Project & Maintenance Professional – Electrical, Mechanical & Instrumentation
Proactive decision maker, targeting challenging assignments at senior managerial level in Engineering- Electrical &
Instrumentation with Oil/Energy/Steel/Petrochemical industries; executing projects & programs in challenging
business environments demanding high standards of quality and precision, bringing the following transferable:
Certificate:-
 Certificate of appreciation for safety from Saudi Aramco-2015.
Technical Skill:
o Professional Software : 9 YEAR EXP - SAP End user-PM & MM
9 YEAR EXP - Microsoft Office (EXCEL, WORD, POWERPOINT AND OUTLOOK)
1 YEAR EXP - Microsoft Project
6 MONTH EXP - Primavera P6,
9 + YEAR PROFESSIONAL ABRIDGEMENT
SAUDI ARAMCO APR-14 TO 30-NOV-
15
Maintenance Planner (ABIS)
M/S VANDANA VIDHYUT LTD JULY’13 –
APR’14
Asst. Project Planning Manager- (2*135 MW PF Boiler) Power Plant
JINDAL STAINLESS LIMITED, KNIC/JAJPUR/ORISSA 2011-
2013
Asst. Project Planning Engineer-(Coke Oven & Power Distribution)
BHUSHAN STEEL LIMITED, ANGUL, ORRISSA 2009-
2011
Project Planning Engineer-Coke Oven (E & I) Coke Oven technology by Shoughang Group
JINDAL STEEL AND POWER LIMITED, RAIGARH, CHHATTISGARH 2006-
2009
Jr. Project Planning Engineer in Coke Oven (E & I) Coke Oven technology by SSIT
Job Responsibilities:-
 Review and schedule all preventive maintenance plans on the SAP maintenance system to assist
maintenance team complete the work orders as per the maintenance plan and avoid any time conflict
and ensure that all equipment functional location is consistent with the SAP system and the field.
 Man hour’s utilization report generation and also KPI compliance measurement.
 Coordinate with the warehouse to make sure that the required material needed for corrective maintenance
is available with the right quality and quantity in the right time.
 Assists in the update of the jobs to be included in the “week schedule”. Prepare reports on a regular basis to
ensure that all concerned personnel are aware of scheduling activities performance for future reference and
senior management review.
 Build the “week schedule” making the most effective and efficient use of available resource and issuing the
schedule and Leads scheduling meetings.
 Updates work order status as to whether jobs are workable or unworkable, percent completed, estimated
completion date, reasons for delay and other pertinent information.
 Follow all relevant safety, quality and environmental control procedures and instructions.
 Carried out Root cause analysis and brought a consistent reduction in failures.
 Undertook regular inspections and conducted safety talks to prevent accidents and adhering to safety
norms.
Project and turn around responsibilities:-
 Prepares short and long term Shutdown maintenance schedules, monitors completion of the work carried
out and forecasts activities during shutdowns.
 Defines with Operations, Maintenance and Engineering departments any shutdown work scope. Ensures
that all preventive and maintenance, inspection, recertification, repair, overhaul and modifications’
requirements are included in such scope of works.
 Prepares detailed work packages for jobs to be carried out during Shutdowns.
 Prepares implementation programs using “PERT” planning techniques. The “PERT” program will show
clear critical paths.
 Defines maintenance activities, defining manpower and logistic requirements.
 Preparation of tender documents, and providing plans from which Bids can be defined including detailed
scope of work for various services.
 Ensures co-ordination between various divisions, sections and disciplines during overhaul execution, to
ensure that all act in harmony for smooth execution of shutdown.
 Prepares comprehensive shutdown report for evaluation and future reference.
 Checks spare parts and materials availability. Issues materials reservations from stock, and prepares
purchase requests as requested. Follows up with Shutdown Materials Coordinator, warehouse and
purchasing sections on materials status and delivery in support of Operations.
 Coordinate with other Turnaround and Shutdown Planners for the planning of all work orders within the
scope of the turnarounds and shutdowns.
 During turnaround/shutdown executions, this position coordinates the scheduling and progress report to
all levels of the organization
 Integrate post turnaround/shutdown planning report ensuring all executed work orders are properly
documented and finalized in the CMMS
