SlideShare a Scribd company logo
1 of 34
Download to read offline
Pathways to Growth for Indian SMEs
CII – Valcon Session, Ludhiana
27th July, 2012




An Introduction to Valcon
Management Consultants



N. Krishnan
CEO, Valcon India
Valcon overview

Valcon globally                                   Valcon India
 A leading operations and implementations          Specializing in implementation consulting
 consultancy                                       22 highly experienced consultants – and
 About 180 consultants placed in Denmark,          growing
 Sweden, Norway, India, China and Czech            Based out of Chennai, Bangalore and Delhi
 Republic
                                                   Practice areas
 We serve global customers – typically from
 Nordic based headquarters                          Supply management (manufacturing &
                                                    operations excellence, procurement & supply
                                                    chain)
                                                    Demand management (sales excellence,
                                                    growth, entry strategy, etc.)
                                                    Strategic and market analysis (operations
                                                    due diligence, growth and sales potential,
                                                    market entry strategy)
                                                   Customer References from: Caterpillar,
                                                   Biocon, Hero Group, Uniparts, Murugappa
                                                   group, Castrol, FLSmidth, Novozymes,
                                                   Novonordisk, Saint Gobain, CAMS, etc.


                                              2
Valcon is a team of highly experienced consultants, drawn from the best
companies in India
                                          Our team

                                           Our consulting team is based out of Chennai,
                                           Bangalore and Delhi

                                           Valcon is a group of ‘expert consultants’ -
                                           minimum experience of our consultants is 6
                                           years - having worked as either a consultant or
                                           a line manager

                                           All our consultants have hands-on experience
                                           of working in functional roles prior to consulting

                                           We are on “the shop floor” in close collaboration
                                           with the client organisation when solutions are
                                           implemented
                                           Our consultants are drawn from some of the
                                           leading companies of different industries
                                           Ford, Toyota, Maruti -Suzuki, Caterpillar, Saint
                                           Gobain, Escorts Hospital, Motorola, Bajaj, PwC,
                                           ECS, Wipro, McKinsey, ZS Associates, Volvo,
                                           ISRO, Dalmia group, Asian Paints, Castrol, Ashok
                                           Leyland, Coca Cola, Schlumberger


                                     3
Our approach to consulting and focus on results deliver strong benefits for
our clients

• Our focus is on execution – how to
  change
• We are hands-on
• We ask questions & challenge
  thinking
• We focus on important issues
• We go for practical solutions                Client
                                                          Valcon Intervention               Benefits
                                              Industry
• We are on “the shop floor” - with the
                                               Auto       Capacity release      •   20% output increase
  clients – to implement the solutions        Ancillary   assessment                potential identified
                                              Renewable   New Product           •   Development time reduction
• We act and create quick results              Energy     Development               to less than 6 months
                                                          Procurement           •   INR 65 cr savings over 12
                                                EPC
                                                          transformation            months
                                                                                •   Technically superior product
                                                          Product evaluation
                                               Pharma                               selected
                                                          for in-licensing
                                                                                •   Risk eliminated
                                                          Driving speed
                                              Railways                          •   16% energy cost reduction
                                                          optimization
                                                                                •   Increased up-time by 20%-
                                                                                    30%
                                               Auto       Operational
                                                                                •   In-process rejections
                                              Ancillary   Excellence
                                                                                    reduced from 2.4% to 0.06%
                                                                                    of net sales
                                          4
Our offerings address key themes and challenges in our clients’ business
operations...

                 Deployment and execution of corporate strategy
Business
                 Technology and Operational due diligence
Strategy
Execution        Improving products and processes based on market knowledge
                 Transparency in profitability for customers, products and markets


                                                          Marketing and         After sales
Procurement     Production          Logistics
                                                          sales                 service


 Cost savings   Operations           Inventory              New customer         Spare part
 Performance    Excellence           optimisation           acquisition          management
 measurement    Cost reduction       Inbound and            Sales and price      Customer
 Risk           Quality              outbound               models               relationship
 management     improvement          logistics              Channel design       management
                                     optimization           and management
 Supplier       Throughput and
 development    capacity             Sales Operations       Optimising price
                enhancement          planning               and profit
                                                            Sales processes,
                                                            tools and
                                                            competence


                                                5
Pathways to Growth for Indian SMEs
CII – Valcon Session, Ludhiana
27th July, 2012




Maximizing Capacity
Utilization



Anirban Mazumdar
Associate Director, Valcon India
Do you face these situations?

  Demand is stable but often we are not able to complete orders


Overtime & Extra Shift running are often used to ‘manage demand’


 My Operators & Machines are idle some of the days but have to
                work extra time on other days

   There is so much Inventory but still we are not able to meet
                         requirements

 & Do you think that adding machine/ plant is the only solution ?

                                 7
Contents

           Are You Utilizing Your Capacity Well?

           How Can You Improve Capacity Utilization?

           Case : Unearthing Hidden Capacity at Ancillary Unit




                                   8
Focusing only on ‘servicing orders’ gradually leads to
inappropriate capacity utilization


    Supplier




    Supplier
                       Manufacturer


    Supplier

Plant was designed to service a certain
demand at optimum utilization
•     maximize output when demand is
      high
•     finish plan early when demand dips



                                           9
Focusing only on ‘servicing orders’ gradually leads to
inappropriate capacity utilization

                                                      DEMAND

    Supplier




    Supplier
                       Manufacturer                Distribution               Customer


    Supplier                                         DELIVERY

Plant was designed to service a certain         Even with change in demand pattern &
demand at optimum utilization                   fluctuations, working pattern doesn’t
•     maximize output when demand is            change.
      high                                      Focus shifts to ‘meeting daily & month
                                                plans’ & We stop asking –
•     finish plan early when demand dips
                                                “Could we have produced more” or “Did we
                                                take too much time to complete the plan”

                                           10
Are we utilizing our Capacity well?
                                                          ࡭ࢉ࢚࢛ࢇ࢒ ࡻ࢛࢚࢖࢛࢚
                                     Efficiency (%) ൌ
                                                        ࡱࢌࢌࢋࢉ࢚࢏࢜ࢋ ࡯ࢇ࢖ࢇࢉ࢏࢚࢟
                                                                             ࡭ࢉ࢚࢛ࢇ࢒ ࡻ࢛࢚࢖࢛࢚
                                                        Utilization (%) ൌ
                                                                            ࡰࢋ࢙࢏ࢍ࢔ ࡯ࢇ࢖ࢇࢉ࢏࢚࢟

                                                •   Management Policies
                                                •   Allowances
                                                •   Accepted Scrap
                                                •   Maintenance Time, etc.

                                                                     •   Operational Losses
                                                                     •   Process,
                                                                         Manpower, Asset
                                                                         Performance




                                      DESIGN             EFFECTIVE           ACTUAL
                                     CAPACITY            CAPACITY            OUTPUT


                                11
Are we utilizing our Capacity well?
                                                                                         ࡭ࢉ࢚࢛ࢇ࢒ ࡻ࢛࢚࢖࢛࢚
                                                                    Efficiency (%) ൌ
                                                                                       ࡱࢌࢌࢋࢉ࢚࢏࢜ࢋ ࡯ࢇ࢖ࢇࢉ࢏࢚࢟
                                                                                                            ࡭ࢉ࢚࢛ࢇ࢒ ࡻ࢛࢚࢖࢛࢚
                                                                                       Utilization (%) ൌ
                                                                                                           ࡰࢋ࢙࢏ࢍ࢔ ࡯ࢇ࢖ࢇࢉ࢏࢚࢟

                                                                               •   Management Policies
                                                                               •   Allowances
                                                                               •   Accepted Scrap
                                                                               •   Maintenance Time, etc.

