SlideShare a Scribd company logo
1 of 18
Principles of risk assessment
Risk assessment training course
Module 1
Principles of risk assessment
Principles of risk assessment
• Understanding the principles and practicalities
of risk assessment
• Understanding risk evaluation
• Selecting control measures
• Implementing control measures
• Monitoring and reviewing
Session outcomes
Principles of risk assessment
Management Regulations (1999) are the
umbrella regulations
Require employer to:
• Identify hazards
• Assess risks
• Eliminate or control exposure to risks
• Write it down if significant
Legal background
Principles of risk assessment
• What are the hazards?
• Who is doing what, where & when? (WWW)
AND
Who else might be affected by what is done?
• What is the degree of risk?
• What do we need to, or can we, do to control
(eliminate/minimise) exposure to the risk?
• How will we monitor the work/people?
Risk Assessment – the 5 steps
Principles of risk assessment
What comes first?
Even before the 5 steps – one question:
What is it we have/want/would like to do?
We can call this: -
• The task
• The job to do
• The procedure
Everything can be covered in this way
Principles of risk assessment
Let’s have some examples
Principles of risk assessment
Hazard and Risk
Hazard the potential to cause harm or damage
Risk the chance of that harm occurring
Calculated as -
potential severity of harm
(the consequence – or damage)
x
likelihood of event occurring
Principles of risk assessment
• What will I be using/doing?
• How much do I know about what I am
using/doing?
• What factors or properties could there be that
affect the level of hazard (not risk)?
Hazard identification
• Do I really have to do the work/task at all?
• Can I substitute something less hazardous?
Principles of risk assessment
Who is affected by the work?
• Those who do the work
• Maturity
• Experience
• Health and immune status
• Medication
• Disability
• Pregnancy
• Others in the workplace
• Cleaning and maintenance staff
• Visitors
• External – including neighbours
Principles of risk assessment
Can we work out how high the risk is?
• What could go wrong?
• What is the worst that could happen?
Consequence - severity
Likelihood
• How often must it be done?
• How many people do it?
• Is everyone doing it competent and trained?
Principles of risk assessment
Where do our risks fit on the spectrum?
How
likely?
How bad?
Principles of risk assessment
Evaluating the risk
1. Highly unlikely
2. Possibly
3. Quite likely
4. Very likely
1. Slight harm
2. Injury affecting work
3. Serious injury
4. Possible fatality
Principles of risk assessment
Risk Matrix
4 8 12 16
3 6 9 12
2 4 6 8
1 2 3 4
Principles of risk assessment
Risk Matrix
4 8 12 16
3 6 9 12
2 4 6 8
1 2 3 4
Principles of risk assessment
Risk Matrix – Does it work?
4
Tolerable
8
Significant
12
Unacceptable
16
Unacceptable
3
Insignificant
6
Tolerable
9
Significant
12
Unacceptable
2
Insignificant
4
Tolerable
6
Tolerable
8
Significant
1
Insignificant
2
Insignificant
3
Insignificant
4
Tolerable
Principles of risk assessment
Controlling the risk
Unacceptable – stop doing it until
improvements made
Significant - proceed with caution but
improvement high priority
Tolerable - OK to proceed but plan to
improve
Insignificant - Any improvements low
priority
Principles of risk assessment
Controlling the risk
• Decide measures to be taken
• Implement them according to priority
• Confirm measures appropriate and work
Principles of risk assessment
Monitoring and Review
Monitoring
• ‘Live’ nature of assessments
• Possible modification to procedures
Review
• Identifies changes to procedures
• Possible modification to assessment

More Related Content

Similar to Risk assessment presentation 1

pilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptpilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptAsifHussain654789
 
pilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptpilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptShahbazAhmad736457
 
Manie information needed to evaluate risky investment.
Manie information needed to evaluate risky investment.Manie information needed to evaluate risky investment.
Manie information needed to evaluate risky investment.mtlobrido
 
Quality and Safety in Primary Care by VLE
Quality and Safety in Primary Care by VLEQuality and Safety in Primary Care by VLE
Quality and Safety in Primary Care by VLEAtlantic Training, LLC.
 
Lecture 02. OSH Risk Assessment
Lecture 02. OSH Risk Assessment Lecture 02. OSH Risk Assessment
Lecture 02. OSH Risk Assessment KateKazhan
 
Operational risk management
Operational risk managementOperational risk management
Operational risk managementMediotype .
 
