1. based on study 24
AGENDA ARCHIVE SEARCH: Content tag matches
MEETING HUB
MEETING HUB Physical Design
• Voices Area number of visitors seating capacity installation purpose
• Ideas Area • Emerging Voices
• Additional • Emerging Ideas
Conversations
Areas • Donor Wall
• Web App • The Pulse
FILES
GROUP HUB
Interactive Media floor plan
Interactive Media budget
Light study Apr. 3: Ideas area Mar. 22: Web app Mar. 5: 90% DD Work Feb. 26: Leaders
meeting meeting Session Review meeting
PRESENTATION slide 19/30
Decision maps
MY HUB
Interactive Media floor plan
TRANSCRIPT
Commons project Commons project Initial project strategy
Et es aute nulpa sequisc iasperatem et budget technology
volore dolor maximi, utaspellenis num,
comnihitiam quis et apit quia simo beat
est od quo doloritiae moluptat. Archival phrases
Gendendani cone plam ratempo
reperspit molorectem eum estium functional limit to limited pixels option would allow
quidicitis sequis quiatatiae parum et number of people constrain design project to afford all
offic totae doles maximinum ipit mo at each station stations
volorum si cullat inus dolupta eriaectota history of working
vitat ea at eum, seque dollandi omnihic phasing stations groups tradeoff between
tatem. Ut quatio totatist, eum que con into installation if diversity and
plat fugia delicilibus. funds do not programming efficiency
Lesedignis ut quissin perero dolenda materialize possibilities
2. 10:36 am
HOME MEETING Archive search: number of visitors installation purpose
User tag matches seating capacity
95% DD Work Session Review
Conversations
MY HUB AGENDA FILES
3 new • Ideas Area Light study
added by Sam
contributions
GROUP Meeting Suggested
HUB keywords: user tags:
4 common Interactive number of Apr. 3: Ideas area Mar. 22: Web app Mar. 5: 90% DD Work
topics
stations stations meeting meeting Session Review
MEETING Light study number of
HUB visitors Decision maps
2 concurrent Gallagher
& Assoc. seating
meetings
capacity
Second Story
installation
IEI purpose
budget
NEW Commons project Commons project Initial project strategy
Microsoft budget technology
Surface tables
User map nodes
functional limit to limited pixels
Sherri Mark Melanie number of people constrain design
content user ex. comm. at each station
manager designer director history of working
(SS) (SS)
phasing stations groups
Winona Sam Katie into installation if
studio dir. senior design funds do not programming
(GA) designer intern
(GA)
materialize possibilities
settings
3. 10:36 am
HOME MEETING Archive search: User tag matches
95% DD Work number of visitors seating capacity installation purpose
Session Review
MY HUB AGENDA Conversations
3 new • Ideas Area
contributions
FILES
GROUP Light study
HUB added by Sam
4 common
topics
Meeting Apr. 3: Ideas area Mar. 22: Web app Mar. 5: 90% DD Work Feb. 26: Leaders
keywords: meeting meeting Session Review meeting
MEETING
HUB Interactive
Decision maps
2 concurrent stations
meetings
Light study
Gallagher
& Assoc.
more...
Suggested Commons project Commons project Initial project strategy
user tags:
budget technology
number of
visitors User map nodes
seating functional limit to limited pixels history of working
capacity number of people constrain design groups
at each station
installation option would allow programming
purpose phasing stations project to afford all possibilities
more...
in if funds do not stations
more...
settings materialize
4. 10:36 am
HOME Archive search: User tag matches
number of visitors seating capacity installation purpose
MEETING
MY HUB Conversations
3 new
contributions
GROUP
HUB
4 common
topics
Apr. 3: Ideas area Mar. 22: Web app Mar. 5: 90% DD Work Feb. 26: Leaders
meeting meeting Session Review meeting
MEETING
HUB
Decision maps
2 concurrent
meetings
Commons project Commons project Initial project strategy
budget technology
User map nodes
functional limit to limited pixels history of working tradeoff between
number of people constrain design groups diversity and
at each station efficiency
option would allow programming
phasing stations project to afford all possibilities
in if funds do not stations
settings materialize
5. AGENDA ARCHIVE SEARCH: Content tag matches
MEETING HUB
MEETING HUB Physical Design
• Voices Area
number of visitors seating capacity
• Ideas Area • Emerging Voices
• Additional • Emerging Ideas
Conversations
Areas • Donor Wall
• Web App • The Pulse ARCHIVAL PHRASE Created 8/31/10
history of working groups Factor
FILES
GROUP HUB
Interactive Media floor plan
ANNOTATIONS
Interactive Media budget
Apr. 3: Ideas area portions 22:Documents
Light study Transcript Mar. Web app Archival phrases
Mar. 5: 90% DD Work Feb. 26: Leaders
meeting meeting Session Review meeting
PRESENTATION slide 19/30 Ditatempor sunt et quas Peter, assistant director
endiae imil eum et volor a We should talk about this at
Decision maps cus est pla exerio omnihil our next meeting when we
lorrum quiat litatur iaeperum pick out station brands.
