Project Name Start Date Completion Date
Arrington Lakefront Lagoon Renovations - Construction Spring 2014 Fall 2014
Baker Park Renovations TBD TBD
Capital Studies (Facilities, Infrastructure Asset Appraisal) - Evaluation TBD TBD
Church Street Boat Ramp Renovations - Design Summer 2014 Fall 2014
Clark Street Beach Bird Habitat Restoration - Design Fall 2014 Spring 2015
Currey Park Renovations - Design Fall 2014 Spring 2015
Dempster Street Boat Rack Installations - Construction Summer 2014 Fall 2014
Fountain Square Reconstruction Study - Study TBD TBD
Grey Park Renovations – Design Fall 2014 Spring 2015
Ladd Arboretum Bike Path Renovations - Design Summer 2014 Spring 2015
Parks and Facilities Contingency Account N/A N/A
Penny Park Renovations TBD TBD
4
SECTION 1: 2014 PROJECTS
Project Name Start Date Completion Date
Animal Shelter Renovations – Construction TBD TBD
Capital Studies (Facilities, Infrastructure, Asset Appraisal) – Evaluation TBD TBD
Chandler Center Minor Improvements – Construction Fall 2014 Fall 2014
Civic Center Boiler Building Renovations – Construction Summer 2014 Summer 2014
Civic Center Security Improvements – Construction TBD TBD
Collector’s Office Renovations – Construction TBD TBD
Crown Center Minor Improvements – Construction Summer 2014 Fall 2014
Crown Center Partnership Study – Study TBD TBD
Ecology Center Renovations – Construction Fall 2014 Fall 2014
Facilities Capital Improvement Contingency N/A N/A
Fire Station #2 Renovations – Construction Fall 2014 Winter 2014
Fleetwood-Jourdain Minor Improvements – Construction Summer 2014 Summer 2014
Levy Center Renovations – Study Spring 2014 Spring 2014
Noyes Center Roofing and Masonry Repairs – Construction Summer 2013 Spring 2014
Parking Garage Capital Maintenance – Church – Evaluation Spring 2014 Summer 2014
Parking Garage Capital Maintenance – Maple – Evaluation Spring 2014 Summer 2014
Parking Garage Capital Maintenance – Sherman - Evaluation Summer 2014 Fall 2014
Police Fire Headquarters Renovations TBD TBD
Service Center Renovations – Study Spring 2014 Spring 2014
5
SECTION 1: 2014 PROJECTS
2014 Street Improvement Plan
Water Main Replacement and Street Resurfacing Project
Project Proposed Start Date Estimated Completion Date
Lake Street (Forest Ave. to Sheridan Rd.) May 12, 2014 July 31, 2014
Bennett Avenue (Elgin Rd. to Simpson St.) May 12, 2014 July 31, 2014
Prairie Avenue (Grant St. to Lincoln St.) May 12, 2014 July 31, 2014
Woodland Road (Ewing Ave to Bennett Ave.) May 12, 2014 July 31, 2014
Ridge Terrace (Ridge Ave. to Sherman Ave.) May 12, 2014 July 31, 2014
Greenwood Street (Sherman Ave. to Hinman Ave.) July 7, 2014 September 30, 2014
Keeney Street (Hinman Ave. to Forest Ave.) July 7, 2014 September 30, 2014
Keeney Street (Forest Ave. to Sheridan Rd.) July 7, 2014 September 30, 2014
Davis Street (Wesley Ave. to Asbury Ave.) July 7, 2014 September 30, 2014
Howard Street (Custer Ave. to Chicago Ave./Dominick's) July 7, 2014 September 30, 2014
Street Resurfacing CIP
Clark Street (Ridge Ave. to Oak Ave.) June 16, 2014 August 22, 2014
Oak Avenue (Church St. to Clark St.) June 16, 2014 August 22, 2014
Oakton Street (Dodge Ave. to Asbury Ave.) June 16, 2014 August 22, 2014
Ingleside Pl (Sheridan Rd. to East End) June 16, 2014 August 22, 2014
6
SECTION 1: 2014 PROJECTS
ADDITIONAL STREETS RESURFACING
Washington Street (Dodge Ave. to Dewey Ave.) August 2014 September 2014
Madison Street (Chicago Ave. to Custer Ave) August 2014 September 2014
Hartrey Avenue (Greenwood St. to Lake St.) August 2014 September 2014
Thayer Street (Princeton Ave. to Crawford
Ave.)
August 2014 September 2014
Darrow Avenue (Greenleaf St. to Crain St.) August 2014 September 2014
Grove Street (West End to Asbury Ave.) August 2014 September 2014
Project Proposed Start Date Estimated Completion Date
Pitner Sidewalk July 2014 August 2014
Civic Center Parking Lot Reconstruction
Project
August 2014 October 2014
Dodge Ave. Protected Bike Lane September 2014 October 2014
Bridge Street Bridge Reconstruction August 2013 July 2014
2013 Davis Street Protected Bike Lane and
Pavement Markings
June 15, 2014 August 15, 2014
Central Street Improvements Study
(Hartrey to Eastwood)
May 1, 2014 April 2015
Sheridan Road/Chicago Avenue
Improvements Design
May 15, 2014 December 2014
Salt Dome May 2014 August 2014
7
SECTION 1: 2014 PROJECTS
Project Proposed Start Date Estimated Completion Date
Bike Plan Update August 2013 June 2014
ETHS/Church St. Bike Path May 2014
Neighborhood Traffic Calming & Pedestrian/Bike
Accommodations
April 2014 November 2014
Emerson/Ridge/ Green Bay Intersection December 2013 January 2015
Safe Routes to School Improvements July 2014 August 2014
50/50 Sidewalk Replacement Program March 2014 October 2014
CMAQ Chicago Avenue Signal Improvement
Reimbursement
Completed
Dempster Signal Phase I Engineering August 2013 May 2014
Dempster Signal Phase II & III and Construction
Engineering
June 2014 September 2015
ETHS/Dodge Avenue Pedestrian Light
Improvement
April 2014 October 2014
Pedestrian Safety, Pavement Marking, Streetlight
Improvements
May 2014 October 2014
SNAP Lighting May 2014 December 2014
8
SECTION 2: DAVIS STREET
Davis Streetscape Furniture
• 4 benches
• 30 Bike Rack
• 24 Trash Cans
• Color? Black or Bronze
• Cost $52,000
• Installed in July 2014
Davis Street Pavement Markings
• Permanent lane markings
• Permanent bike lane
• Sign installation
• Installed in July 2014
9
Limits: Chicago Ave to Isabella
Roadway / Bike Improvements
Option One
• 3 lane cross section road with on street bike lanes
Option Two
• 4 lane roadway with expand multi-use path on east side of the road
Sustainable Parkway
Consultant Selection April 2014
Design in 2014, Construction in Summer 2015
SECTION 2: SHERIDAN ROAD
10
Limits: Sheridan to Grove
Roadway / Bike Improvement
• Resurface roadway
• Install a two-way cycle track on west
side of road
Design in 2014, Construction in Spring
2015
SECTION 2: CHICAGO AVENUE
11
SECTION 2: CIVIC CENTER PARKING
Sustainable Lot
Construction Fall
2014, 80% funded by
MWRD
12
SECTION 3: 2015 INFRASTRUCTURE
2015 Infrastructure Proposed Projects
Project Name Funding Sources
CIP WM MFT TIF FEDERAL TOTAL
Streets and Water Main Improvements