2-iosh_powerpoint-ra-back-to-basics.pptx
2-iosh_powerpoint-ra-back-to-basics.pptx2-iosh_powerpoint-ra-back-to-basics.pptx
2-iosh_powerpoint-ra-back-to-basics.pptxwaleed50405
 
Risk based thinking ppt mal
Risk based thinking ppt malRisk based thinking ppt mal
Risk based thinking ppt malmichaelnano79
 
E safety safeguarding and risk assessment
E safety safeguarding and risk assessmentE safety safeguarding and risk assessment
E safety safeguarding and risk assessmentJISC infoNet
 
7EL996_Risk Assessment_FINAL_2023.pptx
7EL996_Risk Assessment_FINAL_2023.pptx7EL996_Risk Assessment_FINAL_2023.pptx
7EL996_Risk Assessment_FINAL_2023.pptxRichard175921
 
SAI Global Webinar: Tips to conduct an effective food safety risk assessment
SAI Global Webinar: Tips to conduct an effective food safety risk assessmentSAI Global Webinar: Tips to conduct an effective food safety risk assessment
SAI Global Webinar: Tips to conduct an effective food safety risk assessmentSwitzerland09
 
11 hazardrecognition
11 hazardrecognition11 hazardrecognition
11 hazardrecognitionFahad Hashmi
 
Supervisor role in safety
Supervisor role in safetySupervisor role in safety
Supervisor role in safetysuresh tusia
 

Similar to Risk assessment presentation 1 (20)

pilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptpilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.ppt
 
pilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptpilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.ppt
 
Manie information needed to evaluate risky investment.
Manie information needed to evaluate risky investment.Manie information needed to evaluate risky investment.
Manie information needed to evaluate risky investment.
 
HIRA training
HIRA   trainingHIRA   training
HIRA training
 
Quality and Safety in Primary Care by VLE
Quality and Safety in Primary Care by VLEQuality and Safety in Primary Care by VLE
Quality and Safety in Primary Care by VLE
 
Lecture 02. OSH Risk Assessment
Lecture 02. OSH Risk Assessment Lecture 02. OSH Risk Assessment
Lecture 02. OSH Risk Assessment
 
Operational risk management
Operational risk managementOperational risk management
Operational risk management
 
2-iosh_powerpoint-ra-back-to-basics.pptx
2-iosh_powerpoint-ra-back-to-basics.pptx2-iosh_powerpoint-ra-back-to-basics.pptx
2-iosh_powerpoint-ra-back-to-basics.pptx
 
Risk based thinking ppt mal
Risk based thinking ppt malRisk based thinking ppt mal
Risk based thinking ppt mal
 
2; Fire Risk
2; Fire Risk2; Fire Risk
2; Fire Risk
 
E safety safeguarding and risk assessment
E safety safeguarding and risk assessmentE safety safeguarding and risk assessment
E safety safeguarding and risk assessment
 
Problem Solving-MIT.pptx
Problem Solving-MIT.pptxProblem Solving-MIT.pptx
Problem Solving-MIT.pptx
 
7EL996_Risk Assessment_FINAL_2023.pptx
7EL996_Risk Assessment_FINAL_2023.pptx7EL996_Risk Assessment_FINAL_2023.pptx
7EL996_Risk Assessment_FINAL_2023.pptx
 
How did Goldilocks find out about the bears? Effectiveness of risk assessment...
How did Goldilocks find out about the bears? Effectiveness of risk assessment...How did Goldilocks find out about the bears? Effectiveness of risk assessment...
How did Goldilocks find out about the bears? Effectiveness of risk assessment...
 
SAI Global Webinar: Tips to conduct an effective food safety risk assessment
SAI Global Webinar: Tips to conduct an effective food safety risk assessmentSAI Global Webinar: Tips to conduct an effective food safety risk assessment
SAI Global Webinar: Tips to conduct an effective food safety risk assessment
 
risk assessment
 risk assessment risk assessment
risk assessment
 
11 hazardrecognition
11 hazardrecognition11 hazardrecognition
11 hazardrecognition
 
Hazard analysis
Hazard analysisHazard analysis
Hazard analysis
 
Job hazard analysis
Job hazard analysisJob hazard analysis
Job hazard analysis
 
Supervisor role in safety
Supervisor role in safetySupervisor role in safety
Supervisor role in safety
 