 Comply with all Health and Safety requirements
 Coordinate with the warehouse to make sure that the required material needed for corrective maintenance
is available with the right quality and quantity in the right time.
 Maintenance Budgeting & Costing, Materials Requirement Planning.
 Allocate the unutilised manpower to corrective maintenance activities in a manner that ensures
uninterrupted preventive maintenance activities.
 Identify resource requirements for the scheduled jobs using the job plans.
 Communicates with operations on scheduling status.
 Planned and implemented proactive / predictive / preventive / shut down maintenance schedules for
various rotary and static equipment so as to increase up-time / equipment reliability.
 Undertook regular inspections and conducted safety talks to prevent accidents and adhering to safety
norms.
Addition knowledge:-
 Troubleshooting of electrical and instrumentation faults in PCC, MCC or RIO PANEL.
Vibromotor, LT motor with Siemens drive 440 RDOL motor for conveyor, DOL motor for conveyor, HT
motor for crusher 900kw, motorized RDOL actuator, Star delta motor for hydraulic station, HT panel
Siemens VCB breaker, LT panel L&T ACB breaker, PDB, PMCC, MCC, Star delta connection for moving
machines, grab bucket, LDB, MLDB, motor testing, meggering, earth resistance testing, earth pit making,
220Kv Substation operation and maintenance of 16 bays, Siemens VCB panel board, ACB panel board and
SF6 circuit breaker. And I am capable to trouble shoot the any type of problem in this breaker or its control
circuit, 6 MV DG set
 Successfully handled testing of various HV electrical equipment’s like Transformer, Circuit-Breaker, and
Isolator etc.
 Playing a key role in on Instillation and Commissioning and testing of Coal Coke route, Coke oven battery
and By-product section over all electrical and instrumentation equipment’s. Air blaster, solenoid coil AC/
DC, valve , Level transmitter radar type, magnetic strip level indicator, float level indicator, level indicator,
ultrasonic type and RTD, Weigh feeder (Schenk) load cell, speed sensor Siemens drive MM440, sprinkling
system, magnet, de-multiplexer, RTD cable, ZSS, PCS, BSS, belt weigher (schenck), pneumatic actuator (disc
type, smart type and cylinder type), Siemens PLC S7 300, pressure switch, temperature switch, pressure
gauge, temperature gauge, proximity switch, limit switch, Pressure transmitter, u tube manometer,
temperature transmitter, multiplexer, PA system, Rotary limit switch, earth resistance testing, electronic
earth pit making, RIO panel cable scheduling, loop testing, compensating cable for t/c, fiber optic cable for
automation, DCS ABB, Thermocouple S & K type, etc.
I have good knowledge of Instrumentation calibration kit/tools:-
 Dead weight tester, Temperature bath, mA and mV source generator and HART communicator.
Executed Projects
M/S VANDANA VIDHYUT LTD - (2*135 MW PF Boiler) Power Plant
JINDAL STAINLESS LIMITED - Recovery Type Coke Oven & Power Distribution
BHUSHAN STEEL LIMITED - Recovery Type Coke Oven
JINDAL STEEL AND POWER LIMITED - Non - Recovery Type Coke Oven
ACADEMIA
Diploma Instrumentation Engineering Gurughansidas University - 2006.
12th  CG Board, Raipur  2003
PERSONAL DOSSIER
Father’s Name – Lt. B.P.Chouhan
Date of Birth: 28th July 1984;
Languages Known: English, Hindi;
Nationality – Indian
Religion - Hindu
Permanent Address: CSEB Colony, SF-459, East Korba, CG;
References: Available on request
Passport Number: L6343695 (Issue on-07/01/2014, Expire on – 06/01/2024)
ANNEXURE
Clients Jindal Steel And Power Limited
Platform Electrical And Instrumentation
Languages & tools Used English, Hindi
Responsibilities Machines Engineering
Location Raigarh
Duration 3.5 Years
Clients Bhushan Steel Limited
Platform Electrical And Instrumentation
Languages & tools Used English, Hindi,Oriya
Responsibilities Machines Engineering
Location Angul
Duration 2 Years
Clients Jindal Stainless Limited
Platform Electrical And Instrumentation
Languages & tools Used English, Hindi,Oriya
Responsibilities Machines Engineering And 220kv Substation
Location Jajpur
Duration 2 Years
Clients Vandana Vidyut Limited
Platform Control And Instrumentation
Languages & tools Used English, Hindi
Responsibilities Control And Instrumentation Work At Boiler Project
Location Korba
Duration 7 Months
Clients SAUDI ARAMCO
Platform Maintenance Planner (ERU)
Languages & tools Used English, Hindi
Responsibilities Maintenance planning
Location Dammam (Saudi Arabia)
Duration 1.7 Years

