The Urgent Rehabilitation of Strategic Irrigation
Project for Western Region of Indonesia (URSIP)
Associates
PT. Mitratama Asia Pacific, PT. Cakra Buana Consultants, PT. Supraharmonia Consultindo and
PT. Multimera Harapan
LAPORAN PROGRESS PELAKSANAAN KEGIATAN PROVSUM PROGRESS
GEOTECHNICAL INVESTIGATION
(PERIODE: 15 DESEMBER 2022 – 24 JANUARI 2023)
Progress Pekerjaan yang telah dilaksanakan pada periode pelaporan tanggal 15 Desember 2022 s/d 24 Januari
2023 adalah sebagai berikut :
 Field Investigation For Deep Boring : 100,00 %
 Field Investigation For Sondir Test : 100,00 %
 Field Investigation For Hand Boring : 100,00 %
 Fied Test Hydraulic Conductivity :
o Pemasangan Casing : 100,00 %
o Pengujian Permeabilitas : 100,00 %
 Field Investigation For Test Pit : 97,00 % in progress
 Laboratory Test :
o Index Properties (29 samples): 69,00 % in progress
o Engineering Properties
 Triaxial UU & CU (5 samples) : 0,00 % in progress
 Direct Shear (20 samples) : 65,00 % in progress
 Hydraulic Conduct. (25 samples) : 100,00 %
 Consolidation Test (25 samples) : 52,00 % in progress
 Compacted Test (4 samples) : 0,00 % in progress
PROSENTASE PROGRES PEKERJAAN:
BH.1
BH.2
BH.3
BH.4
BH.5
CPT.1
CPT.2
CPT.3
CPT.4
CPT.5
CPT.6
CPT.7
CPT.8
CPT.9
CPT.10
CPT.11
CPT.12
CPT.13
HB.1
HB.2
HB.3
HB.4
HB.5
HB.6
HB.7
HB.8
HB.9
HB.10
HB.11
HB.12
HB.13
HB.14
HB.15
HB.16
HB.17
HB.18
HB.19
HB.20
BH.1
BH.2
BH.3
BH.4
BH.5
CPT.1
CPT.2
CPT.3
CPT.4
CPT.5
CPT.6
CPT.7
CPT.8
CPT.9
CPT.10
CPT.11
CPT.12
CPT.13
HB.1
HB.2
HB.3
HB.4
HB.5
HB.6
HB.7
HB.8
HB.9
HB.10
HB.11
HB.12
HB.13
HB.14
HB.15
HB.16
HB.17
HB.18
HB.19
HB.20
Keterangan:
a. Pemboran Dalam : 5 titik (BH.1 sd BH.5)
b. Sondir : 13 titik (CPT.1 sd CPT.13)
c. Bor Tangan (Hand Bor): 20 titik (HB.1 sd HB.20)
d. Test Pit : 4 titik (TP.1,TP.2,TP.3,TP.4)
e. Selesai dikerjakan : 13 Sondir, 20 Hand Bor, 5 Drilling
4 Test Pit
SOIL INVESTIGATION PROGRESS
Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP
TP.1
TP.2
TP.3
TP.4
TP.1
TP.2
TP.3
TP.4
DRILLING (DEEP BORING)
BH.1
BH.2
BH.3
BH.4
BH.5
HB.5
Keterangan:
a. Pemboran Dalam : Finish Drilling
DRILLING LOCATION MAP
Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP
Latitude Longitude
1 BH 1 5°27'37.19"S 105°39'25.07"E
Lampung
Timur FEEDER CANAL Intake Kanan
Jalan Cor menuju
Bendung jabung
2 BH 2 5°29'35.63"S 105°38'29.17"E
Lampung
Selatan FEEDER CANAL Syphone Besar Jalan pematang sawah
3 BH 3 5°32'45.24"S 105°40'37.73"E
Lampung
Timur PRIMER LEBUNG GAYAU
Syhone Jalan pematang sawah
Relokasi 5°31'50.02"S 105°37'22.48"E
