Mahaffey Fabric Structures  Boomerang Buildings4161 Delp Street, Memphis, TN 38118  www.BoomerangBuildings.com
Tents were sustainable long before therewas a green movement.Since 1924, Mahaffey has taken numeroussteps to adapt to thes...
All elements of these temporary structures are carefullydeconstructed after each use, cleaned in our water-conserving wash...
Once the structure has reached the end of its lifespan, itis recycled after selective deconstruction by contactingthe loca...
The Boomerang Building was designed with these               goals in mind.
Industrial professionals lease a Boomerang Buildingwhen:• There’s need for immediate, fully functional space.• New constru...
Should the need arise for a temporary building and there isa limited installation time frame,Boomerang provides the ideal ...
Can’t commit to a large capitalinvestment or new construction notin the budget?Boomerang’s short-term lease freesup cash f...
Benefits:• Lease expense is fully tax deductible vs.  depreciation of permanent real estate.• 1 LEED point potential in ID...
Finally, the Boomerang is a smart alternative to the wasteof resources used constructing permanent buildings forneeds of o...
:: Boomerang Building Mission ::To transform design teams’ thought process of newconstruction by incorporating a lease opt...
Boomerang Buildings are fast and cost-effective.    Want one more reason? They’re green.
Green buildings:  • Reduce construction costs  • Reduce CO2 emissions  • Reduce environmental impacts of new construction ...
The cumulative impact of the design, construction andoperation of built environments has profound implications         on ...
Consider the lifecycle of these buildings:   • Where did the building materials come from?     Recycled content.   • Where...
LEED-related Components
Steel frame→ Nucor Yamato Steel in Blytheville, AR   • Total Post Consumer Recycled Content (Steel): 82.3%   • Total Pre-C...
Boomerang Building Installation
Guardian Steel™ Walls & Roll-Up Door → Haas Door   • Metal siding is made from steel that contains up to     80% recycled ...
Maintenance Building
Temporary Manufacturing Facility
Metal Roof → MBCI in Hernando, MS  • Composed of 35% recycled content.  • 100% reusable after each application.  • Insulat...
Lighting System:Energy-Efficient Fluorescent or LED Lighting   • Technology + Effective Design = Performance &     Energy ...
Industrial Warehouse Building – Smyrna, TN
Elementary School Gymnasium – Joplin, MO
Gymnasium > Two Years Later
Materials & Resources• We pay special attention to the selection of sustainable  materials and their procurement (lifecycl...
Medical Hangar Building – Valentine, NE
Site and Indoor Environmental Quality• Integrated pest management: We have created a plan to  prevent pests from entering ...
As your needs change, so can your building, thanks to itsmodular design and inherent flexibility.Boomerang Buildings can b...
This concept takes green building to the                   next level.      It encourages project teams to createenvironme...
We’re not just creating a better building,           but a smarter one.
By using these structures “doing the right thing”becomes the logical, economical andenvironmentally correct choice.Make a ...
LEED Components of Boomerang Building
LEED Components of Boomerang Building
Upcoming SlideShare
Loading in …5
×

LEED Components of Boomerang Building

756 views

Published on

Transform the thought of new construction by leasing a sustainable building that can be rapidly adapted to society's changing needs. The Boomerang Building is designed for deconstruction. Its components are made from recycled content, and the building is 100% repurposed after each use.

Published in: Real Estate
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
756
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

