2. FY22 SAP INITIATIVES UPDATE–
LOWER BROADWAY PROJECT
$13.250 million taxable G. O. Bond
Issuance
Austin Hwy/lower Broadway
Improvements
Continuing to coordinate with TxDOT
Work continues with Overland, TBG
and WGI for existing 6 lane
configuration 2
3. FY22 FEDERAL SLFRF
UPDATE
Alamo Heights received $1,067,214 in
federal funds from American Rescue
SLFRF Plan August 2021. This was
one-half of funds.
The other half of the proceeds to be
received in August 2022
Funds to be obligated on eligible
projects by December 31, 2024 and
spent by December 31, 2026
3
4. FY22 SAP INITIATIVES UPDATE–
FUTURE LANDSCAPING
PROJECT
FY 22-25 GF transfers for future
landscaping
City responsible for contingency –
originally $978K – amount now
unknown
SARA and Bexar County funding
Issuance of C of O debt – water and
sewer line replacement and 4
5. FY22 SAP INITIATIVES UPDATE –
OTHER FUTURE / ONGOING
COSTS
Overland / TBG - $120,000
estimated
WGI Engineers - $300,000
estimated
Working cost estimated to better
budget in fiscal years
Future landscaping unknown 5
6. FY22 SAP INITIATIVES UPDATE–
EMPLOYEES
COLA for all employees – Starting
point 3%, $240,000 – studying
higher COLA to assist employees
with inflation
Insurance proposals September
2022
Juneteenth Federal Holiday
beginning June 20, 2022
6
7. FY22 SAP INITIATIVES
UPDATE
Centennial Celebration 2022
Working with CE Group, Inc., a local
experienced marketing firm that
specializes in Event & Production
Management
Saturday, Oct. 1st – Saturday, Oct. 8th to
include week long activities & National
Night Out festivities
Budget: FY23 $165,000*including 15%
contingency fees 7
8. FY22 SAP INITIATIVES
UPDATE
Some current planning includes:
Children’s activities – bounce house, face
painting, balloon artist, clowns, etc.
Live music on stage, AHISD, possibility of
Army Golden Knights, and other activities,
Food Trucks, AH business booths
Fireworks or laser show – dependent on
drought
Coordination of decor, beverage & bar
service, tents, stage, stage preparations,
photography, portable 8
9. FY23 INITIATIVES
City Server Upgrades
Replacement starting currently in 2022
Server Upgrades due to aging
Cost $157,742 over 5 years at a 0.18% interest rate
Microsoft Office Migration
By 2023, exchange server will be obsolete and no longer
supported
One-time dual-factor authentication for all city-issued
devices
Basic & Standard users $ 770/month
Migration Cost $5,590 one-time fee
9
10. FY23 INITIATIVES
ADA Accessibility Website
Enhancing current website under Americans with
Disabilities Act (ADA)
Web Content Accessibility Guidelines (WCAG) will be
followed, issued by Department of Justice
Allows users with disabilities improved user
experience and access
Work with Internet Direct and accessiBe to provide
transcripts/closed captions of videos
Project cost $3,500 (one-time cost)
accessiBe $ 49/month
10
11. 5 YEAR SAP PRIORITIES
TxDOT will retain ownership of
Broadway and future roadway
maintenance costs
COAH inter-local agreement for future
landscape maintenance
Street Maintenance Plan-goal is
$1,000,000/yr.
Current dedicated sales tax renewed for
4 years 11
12. 5 YEAR SAP PRIORITIES
Maximize transfers if needed from
GF for – lower Broadway
Limited council projects in future
years
Council ideas for neighborhood
projects – pocket parks,
pedestrian lighting
12
13. 5 YEAR SAP PRIORITIES
Keep property tax rate as low as
possible
Reduce debt service rate from 6.8
cents – original voter approved rate 7
cents
Continue with maximum transfers
to Capital Replacement Fund for
capital equipment
Maintain S&P AAA Bond Rating 13
15. FY22 SAP SUMMARY – PUBLIC
WORKS
W Castano, AH Blvd to Loveta
Loveta, W Castano to College
Evan, AH Blvd to Ciruela
College, AH Blvd to Ciruela
Cardinal, Woodway to St. Luke’s
Imlay, AH Blvd to College
Nacogdoches, Evans to AH Blvd
Redwood, Henderson to N New
Braunfels
Judson Trail parking lot
FY 2022 Street Maintenance – IN
PROGRESS
Broadway, Claywell to Austin Hwy
E Fair Oaks, Broadway to N New Braunfels
FY 2023 Street Maintenance – PROPOSED
16. Capital Improvement – APPROVED, BACK
ORDER
Replace two pickups – one in Public Works & one
in Utilities
Vehicles ordered but on back order
16
FY22 SAP VEHICLE CAPITAL
REPLACEMENT
17. FY23 VEHICLE CAPITAL
REPLACEMENT
Capital Improvement – PROPOSED
Purchase a new chassis and packer for garbage
truck – not to exceed $200,000
Existing truck is 2000 model
17
18. Capital Improvement - COMPLETED
Install emergency water supply back up motor
(natural gas) at Well #4
Located at AH
High School
18
FY21 SAP INITATIVE –
UTILITIES
19. Sewer Upgrades – SUBSTANTIALLY