Dodge (Oakton to Mulford) $350,000.00 $494,000.00 $844,000.00
Sheridan (Isabella to Chicago)* $950,000.00 $1,600,000.00 $2,550,000.00
Isabella Bridge Design $120,000.00 $120,000.00
Chicago (Sheridan to Grove) $500,000.00 $254,600.00 $1,000,000.00 $1,754,600.00
Main (Hinman to Sheridan) $225,000.00 $608,000.00 $833,000.00
Dempster (McCormick to Ridge) $615,500.00 $615,500.00
Pitner (Dempster to Nathaniel) $195,000.00 $617,500.00 $812,500.00
Hinman (Main to South Blvd) $400,000.00 $400,000.00
Ashland (Isabella to Central)* $600,000.00 $608,000.00 $1,208,000.00
Lake (Chicago to Sherman) $115,000.00 $115,000.00
Streetscape and Sidewalk Improvements
Central Streetscape (Greenbay to Prairie (north side)) $500,000.00 $500,000.00
50/50 Sidewalk Program $250,000.00 $250,000.00
Central Streetscape (Lincolnwood to Ewing( north side)) $350,000.00 $350,000.00
Chicago (Church to Grove) $100,000.00 $500,000.00 $600,000.00
Pedestrian Safety $200,000.00 $200,000.00
Biking Improvements
Sheridan/Chicago Bike Lane (Grove to Isabella)* $396,603.00 $1,468,900.00 $1,865,503.00
Ladd Arboretum Multi-use Path $145,000.00 $580,000.00 $725,000.00
Hinman Bike Lane (Main to South Blvd) $50,000.00 $50,000.00
Total $4,046,603.00 $3,197,600.00 $1,400,000.00 $1,500,000.00 $3,648,900.00 $13,793,103.00
* Note: These items are located adjacent to Northwestern
and the City plans to requests funding participation from the
university.
13
SECTION 3: 2016 INFRASTRUCTURE
2016 Proposal for Streets, Water Main, and Streetscape Improvement
Project Name Funding Sources
CIP WM MFT TIF Federal TOTALS
Streets and Water Main Improvements
Poplar (South end to Colfax) $21,933.00 $21,933.00
Howard (Dodge to Ashland) $127,353.00 $653,600.00 $780,953.00
Howard (City Limits to Dodge) $180,000.00 $200,000.00 $380,000.00
Otto Lane (West-End to Highland) $63,726.00 $63,726.00
Maple (Emerson to University) $100,599.00 $100,599.00
Hartrey (Cleveland to Oakton) $241,705.00 $241,705.00
Hartrey (Washington to Cleveland) $109,500.00 $109,500.00
Asbury (Green Bay to Emerson) $117,248.00 $171,000.00 $288,248.00
Green Bay (Channel-Emerson) $94,240.00 $494,000.00 $588,240.00
Green Bay (Simpson-Asbury) $94,240.00 $361,000.00 $455,240.00
Green Bay/Ridge/Emerson Intersection $410,000.00 $410,000.00
Dewey (Davis to Lake) $91,593.00 $589,000.00 $680,593.00
Lee (Dodge to Dewey) $108,047.00 $334,000.00 $442,047.00
Hastings (Harrison to Colfax) $83,334.00 $273,600.00 $356,934.00
Bennett (Lincoln to Colfax) $43,000.00 $180,500.00 $223,500.00
Davis (Fowler to Pitner) $58,227.00 $58,227.00
Brown (Washington to Cleveland) $93,006.00 $93,006.00
Lincoln (Lincolnwood toGreenbay) $391,000.00 $299,060.00 $690,060.00
Sherman Ave.(Church-Grove) $600,000.00 $600,000.00
Chicago (South Blvd to Howard) $600,000.00 $600,000.00
Isabella Bridge Construction $600,000.00 $600,000.00
Streetscape and Sidewalk Improvements
50/50 Sidewalk $250,000.00 $250,000.00
Pedestrian Safety $200,000.00 $200,000.00
Howard Streetscape (Hartrey-Kedzie) $250,000.00 $500,000.00
Maple Ave. Streetscape (University Place-Clark) $400,000.00 $400,000.00
Central Streetscape (Greenbay-Prairie) $400,000.00 $400,000.00
Sherman Ave Fountain and Streetscape $2,300,000.00 $2,300,000.00
Biking Improvements
Lincoln Bike Lane (Lincolnwood-Greenbay)* $600,000.00 $600,000.00
Chicago Bike Lane (South Blvd to Howard) $75,000.00 $75,000.00
Total $3,524,994.00 $3,355,760.00 $1,428,757.00 $3,350,000.00 $600,000.00 $12,259,511.00
*Note: Bike lane improvement will be part of an ITEP grant
14
SECTION 3: 2017 INFRASTRUCTURE
2017 Proposal for Streets, Water Main, and Streetscape Improvement
Project Name Funding Sources
CIP WM MFT TIF FEDERAL TOTALS
Streets and Water Main Improvements
Main Street (Maple to Hinman) $247,926.00 $315,400.00 $891,540.00 $1,454,866.00
Chicago (Hamilton to Madison) $580,266.00 $741,000.00 $505,400.00 $1,826,666.00
Lawndale (Grant to Simpson) $203,833.00 $494,000.00 $1,066,899.00
Grant (Cowper to Lawndale) $134,667.00 $437,000.00 $571,667.00
Seward (Hartrey to Dodge) $152,507.00 $482,600.00 $635,107.00
Colfax (Bryant to Ridge) $78,120.00 $313,500.00 $391,620.00
Chicago (Grove to Hamilton) $0.00
Crain (Florence to Asbury) $165,200 $165,200.00
Dewey (Kirk to Oakton) $102,000 $102,000.00
South Blvd. (Barton to Asbury) $74,600 $74,600.00
Sherman Avenue (Crain to Dempster) $107,000 $107,000.00
Grey Avenue (Noyes to Grant) $51,500 $51,500.00
Florence Avenue (Washington to Main) $68,400 $68,400.00
Oak Street (Davis to Church) $142,600 $142,600.00
Oakton Street (Asbury to Custer) $619,000 $619,000.00
Streetscape and Sidewalk Improvements
50/50 Sidewalk Program $250,000.00 $250,000.00
Pedestrian Safety $200,000.00 $200,000.00
Chicago Avenue Streetscape $500,000.00 $100,000.00 $600,000.00
Main Street Streetscape $250,000.00 $500,000.00 $750,000.00
Biking Improvements
Chicago Avenue Bike Lane $75,000.00 $75,000.00
Total $2,672,319.00 $2,783,500.00 $1,330,300.00 $1,996,940.00 $0.00 $8,783,059.00
METHODOLOGY FOR STREET
RESURFACING
• Utility Priority
• Surface Condition
• Grant/TIF Priority
15
SURFACE
CONDITION Total SQ YD Cost
Less than 40 35722.42 $1,821,844
40 - 50 51374.89 $2,620,119
50 - 59 91053.18 $4,643,712
60 - 65 89531.91 $4,566,127
Total $13,651,802
SURFACE
CONDITION Total SQ YD Cost
Less than 40 31141.00 $1,276,781
40 - 50 96344.40 $3,950,120
50 - 59 225700.80 $9,253,733
60 - 65 208599.10 $8,552,563
Total $23,033,197
Primary Routes
Residential Routes
Implementation of
2015 to 2017 Plan will
result in completing all
primary and
residential routes rated
below 50
16Open Space in Evanston
SECTION 4: PARKS
2001Parks Strategic Plan
• Evaluated / classified
park system
• Developed detailed list
of capital needs
17
Methodology for Park Improvements
Individual Park Components
• Condition of Individual Park Components
• Accessibility
• Funding opportunities
Park Redesign
• Condition of Overall Site
• Accessibility
• Community concerns about existing amenities and/or their
location
• Funding opportunities
Once a methodology is developed staff will develop a 2015 to 2017 plan
and request a dedicated CIP funding level each year to ensure we
maintain a high quality park system
Facilities will be discussed at a future Council meeting
SECTION 4: PARKS
18
QUESTIONS