                                                                                                    •   Operational Losses
                                                                                                    •   Process,
                                             Mostly Medium &                                            Manpower, Asset
                                               Small Firms                                              Performance
Mostly Large Sized
      Firms

Medium & Small firms appear to be lagging
in capacity utilization and need to take
measures to improve                                                  DESIGN             EFFECTIVE           ACTUAL
                                                                    CAPACITY            CAPACITY            OUTPUT

Source : 77th Business Outlook Survey, CII
                                                               12
So, How do we ‘lose Capacity’?


     1   Policies & Standards


         2       Bottleneck under-Utilization


             3    Process under-Utilization


         4       Capacity Imbalance


     5   Capacity in-flexibility (Process, Operators & Plant)


                                   13
Designed Policies & Standards often lead to capacity under-
utilization which goes unnoticed

                                      Purchase & Spares Policy


                                      Inventory & Stores norms


                                           Manpower Policy


                                     Reward & Recognition Policy


                                    Accepted ‘standards’ of process
                                        loss, set up time, etc.

                                    ‘Unwritten rules’ of production,
                                                   …

                               14
Designed Policies & Standards often lead to capacity under-
utilization which goes unnoticed
Availability & Quality of Spares is            Purchase & Spares Policy
impacted by Purchase policies

No machines are run during lunch               Inventory & Stores norms
time
                                                    Manpower Policy
Checks on the machine can be done
only by the maintainers
                                              Reward & Recognition Policy
“Set up can’t be done in night shift”
                                             Accepted ‘standards’ of process
                                                 loss, set up time, etc.
“Production shouldn’t do any quality
checks”
                                             ‘Unwritten rules’ of production,
…                                                           …

                                        15
Identification & utilization of bottleneck resource is one of the
biggest challenges to capacity release
                                       Plant capacity can’t be more than
                                       the bottleneck’s capacity




                                                         Estimated Capacity (pcs)

                                                                        77624




                                        35928    38880
                                                                                    30580
                                                            22162                           20736




                                        CNC     Tempering Sand Pre-setting Inspection Painting
                                      Machining           Blasting




                                 16
Identification & utilization of bottleneck resource is one of the
biggest challenges to capacity release
                                             Plant capacity can’t be more than
Inability to identify the bottleneck         the bottleneck’s capacity

Inadequate maintenance of
bottleneck – high downtimes

Changing product mix leading to                                Estimated Capacity (pcs)
shifting bottlenecks
                                                                              77624

Management’s focus on the ‘costliest
machine’ than the bottleneck
                                              35928    38880
                                                                                          30580
Bottleneck machine treated in the                                 22162                           20736
same way as any other machine

Manual or non-production activities           CNC     Tempering Sand Pre-setting Inspection Painting
                                            Machining           Blasting
becoming bottlenecks
…

                                       17
Contents

           Are You Utilizing Your Capacity Well?

           How Can You Improve Capacity Utilization?

           Case : Unearthing Hidden Capacity at Ancillary Unit




                                   18
Capacity “release” needs to be undertaken systematically & in a
phased manner

    Achieving Effective Capacity
 • Operational Improvements
 • Shop floor initiatives & systems
   implementation
 • High involvement of local team
   members
 • Localized improvements aligned to
   bigger objectives
 • Challenging work practices


     Achieving Design Capacity
 • Management policies, designs,
   processes and standards changes
 • Initiatives & decisions driven by senior
   management                                       DESIGN    EFFECTIVE   ACTUAL
 • Cross functional initiatives – broad            CAPACITY   CAPACITY    OUTPUT
   based objectives
 • Challenging mindset

                                              19
Causes for losing Effective Capacity could lie across many
areas in operations
                                      No Plan
                                      Situation



                      Not            No Material

                    Produced
                                        No
                                     Manpower
                                                      Output Loss
                                        Asset
                                      Downtime


                                     Produced at
             Produced but            Lower Rate

             lower output            Rejected/
                                     Reworked

                                         Flow
  Produced but                       Interruption

couldn’t move out                      Wrong
                                     Production
                               20
Multiple initiatives may be required to improve Capacity
Utilization – the right ones need to be identified & prioritized
                                                No Plan
                       Poor Planning
                                                Situation
                      Material Quality/
                      Delivery Failures
                                               No Material
                      Poor Skill Levels

                        Inadequate
                        Maintenance               No
                                               Manpower
                       Low Manpower
                         Utilization                          Output Loss
                                                  Asset
                         Cycle Time             Downtime
                         Variations

                         Productivity
                                               Produced at
                          Variations
                                               Lower Rate
                       Low Equipment
                         Capability            Rejected/
                                               Reworked
                      Inadequate Layout
                                                   Flow
                                               Interruption
                       Flow Imbalance
                                                 Wrong
                                               Production
                       Line Imbalance
                                          21
Multiple initiatives may be required to improve Capacity
Utilization – the right ones need to be identified & prioritized
                                                No Plan
  SUPPLIER             Poor Planning
                                                Situation
DEVELOPMENT           Material Quality/
                      Delivery Failures
  PLANNING            Poor Skill Levels
                                               No Material
IMPROVEMENT
                        Inadequate
                        Maintenance               No
  PLANNED                                      Manpower
                       Low Manpower
MAINTENANCE              Utilization                          Output Loss
                                                  Asset
                         Cycle Time
   SKILL                 Variations
                                                Downtime
DEVELOPMENT
                         Productivity
                                               Produced at
                          Variations
   QUALITY                                     Lower Rate
                       Low Equipment
IMPROVEMENT              Capability            Rejected/
                                               Reworked
    FLOW              Inadequate Layout
                                                   Flow
IMPROVEMENT                                    Interruption
                       Flow Imbalance
PRODUCTIVITY                                     Wrong
                                               Production
IMPROVEMENT            Line Imbalance
                                          22
Supplier Performance improvement focuses on working
closely with them to improve reliability
  SUPPLIER                               •   Equipment Capability
                                         •   Process Stability
DEVELOPMENT
                                         •   Quality Systems
                        Supplier         •   Quality Audits
  PLANNING              Quality
IMPROVEMENT

  PLANNED
MAINTENANCE
                                                   •   Capacity Assessment
    Supplier                      Supplier         •   Planning & Scheduling
   SKILL                                               Systems
 Performance
DEVELOPMENT                       Delivery         •   Flexibility

   QUALITY
IMPROVEMENT

    FLOW
                       Procure to
                                         •   Supporting Processes
IMPROVEMENT               Pay                Adequacy
                       Processes         •   Skill of People
PRODUCTIVITY                             •   Simplicity of Processes
IMPROVEMENT
                             23
An ‘Integrated Planning’ model, customized for the company
helps in ensuring uninterrupted production to plan
  SUPPLIER           Rough Cut Capacity Planning
DEVELOPMENT                                                  Raw Material Planning
                  Domestic
                   Orders
  PLANNING                            Sales Order Book
                                            for M1            RM ordering for Long
IMPROVEMENT        Export                                     Lead Items for M2, M3
                   Orders
  PLANNED
MAINTENANCE       RCCP for
                                    RCCP for M1 (W1 - W4)
                   M2/M3                                       RM Ordering for M1
                                                               (Low LT, Non ROP)
   SKILL                           Iterations
DEVELOPMENT       Every Week           Next Week Fixed
                                            Plan
                                                                RM Check for M1
   QUALITY                                                    (Available + Ordered)
IMPROVEMENT                 Production Scheduling
                 Twice
               Every Week        Prioritizing & Sequencing
                                                                  Confirmed RM
    FLOW                                                           Availability
IMPROVEMENT                                                   In Store/ GIT (expected to
                  Modific