4 BH 4 5°35'54.29"S 105°41'25.24"E
Lampung
Selatan PRIMER PULAU TENGAH
Syhone Jalan Pematang Sawah
Relokasi 5°34'14.48"S 105°39'9.11"E
5 BH 5 5°37'2.55"S 105°43'36.39"E
Lampung
Selatan PRIMER PULAU TENGAH
Syhone Jalan pematang sawah
Relokasi 5°29'37.72"S 105°38'27.88"E
PEMBORAN DALAM (BH)
No. KODE
Ordinat
Kabutaen Nama Saluran Nama Bangunan Akses Jalan
Field Investigation For Drilling (Deep Boring)
 Pelaksanaan kegiatan pemboran dalam telah dilaksanakan sebanyak 5 titik, yaitu BH.2 dan BH.5 (Syphon Ketibung)
kedalaman mencapai 30 meter. BH 1 (Sand Trap) , BH 3 & BH 4 (Aqueduct BPT 5 & BPT 8) dengan kedalaman 20 meter.
 Pelaksanaan kegiatan tes SPT (N-SPT > 50) telah dilaksanakan pada 5 titik bor tersebut, untuk pembuatan peta stratigrafi
lapisan tanah & profile dilakukan pengujian SPT dengan ketentuan interval setiap kedalaman 2 meter dilakukan pembacaan,
hingga ditemukan N-SPT > 50. Pada kegiatan ini, pengujian SPT pada titik BH.2 telah mencapai N-SPT > 50 pada
kedalaman bor mencapai 30 meter dari permukaan tanah, pengujian SPT pada titik BH.5 telah mencapai N-SPT > 60 pada
kedalaman bor mencapai 30 meter, pengujian SPT pada titik BH.1 telah mencapai N-SPT > 50 pada kedalaman bor
mencapai 20 meter, pengujian SPT pada titik BH.3 telah mencapai N-SPT > 50 pada kedalaman bor mencapai 20 meter,
pengujian SPT pada titik BH.4 telah mencapai N-SPT > 60 pada kedalaman bor mencapai 20 meter.
 Pelaksanaan kegiatan Field Test Hydraulic Conductivity telah dilaksanakan pada 5 titik bor tersebut dengan Metode
Pengujian Permeabilitas Lapangan pada Lubang Bor.
 Pelaksanaan pengambilan sampel UDS (undisturbed sampel) telah dilaksanakan sebanyak 5 titik bor tersebut di atas,
dengan ketentuan dimana setiap titik bor hole telah dilakukan pengambilan UDS sebanyak 10 sampel tanah untuk
pengujian di laboratorium.
N: 63
N: 57
Nilai N –SPT, Deskripsi, Klasifikasi BH 1
Depth 10 Meter
BH 1
N 60 in 10 meter
TITIK DEPTH(m) KLASIFIKASIJENISTANAH
BorHole
(BH.1)
0,00–6,00 Lempung(Clay/CL)Kemerahan(Reddish)
6,00–10,00 LempungBerpasir(SandyClay/CL)Kecoklatan(Brownish)
10,00–15,00
PasirBerlempung(ClayeySand/SC)Kecoklatan(Brownish)
UNDISTURBEDSAMPLE/UDS(10,00–11,45)
15,00–20,00 PasirBerlempung(ClayeySand/SC)Keabuan(Grayish)
N: 62
N: 61
Depth 8 Meter
Depth 12 Meter
BH 2
N 62 in 8 meter
Bor Hole
(BH.2)
0,00 – 2,00 Lempung Lunak (Soft Clay/CH) Coklat Keabuan (Grayish Brown)
2,00 – 5,00
Lempung Berpasir (Sandy Clay/CL) Coklat Keabuan (Grayish Brown)
UNDISTURBED SAMPLE/ UDS (3,55 – 5,00)
