Catapulting Auto Ancillary Industry To The Next Level
Maximizing Capacity Utilization 27 Jul12
1. Pathways to Growth for Indian SMEs
CII – Valcon Session, Ludhiana
27th July, 2012
An Introduction to Valcon
Management Consultants
N. Krishnan
CEO, Valcon India
2. Valcon overview
Valcon globally Valcon India
A leading operations and implementations Specializing in implementation consulting
consultancy 22 highly experienced consultants – and
About 180 consultants placed in Denmark, growing
Sweden, Norway, India, China and Czech Based out of Chennai, Bangalore and Delhi
Republic
Practice areas
We serve global customers – typically from
Nordic based headquarters Supply management (manufacturing &
operations excellence, procurement & supply
chain)
Demand management (sales excellence,
growth, entry strategy, etc.)
Strategic and market analysis (operations
due diligence, growth and sales potential,
market entry strategy)
Customer References from: Caterpillar,
Biocon, Hero Group, Uniparts, Murugappa
group, Castrol, FLSmidth, Novozymes,
Novonordisk, Saint Gobain, CAMS, etc.
2
3. Valcon is a team of highly experienced consultants, drawn from the best
companies in India
Our team
Our consulting team is based out of Chennai,
Bangalore and Delhi
Valcon is a group of ‘expert consultants’ -
minimum experience of our consultants is 6
years - having worked as either a consultant or
a line manager
All our consultants have hands-on experience
of working in functional roles prior to consulting
We are on “the shop floor” in close collaboration
with the client organisation when solutions are
implemented
Our consultants are drawn from some of the
leading companies of different industries
Ford, Toyota, Maruti -Suzuki, Caterpillar, Saint
Gobain, Escorts Hospital, Motorola, Bajaj, PwC,
ECS, Wipro, McKinsey, ZS Associates, Volvo,
ISRO, Dalmia group, Asian Paints, Castrol, Ashok
Leyland, Coca Cola, Schlumberger
3
4. Our approach to consulting and focus on results deliver strong benefits for
our clients
• Our focus is on execution – how to
change
• We are hands-on
• We ask questions & challenge
thinking
• We focus on important issues
• We go for practical solutions Client
Valcon Intervention Benefits
Industry
• We are on “the shop floor” - with the
Auto Capacity release • 20% output increase
clients – to implement the solutions Ancillary assessment potential identified
Renewable New Product • Development time reduction
• We act and create quick results Energy Development to less than 6 months
Procurement • INR 65 cr savings over 12
EPC
transformation months
• Technically superior product
Product evaluation
Pharma selected
for in-licensing
• Risk eliminated
Driving speed
Railways • 16% energy cost reduction
optimization
• Increased up-time by 20%-
30%
Auto Operational
• In-process rejections
Ancillary Excellence
reduced from 2.4% to 0.06%
of net sales
4
5. Our offerings address key themes and challenges in our clients’ business
operations...
Deployment and execution of corporate strategy
Business
Technology and Operational due diligence
Strategy
Execution Improving products and processes based on market knowledge
Transparency in profitability for customers, products and markets
Marketing and After sales
Procurement Production Logistics
sales service
Cost savings Operations Inventory New customer Spare part
Performance Excellence optimisation acquisition management
measurement Cost reduction Inbound and Sales and price Customer
Risk Quality outbound models relationship
management improvement logistics Channel design management
optimization and management
Supplier Throughput and
development capacity Sales Operations Optimising price
enhancement planning and profit
Sales processes,
tools and
competence
5
6. Pathways to Growth for Indian SMEs
CII – Valcon Session, Ludhiana
27th July, 2012
Maximizing Capacity
Utilization
Anirban Mazumdar
Associate Director, Valcon India
7. Do you face these situations?
Demand is stable but often we are not able to complete orders
Overtime & Extra Shift running are often used to ‘manage demand’
My Operators & Machines are idle some of the days but have to
work extra time on other days
There is so much Inventory but still we are not able to meet
requirements
& Do you think that adding machine/ plant is the only solution ?
7
8. Contents
Are You Utilizing Your Capacity Well?
How Can You Improve Capacity Utilization?
