SlideShare a Scribd company logo
1 of 3
PERSONAL INFORMATION
Name: ZohaibAshraf
Father’sName: MuhammadAshraf
CNICNo. 37406-3654067-9
PassportNo. GM1840671
Date of Birth: November01,1992
Postal Address: H # D-754 Line no 9 QubrastanRoad LalaRukh Wah Cantt
Languages: English, Urdu, Arabic
Tel No: 051-4925205
Gender: Male
Marital Status: Married
Religion: Islam
Nationality: Pakistani
Direct: +923425064525 Zohaibchuhan947@Gmail.Com Skype ID: Zohaib Chuhan
EDUCATION
Diploma of Associate Engineering DAE recognized by Punjab Board Of Technical Eduction Lahore (13 Years)
Duration: 3-years (2010-2013)
Degree Awarded: Diploma of Associate Engineering in Electronics
University/College: Swedish College Of Engineering and Technolgy Wah Cantt
Secondary School Certificate S.S.C (GCSE O-Level Equivalent) (10 Years)
Duration: 2-years (2008-2010)
Degree Awarded: Matriculation (S.S.C) Major:Science
College: FG Boys High School No 6 Wah Cantt
Board: Federal Board of Intermediate & Secondary Education,Islamabad
WORK EXPERIENCE: 4.3 Years
1.WORK PERFORMED/ROLES AND RESPONSIBLITIES:
POSITION: E & I Technician
COMPANY: PakistanAccumulatorPvt,Ltd Hattar KPK (01-10-2013 to 30-09-2014)
MAJOR JOBS INCLUDE:
 Calibrate the all type of gauges and different bars and its installation.
 Repairing and maintenes the BDS.
 Plate’s dryer calibration.
 Install the PT-100 and its mainteness
 Install the different type of level sensors.
 Repaired and install the sov`s.
2. WORK PERFORMED/ROLES AND RESPONSIBLITIES:
POSITION: JuniorOfficerIIIElectrical (Instruments)
COMPANY: FectoCementLimitedIslamabad (15-10-2014 to 30-09-2015)
MAJOR JOBS INCLUDE:
 Thermocouples & RTD`S maintness and its installation.
 Understanding of instrument & control and P&ID drawing.
ZOHAIB ASHRAF
Pakistan Engineering Council (PEC) Registration No. ELECTRO/16997
 Killen Analyzer & Coal gas analyzer & its calibaration.
 Prepare the pressure transmitter & its calibration and its installation Rosemount.
 Install the different type of sensors. Radar types capctive type vibration type.
 Check the weigh bridges & its load cells.
 Calibaration the physter as per manual.
 Calibaration the weigh feeder`s load cells as per manual.
 Repairing and mainteness the BDS.
 Calibration the PT & PDT and its installation Rosemount.
 Also mainteness the Accutar like BECK. ITT. LEVA and its installation.
 Also able to work in overall plant shut down job.
 And also worked in power house instrumentations and its calibration capacity of power house
(6MW WHRPP )
 Also able to worked and record purchase and indent requisition and mentain the all in store
mentain its update record and update the store inventory.
 And also expert in office work in ms office excel. Word. Power point.
 Also worked in shut down jobs.
 Also able to shut down planed in working in during shut down and over all plant instrumation
calibarations as per manual and ISO standard.
3. WORK PERFORMED/ROLES AND RESPONSIBLITIES:
POSITION: Team LeaderAutomation&Instruments (12-09-2015 to 11-09-2017)
COMPANY: Almarai CompanySaudi Arabia(Gulf BiggestFoodandDairyBeveragesGroup)
MAJOR JOBS INCLUDE:
 Installation, testing and commissioning of plant instruments of the whole plant with
SIEMENS S7-300-400-1200 PLC system.
 Schneider PLC & OMRON Sysmac CP1L-J and Backhoff and Allen Bradly compact Logix
L35E & Siemens SCADA Win CC.
 Configuration and checking the PLC System interlocking and loop function and testing RS
Logix 5000.
 To make modification/changing from software and hardware side as per plant and production
requirement.
 Responsible for smooth operation of plant with minimum downtime.
 Responsible for the automation related spares management for inventory.
 Co-ordinate with supplier for automation related spares, or services.
 On job traning for staff.
 Co-ordinate with process team for process improvement.
 Worked with GEA and CFS Twin Star Machines, GEA Shrink Pack Machines, ISHIDA
Packing Machines.
 Installation of the different field instrumentation.
 Responsible for preparation of electrical, instrument plant breakdown reports and MIS
process reports on daily and monthly basis.
 To supervise the team of technical officers and technicians and utilize them to the best of
their works.
 Also all instrumentation and calibration of the Utilty Area Ammonia Refrigeration Plant-
Boiler, RO Plant, Waste Water Treatment Plant, Power house (16×2=32MW)
Cummins power Generation.
4. WORK PERFORMING/ROLES AND RESPONSIBLITIES:
POSITION: JTO (E & I)
COMPANY: BestwayCementLimitedProjects(Faroqia)- (01-10-2017 to Present)
MAJOR JOBS INCLUDE:
 Supervision on behalf of BCL to M/s Sinoma Engineering China for Cement Plant Err action and
Installation Line II.
 TRAININGS/ CERTIFICATIONS
 ISO 9001-2008 Quality of Product System.
 ISO 22000-2005 Food Safety System.
 5-S Traning.
 Fire Fighter Traning.
 Work at height Traning
 Office Automation Cource
 PLC & SCADA
 Renewable energy
 CIT Cource
I think I will be suitable for your requirement and I really want to achieve this post and want to work hard
with your organization.