5,00 – 9,00 Lempung Berpasir (Sandy Clay/CL) Coklat Keabuan (Grayish Brown)
9,00 – 14,00
Pasir Berlempung (Clayey Sand/SC) Coklat Keabuan (Grayish Brown)
UNDISTURBED SAMPLE/ UDS (10,45 – 11,55)
14,00 – 25,00 Pasir Kasar (Coarse Sand/SP) Coklat Keabuan (Grayish Brown)
25,00 – 30,00 Pasir Kasar Berlempung (Coarse Clayey Sand/SP) Coklat Keabuan (Grayish Brown)
Nilai N –SPT, Deskripsi, Klasifikasi BH 2
N: 62
Depth 14 Meter
BH 3
N 58 in 14 meter
BorHole
(BH.3)
0,00–12,00 Lanau(SoftSilt/MH)HitamPekat(PicthBlack)
12,00–20,00
LempungBerpasir(SandyClay/CL)AbuGelap(DarkGray)
UNDISTURBEDSAMPLE/UDS(10,45–11,90)
Nilai N –SPT, Deskripsi, Klasifikasi BH 3
N 50 in 12 meter
Depth 12 Meter
Nilai N –SPT, Deskripsi, Klasifikasi BH 4
BorHole
(BH.4)
0,00–1,00 LempungBerpasir(SandyClay/CL)CoklatKekuningan(YellowishBrown)-FillMaterial
1,00–2,50 Lempung(Clay/CL)Kecoklatan(Brownish)–FillMaterial
2,50–9,00
LempungBerpasir(SandyClay/CL)CoklatKeabuan(GrayishBrown)-FillMaterial
UNDISTURBEDSAMPLE/UDS(6,55–7,45)
9,00–20,00 PasirKasar(CoarseSand/SP)CoklatKekuningan(YellowishBrown)
BH 4
N: 60
N: 60-63
Depth 26 Meter
Depth 6 Meter
BH 5
N 60 in 6 meter
Nilai N –SPT, Deskripsi, Klasifikasi BH 5
BorHole
(BH.5)
0,00–4,00
LempungLunak(SoftClay/CH)CoklatKeabuan(GrayishBrown)
UNDISTURBEDSAMPLE/UDS(3,55–4,00)
4,00–11,00
LempungBerpasir(SandyClay/CL)CoklatKeabuan(GrayishBrown)
UNDISTURBEDSAMPLE/UDS(4,00–5,00)
11,00–20,00 LempungBerpasir(SandyClay/CL)CoklatKeabuan(GrayishBrown)
20,00–23,00 PasirKasar(CoarseSand/SP)CoklatKeabuan(GrayishBrown)
23,00–25,00 PasirKasarBerlempung(CoarseClayeySand/SP)CoklatKeabuan(GrayishBrown)
25,00–30,00 PasirKasarBerkerikil(GravellySand/SP)AbuGelap(DarkGray)
BH.1
10 m
BH.2
8 m
BH.3
14 m
BH.4
12 m
BH.5
6 m
HB.5
Keterangan:
a. Pemboran Dalam : Finish Drilling
DRILLING LOCATION MAP
Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP
N > 50 value distribution map based on depth:
SONDIR TEST
CPT.1
CPT.2
CPT.3
CPT.4
CPT.5
CPT.6
CPT.7
CPT.8
CPT.9
CPT.10
CPT.11
CPT.12
CPT.13
Keterangan:
a. Sondir : 13 titik (CPT.1 sd CPT.13)
SONDIR LOCATION MAP
Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP
CPT.14
CPT.15
Latitude Longitude
1 CPT 1
5°27'30.10"S 105°39'21.77"E
Lampung
Timur FEEDER CANAL Intake Kanan
Jalan Cor menuju
Bendung jabung
2 CPT 2
5°30'9.06"S 105°37'45.17"E
Lampung
Selatan FEEDER CANAL Syphone Besar Jalan Pematang Sawah
3 CPT 3
5°31'9.56"S 105°37'16.44"E
Lampung
Selatan PRIMER LEBUNG GAYAU
Bangunan bagi Jalan Tanah
4 CPT 4
5°31'50.02"S 105°37'22.48"E
Lampung
Selatan PRIMER LEBUNG GAYAU