Case : Unearthing Hidden Capacity at Ancillary Unit
8
9. Focusing only on ‘servicing orders’ gradually leads to
inappropriate capacity utilization
Supplier
Supplier
Manufacturer
Supplier
Plant was designed to service a certain
demand at optimum utilization
• maximize output when demand is
high
• finish plan early when demand dips
9
10. Focusing only on ‘servicing orders’ gradually leads to
inappropriate capacity utilization
DEMAND
Supplier
Supplier
Manufacturer Distribution Customer
Supplier DELIVERY
Plant was designed to service a certain Even with change in demand pattern &
demand at optimum utilization fluctuations, working pattern doesn’t
• maximize output when demand is change.
high Focus shifts to ‘meeting daily & month
plans’ & We stop asking –
• finish plan early when demand dips
“Could we have produced more” or “Did we
take too much time to complete the plan”
10
11. Are we utilizing our Capacity well?
ࢉ࢚࢛ࢇ ࡻ࢛࢚࢛࢚
Efficiency (%) ൌ
ࡱࢌࢌࢋࢉ࢚࢜ࢋ ࢇࢇࢉ࢚࢟
ࢉ࢚࢛ࢇ ࡻ࢛࢚࢛࢚
Utilization (%) ൌ
ࡰࢋ࢙ࢍ ࢇࢇࢉ࢚࢟
• Management Policies
• Allowances
• Accepted Scrap
• Maintenance Time, etc.
• Operational Losses
• Process,
Manpower, Asset
Performance
DESIGN EFFECTIVE ACTUAL
CAPACITY CAPACITY OUTPUT
11
12. Are we utilizing our Capacity well?
ࢉ࢚࢛ࢇ ࡻ࢛࢚࢛࢚
Efficiency (%) ൌ
ࡱࢌࢌࢋࢉ࢚࢜ࢋ ࢇࢇࢉ࢚࢟
ࢉ࢚࢛ࢇ ࡻ࢛࢚࢛࢚
Utilization (%) ൌ
ࡰࢋ࢙ࢍ ࢇࢇࢉ࢚࢟
• Management Policies
• Allowances
• Accepted Scrap
• Maintenance Time, etc.
• Operational Losses
• Process,
Mostly Medium & Manpower, Asset
Small Firms Performance
Mostly Large Sized
Firms
Medium & Small firms appear to be lagging
in capacity utilization and need to take
measures to improve DESIGN EFFECTIVE ACTUAL
CAPACITY CAPACITY OUTPUT
Source : 77th Business Outlook Survey, CII
12
13. So, How do we ‘lose Capacity’?
1 Policies & Standards
2 Bottleneck under-Utilization
3 Process under-Utilization
4 Capacity Imbalance
5 Capacity in-flexibility (Process, Operators & Plant)
13
14. Designed Policies & Standards often lead to capacity under-
utilization which goes unnoticed
Purchase & Spares Policy
Inventory & Stores norms
Manpower Policy
Reward & Recognition Policy
Accepted ‘standards’ of process
loss, set up time, etc.
‘Unwritten rules’ of production,
…
14
15. Designed Policies & Standards often lead to capacity under-
utilization which goes unnoticed
Availability & Quality of Spares is Purchase & Spares Policy
impacted by Purchase policies
No machines are run during lunch Inventory & Stores norms
time
Manpower Policy
Checks on the machine can be done
only by the maintainers
Reward & Recognition Policy
“Set up can’t be done in night shift”
Accepted ‘standards’ of process
loss, set up time, etc.
“Production shouldn’t do any quality
checks”
‘Unwritten rules’ of production,
… …
15
16. Identification & utilization of bottleneck resource is one of the
biggest challenges to capacity release
Plant capacity can’t be more than
the bottleneck’s capacity
Estimated Capacity (pcs)
77624
35928 38880
30580
22162 20736
CNC Tempering Sand Pre-setting Inspection Painting
Machining Blasting
16
17. Identification & utilization of bottleneck resource is one of the
biggest challenges to capacity release
Plant capacity can’t be more than
Inability to identify the bottleneck the bottleneck’s capacity
Inadequate maintenance of
bottleneck – high downtimes
Changing product mix leading to Estimated Capacity (pcs)
shifting bottlenecks
77624
Management’s focus on the ‘costliest
machine’ than the bottleneck
35928 38880
30580
Bottleneck machine treated in the 22162 20736
same way as any other machine
Manual or non-production activities CNC Tempering Sand Pre-setting Inspection Painting
Machining Blasting
becoming bottlenecks
…
17
18. Contents
Are You Utilizing Your Capacity Well?
How Can You Improve Capacity Utilization?