                                 3/4 Days Fixed Schedule
                  ations




                                                                 reach in 2 days time)

PRODUCTIVITY                       Execution & Schedule
IMPROVEMENT                             Adherence
                                                24
A Planned Maintenance program implements maintenance
systems after equipment classification
  SUPPLIER
   Most Critical     Critical     Non-critical
DEVELOPMENT
    Equipment       Equipment     Equipment


    Reliability
  PLANNING          Proactive
     Centric                       Run to Fail             Improvement maintenance (proactive)
IMPROVEMENT
   Maintenance
                   Maintenance


  PLANNED
MAINTENANCE
                                                        Predictive maintenance
   SKILL
DEVELOPMENT
                                                 Preventive maintenance
   QUALITY
IMPROVEMENT
                                 Routine maintenance
    FLOW
IMPROVEMENT
     Breakdown or Corrective maintenance
PRODUCTIVITY
IMPROVEMENT
                                                 25
Flow Improvement would look at extended value stream and
eliminate interruptions
                                                                                                 CORRECTION
                                                                Industrial Segment                 WAITING
  SUPPLIER                                                            • Many iterations in
DEVELOPMENT                                                             customer requirement
                                                                      • Waiting periods for
                                                                        complete customer reqmt.
  PLANNING
IMPROVEMENT             CORRECTION
                          WAITING • Mold Rework
                                    • High Inventory
  PLANNED                           • Waiting for complete mold information                  • Deco Rework
MAINTENANCE                                                                                  • High Inventory between
                                                                                               intermediate processes
                                                                                     WAITING • Waiting for material
                                                                                   INVENTORY
   SKILL                       OVERPRODUCTION                                     CORRECTION
                                                                                               from plant

DEVELOPMENT                              • Over planning to
                                         address poor yields

   QUALITY
IMPROVEMENT                                                                              Job
                                                                                        Worker
                                                                                             • QA/ PDI rework
                                                                                             • High material
   CONVEYANCE
    FLOW                                                                                       movement within w/h
  • Multiple handling losses                                                                 • High Inventory
IMPROVEMENT                                               WAITING
                                                        INVENTORY                                        CORRECTION
                                                       CORRECTION                                        CONVEYANCE
PRODUCTIVITY                                  • Many iterations in resorting                              INVENTORY
                                              • High rework on resorting
IMPROVEMENT                                   • High inventory
                                                           26
Contents

           Are You Utilizing Your Capacity Well?

           How Can You Improve Capacity Utilization?

           Case : Unearthing Hidden Capacity at Ancillary Unit




                                   27
Situation : The ancillary unit was ‘losing sales’ every month
  though analysis indicated sufficient ‘effective capacity’
The Effective Capacity was identified to be 25500 pcs per day
based on bottleneck capacity
Effective Capacity (pcs/day)
                                       77624




    35928      38880
                                                   30580
                           25500                               25920




    CNC     Tempering      Sand      Pre-setting Inspection   Painting
  Machining               Blasting




                                                                         28
Situation : The ancillary unit was ‘losing sales’ every month
  though analysis indicated sufficient ‘effective capacity’
The Effective Capacity was identified to be 25500 pcs per day                 There was a steady demand of 20000 pcs per day from the OEM
based on bottleneck capacity                                                  every month
Effective Capacity (pcs/day)                                                     Effective Capacity & Demand (pcs/day)
                                       77624                                                                             77624




    35928      38880                                                                              38880
                                                                                        35928
                                                   30580                                                                             30580
                           25500                               25920                                         25500                               25920
                                                                              20000



    CNC     Tempering      Sand      Pre-setting Inspection   Painting                  CNC     Tempering    Sand      Pre-setting Inspection   Painting
  Machining               Blasting                                                    Machining             Blasting




                                                                         29
Situation : The ancillary unit was ‘losing sales’ every month
  though analysis indicated sufficient ‘effective capacity’
The Effective Capacity was identified to be 25500 pcs per day                 There was a steady demand of 20000 pcs per day from the OEM
based on bottleneck capacity                                                  every month
Effective Capacity (pcs/day)                                                     Effective Capacity & Demand (pcs/day)
                                       77624                                                                                      77624




    35928      38880                                                                              38880
                                                                                        35928
                                                   30580                                                                                   30580
                           25500                               25920                                              25500                                25920
                                                                              20000



    CNC     Tempering      Sand      Pre-setting Inspection   Painting                  CNC     Tempering         Sand       Pre-setting Inspection   Painting
  Machining               Blasting                                                    Machining                  Blasting



                                                                              The average daily output was however consistently below the
                                                                              effective capacity of the bottleneck
                                                                                 Effective Capacity & Avg. Output (pcs/day)
                                                                                                                 77624




                                                                                           35928 38880
                                                                                                                          30580
                                                                                                         25500                    25920
                                                                                                                                            16942 18051 16834




                                                                         30
Situation : The ancillary unit was ‘losing sales’ every month
  though analysis indicated sufficient ‘effective capacity’
The Effective Capacity was identified to be 25500 pcs per day                        There was a steady demand of 20000 pcs per day from the OEM
based on bottleneck capacity                                                         every month
Effective Capacity (pcs/day)                                                            Effective Capacity & Demand (pcs/day)
                                            77624                                                                                        77624




     35928      38880                                                                                    38880
                                                                                               35928
                                                        30580                                                                                     30580
                              25500                                 25920                                                25500                                25920
                                                                                     20000



    CNC     Tempering         Sand        Pre-setting Inspection   Painting                    CNC     Tempering         Sand       Pre-setting Inspection   Painting
  Machining                  Blasting                                                        Machining                  Blasting

                                      X
Analysis of the bottleneck output indicated that they were                           The average daily output was however consistently below the
utilized only to the extent of ~72%                                                  effective capacity of the bottleneck
 Utilization of Bottleneck                 77624                                        Effective Capacity & Avg. Output (pcs/day)
                                                                                                                        77624



    35928      38880
                                   72%                 30580            75%                       35928 38880
                             25500                                 25920                                                         30580
                                                                                                                25500                    25920
                                  18360                                 19440                                                                      16942 18051 16834



     CNC     Tempering        Sand        Pre-setting Inspection   Painting
   Machining                 Blasting


                                                                                31
Analysis : Ineffective Maintenance systems and Inadequate
focus on bottleneck were leading to high capacity losses
3 hours (14% time) was being lost in Sand Blasting
repetitive breakdowns everyday                             ?
Breakdown Maintenance being practised;
checklists do not include ‘critical checks’

Incomplete loading of Sand Blasting unit
                                                               25500

Delays by operators between sand blasting cycles

All Planning & Scheduling being done for CNC
machine – NOT the bottleneck                                           17275

Management focused on maximizing output of
CNC machine – the costliest investment


For a simple process, a zig-zag layout used
leading to multiple handling and stage inventories