Bangunan bagi Jalan Pengerasan
Relokasi 5°32'45.25"S 105°40'37.73"E
5 CPT 5
5°34'14.48"S 105°39'9.11"E
Lampung
Selatan PRIMER LEBUNG GAYAU
Syphone Jalan Pengerasan
Relokasi 5°35'54.29"S 105°41'25.24"
6 CPT 6
5°35'2.83"S 105°39'24.78"E
Lampung
Selatan PRIMER PULAU TENGAH
Bangunan bagi Jalan Pematang Sawah
7 CPT 7
5°35'56.63"S 105°40'49.39"E
Lampung
Selatan PRIMER PULAU TENGAH
Bangunan bagi Jalan Pematang Sawah
8 CPT 8
5°36'43.82"S 105°41'43.95"E
Lampung
Selatan PRIMER PULAU TENGAH
Syphone Jalan Pengerasan
5°36'43.84" 105°41'43.93"E
9 CPT 9
5°37'0.97"S 105°43'34.84"E
Lampung
Selatan PRIMER PULAU TENGAH
Syphone Jalan Pematang Sawah
Relokasi 5°35'26.64"S 105°42'55.64"E
10 CPT 10
5°33'30.00"S 105°41'11.37"E
Lampung
Timur PRIMER PULAU TENGAH
Syphone Jalan Pematang Sawah
11 CPT 11
5°33'12.84"S 105°40'4.82"E
Lampung
Timur PRIMER PULAU TENGAH
Syphone Jalan Pematang sawah
12 CPT 12
5°31'2.98"S 105°40'11.55"E
Lampung
Timur PRIMER PULAU TENGAH
Syphone Jalan Pematang sawah
13 CPT 13
5°29'27.33"S 105°38'35.39"E
Lampung
Selatan PRIMER PULAU TENGAH
Box tersier
Jalan tanggul
pematang sawah
SONDIR (CPT)
No. KODE
Ordinat
Kabutaen Nama Saluran Nama Bangunan Akses Jalan
Field Investigation For Sondir Test (CPT):
Pelaksanaan kegiatan sondir/CPT telah dilaksanakan sebanyak 13 titik, yaitu CPT.1 s/d CPT.13, dengan
kedalaman tanah keras atau qc ≥ 200 kg/cm2 yang bervariatif mulai dari kedalaman 5,8 meter hingga
maksimum kedalaman pengujian 20 meter. Adapun rincian data sondir (CPT) yang telah dilaksanakan
adalah sebagai berikut:
CPT.1 : Nilai qc = 210 kg/cm2 pada kedalaman maks. 11,6 meter.
CPT.2 : Nilai qc = 70 kg/cm2 pada kedalaman maks. 20,0 meter.
CPT.3 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 12,4 meter.
CPT.4 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 14,0 meter.
CPT.5 : Nilai qc = 205 kg/cm2 pada kedalaman maks. 8,0 meter.
CPT.6 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 7,8 meter.
CPT.7 : Nilai qc = 205 kg/cm2 pada kedalaman maks. 6,8 meter.
CPT.8 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 7,6 meter.
CPT.9 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 13,8 meter.
CPT.10 : Nilai qc = 140 kg/cm2 pada kedalaman maks. 20,0 meter.
CPT.11 : Nilai qc = 122 kg/cm2 pada kedalaman maks. 20,0 meter.
CPT.12 : Nilai qc = 205 kg/cm2 pada kedalaman maks. 19,6 meter.
CPT.13 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 5,8 meter.
CPT.1
11,6m
CPT.2
> 20m
CPT.3
12,4 m
CPT.4
14m
CPT.5
8m
CPT.6
7,8m
CPT.7
6,8m
CPT.8
7,6m
CPT.9
13,8m
CPT.10