More from Akhilesh Singh

BRSR and GRI framework with comprative statement
BRSR and GRI framework with comprative statementBRSR and GRI framework with comprative statement
BRSR and GRI framework with comprative statementAkhilesh Singh
 
Process-Safety-Management-webinar-PPT.pdf
Process-Safety-Management-webinar-PPT.pdfProcess-Safety-Management-webinar-PPT.pdf
Process-Safety-Management-webinar-PPT.pdfAkhilesh Singh
 
National Safety Council -Safety management
National Safety Council -Safety managementNational Safety Council -Safety management
National Safety Council -Safety managementAkhilesh Singh
 
E waste management india
E waste management  indiaE waste management  india
E waste management indiaAkhilesh Singh
 
Wks 4-excavations-excavation-safety-guide
Wks 4-excavations-excavation-safety-guideWks 4-excavations-excavation-safety-guide
Wks 4-excavations-excavation-safety-guideAkhilesh Singh
 
159 1495446397 mediaphoto192
159 1495446397 mediaphoto192159 1495446397 mediaphoto192
159 1495446397 mediaphoto192Akhilesh Singh
 

More from Akhilesh Singh (8)

BRSR and GRI framework with comprative statement
BRSR and GRI framework with comprative statementBRSR and GRI framework with comprative statement
BRSR and GRI framework with comprative statement
 
Process-Safety-Management-webinar-PPT.pdf
Process-Safety-Management-webinar-PPT.pdfProcess-Safety-Management-webinar-PPT.pdf
Process-Safety-Management-webinar-PPT.pdf
 
National Safety Council -Safety management
National Safety Council -Safety managementNational Safety Council -Safety management
National Safety Council -Safety management
 
E waste management india
E waste management  indiaE waste management  india
E waste management india
 
Safety cycle
Safety cycleSafety cycle
Safety cycle
 
Nitrogen cycle
Nitrogen cycleNitrogen cycle
Nitrogen cycle
 
Wks 4-excavations-excavation-safety-guide
Wks 4-excavations-excavation-safety-guideWks 4-excavations-excavation-safety-guide
Wks 4-excavations-excavation-safety-guide
 
159 1495446397 mediaphoto192
159 1495446397 mediaphoto192159 1495446397 mediaphoto192
159 1495446397 mediaphoto192
 

Recently uploaded

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Risk assessment presentation 1

  • 1. Principles of risk assessment Risk assessment training course Module 1 Principles of risk assessment
  • 2. Principles of risk assessment • Understanding the principles and practicalities of risk assessment • Understanding risk evaluation • Selecting control measures • Implementing control measures • Monitoring and reviewing Session outcomes
  • 3. Principles of risk assessment Management Regulations (1999) are the umbrella regulations Require employer to: • Identify hazards • Assess risks • Eliminate or control exposure to risks • Write it down if significant Legal background
  • 4. Principles of risk assessment • What are the hazards? • Who is doing what, where & when? (WWW) AND Who else might be affected by what is done? • What is the degree of risk? • What do we need to, or can we, do to control (eliminate/minimise) exposure to the risk? • How will we monitor the work/people? Risk Assessment – the 5 steps
  • 5. Principles of risk assessment What comes first? Even before the 5 steps – one question: What is it we have/want/would like to do? We can call this: - • The task • The job to do • The procedure Everything can be covered in this way
  • 6. Principles of risk assessment Let’s have some examples
  • 7. Principles of risk assessment Hazard and Risk Hazard the potential to cause harm or damage Risk the chance of that harm occurring Calculated as - potential severity of harm (the consequence – or damage) x likelihood of event occurring
  • 8. Principles of risk assessment • What will I be using/doing? • How much do I know about what I am using/doing? • What factors or properties could there be that affect the level of hazard (not risk)? Hazard identification • Do I really have to do the work/task at all? • Can I substitute something less hazardous?
  • 9. Principles of risk assessment Who is affected by the work? • Those who do the work • Maturity • Experience • Health and immune status • Medication • Disability • Pregnancy • Others in the workplace • Cleaning and maintenance staff • Visitors • External – including neighbours
  • 10. Principles of risk assessment Can we work out how high the risk is? • What could go wrong? • What is the worst that could happen? Consequence - severity Likelihood • How often must it be done? • How many people do it? • Is everyone doing it competent and trained?
  • 11. Principles of risk assessment Where do our risks fit on the spectrum? How likely? How bad?
  • 12. Principles of risk assessment Evaluating the risk 1. Highly unlikely 2. Possibly 3. Quite likely 4. Very likely 1. Slight harm 2. Injury affecting work 3. Serious injury 4. Possible fatality
  • 13. Principles of risk assessment Risk Matrix 4 8 12 16 3 6 9 12 2 4 6 8 1 2 3 4
  • 14. Principles of risk assessment Risk Matrix 4 8 12 16 3 6 9 12 2 4 6 8 1 2 3 4
  • 15. Principles of risk assessment Risk Matrix – Does it work? 4 Tolerable 8 Significant 12 Unacceptable 16 Unacceptable 3 Insignificant 6 Tolerable 9 Significant 12 Unacceptable 2 Insignificant 4 Tolerable 6 Tolerable 8 Significant 1 Insignificant 2 Insignificant 3 Insignificant 4 Tolerable
  • 16. Principles of risk assessment Controlling the risk Unacceptable – stop doing it until improvements made Significant - proceed with caution but improvement high priority Tolerable - OK to proceed but plan to improve Insignificant - Any improvements low priority
  • 17. Principles of risk assessment Controlling the risk • Decide measures to be taken • Implement them according to priority • Confirm measures appropriate and work
  • 18. Principles of risk assessment Monitoring and Review Monitoring • ‘Live’ nature of assessments • Possible modification to procedures Review • Identifies changes to procedures • Possible modification to assessment