Potential for reducing the sand blasting cycle time
by 11% identified

Many Quality Circles working but none focused on
improving sand blasting output

                                                      32
A roadmap was designed for ~25% increase in actual output &
subsequently moving towards Design Capacity
           •   Reduce & re-establish Sand Blasting
               cycle time
           •   Simplify layout into a flow
           •   Design Planning model around sand
       ?                                               •   Design & Implement a Planned
               blasting utilization
                                                           Maintenance system
           •   Plant goals’ alignment to utilization
                                                       •   Simple automations to reduce
               maximization
                                                           Operator delays
           •   Align team objectives to improve
                                                       •   Reduce Minor Stoppages by
               bottleneck output
                                                           Autonomous Maintenance
                                            25500      •   Visual systems to improve loading
                                                           of bottleneck
                                                       •   Reduce loading & unloading time by
                                                           use of fixtures
                                                                             17275




     DESIGN                               EFFECTIVE                        ACTUAL
    CAPACITY                              CAPACITY                         OUTPUT

                                             33
Thank You

More Related Content

What's hot

Customer satisfaction & business excellence sdm college-4th june 2012
Customer satisfaction & business excellence  sdm college-4th june 2012Customer satisfaction & business excellence  sdm college-4th june 2012
Customer satisfaction & business excellence sdm college-4th june 2012Chandramouli Natarajan
 
aerce 201006 (slideshare)
 aerce 201006 (slideshare) aerce 201006 (slideshare)
aerce 201006 (slideshare)Sammy Rashed
 
Creating a strategy map #PCV12
Creating a strategy map #PCV12Creating a strategy map #PCV12
Creating a strategy map #PCV12Dave Sharrock
 
Customer Insight - What Customers Really Want - Webinar (15 March, 2012)
Customer Insight - What Customers Really Want - Webinar (15 March, 2012)Customer Insight - What Customers Really Want - Webinar (15 March, 2012)
Customer Insight - What Customers Really Want - Webinar (15 March, 2012)waqdev786
 
Visure Solutions Requirements Engineering_The word in a nutshell - Ulf Sandberg
Visure Solutions Requirements Engineering_The word in a nutshell - Ulf SandbergVisure Solutions Requirements Engineering_The word in a nutshell - Ulf Sandberg
Visure Solutions Requirements Engineering_The word in a nutshell - Ulf SandbergVisure Solutions
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin MannDubai Quality Group
 
Scor 9.0 reference guide
Scor 9.0 reference guideScor 9.0 reference guide
Scor 9.0 reference guideM Geek
 
Croissance Consulting Presentation V2
Croissance Consulting Presentation V2Croissance Consulting Presentation V2
Croissance Consulting Presentation V2Ashish Bhatnagar
 
Integrated Customer Innovation
Integrated Customer InnovationIntegrated Customer Innovation
Integrated Customer Innovationmaikellieste
 
Keynote (EN): Beyond Budgeting in Practice, at Quality & Excellence Conferenc...
Keynote (EN): Beyond Budgeting in Practice, at Quality & Excellence Conferenc...Keynote (EN): Beyond Budgeting in Practice, at Quality & Excellence Conferenc...
Keynote (EN): Beyond Budgeting in Practice, at Quality & Excellence Conferenc...Gebhard Borck
 
Transformance for high performance
Transformance for high performanceTransformance for high performance
Transformance for high performanceMichael Walters
 
Extending Rhapsody -Rick boldt
Extending Rhapsody -Rick boldtExtending Rhapsody -Rick boldt
Extending Rhapsody -Rick boldtRoopa Nadkarni
 
Lean Six Sigma Overview
Lean Six Sigma OverviewLean Six Sigma Overview
Lean Six Sigma OverviewPartner
 
Lean Six Sigma Overview
Lean Six Sigma OverviewLean Six Sigma Overview
Lean Six Sigma OverviewPartner
 

What's hot (20)

Customer satisfaction & business excellence sdm college-4th june 2012
Customer satisfaction & business excellence  sdm college-4th june 2012Customer satisfaction & business excellence  sdm college-4th june 2012
Customer satisfaction & business excellence sdm college-4th june 2012
 
Business Model Dashboard
Business Model DashboardBusiness Model Dashboard
Business Model Dashboard
 
aerce 201006 (slideshare)
 aerce 201006 (slideshare) aerce 201006 (slideshare)
aerce 201006 (slideshare)
 
Creating a strategy map #PCV12
Creating a strategy map #PCV12Creating a strategy map #PCV12
Creating a strategy map #PCV12
 
4C Associates
4C Associates4C Associates
4C Associates
 
Customer Insight - What Customers Really Want - Webinar (15 March, 2012)
Customer Insight - What Customers Really Want - Webinar (15 March, 2012)Customer Insight - What Customers Really Want - Webinar (15 March, 2012)
Customer Insight - What Customers Really Want - Webinar (15 March, 2012)
 
Heizer 02
Heizer 02Heizer 02
Heizer 02
 
Visure Solutions Requirements Engineering_The word in a nutshell - Ulf Sandberg
Visure Solutions Requirements Engineering_The word in a nutshell - Ulf SandbergVisure Solutions Requirements Engineering_The word in a nutshell - Ulf Sandberg
Visure Solutions Requirements Engineering_The word in a nutshell - Ulf Sandberg
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann
 
Customer Process Management
Customer Process ManagementCustomer Process Management
Customer Process Management
 
Scor 9.0 reference guide
Scor 9.0 reference guideScor 9.0 reference guide
Scor 9.0 reference guide
 
Croissance Consulting Presentation V2
Croissance Consulting Presentation V2Croissance Consulting Presentation V2
Croissance Consulting Presentation V2
 
iCognitive SCOR Model & iCognitive Methodology
iCognitive SCOR Model & iCognitive MethodologyiCognitive SCOR Model & iCognitive Methodology
iCognitive SCOR Model & iCognitive Methodology
 
Integrated Customer Innovation
Integrated Customer InnovationIntegrated Customer Innovation
Integrated Customer Innovation
 
Keynote (EN): Beyond Budgeting in Practice, at Quality & Excellence Conferenc...
Keynote (EN): Beyond Budgeting in Practice, at Quality & Excellence Conferenc...Keynote (EN): Beyond Budgeting in Practice, at Quality & Excellence Conferenc...
Keynote (EN): Beyond Budgeting in Practice, at Quality & Excellence Conferenc...
 
Transformance for high performance
Transformance for high performanceTransformance for high performance
Transformance for high performance
 
Tcl corporate v0 01 vs 03052012
Tcl corporate v0 01 vs 03052012Tcl corporate v0 01 vs 03052012
Tcl corporate v0 01 vs 03052012
 
Extending Rhapsody -Rick boldt
Extending Rhapsody -Rick boldtExtending Rhapsody -Rick boldt
Extending Rhapsody -Rick boldt
 
Lean Six Sigma Overview
Lean Six Sigma OverviewLean Six Sigma Overview
Lean Six Sigma Overview
 
Lean Six Sigma Overview
Lean Six Sigma OverviewLean Six Sigma Overview
Lean Six Sigma Overview
 

Viewers also liked

capacity utilization
capacity utilizationcapacity utilization
capacity utilizationsai precious
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 
Capacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsCapacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsSai Praveen Chettupalli
 
An Introduction to Operations Management
An Introduction to Operations ManagementAn Introduction to Operations Management
An Introduction to Operations ManagementChristian Reinboth
 
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning pptGagan bhati
 
Operations - Decisions
Operations - DecisionsOperations - Decisions
Operations - Decisionstutor2u
 
3.11 understanding operational objectives - moodle
3.11   understanding operational objectives - moodle3.11   understanding operational objectives - moodle
3.11 understanding operational objectives - moodleMissHowardHA
 
Team Crucial, Capacity Write Up
Team Crucial, Capacity Write UpTeam Crucial, Capacity Write Up
Team Crucial, Capacity Write Upsgskinne
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processRohan Monis
 