> 20m
CPT.11
>20m
CPT.12
19,6m
CPT.13
5,8m
Keterangan:
a. Sondir : 13 titik (CPT.1 sd CPT.13)
SONDIR LOCATION MAP
Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP
Qc 200 kg/cm2 distribution map based on depth:
HAND AUGER (HAND BOR)
HB.1
HB.3
HB.5
HB.6
HB.7
HB.8
HB.9
HB.10
HB.11
HB.12
HB.13
HB.14
HB.15
HB.16
HB.17
HB.18
HB.19
HB.20
Keterangan:
a. Bor Tangan (Hand Bor): 20 titik (HB.1 sd HB.20)
Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP
HAND AUGER LOCATION MAP
HB.4
HB.2
Latitude Longitude
1 HB 1
5°30'44.89"S 105°37'22.28"E
Lampung
Selatan FEEDER CANAL Intake Kanan Jalan Pengerasan Desa
2 HB 2
5°33'38.72"S 105°38'4.82"E
Lampung
Selatan FEEDER CANAL Syphone Besar
Jalan tanggul
pematang sawah
3 HB 3
5°35'47.09"S 105°40'15.52"E
Lampung
Selatan PRIMER LEBUNG GAYAU
Bangunan bagi Jalan Tanah Desa
4 HB 4
5°37'2.92"S 105°42'10.56"E
Lampung
Selatan PRIMER LEBUNG GAYAU
Bangunan bagi Jalan Pengersan Desa
5 HB 5
5°37'17.48"S 105°42'38.77"E
Lampung
Selatan PRIMER LEBUNG GAYAU
Bangunan bagi Jalan Pengersan Desa
6 HB 6
5°37'26.01"S 105°44'25.17"E
Lampung
Selatan PRIMER LEBUNG GAYAU
Bangunan bagi Jalan pematang sawah
Relokasi 5°34'24.64"S 105°40'35.25"E
7 HB 7
5°37'32.55"S 105°45'18.18"E
Lampung
Selatan PRIMER LEBUNG GAYAU
Bangunan bagi Jalan pematang sawah
Relokasi 5°32'9.40"S 105°39'7.05"E
8 HB 8
5°34'16.79"S 105°42'2.74"E
Lampung
Timur PRIMER LEBUNG GAYAU
Bangunan bagi Jalan pematang sawah
9 HB 9
5°32'45.71"S 105°40'38.49"E
Lampung
Timur PRIMER LEBUNG GAYAU
Box tersier Jalan Tanggul Sungai
10 HB 10
5°31'53.54"S 105°40'34.41"E
Lampung
Timur PRIMER PULAU TENGAH
Syphone Jalan pematang sawah
11 HB 11
5°30'23.63"S 105°40'1.78"E
Lampung
Timur PRIMER PULAU TENGAH
Syphone Jalan tanah/ Desa
12 HB 12
5°30'0.90"S 105°38'52.17"E
Lampung
Selatan PRIMER PULAU TENGAH
Syphone Jalan pematang sawah
13 HB 13
5°28'23.66"S 105°39'0.66"E
Lampung
Timur PRIMER PULAU TENGAH
Syphone Jalan kebun Desa
14 HB 14
5°27'49.37"S 105°39'5.77"E
Lampung
Timur PRIMER PULAU TENGAH
Syphone Jalan Kebun Karet
15 HB 15
5°29'33.20"S 105°37'23.39"E
Lampung
Selatan PRIMER PULAU TENGAH
Syphone Jalan pematang sawah
16 HB 16
5°31'16.69"S 105°38'5.21"E
Lampung
Selatan PRIMER PULAU TENGAH
Syphone Jalan pematang sawah
17 HB 17
5°30'47.44"S 105°39'27.15"E
Lampung
Selatan PRIMER PULAU TENGAH
Syphone Jalan pematang sawah
18 HB 18
5°32'15.22"S 105°40'5.69"E
Lampung
Timur PRIMER PULAU TENGAH
Box tersier Jalan pematang sawah
19 HB 19
5°32'6.64"S 105°38'26.76"E
Lampung
Selatan PRIMER PULAU TENGAH
Box tersier Jalan Tanggul Saluran