Case : Unearthing Hidden Capacity at Ancillary Unit
18
19. Capacity “release” needs to be undertaken systematically & in a
phased manner
Achieving Effective Capacity
• Operational Improvements
• Shop floor initiatives & systems
implementation
• High involvement of local team
members
• Localized improvements aligned to
bigger objectives
• Challenging work practices
Achieving Design Capacity
• Management policies, designs,
processes and standards changes
• Initiatives & decisions driven by senior
management DESIGN EFFECTIVE ACTUAL
• Cross functional initiatives – broad CAPACITY CAPACITY OUTPUT
based objectives
• Challenging mindset
19
20. Causes for losing Effective Capacity could lie across many
areas in operations
No Plan
Situation
Not No Material
Produced
No
Manpower
Output Loss
Asset
Downtime
Produced at
Produced but Lower Rate
lower output Rejected/
Reworked
Flow
Produced but Interruption
couldn’t move out Wrong
Production
20
21. Multiple initiatives may be required to improve Capacity
Utilization – the right ones need to be identified & prioritized
No Plan
Poor Planning
Situation
Material Quality/
Delivery Failures
No Material
Poor Skill Levels
Inadequate
Maintenance No
Manpower
Low Manpower
Utilization Output Loss
Asset
Cycle Time Downtime
Variations
Productivity
Produced at
Variations
Lower Rate
Low Equipment
Capability Rejected/
Reworked
Inadequate Layout
Flow
Interruption
Flow Imbalance
Wrong
Production
Line Imbalance
21
22. Multiple initiatives may be required to improve Capacity
Utilization – the right ones need to be identified & prioritized
No Plan
SUPPLIER Poor Planning
Situation
DEVELOPMENT Material Quality/
Delivery Failures
PLANNING Poor Skill Levels
No Material
IMPROVEMENT
Inadequate
Maintenance No
PLANNED Manpower
Low Manpower
MAINTENANCE Utilization Output Loss
Asset
Cycle Time
SKILL Variations
Downtime
DEVELOPMENT
Productivity
Produced at
Variations
QUALITY Lower Rate
Low Equipment
IMPROVEMENT Capability Rejected/
Reworked
FLOW Inadequate Layout
Flow
IMPROVEMENT Interruption
Flow Imbalance
PRODUCTIVITY Wrong
Production
IMPROVEMENT Line Imbalance
22
23. Supplier Performance improvement focuses on working
closely with them to improve reliability
SUPPLIER • Equipment Capability
• Process Stability
DEVELOPMENT
• Quality Systems
Supplier • Quality Audits
PLANNING Quality
IMPROVEMENT
PLANNED
MAINTENANCE
• Capacity Assessment
Supplier Supplier • Planning & Scheduling
SKILL Systems
Performance
DEVELOPMENT Delivery • Flexibility
QUALITY
IMPROVEMENT
FLOW
Procure to
• Supporting Processes
IMPROVEMENT Pay Adequacy
Processes • Skill of People
PRODUCTIVITY • Simplicity of Processes
IMPROVEMENT
23
24. An ‘Integrated Planning’ model, customized for the company
helps in ensuring uninterrupted production to plan
SUPPLIER Rough Cut Capacity Planning
DEVELOPMENT Raw Material Planning
Domestic
Orders
PLANNING Sales Order Book
for M1 RM ordering for Long
IMPROVEMENT Export Lead Items for M2, M3
Orders
PLANNED
MAINTENANCE RCCP for
RCCP for M1 (W1 - W4)
M2/M3 RM Ordering for M1
(Low LT, Non ROP)
SKILL Iterations
DEVELOPMENT Every Week Next Week Fixed
Plan
RM Check for M1
QUALITY (Available + Ordered)
IMPROVEMENT Production Scheduling
Twice
Every Week Prioritizing & Sequencing
Confirmed RM
FLOW Availability
IMPROVEMENT In Store/ GIT (expected to
Modific
3/4 Days Fixed Schedule
ations
reach in 2 days time)
PRODUCTIVITY Execution & Schedule
IMPROVEMENT Adherence
24
25. A Planned Maintenance program implements maintenance
systems after equipment classification
SUPPLIER
Most Critical Critical Non-critical
DEVELOPMENT
Equipment Equipment Equipment
Reliability
PLANNING Proactive
Centric Run to Fail Improvement maintenance (proactive)
IMPROVEMENT
Maintenance
Maintenance
PLANNED
MAINTENANCE
Predictive maintenance
SKILL
DEVELOPMENT
Preventive maintenance
QUALITY
IMPROVEMENT
Routine maintenance
FLOW
IMPROVEMENT
Breakdown or Corrective maintenance
PRODUCTIVITY
IMPROVEMENT
25
26. Flow Improvement would look at extended value stream and
eliminate interruptions
CORRECTION
Industrial Segment WAITING
SUPPLIER • Many iterations in
DEVELOPMENT customer requirement
• Waiting periods for
complete customer reqmt.
PLANNING
IMPROVEMENT CORRECTION
WAITING • Mold Rework
• High Inventory
PLANNED • Waiting for complete mold information • Deco Rework
MAINTENANCE • High Inventory between
intermediate processes
WAITING • Waiting for material
INVENTORY
SKILL OVERPRODUCTION CORRECTION
from plant
DEVELOPMENT • Over planning to
address poor yields
QUALITY
IMPROVEMENT Job
Worker
• QA/ PDI rework
• High material
CONVEYANCE
FLOW movement within w/h
• Multiple handling losses • High Inventory
IMPROVEMENT WAITING
INVENTORY CORRECTION
CORRECTION CONVEYANCE
PRODUCTIVITY • Many iterations in resorting INVENTORY
• High rework on resorting
IMPROVEMENT • High inventory
26
27. Contents
Are You Utilizing Your Capacity Well?
