SlideShare a Scribd company logo
1 of 2
Download to read offline
Primavera Project Manager And Construction Projects
The operations that are carried out for constructing an embankment are clearing, stripping and
storing top soil, placing of embankment, rolling and finishing. It optimizes the scheduling through
identification of the critical path and can provide historical information around the relationship
between planned and actual project performance. The second one was obviously a concrete walls of
the service core I mentioned above. The second one was obviously a concrete walls of the service
core I mentioned above. Houses, apartments, industries, offices, schools, streets, and bridges are a
few of the few products of the construction industry.
Crawler and Bulldozer: Crawler, a vehicle heavy weight
vehicle, can be used for flattening road surfaces. But in the
wedding the fund is insufficient for your manifestation of all
of the specifications, then estimating ought to be done. A
construction professional should meet all of the
requirements according for the available fund. The camber
provided is steep ranging from1 in 20 to 1 in23 which allows
water to drain off quickly. The design-build method must be used by those that accept as factual an
architect-contactor group having a past history of working simultaneously will be more effective and,
as a possible outcome, lower than an architect and contractor working simultaneously for that first
time.
The x factor of construction debris removal and construction clean up is TIME. But if the fund is
insufficient for that manifestation of all the specifications, then estimating should be done. This is
laid on a prepared sub-grade, sub-base or base or on an existing pavement. In the entire process of
its foundation construction, temporary support for both mat and below-grade concrete floors were
made because of the use of top-down construction method, H-piles large steel sections extended
from your piling towards the ground surface.
Trimmings are merely applicable for
purchase of materials needed, professional
fees and cost-maintenance. They should not
connect with standard labor cost of the
masons, steel men, plumbers and workers
in other specializations. The design allows
to get a 200 year period for typhoon return
and a 2000 year return on earthquake. The
design allows for a 200 year period for
typhoon return along with a 2000 year
return on earthquake. So whatever your constructions disposal needs are if it involves wood or
concrete debris that's the end result of a renovation or construction project, or just have old items
or furniture you have to have hauled away, construction debris removal and construction cleanup
crews are the approach to go!.
_North_Dakota.jpg" width="305" />
Compact Excavator: Compact Excavator can be a
vehicle with backfill blade and swing boom attached
with it. Customers would only be careful for that exact
space used inside a truck compared to just how much
debris is hauled away. Customers would only assume
responsibilty for your exact space used in a truck
relative to how much debris is hauled away. Paver:
Paver is used for spreading and labeling the asphalt layer within the making of roads.
Each geographical location requires specific,
special requirement, to be developed and
tested, when the project is breaking new
ground, like The Shanghai World Financial
Center construction. Without the use of your
well trained and experienced construction
team, these steps are more unlikely to be
accomplished in a proficient manner.
Although other buildings were structured in
that geographical location, however, not with
the same height and greatness.

More Related Content

What's hot

Item #12 ppt Judson Nature Trail Building
Item #12   ppt Judson Nature Trail BuildingItem #12   ppt Judson Nature Trail Building
Item #12 ppt Judson Nature Trail Buildingahcitycouncil
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionDavid H Moloney
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanJames Zhang (Chi, Zhang)
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1Vincent Lee
 
Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007Mook NP
 
Construction Methods & Sequence
Construction  Methods & SequenceConstruction  Methods & Sequence
Construction Methods & SequenceDavid H Moloney
 
Portfolio_DBotelho_2016
Portfolio_DBotelho_2016Portfolio_DBotelho_2016
Portfolio_DBotelho_2016Diogo Botelho
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDavid H Moloney
 
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructureJoint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructurePostTensioningInstitute
 
Metro North, Dublin - Construction Explained
Metro North, Dublin  - Construction ExplainedMetro North, Dublin  - Construction Explained
Metro North, Dublin - Construction ExplainedDavid H Moloney
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan David H Moloney
 
Muscat Airport Construction
Muscat Airport ConstructionMuscat Airport Construction
Muscat Airport ConstructionDavid H Moloney
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)DC Department of General Services
 
Route 2020 Metro Dubai Construction Details
Route 2020 Metro Dubai   Construction DetailsRoute 2020 Metro Dubai   Construction Details
Route 2020 Metro Dubai Construction DetailsDavid H Moloney
 
Civil Engineering Construction Techniques
Civil Engineering  Construction TechniquesCivil Engineering  Construction Techniques
Civil Engineering Construction TechniquesDavid H Moloney
 

What's hot (20)

Item #12 ppt Judson Nature Trail Building
Item #12   ppt Judson Nature Trail BuildingItem #12   ppt Judson Nature Trail Building
Item #12 ppt Judson Nature Trail Building
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge Construction
 
Iiepl profile
Iiepl profileIiepl profile
Iiepl profile
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution Plan
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1
 
Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007
 
Construction Methods & Sequence
Construction  Methods & SequenceConstruction  Methods & Sequence
Construction Methods & Sequence
 
Portfolio_DBotelho_2016
Portfolio_DBotelho_2016Portfolio_DBotelho_2016
Portfolio_DBotelho_2016
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in Tunnels
 
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructureJoint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking Structure
 
Metro North, Dublin - Construction Explained
Metro North, Dublin  - Construction ExplainedMetro North, Dublin  - Construction Explained
Metro North, Dublin - Construction Explained
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
 
Green Screen Parking Structure
Green Screen Parking StructureGreen Screen Parking Structure
Green Screen Parking Structure
 
Muscat Airport Construction
Muscat Airport ConstructionMuscat Airport Construction
Muscat Airport Construction
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)
 
Dmrc project
Dmrc projectDmrc project
Dmrc project
 
Airport Construction
Airport ConstructionAirport Construction
Airport Construction
 
Route 2020 Metro Dubai Construction Details
Route 2020 Metro Dubai   Construction DetailsRoute 2020 Metro Dubai   Construction Details
Route 2020 Metro Dubai Construction Details
 
Civil Engineering Construction Techniques
Civil Engineering  Construction TechniquesCivil Engineering  Construction Techniques
Civil Engineering Construction Techniques
 

Viewers also liked

Desarrollo de la parte inicial del silabo de ética profesinal
Desarrollo de la parte inicial del silabo de ética profesinalDesarrollo de la parte inicial del silabo de ética profesinal
Desarrollo de la parte inicial del silabo de ética profesinalOswaldo Xavier torres merlo
 
Fast food supervisor performance appraisal
Fast food supervisor performance appraisalFast food supervisor performance appraisal
Fast food supervisor performance appraisalandersonben710
 
Food & beverage supervisor performance appraisal
Food & beverage supervisor performance appraisalFood & beverage supervisor performance appraisal
Food & beverage supervisor performance appraisalandersonben710
 
Los 7 habitos de la gente altamente afectiva
Los 7 habitos de la gente altamente afectivaLos 7 habitos de la gente altamente afectiva
Los 7 habitos de la gente altamente afectivayaralvis castillo
 
Hoja de vida sori nieto
Hoja de vida sori nietoHoja de vida sori nieto
Hoja de vida sori nietosorihernandez
 
Gym supervisor performance appraisal
Gym supervisor performance appraisalGym supervisor performance appraisal
Gym supervisor performance appraisalandersonben710
 
ACHIEVE ACADEMIC SUCCESS WITH YOUR CHILD IN SPITE ALL ODDS!
ACHIEVE ACADEMIC SUCCESS WITH YOUR CHILD IN SPITE ALL ODDS!ACHIEVE ACADEMIC SUCCESS WITH YOUR CHILD IN SPITE ALL ODDS!
ACHIEVE ACADEMIC SUCCESS WITH YOUR CHILD IN SPITE ALL ODDS!Kayode Olufemi-Ayoola
 
Peii e-n101034-2012-120716172228-phpapp02
Peii e-n101034-2012-120716172228-phpapp02Peii e-n101034-2012-120716172228-phpapp02
Peii e-n101034-2012-120716172228-phpapp02May Jmm
 
Curso Rigging & Hoist Industrial - Informações
Curso Rigging & Hoist Industrial - Informações Curso Rigging & Hoist Industrial - Informações
Curso Rigging & Hoist Industrial - Informações eugeniorocha
 
Housekeeping floor supervisor performance appraisal
Housekeeping floor supervisor performance appraisalHousekeeping floor supervisor performance appraisal
Housekeeping floor supervisor performance appraisalandersonben710
 
Uso del diccionario
Uso del diccionarioUso del diccionario
Uso del diccionarioAdrianaOrdez
 
Instructivoplaninstitucionaldegestionderiesgosparacentroseducativos1 12120314...
Instructivoplaninstitucionaldegestionderiesgosparacentroseducativos1 12120314...Instructivoplaninstitucionaldegestionderiesgosparacentroseducativos1 12120314...
Instructivoplaninstitucionaldegestionderiesgosparacentroseducativos1 12120314...May Jmm
 
Sample Headend Drawing C4 Downstream to Transmitter 2
Sample Headend Drawing C4 Downstream to Transmitter 2Sample Headend Drawing C4 Downstream to Transmitter 2
Sample Headend Drawing C4 Downstream to Transmitter 2Mark Keefer
 

Viewers also liked (18)

ADA 6.X
ADA 6.XADA 6.X
ADA 6.X
 
organization chart
organization chartorganization chart
organization chart
 
Desarrollo de la parte inicial del silabo de ética profesinal
Desarrollo de la parte inicial del silabo de ética profesinalDesarrollo de la parte inicial del silabo de ética profesinal
Desarrollo de la parte inicial del silabo de ética profesinal
 