MY HUB
alicil invel ipientem laccabo.
Accae. Ape sunt, temquat
aceped eaqui to doluptae. 11/30/10
Added to 1/09/11 agenda
Nemporeperum aute
Interactive Media floor plan
Sent dolum fugitatus mintio Amy, policy manager
consect estium ipsunt. I’m glad we agreed on 24
TRANSCRIPT Sundant. Musdaestibus
Commons project Commons project Initial people for groups in this
project strategy
Et es aute nulpa sequisc iasperatem et erum hil exceper ciuntor area. Let’s see if everyone at
budget technology
poribusae ea simusamus,
volore dolor maximi, utaspellenis num, Second Story agrees.
comnihitiam quis et apit quia simo beat sus reperunt fugit ipicili
10/22/10
est od quo doloritiae moluptat. bearit, sit voluptatus dolorep
Archival phrases erchitam, quatemp
Notified 2 people
Gendendani cone plam ratempo
reperspit molorectem eum estium functional limit to limited pixels option would allow
Melanie, comm.
quidicitis sequis quiatatiae parum et number of people constrain design volupta que
Sequos sequo
project to afford all director
offic totae doles maximinum ipit mo at each station aut haribus consequam stations If working groups were
volorum si cullat inus dolupta eriaectota venimin velendamus, conet
history of working 12–18 people each, what
vitat ea at eum, seque dollandi omnihic phasing stations groups vellabo riorupt aquiamust if we had a number large
hit, tradeoff between
tatem. Ut quatio totatist, eum que con into installation if eatet doloris acea con et es
diversity and to be split in two?
enough
plat fugia delicilibus. funds do not dere ipsaectota expliam, es
programming efficiency
materialize 8/31/10
Lesedignis ut quissin perero dolenda possibilities
6. 10:36 am
HOME MEETING Archive search: User tag matches
95% DD Work number of visitors seating capacity installation purpose
Session Review
MY HUB AGENDA
User map node: Created 8/31/10
3 new • Ideas Area
history of working groups Factor
contributions
FILES
GROUP Light study
ANNOTATIONS
HUB added by Sam
4 common Transcript portions Documents User map nodes
topics
Meeting
keywords: Ditatempor sunt et quas Peter, assistant director
MEETING endiae imil eum et volor a We should talk about this at
HUB Interactive cus est pla exerio omnihil our next meeting when we
2 concurrent stations lorrum quiat litatur iaeperum pick out station brands.
alicil invel ipientem laccabo.
meetings Accae. Ape sunt, temquat
Light study 11/30/10
aceped eaqui to doluptae.
Added to 1/09/11 agenda
Nemporeperum aute
Gallagher
& Assoc. Amy, policy manager
Sent dolum fugitatus mintio
more... consect estium ipsunt. I’m glad we agreed on 24
Sundant. Musdaestibus people for groups in this
Suggested erum hil exceper ciuntor area. Let’s see if everyone at
user tags: poribusae ea simusamus, Second Story agrees.
sus reperunt fugit ipicili
10/22/10
number of bearit, sit voluptatus dolorep Notified 2 people
visitors erchitam, quatemp
Sequos sequo volupta que Melanie, comm. director
seating
aut haribus consequam
capacity If working groups were
venimin velendamus, conet 12–18 people each, what
hit, vellabo riorupt aquiamust if we had a number large
installation eatet doloris acea con et es
purpose enough to be split in two?
dere ipsaectota expliam, es
8/31/10
more...
settings
7. 10:36 am
HOME Archive search: User tag matches
number of visitors seating capacity installation purpose
MEETING
MY HUB
User map node: Created 8/31/10
3 new history of working groups Factor
contributions
GROUP
ANNOTATIONS
HUB
4 common Transcript portions Documents Archival phrases
topics
Ditatempor sunt et quas Peter, assistant director
MEETING endiae imil eum et volor a We should talk about this at
HUB cus est pla exerio omnihil our next meeting when we
2 concurrent
lorrum quiat litatur iaeperum pick out station brands.
alicil invel ipientem laccabo.
meetings Accae. Ape sunt, temquat
aceped eaqui to doluptae. 11/30/10
Added to 1/09/11 agenda
Nemporeperum aute
Sent dolum fugitatus mintio Amy, policy manager
consect estium ipsunt. I’m glad we agreed on 24
Sundant. Musdaestibus people for groups in this
erum hil exceper ciuntor area. Let’s see if everyone at
poribusae ea simusamus, Second Story agrees.
sus reperunt fugit ipicili
10/22/10
bearit, sit voluptatus dolorep Notified 2 people
erchitam, quatemp
Sequos sequo volupta que Melanie, comm. director
aut haribus consequam If working groups were
venimin velendamus, conet 12–18 people each, what
hit, vellabo riorupt aquiamust if we had a number large
eatet doloris acea con et es enough to be split in two?
dere ipsaectota expliam, es
8/31/10
settings