More Related Content

What's hot

ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERHabeeb Omer
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_ResumeJaime Navarro
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBaneshwar Pai
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVmohammed zameel zainudheen
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)Marlowe Salenga
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame
 

What's hot (20)

ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
ARNOLD BUSTAMANTE - RESUME
ARNOLD BUSTAMANTE - RESUMEARNOLD BUSTAMANTE - RESUME
ARNOLD BUSTAMANTE - RESUME
 
CV Elect
CV ElectCV Elect
CV Elect
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Ali Raza CV(Final)
Ali Raza CV(Final)Ali Raza CV(Final)
Ali Raza CV(Final)
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
RESUME
RESUMERESUME
RESUME
 

Viewers also liked

Ujmd trip advisorppt
Ujmd trip advisorpptUjmd trip advisorppt
Ujmd trip advisorpptBryss Melgar
 
DECRETO SUPREMO Nº 277-2012-EF - CREDITO SUPLEMENTARIO PARA APLICACION DE L...
DECRETO SUPREMO Nº 277-2012-EF  -  CREDITO SUPLEMENTARIO PARA APLICACION DE L...DECRETO SUPREMO Nº 277-2012-EF  -  CREDITO SUPLEMENTARIO PARA APLICACION DE L...
DECRETO SUPREMO Nº 277-2012-EF - CREDITO SUPLEMENTARIO PARA APLICACION DE L...David Avalos Perez
 
Inspirato Trendtag MULTISCREEN
Inspirato Trendtag MULTISCREENInspirato Trendtag MULTISCREEN
Inspirato Trendtag MULTISCREENFranziska Thiele
 
anheuser-busch ABProxy2003
anheuser-busch ABProxy2003anheuser-busch ABProxy2003
anheuser-busch ABProxy2003finance15
 
Eval. preesc. listisima inicial.
Eval. preesc. listisima inicial.Eval. preesc. listisima inicial.
Eval. preesc. listisima inicial.RossyPalmaM Palma M
 
Ludvigsson register 28maj_2013
Ludvigsson register 28maj_2013Ludvigsson register 28maj_2013
Ludvigsson register 28maj_2013Jonas Ludvigsson
 
Documento de trabajo foro enviado a los docentes primario
Documento de trabajo foro enviado a los docentes primarioDocumento de trabajo foro enviado a los docentes primario
Documento de trabajo foro enviado a los docentes primariopsicoadrian10
 
Cosmochemicals Química Arrojada
 Cosmochemicals Química Arrojada Cosmochemicals Química Arrojada
Cosmochemicals Química ArrojadaPetrusReis
 
Servicios Laborales
Servicios LaboralesServicios Laborales
Servicios LaboralesIale Elians
 
Sahana Eden : Deployment (SahanaCamp 1.2)
Sahana Eden : Deployment (SahanaCamp 1.2)Sahana Eden : Deployment (SahanaCamp 1.2)
Sahana Eden : Deployment (SahanaCamp 1.2)AidIQ
 
Strategi komunikasi brand bodrex
Strategi komunikasi brand bodrexStrategi komunikasi brand bodrex
Strategi komunikasi brand bodrexCharly Buchari
 

Viewers also liked (20)

Contador publico
Contador publicoContador publico
Contador publico
 
Ujmd trip advisorppt
Ujmd trip advisorpptUjmd trip advisorppt
Ujmd trip advisorppt
 
DECRETO SUPREMO Nº 277-2012-EF - CREDITO SUPLEMENTARIO PARA APLICACION DE L...
DECRETO SUPREMO Nº 277-2012-EF  -  CREDITO SUPLEMENTARIO PARA APLICACION DE L...DECRETO SUPREMO Nº 277-2012-EF  -  CREDITO SUPLEMENTARIO PARA APLICACION DE L...
DECRETO SUPREMO Nº 277-2012-EF - CREDITO SUPLEMENTARIO PARA APLICACION DE L...
 