Dapatkan
DapatkanDapatkan
Dapatkan
 
Fast food supervisor performance appraisal
Fast food supervisor performance appraisalFast food supervisor performance appraisal
Fast food supervisor performance appraisal
 
Food & beverage supervisor performance appraisal
Food & beverage supervisor performance appraisalFood & beverage supervisor performance appraisal
Food & beverage supervisor performance appraisal
 
Los 7 habitos de la gente altamente afectiva
Los 7 habitos de la gente altamente afectivaLos 7 habitos de la gente altamente afectiva
Los 7 habitos de la gente altamente afectiva
 
El universo
El universoEl universo
El universo
 
Hoja de vida sori nieto
Hoja de vida sori nietoHoja de vida sori nieto
Hoja de vida sori nieto
 
Gym supervisor performance appraisal
Gym supervisor performance appraisalGym supervisor performance appraisal
Gym supervisor performance appraisal
 
ACHIEVE ACADEMIC SUCCESS WITH YOUR CHILD IN SPITE ALL ODDS!
ACHIEVE ACADEMIC SUCCESS WITH YOUR CHILD IN SPITE ALL ODDS!ACHIEVE ACADEMIC SUCCESS WITH YOUR CHILD IN SPITE ALL ODDS!
ACHIEVE ACADEMIC SUCCESS WITH YOUR CHILD IN SPITE ALL ODDS!
 
Peii e-n101034-2012-120716172228-phpapp02
Peii e-n101034-2012-120716172228-phpapp02Peii e-n101034-2012-120716172228-phpapp02
Peii e-n101034-2012-120716172228-phpapp02
 
Curso Rigging & Hoist Industrial - Informações
Curso Rigging & Hoist Industrial - Informações Curso Rigging & Hoist Industrial - Informações
Curso Rigging & Hoist Industrial - Informações
 
Mayordomía codicia
Mayordomía codiciaMayordomía codicia
Mayordomía codicia
 
Housekeeping floor supervisor performance appraisal
Housekeeping floor supervisor performance appraisalHousekeeping floor supervisor performance appraisal
Housekeeping floor supervisor performance appraisal
 
Uso del diccionario
Uso del diccionarioUso del diccionario
Uso del diccionario
 
Instructivoplaninstitucionaldegestionderiesgosparacentroseducativos1 12120314...
Instructivoplaninstitucionaldegestionderiesgosparacentroseducativos1 12120314...Instructivoplaninstitucionaldegestionderiesgosparacentroseducativos1 12120314...
Instructivoplaninstitucionaldegestionderiesgosparacentroseducativos1 12120314...
 
Sample Headend Drawing C4 Downstream to Transmitter 2
Sample Headend Drawing C4 Downstream to Transmitter 2Sample Headend Drawing C4 Downstream to Transmitter 2
Sample Headend Drawing C4 Downstream to Transmitter 2
 

Similar to Primavera Project Manager And Construction Projects

Construction Estimate, Finding natives
Construction Estimate, Finding nativesConstruction Estimate, Finding natives
Construction Estimate, Finding nativesdaffysuburb8048
 
A Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction ProcessA Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction Processdaffysuburb8048
 
Types Of Construction Equipment As Well As Their Uses
Types Of Construction Equipment As Well As Their UsesTypes Of Construction Equipment As Well As Their Uses
Types Of Construction Equipment As Well As Their Usesiratequarrel2587
 
Shanghai World Financial Center Construction
Shanghai World Financial Center ConstructionShanghai World Financial Center Construction
Shanghai World Financial Center Constructioniratequarrel2587
 
A Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction ProcessA Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction Processiratequarrel2587
 
Types Of Construction Equipment and Their Uses
Types Of Construction Equipment and Their UsesTypes Of Construction Equipment and Their Uses
Types Of Construction Equipment and Their Usesiratequarrel2587
 
Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageGirish Damle
 
Pre-Cast Technology for Green field
Pre-Cast Technology for Green fieldPre-Cast Technology for Green field
Pre-Cast Technology for Green fieldSuresh C Tripathi
 
Construction Estimate, Finding natives
Construction Estimate, Finding nativesConstruction Estimate, Finding natives
Construction Estimate, Finding nativesbeverly0bennett8
 
Development OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallDevelopment OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallIRJET Journal
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdfRanadita
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteSrikanthReddy345872
 
ADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMDeepak Verma
 
IRJET- Experimental Study of Compressive Strength on Foam Concrete with Q...
IRJET-  	  Experimental Study of Compressive Strength on Foam Concrete with Q...IRJET-  	  Experimental Study of Compressive Strength on Foam Concrete with Q...
IRJET- Experimental Study of Compressive Strength on Foam Concrete with Q...IRJET Journal
 