Big Data: Improving capacity utilization of transport companies
Big Data: Improving capacity utilization of transport companiesBig Data: Improving capacity utilization of transport companies
Big Data: Improving capacity utilization of transport companiesData Science Society
 
Locating Facilities
Locating FacilitiesLocating Facilities
Locating Facilitiesfrancis_rull
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and servicesgerlyn bonus
 
Operations management
Operations management Operations management
Operations management vinaykar51
 
Resources and Development
Resources and DevelopmentResources and Development
Resources and DevelopmentAdarsh NJ
 
Presentación marta y jorge process strategy
Presentación marta y jorge process strategyPresentación marta y jorge process strategy
Presentación marta y jorge process strategyJorge Fuentes
 
Process strategy
Process strategyProcess strategy
Process strategyMoezza A
 
CAPACITY PLANNING
CAPACITY PLANNING CAPACITY PLANNING
CAPACITY PLANNING 889222
 

Viewers also liked (20)

capacity utilization
capacity utilizationcapacity utilization
capacity utilization
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Capacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsCapacity Planning with reference to McDonlds
Capacity Planning with reference to McDonlds
 
Capacity Management
Capacity ManagementCapacity Management
Capacity Management
 
An Introduction to Operations Management
An Introduction to Operations ManagementAn Introduction to Operations Management
An Introduction to Operations Management
 
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning ppt
 
Operations - Decisions
Operations - DecisionsOperations - Decisions
Operations - Decisions
 
3.11 understanding operational objectives - moodle
3.11   understanding operational objectives - moodle3.11   understanding operational objectives - moodle
3.11 understanding operational objectives - moodle
 
Team Crucial, Capacity Write Up
Team Crucial, Capacity Write UpTeam Crucial, Capacity Write Up
Team Crucial, Capacity Write Up
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning process
 
Big Data: Improving capacity utilization of transport companies
Big Data: Improving capacity utilization of transport companiesBig Data: Improving capacity utilization of transport companies
Big Data: Improving capacity utilization of transport companies
 
Locating Facilities
Locating FacilitiesLocating Facilities
Locating Facilities
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Operations management
Operations management Operations management
Operations management
 
Resources and Development
Resources and DevelopmentResources and Development
Resources and Development
 
Presentación marta y jorge process strategy
Presentación marta y jorge process strategyPresentación marta y jorge process strategy
Presentación marta y jorge process strategy
 
Process strategy
Process strategyProcess strategy
Process strategy
 
Capacity to contract
Capacity to contractCapacity to contract
Capacity to contract
 
CAPACITY PLANNING
CAPACITY PLANNING CAPACITY PLANNING
CAPACITY PLANNING
 

Similar to Maximizing Capacity Utilization 27 Jul12

Business Healthcheck Service By John Capper & Co
Business Healthcheck Service By John Capper & CoBusiness Healthcheck Service By John Capper & Co
Business Healthcheck Service By John Capper & CoJohn Capper & Co
 
Unlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management PotentialUnlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management PotentialImranMasood
 
Company profile trustpartners april 2013
Company profile trustpartners april 2013Company profile trustpartners april 2013
Company profile trustpartners april 2013TrustPartners
 
JMBI, LLC Collateral
JMBI, LLC CollateralJMBI, LLC Collateral
JMBI, LLC Collateraljoebon
 
Field force motivation
Field force motivationField force motivation
Field force motivationDEEPAK SAHU
 
Saa s sales and marketing lilia shirman_marketngcamp-for web
Saa s sales and marketing lilia shirman_marketngcamp-for webSaa s sales and marketing lilia shirman_marketngcamp-for web
Saa s sales and marketing lilia shirman_marketngcamp-for webPaul Wcislo
 
Balanced Scorecard Presentation For Gemba
Balanced Scorecard Presentation For GembaBalanced Scorecard Presentation For Gemba
Balanced Scorecard Presentation For GembaBenjamin Shobert
 
Quality Core
Quality CoreQuality Core
Quality Corealanlund
 
Introduction IimpelPro - may'11
Introduction  IimpelPro - may'11Introduction  IimpelPro - may'11
Introduction IimpelPro - may'11sunpreeth
 
Value Stream Manager concept applied to Software Product Development
Value Stream Manager concept applied to Software Product DevelopmentValue Stream Manager concept applied to Software Product Development
Value Stream Manager concept applied to Software Product DevelopmentKen Power
 
Crystal Ball BY blucero.c.la
Crystal Ball BY blucero.c.laCrystal Ball BY blucero.c.la
Crystal Ball BY blucero.c.laguest93e1f3
 
Introductory Advantage Presentation 4 1 09
Introductory Advantage Presentation 4 1 09Introductory Advantage Presentation 4 1 09
Introductory Advantage Presentation 4 1 09Earlynn373
 
P2P lean management transformation 2012
P2P lean management transformation 2012P2P lean management transformation 2012
P2P lean management transformation 2012FGB
 
PRIMUS Techsystems Company Profile
PRIMUS Techsystems Company ProfilePRIMUS Techsystems Company Profile
PRIMUS Techsystems Company Profilesambhajichawale
 

Similar to Maximizing Capacity Utilization 27 Jul12 (20)

Business Healthcheck Service By John Capper & Co
Business Healthcheck Service By John Capper & CoBusiness Healthcheck Service By John Capper & Co
Business Healthcheck Service By John Capper & Co
 
Unlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management PotentialUnlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management Potential
 
Benefits of Using ROCG North Florida
Benefits of Using ROCG North FloridaBenefits of Using ROCG North Florida
Benefits of Using ROCG North Florida
 
Maruti
MarutiMaruti
Maruti
 
Company profile trustpartners april 2013
Company profile trustpartners april 2013Company profile trustpartners april 2013
Company profile trustpartners april 2013
 
JMBI, LLC Collateral
JMBI, LLC CollateralJMBI, LLC Collateral
JMBI, LLC Collateral
 
Field force motivation
Field force motivationField force motivation
Field force motivation
 
Travel Transport And Leisure Offerings 2009
Travel Transport And Leisure Offerings 2009Travel Transport And Leisure Offerings 2009
Travel Transport And Leisure Offerings 2009
 
Saa s sales and marketing lilia shirman_marketngcamp-for web
Saa s sales and marketing lilia shirman_marketngcamp-for webSaa s sales and marketing lilia shirman_marketngcamp-for web
Saa s sales and marketing lilia shirman_marketngcamp-for web
 
Balanced Scorecard Presentation For Gemba
Balanced Scorecard Presentation For GembaBalanced Scorecard Presentation For Gemba
Balanced Scorecard Presentation For Gemba
 
Quality Core
Quality CoreQuality Core
Quality Core
 
Introduction IimpelPro - may'11
Introduction  IimpelPro - may'11Introduction  IimpelPro - may'11
Introduction IimpelPro - may'11
 
Milagrow Business and Knowledge Solutions Corporate PPT
Milagrow Business and Knowledge Solutions Corporate PPTMilagrow Business and Knowledge Solutions Corporate PPT
Milagrow Business and Knowledge Solutions Corporate PPT
 
Avalon Group Profile
Avalon Group ProfileAvalon Group Profile
Avalon Group Profile
 
Value Stream Manager concept applied to Software Product Development
Value Stream Manager concept applied to Software Product DevelopmentValue Stream Manager concept applied to Software Product Development
Value Stream Manager concept applied to Software Product Development
 
Crystal Ball BY blucero.c.la
Crystal Ball BY blucero.c.laCrystal Ball BY blucero.c.la
Crystal Ball BY blucero.c.la
 