More Related Content

What's hot

Sp8 davis street furniture 6.17.13
Sp8 davis street furniture 6.17.13Sp8 davis street furniture 6.17.13
Sp8 davis street furniture 6.17.13cityofevanston
 
Sheridan Road City Council Presentation
Sheridan Road City Council PresentationSheridan Road City Council Presentation
Sheridan Road City Council Presentationcityofevanston
 
Apw2 sheridan and chicago avenue presentation full 7.14.14
Apw2 sheridan and chicago avenue presentation full 7.14.14Apw2 sheridan and chicago avenue presentation full 7.14.14
Apw2 sheridan and chicago avenue presentation full 7.14.14cityofevanston
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Projectcityofevanston
 
Franklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin Matters
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Fairfax County
 
Lebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting PresentationLebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting PresentationCity of Lebanon
 
2015 member meeting presentation
2015 member meeting presentation2015 member meeting presentation
2015 member meeting presentationmygroc
 
GROC 2014 Year End Review
GROC 2014 Year End ReviewGROC 2014 Year End Review
GROC 2014 Year End Reviewmygroc
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Fairfax County
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationFairfax County
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Fairfax County
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Fairfax County
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOCity of College Station
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014NorthOlympicSalmonCoalition
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014Sarah Doyle
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerFairfax County
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingFairfax County
 

What's hot (20)

Sp8 davis street furniture 6.17.13
Sp8 davis street furniture 6.17.13Sp8 davis street furniture 6.17.13
Sp8 davis street furniture 6.17.13
 
Sheridan Road City Council Presentation
Sheridan Road City Council PresentationSheridan Road City Council Presentation
Sheridan Road City Council Presentation
 
Apw2 sheridan and chicago avenue presentation full 7.14.14
Apw2 sheridan and chicago avenue presentation full 7.14.14Apw2 sheridan and chicago avenue presentation full 7.14.14
Apw2 sheridan and chicago avenue presentation full 7.14.14
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
Franklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming Projects
 
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
 
Lebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting PresentationLebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting Presentation
 
2015 member meeting presentation
2015 member meeting presentation2015 member meeting presentation
2015 member meeting presentation
 
GROC 2014 Year End Review
GROC 2014 Year End ReviewGROC 2014 Year End Review
GROC 2014 Year End Review
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
 

Viewers also liked

Sp1 evanston cradle to career powerpoint updated v2 5.19.14
Sp1 evanston cradle to career powerpoint   updated v2 5.19.14Sp1 evanston cradle to career powerpoint   updated v2 5.19.14
Sp1 evanston cradle to career powerpoint updated v2 5.19.14cityofevanston
 
Apw1 electricity supply for city owned buildings 1.13.14
Apw1 electricity supply for city owned buildings 1.13.14Apw1 electricity supply for city owned buildings 1.13.14
Apw1 electricity supply for city owned buildings 1.13.14cityofevanston
 
2013 crime report epd council 1.27.14
2013 crime report epd council 1.27.142013 crime report epd council 1.27.14
2013 crime report epd council 1.27.14cityofevanston
 
P5 1026 davis st p&d meeting 07.14.14
P5 1026 davis st p&d meeting   07.14.14P5 1026 davis st p&d meeting   07.14.14
P5 1026 davis st p&d meeting 07.14.14cityofevanston
 