20 HB 20
5°33'18.47"S 105°39'8.34"E
Lampung
Selatan PRIMER PULAU TENGAH
Box tersier Jalan pematang sawah
BOR TANGAN (HB)
No.
KODE
Ordinat
Kabutaen Nama Saluran Nama Bangunan Akses Jalan
NO. DESCRIPTION HB 1 HB 2 HB 3 BH 5 HB 8 HB 9 HB 10 HB 11 HB 12 HB 15 HB 16 HB 17 HB 18 HB 20
SAMPEL TABUNG (UNDISTURBED SAMPLE)
1 Kadar Air (Water Content) % 149,76 81,2 49,97 27,42 85,63 177,73 113,67 39,72 36,25 52,19 122,42 72,98 140,82 142,78
2 Berat Volume(Density) gr/ cm 1,262 1,313 1,564 1,544 1,289 0,992 1,204 1,696 1,646 1,523 1,194 1,291 1,187 1,086
3 Berat Jenis (Specific gravity) (Gs) 2,026 2,031 2,349 2,277 2,335 1,629 2,042 2,532 2,677 2,364 2,202 1,964 1,755 1,615
4 Persen Lolos (Percent Passed) No. 200% 74,71 71,62 48,1 32,99 69,64 70,52 73,07 76,97 44,8 75,82 79,05 81,64 67,91 77,49
5 Atterberg(Atterberg Limit)
LL % 139,78 102,19 51,74 49,32 102,24 220,56 134,55 75,85 52,18 94,18 136,5 101,18 155,74 221,17
PL % 64,29 69,16 41,08 31,82 66,41 187,5 67,67 40,99 29,72 52,41 70,02 55,34 71,28 184,23
PI % 75,49 33,02 10,66 17,49 35,83 33,06 66,88 34,86 22,46 41,77 66,48 45,84 84,45 36,93
6 Direct Shear (Direct Shear Test)
Kohesi (Cohesion) ( c) kg/ cm 0,078 0,058 0,065 0,124 0,058 0,039 0,058 0,209 0,058 0,124 0,049 0,045 0,022 0,013
Sudut Geser Dalam (Internal Friction Angle) ... 11,1 11,1 16,4 30,5 11,1 11,1 11,1 26,1 11,1 16,4 5,6 16,4 8,4 8,4
7 Konsolidasi (Consolidation)
Cvcm2/ s 0,032 0,056 0,07 0,072 0,061 0,1 0,069 0,041 0,101 0,034 0,012 0,154 0,028 0,075
Cc 0,825 0,63 0,155 0,093 0,581 1,928 0,669 0,163 0,209 0,193 1,204 0,278 0,769 1,029
Pt
MH -
OH
Pt Pt Pt
KLASIFIKASI TANAH
Test Laboratorium : Index Properties Enginering Properties
Test Pit : Quarry and Borrow
Lokasi Test Pit:
1. Marga Batin (TP.1, TP.2)
2. Beringin Kencana (TP.3, TP.4)
TEST PIT LOCATION MAP (BORROW)
1. Marga Batin
2. Beringin Kencana
Lokasi Marga Batin Estimasi luasan
sekitar 1,2 ha
Lokasi Beringin Kencana 1,3 Ha
Quarry Map with Government Permits (IUP-OP) at North of Jabung Weir Location
source: website geoportal.esdm.co.id (ESDM One Map).
QUARRY LOCATION MAP
Gambar. 1. Mobilisasi Alat
Drilling equipment moving from Trimo Mukti to Bumi Restu (Last point BH 4 – Aqueduct BPT 8)
Test Pit TP 3 Beringin Kencana – Soil Description Test Pit TP 4 Beringin Kencana – GWL measurement
Test Pit TP 3 Laboratory Test – Soil Sampling Test Pit TP 4 Laboratory Test – Soil Sampling
Start from December 15 th, 2022: PKM 1
December January February
January 24, 2023
2023 2023
2022
ahead of
schedule
Terima
Kasih