More Related Content

What's hot (19)

My CV Piping
My CV PipingMy CV Piping
My CV Piping
 
Ac technician (1)
Ac technician (1)Ac technician (1)
Ac technician (1)
 
hampa Resume
hampa Resumehampa Resume
hampa Resume
 
TimSuttonResume2
TimSuttonResume2TimSuttonResume2
TimSuttonResume2
 
Resume Instrumentation Engineer
Resume Instrumentation EngineerResume Instrumentation Engineer
Resume Instrumentation Engineer
 
Shane connely romero 2016 resume p
Shane connely romero 2016 resume pShane connely romero 2016 resume p
Shane connely romero 2016 resume p
 
resume
resumeresume
resume
 
Jaikaran Dan ( Testing and Commissioning Engineer )
Jaikaran Dan ( Testing and Commissioning Engineer  ) Jaikaran Dan ( Testing and Commissioning Engineer  )
Jaikaran Dan ( Testing and Commissioning Engineer )
 
QAZI CV
QAZI CVQAZI CV
QAZI CV
 
aswin resume (1) (1) (1)
aswin resume (1) (1) (1)aswin resume (1) (1) (1)
aswin resume (1) (1) (1)
 
Instrumentation Engineer.
Instrumentation Engineer.Instrumentation Engineer.
Instrumentation Engineer.
 
CV J-PE LOUYD C. LAPECEROS
CV J-PE LOUYD C. LAPECEROSCV J-PE LOUYD C. LAPECEROS
CV J-PE LOUYD C. LAPECEROS
 
cv for ins s tech ptc(1)
cv for ins s tech ptc(1)cv for ins s tech ptc(1)
cv for ins s tech ptc(1)
 
Mresume
MresumeMresume
Mresume
 
cv abdul noufal
cv abdul noufalcv abdul noufal
cv abdul noufal
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
 
SABER CV
SABER CVSABER CV
SABER CV
 
Resume
ResumeResume
Resume
 
BM CV bilal 2016
BM CV bilal 2016BM CV bilal 2016
BM CV bilal 2016
 

Similar to Zohaib resume instrument supervisor

GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.
GAURAV CHOUHAN
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Rahman
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Rahman
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
JAMAL ASHRAF
 
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa
 

Similar to Zohaib resume instrument supervisor (20)

GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
Sunil ,cv
Sunil ,cvSunil ,cv
Sunil ,cv
 
Waqas Khan
Waqas KhanWaqas Khan
Waqas Khan
 
Waqas CV
Waqas CVWaqas CV
Waqas CV
 
ASHIQ.CV.
ASHIQ.CV.ASHIQ.CV.
ASHIQ.CV.
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
 
Sivanpandi
SivanpandiSivanpandi
Sivanpandi
 
Elecctrical Technician
Elecctrical TechnicianElecctrical Technician
Elecctrical Technician
 
Resume
ResumeResume
Resume
 
Manjunath Resume1
Manjunath Resume1 Manjunath Resume1
Manjunath Resume1
 
Ahmed_C.V
Ahmed_C.VAhmed_C.V
Ahmed_C.V
 
Rana muhammad z ahid cv
Rana muhammad z ahid cvRana muhammad z ahid cv
Rana muhammad z ahid cv
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Rana muhammad z ahid cv
Rana muhammad z ahid cvRana muhammad z ahid cv
Rana muhammad z ahid cv
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
New updated eet klf
New updated eet klfNew updated eet klf
New updated eet klf
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 

Recently uploaded (20)

Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 

Zohaib resume instrument supervisor

  • 1. PERSONAL INFORMATION Name: ZohaibAshraf Father’sName: MuhammadAshraf CNICNo. 37406-3654067-9 PassportNo. GM1840671 Date of Birth: November01,1992 Postal Address: H # D-754 Line no 9 QubrastanRoad LalaRukh Wah Cantt Languages: English, Urdu, Arabic Tel No: 051-4925205 Gender: Male Marital Status: Married Religion: Islam Nationality: Pakistani Direct: +923425064525 Zohaibchuhan947@Gmail.Com Skype ID: Zohaib Chuhan EDUCATION Diploma of Associate Engineering DAE recognized by Punjab Board Of Technical Eduction Lahore (13 Years) Duration: 3-years (2010-2013) Degree Awarded: Diploma of Associate Engineering in Electronics University/College: Swedish College Of Engineering and Technolgy Wah Cantt Secondary School Certificate S.S.C (GCSE O-Level Equivalent) (10 Years) Duration: 2-years (2008-2010) Degree Awarded: Matriculation (S.S.C) Major:Science College: FG Boys High School No 6 Wah Cantt Board: Federal Board of Intermediate & Secondary Education,Islamabad WORK EXPERIENCE: 4.3 Years 1.WORK PERFORMED/ROLES AND RESPONSIBLITIES: POSITION: E & I Technician COMPANY: PakistanAccumulatorPvt,Ltd Hattar KPK (01-10-2013 to 30-09-2014) MAJOR JOBS INCLUDE:  Calibrate the all type of gauges and different bars and its installation.  Repairing and maintenes the BDS.  Plate’s dryer calibration.  Install the PT-100 and its mainteness  Install the different type of level sensors.  Repaired and install the sov`s. 2. WORK PERFORMED/ROLES AND RESPONSIBLITIES: POSITION: JuniorOfficerIIIElectrical (Instruments) COMPANY: FectoCementLimitedIslamabad (15-10-2014 to 30-09-2015) MAJOR JOBS INCLUDE:  Thermocouples & RTD`S maintness and its installation.  Understanding of instrument & control and P&ID drawing. ZOHAIB ASHRAF Pakistan Engineering Council (PEC) Registration No. ELECTRO/16997
  • 2.  Killen Analyzer & Coal gas analyzer & its calibaration.  Prepare the pressure transmitter & its calibration and its installation Rosemount.  Install the different type of sensors. Radar types capctive type vibration type.  Check the weigh bridges & its load cells.  Calibaration the physter as per manual.  Calibaration the weigh feeder`s load cells as per manual.  Repairing and mainteness the BDS.  Calibration the PT & PDT and its installation Rosemount.  Also mainteness the Accutar like BECK. ITT. LEVA and its installation.  Also able to work in overall plant shut down job.  And also worked in power house instrumentations and its calibration capacity of power house (6MW WHRPP )  Also able to worked and record purchase and indent requisition and mentain the all in store mentain its update record and update the store inventory.  And also expert in office work in ms office excel. Word. Power point.  Also worked in shut down jobs.  Also able to shut down planed in working in during shut down and over all plant instrumation calibarations as per manual and ISO standard. 3. WORK PERFORMED/ROLES AND RESPONSIBLITIES: POSITION: Team LeaderAutomation&Instruments (12-09-2015 to 11-09-2017) COMPANY: Almarai CompanySaudi Arabia(Gulf BiggestFoodandDairyBeveragesGroup) MAJOR JOBS INCLUDE:  Installation, testing and commissioning of plant instruments of the whole plant with SIEMENS S7-300-400-1200 PLC system.  Schneider PLC & OMRON Sysmac CP1L-J and Backhoff and Allen Bradly compact Logix L35E & Siemens SCADA Win CC.  Configuration and checking the PLC System interlocking and loop function and testing RS Logix 5000.  To make modification/changing from software and hardware side as per plant and production requirement.  Responsible for smooth operation of plant with minimum downtime.  Responsible for the automation related spares management for inventory.  Co-ordinate with supplier for automation related spares, or services.  On job traning for staff.  Co-ordinate with process team for process improvement.  Worked with GEA and CFS Twin Star Machines, GEA Shrink Pack Machines, ISHIDA Packing Machines.  Installation of the different field instrumentation.  Responsible for preparation of electrical, instrument plant breakdown reports and MIS process reports on daily and monthly basis.  To supervise the team of technical officers and technicians and utilize them to the best of their works.  Also all instrumentation and calibration of the Utilty Area Ammonia Refrigeration Plant- Boiler, RO Plant, Waste Water Treatment Plant, Power house (16×2=32MW) Cummins power Generation. 4. WORK PERFORMING/ROLES AND RESPONSIBLITIES: POSITION: JTO (E & I)
  • 3. COMPANY: BestwayCementLimitedProjects(Faroqia)- (01-10-2017 to Present) MAJOR JOBS INCLUDE:  Supervision on behalf of BCL to M/s Sinoma Engineering China for Cement Plant Err action and Installation Line II.  TRAININGS/ CERTIFICATIONS  ISO 9001-2008 Quality of Product System.  ISO 22000-2005 Food Safety System.  5-S Traning.  Fire Fighter Traning.  Work at height Traning  Office Automation Cource  PLC & SCADA  Renewable energy  CIT Cource I think I will be suitable for your requirement and I really want to achieve this post and want to work hard with your organization.