2. AP goals would include:AP goals would include:
design considerations,
square foot needs, q ,
adjacencies,
circulation,
personal forecasts,
user characteristics,
organizational structure
(AP)
ARCHITECTURAL
organizational structure,
budget & costs and
project schedule
PROGRAM
p j
Design Construction Occupancyg p y
3. SYSTEMS COMMISSIONING: What is it?
“A quality focused process forA quality focused process for
enhancing the delivery of a project.
The process focuses on verifying and
documenting that the facility and all
f it t d bliof its systems and assemblies are
planned, designed, installed, tested,
operated and maintained to meet theoperated and maintained to meet the
owner’s project requirements.”
Design Construction Occupancyg p y
5. COMMISSIONING SCOPE
Th O d iThe Owner determines
the systems and
assemblies to be includedassemblies to be included
in the project team’s
scope.
Design Construction Occupancyg p y
6. (OPR)
OWNER’S PROJECT REQUIRMENTS
The OPR goals would include:
minimizing environmental impact minimizing environmental impact,
define energy savings requirements,
defined efficiency for HVAC & water usage,
defined Indoor Air Quality (IAQ) requirements, defined Indoor Air Quality (IAQ) requirements,
maintenance & operations requirements and
sustainable operation.
Design Construction Occupancyg p y
7. (Cx PLAN)
COMMISSIONING PLAN
The Cx Plan includes:
the systems to be commissioned with the the systems to be commissioned with the
type of tests for the equipment & systems
the measurable & acceptable performances,
the Functional Performance Testing (FTP) the Functional Performance Testing (FTP)
documentation,
O&M training requirements and
Cx construction schedule Cx construction schedule.
Design Construction Occupancyg p y
9. (BOD)
BASIS OF DESIGN
The BOD goals would include:
how the building systems meet the OPR how the building systems meet the OPR,
why the systems were selected,
the concepts,
the calculations, the calculations,
all product selections
provide information to the team during each
phase of a project. p p j
Design Construction Occupancyg p y
10. COMMISSIONING SPECIFICATIONS
The Owner shall require byThe Owner shall require, by
agreement, the design /
construction team to include Cx
specifications in the project contractspecifications in the project contract
documents.
Sh ll include the meeting of all
requirements defines in the OPRrequirements defines in the OPR
applicable to the contracted parties
and follow the Cx Process contained
in the project’s Cx Plan. p j
Design Construction Occupancyg p y
11. SYSTEMS TO BE COMMISSIONED
HVAC Systems HVAC Systems
Controls and BMS Systems
Generators
Switchboards Switchboards
Water supply / sanitation
Pumps
Motors
Fire Detection and protection
Security
Lifting and escalators
Acoustic and vibration appraisals
Building Enclosure
other
Design Construction Occupancyg p y
12. (DR)
DESIGN REVIEW
The design review, should also include:
operability & maintainability (O&M) operability & maintainability (O&M),
functionality,
training,
energy efficiency energy efficiency,
control systems,
sequence of operations,
commissioning specifications and commissioning specifications and
the ability to functionally test the systems.
Design Construction Occupancyg p y
14. CONSTRUCTION OBSERVATION AND
TESTING.
Check lists and test procedures.
Cx kick off and scoping meeting.
Executing Test Procedures.
Uniform and effective process for
documentation of testing, to provide Cx
testing and interaction between
commissioned equipment, systems and
assemblies.
Design Construction Occupancyg p y
15. Cx SPECIALISTS
HVAC HVAC,
Controls and BMS,
Electrical & Lighting Controls,
Plumbing Plumbing,
Fire alarm,
Vibration,
Building enclosure Building enclosure,
etc.
Design Construction Occupancyg p y
18. SYSTEMS MANUAL
Th S t M l i l d i 6 tiThe Systems Manual includes in 6 sections:
the OPR,
the BOD,
contract documents contract documents,
Record Documents,
testing information with updates & corrections,
building & equipment specifications & submittals building & equipment specifications & submittals,
manufacturer’s operation & maintenance data,
warranties and
Supplier & subcontractor listing with contact Supplier & subcontractor listing with contact
information.
Copy of Warranties.
Design Construction Occupancyg p y
19. (PFT)
PRE‐FUNCTIONAL TESTING
Visual inspection of whether a particular system Visual inspection of whether a particular system
or assembly is installed as specified.
Whether the correct components were selected
and installed without damage.and installed without damage.
Whether the installation meets the criteria set
forth in the OPR in terms of maintainability, access
and the like.
Design Construction Occupancyg p y
22. 18 (24) MONTH
FINAL COMMISSIONING
REPORT
A final Cx report shall be provided to
summarize the Cx Process and thesummarize the Cx Process and the
building operation for delivery to the
building Owner and other required
recipientsrecipients.
Includes an executive summary
describing the Cx process and identifying
the systems commissionedthe systems commissioned.
Design Construction Occupancyg p y
30. This material was presented by:This material was presented by:
Thank you for watching this presentation.