Mind Chips Consulting Offerings
Mind Chips Consulting   OfferingsMind Chips Consulting   Offerings
Mind Chips Consulting Offerings
 
Introductory Advantage Presentation 4 1 09
Introductory Advantage Presentation 4 1 09Introductory Advantage Presentation 4 1 09
Introductory Advantage Presentation 4 1 09
 
P2P lean management transformation 2012
P2P lean management transformation 2012P2P lean management transformation 2012
P2P lean management transformation 2012
 
PRIMUS Techsystems Company Profile
PRIMUS Techsystems Company ProfilePRIMUS Techsystems Company Profile
PRIMUS Techsystems Company Profile
 

More from Anirban Mazumdar

Eliminating Critical Quality Defects at a Component Manufacturer
Eliminating Critical Quality Defects at a Component ManufacturerEliminating Critical Quality Defects at a Component Manufacturer
Eliminating Critical Quality Defects at a Component ManufacturerAnirban Mazumdar
 
Breaking the ceiling through effective procurement transformation 19 oct13
Breaking the ceiling through effective procurement transformation  19 oct13Breaking the ceiling through effective procurement transformation  19 oct13
Breaking the ceiling through effective procurement transformation 19 oct13Anirban Mazumdar
 
Operational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerOperational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerAnirban Mazumdar
 
Identifying opportunities for unlocking capacity at auto component manufacturer
Identifying opportunities for unlocking capacity at auto component manufacturerIdentifying opportunities for unlocking capacity at auto component manufacturer
Identifying opportunities for unlocking capacity at auto component manufacturerAnirban Mazumdar
 
Procurement cost reduction for auto electrical player
Procurement cost reduction for auto electrical playerProcurement cost reduction for auto electrical player
Procurement cost reduction for auto electrical playerAnirban Mazumdar
 
Releasing working capital by inventory reduction
Releasing working capital by inventory reductionReleasing working capital by inventory reduction
Releasing working capital by inventory reductionAnirban Mazumdar
 
CII - Valcon Report on Engineering Industry in Punjab 2012
CII - Valcon Report on Engineering Industry in Punjab 2012CII - Valcon Report on Engineering Industry in Punjab 2012
CII - Valcon Report on Engineering Industry in Punjab 2012Anirban Mazumdar
 
Making the best of your B-School years
Making the best of your B-School yearsMaking the best of your B-School years
Making the best of your B-School yearsAnirban Mazumdar
 
Catapulting Auto Ancillary Industry To The Next Level
Catapulting Auto Ancillary Industry To The Next LevelCatapulting Auto Ancillary Industry To The Next Level
Catapulting Auto Ancillary Industry To The Next LevelAnirban Mazumdar
 

More from Anirban Mazumdar (9)

Eliminating Critical Quality Defects at a Component Manufacturer
Eliminating Critical Quality Defects at a Component ManufacturerEliminating Critical Quality Defects at a Component Manufacturer
Eliminating Critical Quality Defects at a Component Manufacturer
 
Breaking the ceiling through effective procurement transformation 19 oct13
Breaking the ceiling through effective procurement transformation  19 oct13Breaking the ceiling through effective procurement transformation  19 oct13
Breaking the ceiling through effective procurement transformation 19 oct13
 
Operational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerOperational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturer
 
Identifying opportunities for unlocking capacity at auto component manufacturer
Identifying opportunities for unlocking capacity at auto component manufacturerIdentifying opportunities for unlocking capacity at auto component manufacturer
Identifying opportunities for unlocking capacity at auto component manufacturer
 
Procurement cost reduction for auto electrical player
Procurement cost reduction for auto electrical playerProcurement cost reduction for auto electrical player
Procurement cost reduction for auto electrical player
 
Releasing working capital by inventory reduction
Releasing working capital by inventory reductionReleasing working capital by inventory reduction
Releasing working capital by inventory reduction
 
CII - Valcon Report on Engineering Industry in Punjab 2012
CII - Valcon Report on Engineering Industry in Punjab 2012CII - Valcon Report on Engineering Industry in Punjab 2012
CII - Valcon Report on Engineering Industry in Punjab 2012
 
Making the best of your B-School years
Making the best of your B-School yearsMaking the best of your B-School years
Making the best of your B-School years
 
Catapulting Auto Ancillary Industry To The Next Level
Catapulting Auto Ancillary Industry To The Next LevelCatapulting Auto Ancillary Industry To The Next Level
Catapulting Auto Ancillary Industry To The Next Level
 