COMPLETE
Ogden west to Basin
$535,000 budgeted; $413,000 total costs
Capital Improvement – IN PROGRESS
Upgrade City’s SCADA software system for
water utility management
Budgeted $35,000; anticipated cost up to 19
FY22 SAP INITATIVE –
UTILITIES
20. FY23 SAP INITATIVE –
UTILITIES
Capital Improvement – PROPOSED
TCEQ Compliance for 4 X 2 requirement – install
6 inch water mains along Wildrose, Cloverleaf &
Rosemary
Cost - $450,000
Pre-installation upgrades to Well #3 at City Hall
Necessary prior to installing backup natural gas motor
anticipated in 2024
Total estimated cost - $140,000
20
21. FY23 SAP INITATIVE –
UTILITIES
Capital Improvement – PROPOSED
TCEQ Compliance for 4 X 2 requirement – install
6 inch water mains along Wildrose, Cloverleaf &
Rosemary
Cost - $450,000
Pre-installation upgrades to Well #3 at City Hall
Necessary prior to installing backup natural gas motor
anticipated in 2024
Total estimated cost - $140,000
21
22. Water System Resiliency
Upgrades to backup motors ensure
water supply continues in power
outage
emergency
Natural gas motors at Well #4 (High
School) & #6 (City Hall)
Both backup motors able to meet
peak demand with additional supply
available 22
FY23 SAP INITATIVE –
UTILITIES
23. FY23 SAP INITATIVE –
UTILITIES
23
Capital Improvement –
PROPOSED
Water tank maintenance
Replace telecom screen covers
along top of 600,000 gallon
composite water tank
Labor cost - $50,000
Material cost – Quotes pending
24. 5 YEAR SAP PRIORITIES –
PUBLIC WORKS
Maintenance Priorities
Provide more extensive alley repairs as
needed
Pedestrian enhancements
Street Maintenance Program (SMP)
24
25. 5 YEAR SAP PRIORITIES -
UTILITIES
Resolve TCEQ’s Non-Compliance Issues
Water & sewer lines must have 4’ X 2’ minimum
distance
Compliance required by January 2030
Estimated cost - $1.32M
Lower Broadway Project Utility Identification
Investigate customers impacted by utility
improvements
25
27. FY22 SAP SUMMARY – GIS
DATABASE
Updating to reflect current replat,
rezone, and address modifications
FY23 Goals:
Allow public access via the City’s
website
Verify zoning information (setbacks,
heights, etc.)
Access to permit information and/or
28. FY22 SAP SUMMARY – SIGN
REGULATIONS
Ended moratorium on enforcement
due to pandemic
FY23 Goals:
Resume enforcement while remaining
business friendly
Sign vs public art clarification
29. FY22 SAP SUMMARY –
TECHNOLOGY
Transitioning to MyPermitsNow (MPN)
Eliminate implementation of InCode Community
Development Module (procured in FY20)
Reduction in cost to City
FY23 Goals:
Implementation
Code compliance transition away from RMS
Digitize plan review process
Inspector access to complete project and approved
plans
Provides real time results of reviews and/or
30. FY22 SAP INITIATIVES – CODE
REVISIONS
Zoning
Revise Residential Design Standards to
correct inconsistencies due to previous
revisions
Building
Adopted 2021 Building Codes
Currently align with latest industry
standards
Signs
32. FY22 SAP SUMMARY
Develop and implement a leadership
development program for AHPD officers
Carry forward – Program developed; staffing
shortages have delayed the project
Enhanced officer / dispatcher physical and
mental evaluation and assistance program
Added psychological safety evaluations to the
existing physical assessment program and now
includes dispatchers
Evaluations performed annually; mental services
as needed
33. FY22 SAP SUMMARY
Purchase thirty (30) hand held radios to
replace current inventory
Purchased and currently in use; added three year
extended warranty plan; cost savings $38,000
Ordered ten (10) replacement mobile radios
scheduled for replacement FY2024; cost savings
$51,600 (50%)
Achieved 75% paperless operation
Reduction in new paper records accomplished;
next goal 85%
34. FY23 SAP INITIATIVES
Alarm Permit Software Package
Permit status, automated billing
Incode billing availability
City website permit application, update contact
information
Consider amending City Code Chapter 10,
Section 10-8 Noise Nuisance
Establishes an appropriate maximum allowed
noise decibel level
Model after COSA’s city code
35. FY23 SAP INITIATIVES
Strategies for Recruiting Police Officers
Consider academy sponsorship, including
employment during academy
Present agreement options to City Labor
Attorney for consideration
Update police handguns with optic aiming
systems
Study new technology for best options;
participate in test and evaluation opportunities
Consider safest holster options
No budget impact
36. FY23 SAP INITIATIVES
AHISD requested the addition of two SRO officers
now and two more in a progressive plan for a total of