P4 d residents presentation 1515 chicago ave 4-8 rev.ppt 4.8.14
P4 d residents presentation 1515 chicago ave 4-8 rev.ppt 4.8.14P4 d residents presentation 1515 chicago ave 4-8 rev.ppt 4.8.14
P4 d residents presentation 1515 chicago ave 4-8 rev.ppt 4.8.14cityofevanston
 
Sp5 fy2014 1st qtr financial report presentation v2 5.19.14
Sp5 fy2014   1st qtr financial report presentation v2 5.19.14Sp5 fy2014   1st qtr financial report presentation v2 5.19.14
Sp5 fy2014 1st qtr financial report presentation v2 5.19.14cityofevanston
 
Sp3 youth and young adult programs 7.21.14
Sp3 youth and young adult programs 7.21.14Sp3 youth and young adult programs 7.21.14
Sp3 youth and young adult programs 7.21.14cityofevanston
 
Apw1 banner discussion 5.19.14
Apw1 banner discussion 5.19.14Apw1 banner discussion 5.19.14
Apw1 banner discussion 5.19.14cityofevanston
 
P4 a staff p&d presentation 4.8.14
P4 a staff p&d presentation 4.8.14P4 a staff p&d presentation 4.8.14
P4 a staff p&d presentation 4.8.14cityofevanston
 
P1 Sports Dome Planned Development
P1 Sports Dome Planned DevelopmentP1 Sports Dome Planned Development
P1 Sports Dome Planned Developmentcityofevanston
 
Tree city usa award 2013 5.19.14
Tree city usa award 2013 5.19.14Tree city usa award 2013 5.19.14
Tree city usa award 2013 5.19.14cityofevanston
 
Sp1 financial policies presentation 6.9.14
Sp1 financial policies presentation 6.9.14Sp1 financial policies presentation 6.9.14
Sp1 financial policies presentation 6.9.14cityofevanston
 
A6 a7 apw chiaravalle presentation 4.8.14
A6 a7 apw chiaravalle presentation 4.8.14A6 a7 apw chiaravalle presentation 4.8.14
A6 a7 apw chiaravalle presentation 4.8.14cityofevanston
 
Sp4 b evanston city council bike presentation 2014 0721 7.21.14
Sp4 b evanston city council bike presentation 2014 0721 7.21.14Sp4 b evanston city council bike presentation 2014 0721 7.21.14
Sp4 b evanston city council bike presentation 2014 0721 7.21.14cityofevanston
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Reviewcityofevanston
 
Sp2 evanston climate action plan update and evanston livability plan presenta...
Sp2 evanston climate action plan update and evanston livability plan presenta...Sp2 evanston climate action plan update and evanston livability plan presenta...
Sp2 evanston climate action plan update and evanston livability plan presenta...cityofevanston
 
Images from surveillance camera at brummel st 1.27.14
Images from surveillance camera at brummel st 1.27.14Images from surveillance camera at brummel st 1.27.14
Images from surveillance camera at brummel st 1.27.14cityofevanston
 

Viewers also liked (20)

Sp1 evanston cradle to career powerpoint updated v2 5.19.14
Sp1 evanston cradle to career powerpoint   updated v2 5.19.14Sp1 evanston cradle to career powerpoint   updated v2 5.19.14
Sp1 evanston cradle to career powerpoint updated v2 5.19.14
 
Apw1 electricity supply for city owned buildings 1.13.14
Apw1 electricity supply for city owned buildings 1.13.14Apw1 electricity supply for city owned buildings 1.13.14
Apw1 electricity supply for city owned buildings 1.13.14
 
2013 crime report epd council 1.27.14
2013 crime report epd council 1.27.142013 crime report epd council 1.27.14
2013 crime report epd council 1.27.14
 
P5 1026 davis st p&d meeting 07.14.14
P5 1026 davis st p&d meeting   07.14.14P5 1026 davis st p&d meeting   07.14.14
P5 1026 davis st p&d meeting 07.14.14
 
P4 d residents presentation 1515 chicago ave 4-8 rev.ppt 4.8.14
P4 d residents presentation 1515 chicago ave 4-8 rev.ppt 4.8.14P4 d residents presentation 1515 chicago ave 4-8 rev.ppt 4.8.14
P4 d residents presentation 1515 chicago ave 4-8 rev.ppt 4.8.14
 
Sp5 fy2014 1st qtr financial report presentation v2 5.19.14
Sp5 fy2014   1st qtr financial report presentation v2 5.19.14Sp5 fy2014   1st qtr financial report presentation v2 5.19.14
Sp5 fy2014 1st qtr financial report presentation v2 5.19.14
 
Sp3 youth and young adult programs 7.21.14
Sp3 youth and young adult programs 7.21.14Sp3 youth and young adult programs 7.21.14
Sp3 youth and young adult programs 7.21.14
 
Tobacco 21 5.5.14
Tobacco 21 5.5.14Tobacco 21 5.5.14
Tobacco 21 5.5.14
 
Apw1 banner discussion 5.19.14
Apw1 banner discussion 5.19.14Apw1 banner discussion 5.19.14
Apw1 banner discussion 5.19.14
 
A6 att wi fi 1.13.14
A6 att wi fi 1.13.14A6 att wi fi 1.13.14
A6 att wi fi 1.13.14
 
P4 a staff p&d presentation 4.8.14
P4 a staff p&d presentation 4.8.14P4 a staff p&d presentation 4.8.14
P4 a staff p&d presentation 4.8.14
 
P1 Sports Dome Planned Development
P1 Sports Dome Planned DevelopmentP1 Sports Dome Planned Development
P1 Sports Dome Planned Development
 
Tree city usa award 2013 5.19.14
Tree city usa award 2013 5.19.14Tree city usa award 2013 5.19.14
Tree city usa award 2013 5.19.14
 
Sp1 financial policies presentation 6.9.14
Sp1 financial policies presentation 6.9.14Sp1 financial policies presentation 6.9.14
Sp1 financial policies presentation 6.9.14
 
A6 a7 apw chiaravalle presentation 4.8.14
A6 a7 apw chiaravalle presentation 4.8.14A6 a7 apw chiaravalle presentation 4.8.14
A6 a7 apw chiaravalle presentation 4.8.14
 
Sp4 b evanston city council bike presentation 2014 0721 7.21.14
Sp4 b evanston city council bike presentation 2014 0721 7.21.14Sp4 b evanston city council bike presentation 2014 0721 7.21.14
Sp4 b evanston city council bike presentation 2014 0721 7.21.14
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Review
 
Fleet award 5.19.14
Fleet award 5.19.14Fleet award 5.19.14
Fleet award 5.19.14
 
Sp2 evanston climate action plan update and evanston livability plan presenta...
Sp2 evanston climate action plan update and evanston livability plan presenta...Sp2 evanston climate action plan update and evanston livability plan presenta...
Sp2 evanston climate action plan update and evanston livability plan presenta...
 