Maximizing Capacity Utilization 27 Jul12

  • 1. Pathways to Growth for Indian SMEs CII – Valcon Session, Ludhiana 27th July, 2012 An Introduction to Valcon Management Consultants N. Krishnan CEO, Valcon India
  • 2. Valcon overview Valcon globally Valcon India A leading operations and implementations Specializing in implementation consulting consultancy 22 highly experienced consultants – and About 180 consultants placed in Denmark, growing Sweden, Norway, India, China and Czech Based out of Chennai, Bangalore and Delhi Republic Practice areas We serve global customers – typically from Nordic based headquarters Supply management (manufacturing & operations excellence, procurement & supply chain) Demand management (sales excellence, growth, entry strategy, etc.) Strategic and market analysis (operations due diligence, growth and sales potential, market entry strategy) Customer References from: Caterpillar, Biocon, Hero Group, Uniparts, Murugappa group, Castrol, FLSmidth, Novozymes, Novonordisk, Saint Gobain, CAMS, etc. 2
  • 3. Valcon is a team of highly experienced consultants, drawn from the best companies in India Our team Our consulting team is based out of Chennai, Bangalore and Delhi Valcon is a group of ‘expert consultants’ - minimum experience of our consultants is 6 years - having worked as either a consultant or a line manager All our consultants have hands-on experience of working in functional roles prior to consulting We are on “the shop floor” in close collaboration with the client organisation when solutions are implemented Our consultants are drawn from some of the leading companies of different industries Ford, Toyota, Maruti -Suzuki, Caterpillar, Saint Gobain, Escorts Hospital, Motorola, Bajaj, PwC, ECS, Wipro, McKinsey, ZS Associates, Volvo, ISRO, Dalmia group, Asian Paints, Castrol, Ashok Leyland, Coca Cola, Schlumberger 3
  • 4. Our approach to consulting and focus on results deliver strong benefits for our clients • Our focus is on execution – how to change • We are hands-on • We ask questions & challenge thinking • We focus on important issues • We go for practical solutions Client Valcon Intervention Benefits Industry • We are on “the shop floor” - with the Auto Capacity release • 20% output increase clients – to implement the solutions Ancillary assessment potential identified Renewable New Product • Development time reduction • We act and create quick results Energy Development to less than 6 months Procurement • INR 65 cr savings over 12 EPC transformation months • Technically superior product Product evaluation Pharma selected for in-licensing • Risk eliminated Driving speed Railways • 16% energy cost reduction optimization • Increased up-time by 20%- 30% Auto Operational • In-process rejections Ancillary Excellence reduced from 2.4% to 0.06% of net sales 4
  • 5. Our offerings address key themes and challenges in our clients’ business operations... Deployment and execution of corporate strategy Business Technology and Operational due diligence Strategy Execution Improving products and processes based on market knowledge Transparency in profitability for customers, products and markets Marketing and After sales Procurement Production Logistics sales service Cost savings Operations Inventory New customer Spare part Performance Excellence optimisation acquisition management measurement Cost reduction Inbound and Sales and price Customer Risk Quality outbound models relationship management improvement logistics Channel design management optimization and management Supplier Throughput and development capacity Sales Operations Optimising price enhancement planning and profit Sales processes, tools and competence 5
  • 6. Pathways to Growth for Indian SMEs CII – Valcon Session, Ludhiana 27th July, 2012 Maximizing Capacity Utilization Anirban Mazumdar Associate Director, Valcon India
  • 7. Do you face these situations? Demand is stable but often we are not able to complete orders Overtime & Extra Shift running are often used to ‘manage demand’ My Operators & Machines are idle some of the days but have to work extra time on other days There is so much Inventory but still we are not able to meet requirements & Do you think that adding machine/ plant is the only solution ? 7
  • 8. Contents Are You Utilizing Your Capacity Well? How Can You Improve Capacity Utilization? Case : Unearthing Hidden Capacity at Ancillary Unit 8
  • 9. Focusing only on ‘servicing orders’ gradually leads to inappropriate capacity utilization Supplier Supplier Manufacturer Supplier Plant was designed to service a certain demand at optimum utilization • maximize output when demand is high • finish plan early when demand dips 9
  • 10. Focusing only on ‘servicing orders’ gradually leads to inappropriate capacity utilization DEMAND Supplier Supplier Manufacturer Distribution Customer Supplier DELIVERY Plant was designed to service a certain Even with change in demand pattern & demand at optimum utilization fluctuations, working pattern doesn’t • maximize output when demand is change. high Focus shifts to ‘meeting daily & month plans’ & We stop asking – • finish plan early when demand dips “Could we have produced more” or “Did we take too much time to complete the plan” 10
  • 11. Are we utilizing our Capacity well? ࡭ࢉ࢚࢛ࢇ࢒ ࡻ࢛࢚࢖࢛࢚ Efficiency (%) ൌ ࡱࢌࢌࢋࢉ࢚࢏࢜ࢋ ࡯ࢇ࢖ࢇࢉ࢏࢚࢟ ࡭ࢉ࢚࢛ࢇ࢒ ࡻ࢛࢚࢖࢛࢚ Utilization (%) ൌ ࡰࢋ࢙࢏ࢍ࢔ ࡯ࢇ࢖ࢇࢉ࢏࢚࢟ • Management Policies • Allowances • Accepted Scrap • Maintenance Time, etc. • Operational Losses • Process, Manpower, Asset Performance DESIGN EFFECTIVE ACTUAL CAPACITY CAPACITY OUTPUT 11
  • 12. Are we utilizing our Capacity well? ࡭ࢉ࢚࢛ࢇ࢒ ࡻ࢛࢚࢖࢛࢚ Efficiency (%) ൌ ࡱࢌࢌࢋࢉ࢚࢏࢜ࢋ ࡯ࢇ࢖ࢇࢉ࢏࢚࢟ ࡭ࢉ࢚࢛ࢇ࢒ ࡻ࢛࢚࢖࢛࢚ Utilization (%) ൌ ࡰࢋ࢙࢏ࢍ࢔ ࡯ࢇ࢖ࢇࢉ࢏࢚࢟ • Management Policies • Allowances • Accepted Scrap • Maintenance Time, etc. • Operational Losses • Process, Mostly Medium & Manpower, Asset Small Firms Performance Mostly Large Sized Firms Medium & Small firms appear to be lagging in capacity utilization and need to take measures to improve DESIGN EFFECTIVE ACTUAL CAPACITY CAPACITY OUTPUT Source : 77th Business Outlook Survey, CII 12
  • 13. So, How do we ‘lose Capacity’? 1 Policies & Standards 2 Bottleneck under-Utilization 3 Process under-Utilization 4 Capacity Imbalance 5 Capacity in-flexibility (Process, Operators & Plant) 13
  • 14. Designed Policies & Standards often lead to capacity under- utilization which goes unnoticed Purchase & Spares Policy Inventory & Stores norms Manpower Policy Reward & Recognition Policy Accepted ‘standards’ of process loss, set up time, etc. ‘Unwritten rules’ of production, … 14
  • 15. Designed Policies & Standards often lead to capacity under- utilization which goes unnoticed Availability & Quality of Spares is Purchase & Spares Policy impacted by Purchase policies No machines are run during lunch Inventory & Stores norms time Manpower Policy Checks on the machine can be done only by the maintainers Reward & Recognition Policy “Set up can’t be done in night shift” Accepted ‘standards’ of process loss, set up time, etc. “Production shouldn’t do any quality checks” ‘Unwritten rules’ of production, … … 15
  • 16. Identification & utilization of bottleneck resource is one of the biggest challenges to capacity release Plant capacity can’t be more than the bottleneck’s capacity Estimated Capacity (pcs) 77624 35928 38880 30580 22162 20736 CNC Tempering Sand Pre-setting Inspection Painting Machining Blasting 16
  • 17. Identification & utilization of bottleneck resource is one of the biggest challenges to capacity release Plant capacity can’t be more than Inability to identify the bottleneck the bottleneck’s capacity Inadequate maintenance of bottleneck – high downtimes Changing product mix leading to Estimated Capacity (pcs) shifting bottlenecks 77624 Management’s focus on the ‘costliest machine’ than the bottleneck 35928 38880 30580 Bottleneck machine treated in the 22162 20736 same way as any other machine Manual or non-production activities CNC Tempering Sand Pre-setting Inspection Painting Machining Blasting becoming bottlenecks … 17
  • 18. Contents Are You Utilizing Your Capacity Well? How Can You Improve Capacity Utilization? Case : Unearthing Hidden Capacity at Ancillary Unit 18
  • 19. Capacity “release” needs to be undertaken systematically & in a phased manner Achieving Effective Capacity • Operational Improvements • Shop floor initiatives & systems implementation • High involvement of local team members • Localized improvements aligned to bigger objectives • Challenging work practices Achieving Design Capacity • Management policies, designs, processes and standards changes • Initiatives & decisions driven by senior management DESIGN EFFECTIVE ACTUAL • Cross functional initiatives – broad CAPACITY CAPACITY OUTPUT based objectives • Challenging mindset 19