More Related Content

Recently uploaded

Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di IndonesiaTajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di IndonesiaHaseebBashir5
 
Perspektif Psikologi dalam Perubahan Organisasi
Perspektif Psikologi dalam Perubahan OrganisasiPerspektif Psikologi dalam Perubahan Organisasi
Perspektif Psikologi dalam Perubahan OrganisasiSeta Wicaksana
 
LAPORAN PKP yang telah jadi dan dapat dijadikan contoh
LAPORAN PKP yang telah jadi dan dapat dijadikan contohLAPORAN PKP yang telah jadi dan dapat dijadikan contoh
LAPORAN PKP yang telah jadi dan dapat dijadikan contohkhunagnes1
 
Time Value of Money Mata Kuliah Ekonomi 2
Time Value of Money Mata Kuliah Ekonomi 2Time Value of Money Mata Kuliah Ekonomi 2
Time Value of Money Mata Kuliah Ekonomi 2PutriMuaini
 
"Mitos dan Kemenangan: Zeus Slot dan Dunia Yunani"
"Mitos dan Kemenangan: Zeus Slot dan Dunia Yunani""Mitos dan Kemenangan: Zeus Slot dan Dunia Yunani"
"Mitos dan Kemenangan: Zeus Slot dan Dunia Yunani"HaseebBashir5
 
CALL/WA: 0822 348 60 166 ( TSEL ) Jasa Digital Marketing Solo
CALL/WA: 0822 348 60 166 ( TSEL ) Jasa Digital Marketing SoloCALL/WA: 0822 348 60 166 ( TSEL ) Jasa Digital Marketing Solo
CALL/WA: 0822 348 60 166 ( TSEL ) Jasa Digital Marketing Solojasa marketing online
 
Tentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
Tentang Gerhanatoto: Situs Judi Online yang Menarik PerhatianTentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
Tentang Gerhanatoto: Situs Judi Online yang Menarik PerhatianHaseebBashir5
 
Memaksimalkan Waktu untuk Mendapatkan Kampus Impian melalui SBMPTN (1).pptx
Memaksimalkan Waktu untuk Mendapatkan Kampus Impian melalui SBMPTN (1).pptxMemaksimalkan Waktu untuk Mendapatkan Kampus Impian melalui SBMPTN (1).pptx
Memaksimalkan Waktu untuk Mendapatkan Kampus Impian melalui SBMPTN (1).pptxSintaDosi
 
2. PRINSIP KEUANGAN HIJAU- PELATIHAN GREEN FINANCE.pptx
2. PRINSIP KEUANGAN HIJAU- PELATIHAN GREEN FINANCE.pptx2. PRINSIP KEUANGAN HIJAU- PELATIHAN GREEN FINANCE.pptx
2. PRINSIP KEUANGAN HIJAU- PELATIHAN GREEN FINANCE.pptxerlyndakasim2
 
MODUL PEGAJARAN ASURANSI BELUM KOMPLIT 1
MODUL PEGAJARAN ASURANSI BELUM KOMPLIT 1MODUL PEGAJARAN ASURANSI BELUM KOMPLIT 1
MODUL PEGAJARAN ASURANSI BELUM KOMPLIT 1alvinjasindo
 
1A. INTRODUCTION TO Good corporate governance .ppt
1A. INTRODUCTION TO Good corporate governance .ppt1A. INTRODUCTION TO Good corporate governance .ppt
1A. INTRODUCTION TO Good corporate governance .ppterlyndakasim2
 
SV388: Platform Taruhan Sabung Ayam Online yang Populer
SV388: Platform Taruhan Sabung Ayam Online yang PopulerSV388: Platform Taruhan Sabung Ayam Online yang Populer
SV388: Platform Taruhan Sabung Ayam Online yang PopulerHaseebBashir5
 
Manajemen_Risiko_PT_Murni_Sadar_Tbk.pdf man
Manajemen_Risiko_PT_Murni_Sadar_Tbk.pdf manManajemen_Risiko_PT_Murni_Sadar_Tbk.pdf man
Manajemen_Risiko_PT_Murni_Sadar_Tbk.pdf manrasyidakhdaniyal10
 
Slide tentang Akuntansi Perpajakan Indonesia
Slide tentang Akuntansi Perpajakan IndonesiaSlide tentang Akuntansi Perpajakan Indonesia
Slide tentang Akuntansi Perpajakan IndonesiaNovrinKartikaTumbade
 