five SRO officers
Police presence on selected campuses now and all
campuses in future
Cambridge Elementary, Alamo Heights Junior High,
Woodridge Elementary, Howard Elementary
Recent events and increased threats against schools
Program Funding Considerations
Percentage of cost share; FY23 salary & benefits ($90,348
per SRO)
37. FY23 SAP INITIATIVES
Pay rate options for SRO officers; campus only vs
PD ready
Cost of equipment ($10,000 each) and vehicles
(in inventory)
Shared cost of SRO Program
supervisory/administrative officer
FY22 Budget amendment may be necessary to
fund two additional officers by mid-August
Challenges
Finding two SRO qualified officers before school is
in session
38. FY23 SAP INITIATIVES
Alternatives for ISD
License their own law enforcement agency
Satisfy new State accreditation standards
Contract with another law enforcement agency
39. 5 YEAR SAP PRIORITIES
Study on-going police reforms; adjust operations/
policies/training as mandated; maintain
accreditation standards
On-street parking; progressive approach to
resolving current and anticipated parking issues
Expand non-enforcement driver safety awareness
efforts; electronic awareness signs
Improve police preparedness for response to
critical, life-threatening situations
41. FY22 SAP SUMMARY
Continued tree trimming in right-of-way
Continue progress with Texas Fire Chiefs
Association Best Practices recognition program
Insurance Services Office Audit, assessment
and rating
Posted safety videos to Fire Department
website
42. FY22 SAP SUMMARY
“Geriatric Emergency Management” Program
“Stop the Bleed” program
“Civilian Response to Active Shooter/Active
Attack Events” program
Added Pharmaceuticals:
Tranexamic Acid
Cefepime
43. FY23 SAP INITIATIVE
Tree trimming in right-of-way
Texas Fire Chiefs Association Best Practices
recognition program
Smoke Detector Awareness
“Civilian Response to Active Shooter/Active
Attack Events”
CPR Training
44. FY23 SAP INITIATIVE
Upgrade fire data software
Update Emergency Management Annexes (7 of
23) in Texas All Hazards Planning Systems
Program
Update Bexar County Office of Emergency
Management Hazard Plan
Develop Benevolence Committee
45. FY23 SAP INITIATIVE
Renew Texas Department of State Health
Services Continuing Education Program
Renew Clinical Laboratory Improvement
Amendment (CLIA) Program: add blood draws
for septic patients:
Develop an Emergency Medical Services
Standard Medical Operations Protocols
Application for cell phone access
46. FY23 SAP INITIATIVE
Integrate Emergency Medical Services with
Alamo Area Metro Special Weapons And Tactics
Rescue Task Force
Integrate Bexar County Mental Health with
Emergency Medical Services system
Obtain ultrasound technology
Draft new Emergency Medical Services Billing
contract for Tri-Cities
47. 5 YEAR SAP PRIORITIES - CAPITAL
REPLACEMENTS
Fire Capital Replacements
Year Description Fiscal
Impact
2023-
24 F250 crew cab 4x4 $54,529
2024-
25
Desktop Radio (2)
Mobile Truck Radios
(2)
$12,934
$16,849
2026-
27
SCBA (10) $146,069
48. 5 YEAR SAP PRIORITIES - CAPITAL
REPLACEMENTS
EMS Capital Replacements
Year Description Fiscal Impact
2023-24 Medic Unit (1)
Stretcher
$180,000
$43,000
2025-26 Stretcher (2)
Cardiac Monitor (4)
AED (9)
$86,000
$156,000
$27,000
Editor's Notes
Work authorization approved with Freese & Nichols. Hope to bid (or use BuyBoard) by end of July.
Upgrades improve City sewer system discharge line exiting to SAWS outfall near dam
Existing 8” & 10” sewer line upsized to 12” new sewer main by pipe bursting
Inflation overages to be covered with current year savings
Use of City staff for project anticipated to yield $1.36M in savings ($1.8M vs $440K)
Use of City staff for project anticipated to yield $1.36M in savings ($1.8M vs $440K)
Replace column pipe, pump and install spline prior to motor purchase *2024. Drive motor pictured is less than 4 years old. Estimate well up grades pre motor install of 90K, motor 35K, well house improvements 15K total 140K
Resolving TCEQ 4 X 2 issues by:
Performing most work in-house to control costs
Contracting certain phases City can’t perform, such as directional boring
Wildrose, Cloverleaf & Rosemary - $550,000
Phase 1 (in progress) - $450,000
Phase 2 (yard piping, date TBD) - $75,000
200 block Elmview, Edgewood & E. Oakview - $425,000
Claywell, Canyon, Arcadia off NNB & Encino at Argyle – $345,000
Lower Broadway Utility Identification
Investigate customers impacted by water shut down tests & infrastructure performance
Replace broken or frozen water valves
Detect leaks & repair ahead of actual installation