Editor's Notes

  1. Important to emphasise that this is a course on FIRST PRINCIPLES but should NOT be considered as BASIC. The message is that if we approach the process via first principles, they can be applied to all assessments, be they general, generic or highly specific. By the end of the workshop, delegates should understand why they do risk assessments and how to approach them.
  2. This provides the legal background to the duty to make risk assessments (and could be the only slide about the law). Opportunity to introduce the thought that if you start from the ‘top’ on a task by task basis, before applying specific regulations for certain assessments (e.g. manual handling), rather than using the Management regulations to ‘plug the gaps’, then key areas that do not fit neatly into specific slots will not be missed. Key example – Slips, trips and falls
  3. You may wish to hand out the HSE ‘five steps’ leaflet to delegates. Whether you do or not, this slide turns the steps into questions. The steps are introduced first and in this way, to ensure that delegates learn first that risk assessment is a logical exercise with a meaningful outcome. Where to start the process and clarifying definitions are dealt with in the following slides. Not too long need be spent on each step as long as people remember What hazards? Who is possibly exposed? How big is the risk? What can we do about it? How do we check it is working (including compliance)?
  4. Aim: to get people to start with the question ‘What am I trying to do/achieve?’ before they start looking at the hazards. Can go on to propose splitting up the task into steps if necessary.
  5. Examples can be put onto a flip chart for future reference. If no, or limited, examples are given? You can draw from this list or use your own examples Data entry (DSE/ergonomics) Unloading a vehicle (Manual handling) Driving from A to B on work business Travelling to a conference Moving offices Working in the community Working in a laboratory
  6. Important to agree definitions. The definitions used in this slide have been used in the MRC over time, are sound, and are in line with HSE definitions. It may be opportune to point out that if delegates are involved in corporate business risk management, the definitions are not the same – which is in some ways unfortunate. Very important to stress that these are health and safety definitions. Useful, to call for examples: e.g. a car (Stationary car usually not a hazard – but what about parking on a hill? Moving car a hazard; risk of injury to driver, to other drivers, pedestrians. Each of these potential sets of people carries its own risks of injury. To be meaningful, risk has to connected to a task, e.g., crossing the road, driving on a journey and considering self, pedestrians and other vehicles. Whose risk is it?)
  7. Identifying hazards. This introduces concept of ‘competence’ in the second question. Discussion can be around ‘who does the assessment?’ and ‘who is responsible for it?’. Main answer should be that person doing the work should do assessment (shouldn’t be doing it if they do not know what they are doing) with team leader/PI/functional manager retaining overall responsibility). This also introduces link to hierarchy of control (two blue bullets) but mainly dwells on the duty to ask the two last questions.
  8. Key issue: No such thing as a ‘normal’ person. However many risk assessments can be properly made that apply to the majority of people. Even so, individual characteristics do affect the level of risk, on the ‘severity’ or ‘consequence’ spectrum. Each should be discussed briefly. When considering disability, emphasise ‘inclusivity’ and the MRC aim of enabling as many people with disabilities to work in as many areas as possible. Duty to adjust. In all groups (e.g. cleaners as well as own employees) communication is important so language skills can be important.
  9. This is the first of a series of slides looking at Step 3: evaluation of risk. In the series of slides we look at: The 2 parameters of consequence and likelihood Translating the two factors into a graph with ‘risk’ assessed as the area under the graph (simple product) Understanding the limits we have on controlling ‘severity’ in some situations and ‘likelihood’ in others Translating a graph into a numerical matrix Adding words to the matrix that determine actions Defining those actions
