warahmatullahi Wabarokatuh, Pimpinan dan Anggota Komisi VII DRP-RI yang kami hormati; Pertama-tama izinkan kami untuk menyampaikan terima kasih atas kesempatan yang diberikan untuk menyampaikan pengembangan terkini dari energi baru dan terbarukan yang merupakan ruang lingkup Direktorat Jenderal EBTKE. Berdasarkan Permen ESDM Nomor 018 Tahun 2010, ruang lingkup Ditjen. EBTKE meliputi energi baru, energi terbarukan dan konservasi energi. Sesuai dengan Undang-undang Nomor 30 Tahun 2007 tentang Energi, energi baru antara lain meliputi juga CBM dan shale gas yang sampai saat ini penanganannya masih belum diserahkan kepada Ditjen. EBTKE (masih ditempat yang lama yaitu Ditjen. Migas) sehingga dalam penjelasan nanti dua jenis energi ini masih belum dimasukkan didalam paparan. Pada kesempatan ini kami ingin menyampaikan secara garis besar jawaban atas pertanyaan yang telah disampaikan kepada kami. Kami awali dengan pertanyaan nomor 1 yaitu: Penjelasan tentang pengembangan tiap-tiap sumber energi terbarukan di Indonesia.