Images from surveillance camera at brummel st 1.27.14
Images from surveillance camera at brummel st 1.27.14Images from surveillance camera at brummel st 1.27.14
Images from surveillance camera at brummel st 1.27.14
 

Similar to Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14

Ocean City's 2015 capital plan presentation
Ocean City's 2015 capital plan presentationOcean City's 2015 capital plan presentation
Ocean City's 2015 capital plan presentationOceanCityGazette
 
Fulton Market Taskforce Meeting 10-04-2017
Fulton Market Taskforce Meeting 10-04-2017Fulton Market Taskforce Meeting 10-04-2017
Fulton Market Taskforce Meeting 10-04-2017West Central Association
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017Paul B. Martin
 
Sp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationSp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationcityofevanston
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)GardinerEast
 
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction ProjectsCourtney Hayden
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015Paul Schumann
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30finalCityofEvanston2
 
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Fairfax County
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14West Central Association
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsFairfax County
 
Southside Green - Team 2
Southside Green - Team 2Southside Green - Team 2
Southside Green - Team 2M. Damon Weiss
 
Progress update please do not remove
Progress update   please do not removeProgress update   please do not remove
Progress update please do not removeamberaley
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation VDOT Northern Virginia
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014West Central Association
 
Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger
 

Similar to Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14 (20)

Ocean City's 2015 capital plan presentation
Ocean City's 2015 capital plan presentationOcean City's 2015 capital plan presentation
Ocean City's 2015 capital plan presentation
 
Fulton Market Taskforce Meeting 10-04-2017
Fulton Market Taskforce Meeting 10-04-2017Fulton Market Taskforce Meeting 10-04-2017
Fulton Market Taskforce Meeting 10-04-2017
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
 
Sp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationSp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentation
 
Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10
 
Four Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force PresentationFour Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force Presentation
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction Projects
 
Capital Improvement Plan Update
Capital Improvement Plan UpdateCapital Improvement Plan Update
Capital Improvement Plan Update
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30final
 
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
Southside Green - Team 2
Southside Green - Team 2Southside Green - Team 2
Southside Green - Team 2
 
Progress update please do not remove
Progress update   please do not removeProgress update   please do not remove
Progress update please do not remove
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
 
Florida's Turnpike Enterprise (FTE) Construction Projects Update
Florida's Turnpike Enterprise (FTE) Construction Projects UpdateFlorida's Turnpike Enterprise (FTE) Construction Projects Update
Florida's Turnpike Enterprise (FTE) Construction Projects Update
 
Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117
 

More from cityofevanston

SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020cityofevanston
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015cityofevanston
 
Human services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationHuman services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationcityofevanston
 
Age friendlyhealth summit
Age friendlyhealth summitAge friendlyhealth summit
Age friendlyhealth summitcityofevanston
 
Divvy Community Meeting Presentation
Divvy Community Meeting PresentationDivvy Community Meeting Presentation
Divvy Community Meeting Presentationcityofevanston
 
Human services noyes ctr successes 2014
Human services noyes ctr successes 2014Human services noyes ctr successes 2014
Human services noyes ctr successes 2014cityofevanston
 
Leathers & Associates Penny Park Presentation
Leathers & Associates Penny Park PresentationLeathers & Associates Penny Park Presentation
Leathers & Associates Penny Park Presentationcityofevanston
 
SP1 Second Quarter Financial Review
SP1 Second Quarter Financial ReviewSP1 Second Quarter Financial Review
SP1 Second Quarter Financial Reviewcityofevanston
 
Presentation - japanese visitors
Presentation - japanese visitorsPresentation - japanese visitors
Presentation - japanese visitorscityofevanston
 
Evanston committee 3 5-2012
Evanston committee 3 5-2012Evanston committee 3 5-2012
Evanston committee 3 5-2012cityofevanston
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10cityofevanston
 
Council meeting 3.20.12 cross fit e-town
Council meeting 3.20.12  cross fit e-townCouncil meeting 3.20.12  cross fit e-town
Council meeting 3.20.12 cross fit e-towncityofevanston
 
TIF presentation final 12.10.12
TIF presentation final 12.10.12TIF presentation final 12.10.12
TIF presentation final 12.10.12cityofevanston
 
Pd1 1890 maple 11.22.12
Pd1 1890 maple 11.22.12Pd1 1890 maple 11.22.12
Pd1 1890 maple 11.22.12cityofevanston
 
2012 paint evanston plow contest slideshow 11.22.12
2012 paint evanston plow contest slideshow 11.22.122012 paint evanston plow contest slideshow 11.22.12
2012 paint evanston plow contest slideshow 11.22.12cityofevanston
 
Public hearing presentation main chicago proposed tif draft 11.12.12
Public hearing presentation main chicago proposed tif draft 11.12.12Public hearing presentation main chicago proposed tif draft 11.12.12
Public hearing presentation main chicago proposed tif draft 11.12.12cityofevanston
 
NU fire lane city council presentation final (11-12-12)
NU fire lane city council presentation final (11-12-12)NU fire lane city council presentation final (11-12-12)
NU fire lane city council presentation final (11-12-12)cityofevanston
 
Fy 2013 proposed budget - tax levy hearing presentation for 11-10-12 v1
Fy 2013 proposed budget - tax levy hearing presentation for 11-10-12 v1Fy 2013 proposed budget - tax levy hearing presentation for 11-10-12 v1
Fy 2013 proposed budget - tax levy hearing presentation for 11-10-12 v1cityofevanston
 

More from cityofevanston (20)

SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015
 
Human services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationHuman services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentation
 
Age friendlyhealth summit
Age friendlyhealth summitAge friendlyhealth summit
Age friendlyhealth summit
 