Outsourcingderecursoshumanos
OutsourcingderecursoshumanosOutsourcingderecursoshumanos
Outsourcingderecursoshumanos
 
Manual sobre la transposición de la directiva de servicios
Manual sobre la transposición de la directiva de serviciosManual sobre la transposición de la directiva de servicios
Manual sobre la transposición de la directiva de servicios
 
1223290786 u1mkk3no2zu36nc6
1223290786 u1mkk3no2zu36nc61223290786 u1mkk3no2zu36nc6
1223290786 u1mkk3no2zu36nc6
 
Caldas arreglado(1)
Caldas arreglado(1)Caldas arreglado(1)
Caldas arreglado(1)
 
Inspirato Trendtag MULTISCREEN
Inspirato Trendtag MULTISCREENInspirato Trendtag MULTISCREEN
Inspirato Trendtag MULTISCREEN
 
anheuser-busch ABProxy2003
anheuser-busch ABProxy2003anheuser-busch ABProxy2003
anheuser-busch ABProxy2003
 
Eval. preesc. listisima inicial.
Eval. preesc. listisima inicial.Eval. preesc. listisima inicial.
Eval. preesc. listisima inicial.
 
Ludvigsson register 28maj_2013
Ludvigsson register 28maj_2013Ludvigsson register 28maj_2013
Ludvigsson register 28maj_2013
 
VOCABULARIO
VOCABULARIOVOCABULARIO
VOCABULARIO
 
a3f group
a3f groupa3f group
a3f group
 
Documento de trabajo foro enviado a los docentes primario
Documento de trabajo foro enviado a los docentes primarioDocumento de trabajo foro enviado a los docentes primario
Documento de trabajo foro enviado a los docentes primario
 
Cosmochemicals Química Arrojada
 Cosmochemicals Química Arrojada Cosmochemicals Química Arrojada
Cosmochemicals Química Arrojada
 
TATA STEEL PPT
TATA STEEL PPTTATA STEEL PPT
TATA STEEL PPT
 
Servicios Laborales
Servicios LaboralesServicios Laborales
Servicios Laborales
 
Sahana Eden : Deployment (SahanaCamp 1.2)
Sahana Eden : Deployment (SahanaCamp 1.2)Sahana Eden : Deployment (SahanaCamp 1.2)
Sahana Eden : Deployment (SahanaCamp 1.2)
 
Strategi komunikasi brand bodrex
Strategi komunikasi brand bodrexStrategi komunikasi brand bodrex
Strategi komunikasi brand bodrex
 
Arreglos y matrices c++
Arreglos y matrices c++Arreglos y matrices c++
Arreglos y matrices c++
 

Similar to GOURAV_CHOUHAN_CV 120515. (20)

Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
Resume
Resume Resume
Resume
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
ELEC TECH F
ELEC TECH FELEC TECH F
ELEC TECH F
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resume
 
Resume
ResumeResume
Resume
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
SHAFFEE CV
SHAFFEE CVSHAFFEE CV
SHAFFEE CV
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
REY CV
REY CVREY CV
REY CV
 
sreeram cv 2016
sreeram cv 2016sreeram cv 2016
sreeram cv 2016
 

GOURAV_CHOUHAN_CV 120515.