  10. Most of this series of slides should be viewed as a slideshow while reading these notes to enhance the points made. Here we introduce ‘How likely’ on the ‘y’ axis, explaining that likelihood could in some circumstances relate to ‘how many times it is done’ but also can relate to the human factors set out in previous slides (Experience, etc.) ‘How bad’ places severity on the ‘x’ axis, with the explanation that this could range from a slight injury to possible fatality.
  11. MRC operates using a 4 x 4 matrix, so we are introducing an example model of a 4 x 4. In our model we are dividing the ‘y’ and ‘x’ axes each into 4 distinct steps. It can be emphasised that matrices vary in the number or options and the wording also varies, but our model ranges from something that is very unlikely to happen to near certainty and from slight harm to possible fatality. Delegates should be encouraged to keep the printed slides as reference during these slides.
  12. View the slide presentation first. Matrix created by multiplying the 2 axes values. Highest number at top right equals highest risk. Arrow flying in from top right indicates direction we would ideally like our risk to go once controls applied Arrow from right is to demonstrate that we cannot always control how many times a task is performed, or the number of people performing it, so we will focus on reducing the potential severity, or consequences Arrow from top indicates that sometimes we cannot change the potential severity of an event, so we reduce the chances of it happening (or the likelihood). An example would be the need to fly by aeroplane. We can reduce the chance of a plane crashing through good construction, maintenance and training, since we cannot influence the outcome to any significant extent.
  13. Once again run through this first. The main point is that in our workplace we rarely if at all work with hazards where the risks are toward the top tight of the matrix. Using the printed overheads for reference we can suggest that our range is usually from value ‘9’ downwards, which translates as an outcome of ‘quite likely there is a serious injury’. An example could be the risk of injuring a back sufficiently to be away from work for more than 3 days through attempting to lift or move heavy objects. In case the question arises, the point can be made that the very nature of using probabilities means that a person can do a task badly several times without apparent injury and then get injured on the next occasion without warning. Sometimes previous statistics can be a help and the risk properly calculated, but on other occasions we have to use our skills, knowledge and experience to anticipate problems.
  14. We can now make an attempt to add meaningful words to our matrix. We can try these words and see if they work. Thus we are saying that 10 or over is unacceptable. This includes ‘very likely serious injury’ and ‘quite likely possible fatality’ the category seems sensible 7-9 is significant. This includes ‘very likely injury affecting work’ through to ‘possibly a possible fatality’ Again this works. 4-6 is tolerable. This might include ‘very likely risk of slight harm’, via a ‘possible injury affecting work’ through to a ‘very unlikely risk of possible fatality’. Again this works, with all others rated at 1-3 regarded as insignificant.
  15. But the ‘acceptance level’ is only worthwhile if it is connected to an action plan. In this slide we place actions against each category from the matrix. Each establishment can make their own judgement on acceptance of risk which may be related to the skills, knowledge and experience of individuals for a wide range of tasks (can refer back to first example slide). Important that all assessors are aware of local standards.
  16. Aspects of controlling risk – introduced as ‘What can we do to remove or reduce risk?’ are discussed in Presentation 2. This slide just sets the scene on what needs to be done as Step 4.
  17. Step 5 is the need to monitor the risk assessment in action. Can take the opportunity to differentiate between monitoring and reviewing, with the message that they are really two arms of the same process – to ensure risk assessments remain live. Regular monitoring of a risk assessment may lead to changes being made to procedures (changing the risk control) Regular review of procedures may lead to changes made to assessments (and sometimes back to the procedures again).