1) Create two operation modes called "Day" and "Night" in transaction RZ04. 2) Assign different numbers of work processes to each operation mode. 3) Schedule the operation modes so that "Day" runs from 01:00-13:00 and "Night" runs from 13:00-00:00 using transaction SM63. 4) Manually switch between the operation modes using transaction RZ03 and verify the work process changes in SM50.