Similar to Primavera Project Manager And Construction Projects (20)

Highway Construction
Highway ConstructionHighway Construction
Highway Construction
 
Highway Construction
Highway ConstructionHighway Construction
Highway Construction
 
Construction Estimate, Finding natives
Construction Estimate, Finding nativesConstruction Estimate, Finding natives
Construction Estimate, Finding natives
 
Highway Construction
Highway ConstructionHighway Construction
Highway Construction
 
A Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction ProcessA Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction Process
 
Highway Construction
Highway ConstructionHighway Construction
Highway Construction
 
Highway Construction
Highway ConstructionHighway Construction
Highway Construction
 
Types Of Construction Equipment As Well As Their Uses
Types Of Construction Equipment As Well As Their UsesTypes Of Construction Equipment As Well As Their Uses
Types Of Construction Equipment As Well As Their Uses
 
Shanghai World Financial Center Construction
Shanghai World Financial Center ConstructionShanghai World Financial Center Construction
Shanghai World Financial Center Construction
 
A Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction ProcessA Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction Process
 
Types Of Construction Equipment and Their Uses
Types Of Construction Equipment and Their UsesTypes Of Construction Equipment and Their Uses
Types Of Construction Equipment and Their Uses
 
Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 Page
 
Pre-Cast Technology for Green field
Pre-Cast Technology for Green fieldPre-Cast Technology for Green field
Pre-Cast Technology for Green field
 
Highway Construction
Highway ConstructionHighway Construction
Highway Construction
 
Construction Estimate, Finding natives
Construction Estimate, Finding nativesConstruction Estimate, Finding natives
Construction Estimate, Finding natives
 
Development OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallDevelopment OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound Wall
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdf
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering institute
 
ADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEM
 
IRJET- Experimental Study of Compressive Strength on Foam Concrete with Q...
IRJET-  	  Experimental Study of Compressive Strength on Foam Concrete with Q...IRJET-  	  Experimental Study of Compressive Strength on Foam Concrete with Q...
IRJET- Experimental Study of Compressive Strength on Foam Concrete with Q...
 

Primavera Project Manager And Construction Projects

  • 1. Primavera Project Manager And Construction Projects The operations that are carried out for constructing an embankment are clearing, stripping and storing top soil, placing of embankment, rolling and finishing. It optimizes the scheduling through identification of the critical path and can provide historical information around the relationship between planned and actual project performance. The second one was obviously a concrete walls of the service core I mentioned above. The second one was obviously a concrete walls of the service core I mentioned above. Houses, apartments, industries, offices, schools, streets, and bridges are a few of the few products of the construction industry. Crawler and Bulldozer: Crawler, a vehicle heavy weight vehicle, can be used for flattening road surfaces. But in the wedding the fund is insufficient for your manifestation of all of the specifications, then estimating ought to be done. A construction professional should meet all of the requirements according for the available fund. The camber provided is steep ranging from1 in 20 to 1 in23 which allows water to drain off quickly. The design-build method must be used by those that accept as factual an architect-contactor group having a past history of working simultaneously will be more effective and, as a possible outcome, lower than an architect and contractor working simultaneously for that first time. The x factor of construction debris removal and construction clean up is TIME. But if the fund is insufficient for that manifestation of all the specifications, then estimating should be done. This is laid on a prepared sub-grade, sub-base or base or on an existing pavement. In the entire process of its foundation construction, temporary support for both mat and below-grade concrete floors were made because of the use of top-down construction method, H-piles large steel sections extended from your piling towards the ground surface. Trimmings are merely applicable for purchase of materials needed, professional fees and cost-maintenance. They should not connect with standard labor cost of the masons, steel men, plumbers and workers in other specializations. The design allows to get a 200 year period for typhoon return and a 2000 year return on earthquake. The design allows for a 200 year period for typhoon return along with a 2000 year return on earthquake. So whatever your constructions disposal needs are if it involves wood or concrete debris that's the end result of a renovation or construction project, or just have old items
  • 2. or furniture you have to have hauled away, construction debris removal and construction cleanup crews are the approach to go!. _North_Dakota.jpg" width="305" /> Compact Excavator: Compact Excavator can be a vehicle with backfill blade and swing boom attached with it. Customers would only be careful for that exact space used inside a truck compared to just how much debris is hauled away. Customers would only assume responsibilty for your exact space used in a truck relative to how much debris is hauled away. Paver: Paver is used for spreading and labeling the asphalt layer within the making of roads. Each geographical location requires specific, special requirement, to be developed and tested, when the project is breaking new ground, like The Shanghai World Financial Center construction. Without the use of your well trained and experienced construction team, these steps are more unlikely to be accomplished in a proficient manner. Although other buildings were structured in that geographical location, however, not with the same height and greatness.