  • 20. Causes for losing Effective Capacity could lie across many areas in operations No Plan Situation Not No Material Produced No Manpower Output Loss Asset Downtime Produced at Produced but Lower Rate lower output Rejected/ Reworked Flow Produced but Interruption couldn’t move out Wrong Production 20
  • 21. Multiple initiatives may be required to improve Capacity Utilization – the right ones need to be identified & prioritized No Plan Poor Planning Situation Material Quality/ Delivery Failures No Material Poor Skill Levels Inadequate Maintenance No Manpower Low Manpower Utilization Output Loss Asset Cycle Time Downtime Variations Productivity Produced at Variations Lower Rate Low Equipment Capability Rejected/ Reworked Inadequate Layout Flow Interruption Flow Imbalance Wrong Production Line Imbalance 21
  • 22. Multiple initiatives may be required to improve Capacity Utilization – the right ones need to be identified & prioritized No Plan SUPPLIER Poor Planning Situation DEVELOPMENT Material Quality/ Delivery Failures PLANNING Poor Skill Levels No Material IMPROVEMENT Inadequate Maintenance No PLANNED Manpower Low Manpower MAINTENANCE Utilization Output Loss Asset Cycle Time SKILL Variations Downtime DEVELOPMENT Productivity Produced at Variations QUALITY Lower Rate Low Equipment IMPROVEMENT Capability Rejected/ Reworked FLOW Inadequate Layout Flow IMPROVEMENT Interruption Flow Imbalance PRODUCTIVITY Wrong Production IMPROVEMENT Line Imbalance 22
  • 23. Supplier Performance improvement focuses on working closely with them to improve reliability SUPPLIER • Equipment Capability • Process Stability DEVELOPMENT • Quality Systems Supplier • Quality Audits PLANNING Quality IMPROVEMENT PLANNED MAINTENANCE • Capacity Assessment Supplier Supplier • Planning & Scheduling SKILL Systems Performance DEVELOPMENT Delivery • Flexibility QUALITY IMPROVEMENT FLOW Procure to • Supporting Processes IMPROVEMENT Pay Adequacy Processes • Skill of People PRODUCTIVITY • Simplicity of Processes IMPROVEMENT 23
  • 24. An ‘Integrated Planning’ model, customized for the company helps in ensuring uninterrupted production to plan SUPPLIER Rough Cut Capacity Planning DEVELOPMENT Raw Material Planning Domestic Orders PLANNING Sales Order Book for M1 RM ordering for Long IMPROVEMENT Export Lead Items for M2, M3 Orders PLANNED MAINTENANCE RCCP for RCCP for M1 (W1 - W4) M2/M3 RM Ordering for M1 (Low LT, Non ROP) SKILL Iterations DEVELOPMENT Every Week Next Week Fixed Plan RM Check for M1 QUALITY (Available + Ordered) IMPROVEMENT Production Scheduling Twice Every Week Prioritizing & Sequencing Confirmed RM FLOW Availability IMPROVEMENT In Store/ GIT (expected to Modific 3/4 Days Fixed Schedule ations reach in 2 days time) PRODUCTIVITY Execution & Schedule IMPROVEMENT Adherence 24
  • 25. A Planned Maintenance program implements maintenance systems after equipment classification SUPPLIER Most Critical Critical Non-critical DEVELOPMENT Equipment Equipment Equipment Reliability PLANNING Proactive Centric Run to Fail Improvement maintenance (proactive) IMPROVEMENT Maintenance Maintenance PLANNED MAINTENANCE Predictive maintenance SKILL DEVELOPMENT Preventive maintenance QUALITY IMPROVEMENT Routine maintenance FLOW IMPROVEMENT Breakdown or Corrective maintenance PRODUCTIVITY IMPROVEMENT 25
  • 26. Flow Improvement would look at extended value stream and eliminate interruptions CORRECTION Industrial Segment WAITING SUPPLIER • Many iterations in DEVELOPMENT customer requirement • Waiting periods for complete customer reqmt. PLANNING IMPROVEMENT CORRECTION WAITING • Mold Rework • High Inventory PLANNED • Waiting for complete mold information • Deco Rework MAINTENANCE • High Inventory between intermediate processes WAITING • Waiting for material INVENTORY SKILL OVERPRODUCTION CORRECTION from plant DEVELOPMENT • Over planning to address poor yields QUALITY IMPROVEMENT Job Worker • QA/ PDI rework • High material CONVEYANCE FLOW movement within w/h • Multiple handling losses • High Inventory IMPROVEMENT WAITING INVENTORY CORRECTION CORRECTION CONVEYANCE PRODUCTIVITY • Many iterations in resorting INVENTORY • High rework on resorting IMPROVEMENT • High inventory 26
  • 27. Contents Are You Utilizing Your Capacity Well? How Can You Improve Capacity Utilization? Case : Unearthing Hidden Capacity at Ancillary Unit 27
  • 28. Situation : The ancillary unit was ‘losing sales’ every month though analysis indicated sufficient ‘effective capacity’ The Effective Capacity was identified to be 25500 pcs per day based on bottleneck capacity Effective Capacity (pcs/day) 77624 35928 38880 30580 25500 25920 CNC Tempering Sand Pre-setting Inspection Painting Machining Blasting 28
  • 29. Situation : The ancillary unit was ‘losing sales’ every month though analysis indicated sufficient ‘effective capacity’ The Effective Capacity was identified to be 25500 pcs per day There was a steady demand of 20000 pcs per day from the OEM based on bottleneck capacity every month Effective Capacity (pcs/day) Effective Capacity & Demand (pcs/day) 77624 77624 35928 38880 38880 35928 30580 30580 25500 25920 25500 25920 20000 CNC Tempering Sand Pre-setting Inspection Painting CNC Tempering Sand Pre-setting Inspection Painting Machining Blasting Machining Blasting 29
  • 30. Situation : The ancillary unit was ‘losing sales’ every month though analysis indicated sufficient ‘effective capacity’ The Effective Capacity was identified to be 25500 pcs per day There was a steady demand of 20000 pcs per day from the OEM based on bottleneck capacity every month Effective Capacity (pcs/day) Effective Capacity & Demand (pcs/day) 77624 77624 35928 38880 38880 35928 30580 30580 25500 25920 25500 25920 20000 CNC Tempering Sand Pre-setting Inspection Painting CNC Tempering Sand Pre-setting Inspection Painting Machining Blasting Machining Blasting The average daily output was however consistently below the effective capacity of the bottleneck Effective Capacity & Avg. Output (pcs/day) 77624 35928 38880 30580 25500 25920 16942 18051 16834 30
  • 31. Situation : The ancillary unit was ‘losing sales’ every month though analysis indicated sufficient ‘effective capacity’ The Effective Capacity was identified to be 25500 pcs per day There was a steady demand of 20000 pcs per day from the OEM based on bottleneck capacity every month Effective Capacity (pcs/day) Effective Capacity & Demand (pcs/day) 77624 77624 35928 38880 38880 35928 30580 30580 25500 25920 25500 25920 20000 CNC Tempering Sand Pre-setting Inspection Painting CNC Tempering Sand Pre-setting Inspection Painting Machining Blasting Machining Blasting X Analysis of the bottleneck output indicated that they were The average daily output was however consistently below the utilized only to the extent of ~72% effective capacity of the bottleneck Utilization of Bottleneck 77624 Effective Capacity & Avg. Output (pcs/day) 77624 35928 38880 72% 30580 75% 35928 38880 25500 25920 30580 25500 25920 18360 19440 16942 18051 16834 CNC Tempering Sand Pre-setting Inspection Painting Machining Blasting 31
  • 32. Analysis : Ineffective Maintenance systems and Inadequate focus on bottleneck were leading to high capacity losses 3 hours (14% time) was being lost in Sand Blasting repetitive breakdowns everyday ? Breakdown Maintenance being practised; checklists do not include ‘critical checks’ Incomplete loading of Sand Blasting unit 25500 Delays by operators between sand blasting cycles All Planning & Scheduling being done for CNC machine – NOT the bottleneck 17275 Management focused on maximizing output of CNC machine – the costliest investment For a simple process, a zig-zag layout used leading to multiple handling and stage inventories Potential for reducing the sand blasting cycle time by 11% identified Many Quality Circles working but none focused on improving sand blasting output 32
  • 33. A roadmap was designed for ~25% increase in actual output & subsequently moving towards Design Capacity • Reduce & re-establish Sand Blasting cycle time • Simplify layout into a flow • Design Planning model around sand ? • Design & Implement a Planned blasting utilization Maintenance system • Plant goals’ alignment to utilization • Simple automations to reduce maximization Operator delays • Align team objectives to improve • Reduce Minor Stoppages by bottleneck output Autonomous Maintenance 25500 • Visual systems to improve loading of bottleneck • Reduce loading & unloading time by use of fixtures 17275 DESIGN EFFECTIVE ACTUAL CAPACITY CAPACITY OUTPUT 33