LEED Components of Boomerang Building

  1. 1. Mahaffey Fabric Structures  Boomerang Buildings4161 Delp Street, Memphis, TN 38118  www.BoomerangBuildings.com
  2. 2. Tents were sustainable long before therewas a green movement.Since 1924, Mahaffey has taken numeroussteps to adapt to these needs anddecrease our ecological footprint
  3. 3. All elements of these temporary structures are carefullydeconstructed after each use, cleaned in our water-conserving washing machine and then refurbished orrepurposed for another project.The LEED credit “Building Reuse” may be a target, as itcan be shown that the structure has been erectedbefore. It represents 1 LEED point potential in MRc3.
  4. 4. Once the structure has reached the end of its lifespan, itis recycled after selective deconstruction by contactingthe local recycling centers and shipping directly to thenearest mill or smelter. The frame is then melted downand reused.This can contribute to the LEED credit “ConstructionWaste Management”. It represents a 1-2 LEED pointpotential in MRc2.
  5. 5. The Boomerang Building was designed with these goals in mind.
  6. 6. Industrial professionals lease a Boomerang Buildingwhen:• There’s need for immediate, fully functional space.• New construction is not in the budget, but the demand needs to be satisfied tomorrow.• Frustrated that materials are being lost to theft and weather damage.• Project needs change and building(s) must be relocated quickly.• A conventional “tent” structure is not an option due to high winds or other environmental conditions, such as the need for thermal insulation.• Seeking a competitive advantage by supporting sustainable green initiatives.
  7. 7. Should the need arise for a temporary building and there isa limited installation time frame,Boomerang provides the ideal solution in just 21 days.
  8. 8. Can’t commit to a large capitalinvestment or new construction notin the budget?Boomerang’s short-term lease freesup cash flow.Money is always tight. If ownerswere presented with an option tobridge temporary needs withsturdy, temporary buildings in lieu oftents, they may choose thisalternative.
  9. 9. Benefits:• Lease expense is fully tax deductible vs. depreciation of permanent real estate.• 1 LEED point potential in IDc1.1 by showing the cost and CO2 savings.
  10. 10. Finally, the Boomerang is a smart alternative to the wasteof resources used constructing permanent buildings forneeds of only 2-5 years.It has a high content of recycled materials, is reused eachtime it is deployed and is itself recyclable at the end of itsuseful life.This can also contribute to the LEED credit “ConstructionWaste Management”. It may represent a 1-2 LEED pointpotential in MRc2.
  11. 11. :: Boomerang Building Mission ::To transform design teams’ thought process of newconstruction by incorporating a lease option fortemporary, sustainable buildings that can be rapidlyadapted to society’s changing needs, while causing theleast amount of negative impact on our environment.
  12. 12. Boomerang Buildings are fast and cost-effective. Want one more reason? They’re green.
  13. 13. Green buildings: • Reduce construction costs • Reduce CO2 emissions • Reduce environmental impacts of new construction • Reduce liability, and by this, lower insurance costs • Achieve more predictable results in the design, construction and operation of built environments • Save money through tax benefits (lease cost vs. depreciation deduction) • Once the need no longer exists, the temporary building’s site can easily be restored to its landscaped origin.
  14. 14. The cumulative impact of the design, construction andoperation of built environments has profound implications on the environment and the economy.
  15. 15. Consider the lifecycle of these buildings: • Where did the building materials come from? Recycled content. • Where will they go after use? Repurposed.
  16. 16. LEED-related Components
  17. 17. Steel frame→ Nucor Yamato Steel in Blytheville, AR • Total Post Consumer Recycled Content (Steel): 82.3% • Total Pre-Consumer/Post-Industrial Recycled Content: 16.9% • 70 miles from Mahaffey headquarters: 5929 Arkansas 18 Blytheville, AR 72315
  18. 18. Boomerang Building Installation
  19. 19. Guardian Steel™ Walls & Roll-Up Door → Haas Door • Metal siding is made from steel that contains up to 80% recycled material. • CFC-free polyurethane insulation, resulting in energy efficiency, reducing the need for heating or cooling. • Insulated structures help reduce CO2 emissions by the lower energy need of building climate control systems. • High quality, long lasting, factory-applied finishes extend the lifespan of the siding, roof and roll-up door elements and make them reusable over and over again.
  20. 20. Maintenance Building
  21. 21. Temporary Manufacturing Facility
  22. 22. Metal Roof → MBCI in Hernando, MS • Composed of 35% recycled content. • 100% reusable after each application. • Insulation value can be adjusted to owner’s need. • Strength of structure can be adjusted simply by the placement of the footplates. • 25 miles from Mahaffey headquarters: 300 Old Highway 51 S Hernando, MS 38632
  23. 23. Lighting System:Energy-Efficient Fluorescent or LED Lighting • Technology + Effective Design = Performance & Energy Savings • This system is designed using T5 (5/8" in diameter) lamps, or LED lighting for improved energy efficiency. LED luminaries are durable and reusable with a life span of min. 5 years. It offers improved efficiency, higher intensity and potentially longer life due to reduced degradation in light output over time. • ENERGY STAR certified products
  24. 24. Industrial Warehouse Building – Smyrna, TN
  25. 25. Elementary School Gymnasium – Joplin, MO
  26. 26. Gymnasium > Two Years Later
  27. 27. Materials & Resources• We pay special attention to the selection of sustainable materials and their procurement (lifecycle impacts) o Practice sustainable purchasing o Select highly recycled content materials o Salvage all elements of the temporary building o Reuse all elements with minor refurbishment• Waste management o Manage construction waste both during installation and at the end of the components’ useful life. o Salvage and reuse all materials used in the construction process.
  28. 28. Medical Hangar Building – Valentine, NE
  29. 29. Site and Indoor Environmental Quality• Integrated pest management: We have created a plan to prevent pests from entering and damaging the building and its contents.• Select appropriate materials: Use low VOC emitting materials (steel panels vs. fabric, no VOC emitting insulation) to limit off- gassing.• Use lighting controls: Lighting system to include timer to turn off interior lighting and motion sensor as possible for energy saving of exterior lighting.• Control thermal comfort: HVAC systems controlled by a Building Automation System to control indoor temperature as a function of the exterior temperature and humidity.• Provide daylighting and views: Utilize natural light with window walls or skylight systems if requested.
  30. 30. As your needs change, so can your building, thanks to itsmodular design and inherent flexibility.Boomerang Buildings can be reconfigured, expanded andrelocated with ease.
  31. 31. This concept takes green building to the next level. It encourages project teams to createenvironments that may be completely restored or regenerated once the need for the temporary building no longer exists. Through this effort, we are ultimately able to provide positive environmental, social and economic impacts.
  32. 32. We’re not just creating a better building, but a smarter one.
  33. 33. By using these structures “doing the right thing”becomes the logical, economical andenvironmentally correct choice.Make a difference by leasing a temporary, sustainableBoomerang Building. www.boomerangbuildings.com 800.918.5795

×