Divvy Community Meeting Presentation
Divvy Community Meeting PresentationDivvy Community Meeting Presentation
Divvy Community Meeting Presentation
 
Human services noyes ctr successes 2014
Human services noyes ctr successes 2014Human services noyes ctr successes 2014
Human services noyes ctr successes 2014
 
Hs cagngfrndlyupdte
Hs cagngfrndlyupdteHs cagngfrndlyupdte
Hs cagngfrndlyupdte
 
Leathers & Associates Penny Park Presentation
Leathers & Associates Penny Park PresentationLeathers & Associates Penny Park Presentation
Leathers & Associates Penny Park Presentation
 
SP1 Second Quarter Financial Review
SP1 Second Quarter Financial ReviewSP1 Second Quarter Financial Review
SP1 Second Quarter Financial Review
 
Presentation - japanese visitors
Presentation - japanese visitorsPresentation - japanese visitors
Presentation - japanese visitors
 
Evanston committee 3 5-2012
Evanston committee 3 5-2012Evanston committee 3 5-2012
Evanston committee 3 5-2012
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10
 
Council meeting 3.20.12 cross fit e-town
Council meeting 3.20.12  cross fit e-townCouncil meeting 3.20.12  cross fit e-town
Council meeting 3.20.12 cross fit e-town
 
Public announcement 1
Public announcement 1Public announcement 1
Public announcement 1
 
TIF presentation final 12.10.12
TIF presentation final 12.10.12TIF presentation final 12.10.12
TIF presentation final 12.10.12
 
Pd1 1890 maple 11.22.12
Pd1 1890 maple 11.22.12Pd1 1890 maple 11.22.12
Pd1 1890 maple 11.22.12
 
2012 paint evanston plow contest slideshow 11.22.12
2012 paint evanston plow contest slideshow 11.22.122012 paint evanston plow contest slideshow 11.22.12
2012 paint evanston plow contest slideshow 11.22.12
 
Public hearing presentation main chicago proposed tif draft 11.12.12
Public hearing presentation main chicago proposed tif draft 11.12.12Public hearing presentation main chicago proposed tif draft 11.12.12
Public hearing presentation main chicago proposed tif draft 11.12.12
 
NU fire lane city council presentation final (11-12-12)
NU fire lane city council presentation final (11-12-12)NU fire lane city council presentation final (11-12-12)
NU fire lane city council presentation final (11-12-12)
 
Fy 2013 proposed budget - tax levy hearing presentation for 11-10-12 v1
Fy 2013 proposed budget - tax levy hearing presentation for 11-10-12 v1Fy 2013 proposed budget - tax levy hearing presentation for 11-10-12 v1
Fy 2013 proposed budget - tax levy hearing presentation for 11-10-12 v1
 

Recently uploaded

VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...Garima Khatri
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Christina Parmionova
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证mbetknu
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…nishakur201
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 

Recently uploaded (20)

VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 

Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14

  • 1. Public Works CAPITAL IMPROVEMENT PRESENTATION TO THE EVANSTON CITY COUNCIL MARCH 31, 2014
  • 2. INTRODUCTION Section 1: 2014 CIP Project List and Schedule Section 2: 2014 Project Highlights Section 3: 2015-2017 CIP Infrastructure Projects Section 4: Parks Improvement Plan Comments and Questions 2
  • 3. 3 SECTION 1: 2014 PROJECTS Project Name Start Date Completion Date Arrington Lakefront Lagoon Renovations - Construction Spring 2014 Fall 2014 Baker Park Renovations TBD TBD Capital Studies (Facilities, Infrastructure Asset Appraisal) - Evaluation TBD TBD Church Street Boat Ramp Renovations - Design Summer 2014 Fall 2014 Clark Street Beach Bird Habitat Restoration - Design Fall 2014 Spring 2015 Currey Park Renovations - Design Fall 2014 Spring 2015 Dempster Street Boat Rack Installations - Construction Summer 2014 Fall 2014 Fountain Square Reconstruction Study - Study TBD TBD Grey Park Renovations – Design Fall 2014 Spring 2015 Ladd Arboretum Bike Path Renovations - Design Summer 2014 Spring 2015 Parks and Facilities Contingency Account N/A N/A Penny Park Renovations TBD TBD
  • 4. 4 SECTION 1: 2014 PROJECTS Project Name Start Date Completion Date Animal Shelter Renovations – Construction TBD TBD Capital Studies (Facilities, Infrastructure, Asset Appraisal) – Evaluation TBD TBD Chandler Center Minor Improvements – Construction Fall 2014 Fall 2014 Civic Center Boiler Building Renovations – Construction Summer 2014 Summer 2014 Civic Center Security Improvements – Construction TBD TBD Collector’s Office Renovations – Construction TBD TBD Crown Center Minor Improvements – Construction Summer 2014 Fall 2014 Crown Center Partnership Study – Study TBD TBD Ecology Center Renovations – Construction Fall 2014 Fall 2014 Facilities Capital Improvement Contingency N/A N/A Fire Station #2 Renovations – Construction Fall 2014 Winter 2014 Fleetwood-Jourdain Minor Improvements – Construction Summer 2014 Summer 2014 Levy Center Renovations – Study Spring 2014 Spring 2014 Noyes Center Roofing and Masonry Repairs – Construction Summer 2013 Spring 2014 Parking Garage Capital Maintenance – Church – Evaluation Spring 2014 Summer 2014 Parking Garage Capital Maintenance – Maple – Evaluation Spring 2014 Summer 2014 Parking Garage Capital Maintenance – Sherman - Evaluation Summer 2014 Fall 2014 Police Fire Headquarters Renovations TBD TBD Service Center Renovations – Study Spring 2014 Spring 2014
  • 5. 5 SECTION 1: 2014 PROJECTS 2014 Street Improvement Plan Water Main Replacement and Street Resurfacing Project Project Proposed Start Date Estimated Completion Date Lake Street (Forest Ave. to Sheridan Rd.) May 12, 2014 July 31, 2014 Bennett Avenue (Elgin Rd. to Simpson St.) May 12, 2014 July 31, 2014 Prairie Avenue (Grant St. to Lincoln St.) May 12, 2014 July 31, 2014 Woodland Road (Ewing Ave to Bennett Ave.) May 12, 2014 July 31, 2014 Ridge Terrace (Ridge Ave. to Sherman Ave.) May 12, 2014 July 31, 2014 Greenwood Street (Sherman Ave. to Hinman Ave.) July 7, 2014 September 30, 2014 Keeney Street (Hinman Ave. to Forest Ave.) July 7, 2014 September 30, 2014 Keeney Street (Forest Ave. to Sheridan Rd.) July 7, 2014 September 30, 2014 Davis Street (Wesley Ave. to Asbury Ave.) July 7, 2014 September 30, 2014 Howard Street (Custer Ave. to Chicago Ave./Dominick's) July 7, 2014 September 30, 2014 Street Resurfacing CIP Clark Street (Ridge Ave. to Oak Ave.) June 16, 2014 August 22, 2014 Oak Avenue (Church St. to Clark St.) June 16, 2014 August 22, 2014 Oakton Street (Dodge Ave. to Asbury Ave.) June 16, 2014 August 22, 2014 Ingleside Pl (Sheridan Rd. to East End) June 16, 2014 August 22, 2014
  • 6. 6 SECTION 1: 2014 PROJECTS ADDITIONAL STREETS RESURFACING Washington Street (Dodge Ave. to Dewey Ave.) August 2014 September 2014 Madison Street (Chicago Ave. to Custer Ave) August 2014 September 2014 Hartrey Avenue (Greenwood St. to Lake St.) August 2014 September 2014 Thayer Street (Princeton Ave. to Crawford Ave.) August 2014 September 2014 Darrow Avenue (Greenleaf St. to Crain St.) August 2014 September 2014 Grove Street (West End to Asbury Ave.) August 2014 September 2014 Project Proposed Start Date Estimated Completion Date Pitner Sidewalk July 2014 August 2014 Civic Center Parking Lot Reconstruction Project August 2014 October 2014 Dodge Ave. Protected Bike Lane September 2014 October 2014 Bridge Street Bridge Reconstruction August 2013 July 2014 2013 Davis Street Protected Bike Lane and Pavement Markings June 15, 2014 August 15, 2014 Central Street Improvements Study (Hartrey to Eastwood) May 1, 2014 April 2015 Sheridan Road/Chicago Avenue Improvements Design May 15, 2014 December 2014 Salt Dome May 2014 August 2014
  • 7. 7 SECTION 1: 2014 PROJECTS Project Proposed Start Date Estimated Completion Date Bike Plan Update August 2013 June 2014 ETHS/Church St. Bike Path May 2014 Neighborhood Traffic Calming & Pedestrian/Bike Accommodations April 2014 November 2014 Emerson/Ridge/ Green Bay Intersection December 2013 January 2015 Safe Routes to School Improvements July 2014 August 2014 50/50 Sidewalk Replacement Program March 2014 October 2014 CMAQ Chicago Avenue Signal Improvement Reimbursement Completed Dempster Signal Phase I Engineering August 2013 May 2014 Dempster Signal Phase II & III and Construction Engineering June 2014 September 2015 ETHS/Dodge Avenue Pedestrian Light Improvement April 2014 October 2014 Pedestrian Safety, Pavement Marking, Streetlight Improvements May 2014 October 2014 SNAP Lighting May 2014 December 2014
  • 8. 8 SECTION 2: DAVIS STREET Davis Streetscape Furniture • 4 benches • 30 Bike Rack • 24 Trash Cans • Color? Black or Bronze • Cost $52,000 • Installed in July 2014 Davis Street Pavement Markings • Permanent lane markings • Permanent bike lane • Sign installation • Installed in July 2014
  • 9. 9 Limits: Chicago Ave to Isabella Roadway / Bike Improvements Option One • 3 lane cross section road with on street bike lanes Option Two • 4 lane roadway with expand multi-use path on east side of the road Sustainable Parkway Consultant Selection April 2014 Design in 2014, Construction in Summer 2015 SECTION 2: SHERIDAN ROAD
  • 10. 10 Limits: Sheridan to Grove Roadway / Bike Improvement • Resurface roadway • Install a two-way cycle track on west side of road Design in 2014, Construction in Spring 2015 SECTION 2: CHICAGO AVENUE