  • 1. GOURAV CHOUHAN Contact: +966-581231601; +91-8103665310 Email: chouhang07@gmail.com Passport number – L6343695, Skype – gourav.chouhan7 Project & Maintenance Professional – Electrical, Mechanical & Instrumentation Proactive decision maker, targeting challenging assignments at senior managerial level in Engineering- Electrical & Instrumentation with Oil/Energy/Steel/Petrochemical industries; executing projects & programs in challenging business environments demanding high standards of quality and precision, bringing the following transferable: Certificate:-  Certificate of appreciation for safety from Saudi Aramco-2015. Technical Skill: o Professional Software : 9 YEAR EXP - SAP End user-PM & MM 9 YEAR EXP - Microsoft Office (EXCEL, WORD, POWERPOINT AND OUTLOOK) 1 YEAR EXP - Microsoft Project 6 MONTH EXP - Primavera P6, 9 + YEAR PROFESSIONAL ABRIDGEMENT SAUDI ARAMCO APR-14 TO 30-NOV- 15 Maintenance Planner (ABIS) M/S VANDANA VIDHYUT LTD JULY’13 – APR’14 Asst. Project Planning Manager- (2*135 MW PF Boiler) Power Plant JINDAL STAINLESS LIMITED, KNIC/JAJPUR/ORISSA 2011- 2013 Asst. Project Planning Engineer-(Coke Oven & Power Distribution) BHUSHAN STEEL LIMITED, ANGUL, ORRISSA 2009- 2011 Project Planning Engineer-Coke Oven (E & I) Coke Oven technology by Shoughang Group JINDAL STEEL AND POWER LIMITED, RAIGARH, CHHATTISGARH 2006- 2009 Jr. Project Planning Engineer in Coke Oven (E & I) Coke Oven technology by SSIT Job Responsibilities:-  Review and schedule all preventive maintenance plans on the SAP maintenance system to assist maintenance team complete the work orders as per the maintenance plan and avoid any time conflict and ensure that all equipment functional location is consistent with the SAP system and the field.  Man hour’s utilization report generation and also KPI compliance measurement.  Coordinate with the warehouse to make sure that the required material needed for corrective maintenance is available with the right quality and quantity in the right time.  Assists in the update of the jobs to be included in the “week schedule”. Prepare reports on a regular basis to ensure that all concerned personnel are aware of scheduling activities performance for future reference and senior management review.  Build the “week schedule” making the most effective and efficient use of available resource and issuing the schedule and Leads scheduling meetings.  Updates work order status as to whether jobs are workable or unworkable, percent completed, estimated completion date, reasons for delay and other pertinent information.
  • 2.  Follow all relevant safety, quality and environmental control procedures and instructions.  Carried out Root cause analysis and brought a consistent reduction in failures.  Undertook regular inspections and conducted safety talks to prevent accidents and adhering to safety norms. Project and turn around responsibilities:-  Prepares short and long term Shutdown maintenance schedules, monitors completion of the work carried out and forecasts activities during shutdowns.  Defines with Operations, Maintenance and Engineering departments any shutdown work scope. Ensures that all preventive and maintenance, inspection, recertification, repair, overhaul and modifications’ requirements are included in such scope of works.  Prepares detailed work packages for jobs to be carried out during Shutdowns.  Prepares implementation programs using “PERT” planning techniques. The “PERT” program will show clear critical paths.  Defines maintenance activities, defining manpower and logistic requirements.  Preparation of tender documents, and providing plans from which Bids can be defined including detailed scope of work for various services.  Ensures co-ordination between various divisions, sections and disciplines during overhaul execution, to ensure that all act in harmony for smooth execution of shutdown.  Prepares comprehensive shutdown report for evaluation and future reference.  Checks spare parts and materials availability. Issues materials reservations from stock, and prepares purchase requests as requested. Follows up with Shutdown Materials Coordinator, warehouse and purchasing sections on materials status and delivery in support of Operations.  Coordinate with other Turnaround and Shutdown Planners for the planning of all work orders within the scope of the turnarounds and shutdowns.  