How Can You Improve Capacity Utilization?
Case : Unearthing Hidden Capacity at Ancillary Unit
27
28. Situation : The ancillary unit was ‘losing sales’ every month
though analysis indicated sufficient ‘effective capacity’
The Effective Capacity was identified to be 25500 pcs per day
based on bottleneck capacity
Effective Capacity (pcs/day)
77624
35928 38880
30580
25500 25920
CNC Tempering Sand Pre-setting Inspection Painting
Machining Blasting
28
29. Situation : The ancillary unit was ‘losing sales’ every month
though analysis indicated sufficient ‘effective capacity’
The Effective Capacity was identified to be 25500 pcs per day There was a steady demand of 20000 pcs per day from the OEM
based on bottleneck capacity every month
Effective Capacity (pcs/day) Effective Capacity & Demand (pcs/day)
77624 77624
35928 38880 38880
35928
30580 30580
25500 25920 25500 25920
20000
CNC Tempering Sand Pre-setting Inspection Painting CNC Tempering Sand Pre-setting Inspection Painting
Machining Blasting Machining Blasting
29
30. Situation : The ancillary unit was ‘losing sales’ every month
though analysis indicated sufficient ‘effective capacity’
The Effective Capacity was identified to be 25500 pcs per day There was a steady demand of 20000 pcs per day from the OEM
based on bottleneck capacity every month
Effective Capacity (pcs/day) Effective Capacity & Demand (pcs/day)
77624 77624
35928 38880 38880
35928
30580 30580
25500 25920 25500 25920
20000
CNC Tempering Sand Pre-setting Inspection Painting CNC Tempering Sand Pre-setting Inspection Painting
Machining Blasting Machining Blasting
The average daily output was however consistently below the
effective capacity of the bottleneck
Effective Capacity & Avg. Output (pcs/day)
77624
35928 38880
30580
25500 25920
16942 18051 16834
30
31. Situation : The ancillary unit was ‘losing sales’ every month
though analysis indicated sufficient ‘effective capacity’
The Effective Capacity was identified to be 25500 pcs per day There was a steady demand of 20000 pcs per day from the OEM
based on bottleneck capacity every month
Effective Capacity (pcs/day) Effective Capacity & Demand (pcs/day)
77624 77624
35928 38880 38880
35928
30580 30580
25500 25920 25500 25920
20000
CNC Tempering Sand Pre-setting Inspection Painting CNC Tempering Sand Pre-setting Inspection Painting
Machining Blasting Machining Blasting
X
Analysis of the bottleneck output indicated that they were The average daily output was however consistently below the
utilized only to the extent of ~72% effective capacity of the bottleneck
Utilization of Bottleneck 77624 Effective Capacity & Avg. Output (pcs/day)
77624
35928 38880
72% 30580 75% 35928 38880
25500 25920 30580
25500 25920
18360 19440 16942 18051 16834
CNC Tempering Sand Pre-setting Inspection Painting
Machining Blasting
31
32. Analysis : Ineffective Maintenance systems and Inadequate
focus on bottleneck were leading to high capacity losses
3 hours (14% time) was being lost in Sand Blasting
repetitive breakdowns everyday ?
Breakdown Maintenance being practised;
checklists do not include ‘critical checks’
Incomplete loading of Sand Blasting unit
25500
Delays by operators between sand blasting cycles
All Planning & Scheduling being done for CNC
machine – NOT the bottleneck 17275
Management focused on maximizing output of
CNC machine – the costliest investment
For a simple process, a zig-zag layout used
leading to multiple handling and stage inventories
Potential for reducing the sand blasting cycle time
by 11% identified
Many Quality Circles working but none focused on
improving sand blasting output
32
33. A roadmap was designed for ~25% increase in actual output &
subsequently moving towards Design Capacity
• Reduce & re-establish Sand Blasting
cycle time
• Simplify layout into a flow
• Design Planning model around sand
? • Design & Implement a Planned
blasting utilization
Maintenance system
• Plant goals’ alignment to utilization
• Simple automations to reduce
maximization
Operator delays
• Align team objectives to improve
• Reduce Minor Stoppages by
bottleneck output
Autonomous Maintenance
25500 • Visual systems to improve loading
of bottleneck
• Reduce loading & unloading time by
use of fixtures
17275
DESIGN EFFECTIVE ACTUAL
CAPACITY CAPACITY OUTPUT
33