  • 11. 11 SECTION 2: CIVIC CENTER PARKING Sustainable Lot Construction Fall 2014, 80% funded by MWRD
  • 12. 12 SECTION 3: 2015 INFRASTRUCTURE 2015 Infrastructure Proposed Projects Project Name Funding Sources CIP WM MFT TIF FEDERAL TOTAL Streets and Water Main Improvements Dodge (Oakton to Mulford) $350,000.00 $494,000.00 $844,000.00 Sheridan (Isabella to Chicago)* $950,000.00 $1,600,000.00 $2,550,000.00 Isabella Bridge Design $120,000.00 $120,000.00 Chicago (Sheridan to Grove) $500,000.00 $254,600.00 $1,000,000.00 $1,754,600.00 Main (Hinman to Sheridan) $225,000.00 $608,000.00 $833,000.00 Dempster (McCormick to Ridge) $615,500.00 $615,500.00 Pitner (Dempster to Nathaniel) $195,000.00 $617,500.00 $812,500.00 Hinman (Main to South Blvd) $400,000.00 $400,000.00 Ashland (Isabella to Central)* $600,000.00 $608,000.00 $1,208,000.00 Lake (Chicago to Sherman) $115,000.00 $115,000.00 Streetscape and Sidewalk Improvements Central Streetscape (Greenbay to Prairie (north side)) $500,000.00 $500,000.00 50/50 Sidewalk Program $250,000.00 $250,000.00 Central Streetscape (Lincolnwood to Ewing( north side)) $350,000.00 $350,000.00 Chicago (Church to Grove) $100,000.00 $500,000.00 $600,000.00 Pedestrian Safety $200,000.00 $200,000.00 Biking Improvements Sheridan/Chicago Bike Lane (Grove to Isabella)* $396,603.00 $1,468,900.00 $1,865,503.00 Ladd Arboretum Multi-use Path $145,000.00 $580,000.00 $725,000.00 Hinman Bike Lane (Main to South Blvd) $50,000.00 $50,000.00 Total $4,046,603.00 $3,197,600.00 $1,400,000.00 $1,500,000.00 $3,648,900.00 $13,793,103.00 * Note: These items are located adjacent to Northwestern and the City plans to requests funding participation from the university.
  • 13. 13 SECTION 3: 2016 INFRASTRUCTURE 2016 Proposal for Streets, Water Main, and Streetscape Improvement Project Name Funding Sources CIP WM MFT TIF Federal TOTALS Streets and Water Main Improvements Poplar (South end to Colfax) $21,933.00 $21,933.00 Howard (Dodge to Ashland) $127,353.00 $653,600.00 $780,953.00 Howard (City Limits to Dodge) $180,000.00 $200,000.00 $380,000.00 Otto Lane (West-End to Highland) $63,726.00 $63,726.00 Maple (Emerson to University) $100,599.00 $100,599.00 Hartrey (Cleveland to Oakton) $241,705.00 $241,705.00 Hartrey (Washington to Cleveland) $109,500.00 $109,500.00 Asbury (Green Bay to Emerson) $117,248.00 $171,000.00 $288,248.00 Green Bay (Channel-Emerson) $94,240.00 $494,000.00 $588,240.00 Green Bay (Simpson-Asbury) $94,240.00 $361,000.00 $455,240.00 Green Bay/Ridge/Emerson Intersection $410,000.00 $410,000.00 Dewey (Davis to Lake) $91,593.00 $589,000.00 $680,593.00 Lee (Dodge to Dewey) $108,047.00 $334,000.00 $442,047.00 Hastings (Harrison to Colfax) $83,334.00 $273,600.00 $356,934.00 Bennett (Lincoln to Colfax) $43,000.00 $180,500.00 $223,500.00 Davis (Fowler to Pitner) $58,227.00 $58,227.00 Brown (Washington to Cleveland) $93,006.00 $93,006.00 Lincoln (Lincolnwood toGreenbay) $391,000.00 $299,060.00 $690,060.00 Sherman Ave.(Church-Grove) $600,000.00 $600,000.00 Chicago (South Blvd to Howard) $600,000.00 $600,000.00 Isabella Bridge Construction $600,000.00 $600,000.00 Streetscape and Sidewalk Improvements 50/50 Sidewalk $250,000.00 $250,000.00 Pedestrian Safety $200,000.00 $200,000.00 Howard Streetscape (Hartrey-Kedzie) $250,000.00 $500,000.00 Maple Ave. Streetscape (University Place-Clark) $400,000.00 $400,000.00 Central Streetscape (Greenbay-Prairie) $400,000.00 $400,000.00 Sherman Ave Fountain and Streetscape $2,300,000.00 $2,300,000.00 Biking Improvements Lincoln Bike Lane (Lincolnwood-Greenbay)* $600,000.00 $600,000.00 Chicago Bike Lane (South Blvd to Howard) $75,000.00 $75,000.00 Total $3,524,994.00 $3,355,760.00 $1,428,757.00 $3,350,000.00 $600,000.00 $12,259,511.00 *Note: Bike lane improvement will be part of an ITEP grant
  • 14. 14 SECTION 3: 2017 INFRASTRUCTURE 2017 Proposal for Streets, Water Main, and Streetscape Improvement Project Name Funding Sources CIP WM MFT TIF FEDERAL TOTALS Streets and Water Main Improvements Main Street (Maple to Hinman) $247,926.00 $315,400.00 $891,540.00 $1,454,866.00 Chicago (Hamilton to Madison) $580,266.00 $741,000.00 $505,400.00 $1,826,666.00 Lawndale (Grant to Simpson) $203,833.00 $494,000.00 $1,066,899.00 Grant (Cowper to Lawndale) $134,667.00 $437,000.00 $571,667.00 Seward (Hartrey to Dodge) $152,507.00 $482,600.00 $635,107.00 Colfax (Bryant to Ridge) $78,120.00 $313,500.00 $391,620.00 Chicago (Grove to Hamilton) $0.00 Crain (Florence to Asbury) $165,200 $165,200.00 Dewey (Kirk to Oakton) $102,000 $102,000.00 South Blvd. (Barton to Asbury) $74,600 $74,600.00 Sherman Avenue (Crain to Dempster) $107,000 $107,000.00 Grey Avenue (Noyes to Grant) $51,500 $51,500.00 Florence Avenue (Washington to Main) $68,400 $68,400.00 Oak Street (Davis to Church) $142,600 $142,600.00 Oakton Street (Asbury to Custer) $619,000 $619,000.00 Streetscape and Sidewalk Improvements 50/50 Sidewalk Program $250,000.00 $250,000.00 Pedestrian Safety $200,000.00 $200,000.00 Chicago Avenue Streetscape $500,000.00 $100,000.00 $600,000.00 Main Street Streetscape $250,000.00 $500,000.00 $750,000.00 Biking Improvements Chicago Avenue Bike Lane $75,000.00 $75,000.00 Total $2,672,319.00 $2,783,500.00 $1,330,300.00 $1,996,940.00 $0.00 $8,783,059.00
  • 15. METHODOLOGY FOR STREET RESURFACING • Utility Priority • Surface Condition • Grant/TIF Priority 15 SURFACE CONDITION Total SQ YD Cost Less than 40 35722.42 $1,821,844 40 - 50 51374.89 $2,620,119 50 - 59 91053.18 $4,643,712 60 - 65 89531.91 $4,566,127 Total $13,651,802 SURFACE CONDITION Total SQ YD Cost Less than 40 31141.00 $1,276,781 40 - 50 96344.40 $3,950,120 50 - 59 225700.80 $9,253,733 60 - 65 208599.10 $8,552,563 Total $23,033,197 Primary Routes Residential Routes Implementation of 2015 to 2017 Plan will result in completing all primary and residential routes rated below 50
  • 16. 16Open Space in Evanston SECTION 4: PARKS 2001Parks Strategic Plan • Evaluated / classified park system • Developed detailed list of capital needs
  • 17. 17 Methodology for Park Improvements Individual Park Components • Condition of Individual Park Components • Accessibility • Funding opportunities Park Redesign • Condition of Overall Site • Accessibility • Community concerns about existing amenities and/or their location • Funding opportunities Once a methodology is developed staff will develop a 2015 to 2017 plan and request a dedicated CIP funding level each year to ensure we maintain a high quality park system Facilities will be discussed at a future Council meeting SECTION 4: PARKS