During turnaround/shutdown executions, this position coordinates the scheduling and progress report to all levels of the organization  Integrate post turnaround/shutdown planning report ensuring all executed work orders are properly documented and finalized in the CMMS  Comply with all Health and Safety requirements  Coordinate with the warehouse to make sure that the required material needed for corrective maintenance is available with the right quality and quantity in the right time.  Maintenance Budgeting & Costing, Materials Requirement Planning.  Allocate the unutilised manpower to corrective maintenance activities in a manner that ensures uninterrupted preventive maintenance activities.  Identify resource requirements for the scheduled jobs using the job plans.  Communicates with operations on scheduling status.  Planned and implemented proactive / predictive / preventive / shut down maintenance schedules for various rotary and static equipment so as to increase up-time / equipment reliability.  Undertook regular inspections and conducted safety talks to prevent accidents and adhering to safety norms. Addition knowledge:-  Troubleshooting of electrical and instrumentation faults in PCC, MCC or RIO PANEL. Vibromotor, LT motor with Siemens drive 440 RDOL motor for conveyor, DOL motor for conveyor, HT motor for crusher 900kw, motorized RDOL actuator, Star delta motor for hydraulic station, HT panel Siemens VCB breaker, LT panel L&T ACB breaker, PDB, PMCC, MCC, Star delta connection for moving machines, grab bucket, LDB, MLDB, motor testing, meggering, earth resistance testing, earth pit making, 220Kv Substation operation and maintenance of 16 bays, Siemens VCB panel board, ACB panel board and SF6 circuit breaker. And I am capable to trouble shoot the any type of problem in this breaker or its control circuit, 6 MV DG set  Successfully handled testing of various HV electrical equipment’s like Transformer, Circuit-Breaker, and Isolator etc.  Playing a key role in on Instillation and Commissioning and testing of Coal Coke route, Coke oven battery and By-product section over all electrical and instrumentation equipment’s. Air blaster, solenoid coil AC/ DC, valve , Level transmitter radar type, magnetic strip level indicator, float level indicator, level indicator, ultrasonic type and RTD, Weigh feeder (Schenk) load cell, speed sensor Siemens drive MM440, sprinkling system, magnet, de-multiplexer, RTD cable, ZSS, PCS, BSS, belt weigher (schenck), pneumatic actuator (disc type, smart type and cylinder type), Siemens PLC S7 300, pressure switch, temperature switch, pressure gauge, temperature gauge, proximity switch, limit switch, Pressure transmitter, u tube manometer, temperature transmitter, multiplexer, PA system, Rotary limit switch, earth resistance testing, electronic
  • 3. earth pit making, RIO panel cable scheduling, loop testing, compensating cable for t/c, fiber optic cable for automation, DCS ABB, Thermocouple S & K type, etc. I have good knowledge of Instrumentation calibration kit/tools:-  Dead weight tester, Temperature bath, mA and mV source generator and HART communicator. Executed Projects M/S VANDANA VIDHYUT LTD - (2*135 MW PF Boiler) Power Plant JINDAL STAINLESS LIMITED - Recovery Type Coke Oven & Power Distribution BHUSHAN STEEL LIMITED - Recovery Type Coke Oven JINDAL STEEL AND POWER LIMITED - Non - Recovery Type Coke Oven ACADEMIA Diploma Instrumentation Engineering Gurughansidas University - 2006. 12th  CG Board, Raipur  2003 PERSONAL DOSSIER Father’s Name – Lt. B.P.Chouhan Date of Birth: 28th July 1984; Languages Known: English, Hindi; Nationality – Indian Religion - Hindu Permanent Address: CSEB Colony, SF-459, East Korba, CG; References: Available on request Passport Number: L6343695 (Issue on-07/01/2014, Expire on – 06/01/2024) ANNEXURE Clients Jindal Steel And Power Limited Platform Electrical And Instrumentation Languages & tools Used English, Hindi Responsibilities Machines Engineering Location Raigarh Duration 3.5 Years Clients Bhushan Steel Limited Platform Electrical And Instrumentation Languages & tools Used English, Hindi,Oriya Responsibilities Machines Engineering Location Angul Duration 2 Years Clients Jindal Stainless Limited Platform Electrical And Instrumentation Languages & tools Used English, Hindi,Oriya Responsibilities Machines Engineering And 220kv Substation Location Jajpur Duration 2 Years Clients Vandana Vidyut Limited Platform Control And Instrumentation Languages & tools Used English, Hindi Responsibilities Control And Instrumentation Work At Boiler Project Location Korba Duration 7 Months Clients SAUDI ARAMCO Platform Maintenance Planner (ERU) Languages & tools Used English, Hindi