ESTETIK!!! WA 0821 7001 0763 (FORTRESS) Bahan Pintu Aluminium Coklat di Denpa...
ESTETIK!!! WA 0821 7001 0763 (FORTRESS) Bahan Pintu Aluminium Coklat di Denpa...ESTETIK!!! WA 0821 7001 0763 (FORTRESS) Bahan Pintu Aluminium Coklat di Denpa...
ESTETIK!!! WA 0821 7001 0763 (FORTRESS) Bahan Pintu Aluminium Coklat di Denpa...FORTRESS
 
UNIKBET : Agen Slot Resmi Pragmatic Play Ada Deposit Sesama Linkaja
UNIKBET : Agen Slot Resmi Pragmatic Play Ada Deposit Sesama LinkajaUNIKBET : Agen Slot Resmi Pragmatic Play Ada Deposit Sesama Linkaja
UNIKBET : Agen Slot Resmi Pragmatic Play Ada Deposit Sesama Linkajaunikbetslotbankmaybank
 
04 AKMEN new.pdf........................
04 AKMEN new.pdf........................04 AKMEN new.pdf........................
04 AKMEN new.pdf........................rendisalay
 
tugas kelompok Analisis bisnis aplikasi bukalapak
tugas kelompok Analisis bisnis aplikasi bukalapaktugas kelompok Analisis bisnis aplikasi bukalapak
tugas kelompok Analisis bisnis aplikasi bukalapaksmkpelayarandemak1
 
Perkembangan Perbankan di Indonesia Perkembangan Perbankan di Indonesia
Perkembangan Perbankan di Indonesia Perkembangan Perbankan di IndonesiaPerkembangan Perbankan di Indonesia Perkembangan Perbankan di Indonesia
Perkembangan Perbankan di Indonesia Perkembangan Perbankan di Indonesialangkahgontay88
 

Recently uploaded (20)

Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di IndonesiaTajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
 
Perspektif Psikologi dalam Perubahan Organisasi
Perspektif Psikologi dalam Perubahan OrganisasiPerspektif Psikologi dalam Perubahan Organisasi
Perspektif Psikologi dalam Perubahan Organisasi
 
LAPORAN PKP yang telah jadi dan dapat dijadikan contoh
LAPORAN PKP yang telah jadi dan dapat dijadikan contohLAPORAN PKP yang telah jadi dan dapat dijadikan contoh
LAPORAN PKP yang telah jadi dan dapat dijadikan contoh
 
Time Value of Money Mata Kuliah Ekonomi 2
Time Value of Money Mata Kuliah Ekonomi 2Time Value of Money Mata Kuliah Ekonomi 2
Time Value of Money Mata Kuliah Ekonomi 2
 
"Mitos dan Kemenangan: Zeus Slot dan Dunia Yunani"
"Mitos dan Kemenangan: Zeus Slot dan Dunia Yunani""Mitos dan Kemenangan: Zeus Slot dan Dunia Yunani"
"Mitos dan Kemenangan: Zeus Slot dan Dunia Yunani"
 
CALL/WA: 0822 348 60 166 ( TSEL ) Jasa Digital Marketing Solo
CALL/WA: 0822 348 60 166 ( TSEL ) Jasa Digital Marketing SoloCALL/WA: 0822 348 60 166 ( TSEL ) Jasa Digital Marketing Solo
CALL/WA: 0822 348 60 166 ( TSEL ) Jasa Digital Marketing Solo
 
Tentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
Tentang Gerhanatoto: Situs Judi Online yang Menarik PerhatianTentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
Tentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
 
Memaksimalkan Waktu untuk Mendapatkan Kampus Impian melalui SBMPTN (1).pptx
Memaksimalkan Waktu untuk Mendapatkan Kampus Impian melalui SBMPTN (1).pptxMemaksimalkan Waktu untuk Mendapatkan Kampus Impian melalui SBMPTN (1).pptx
Memaksimalkan Waktu untuk Mendapatkan Kampus Impian melalui SBMPTN (1).pptx
 
2. PRINSIP KEUANGAN HIJAU- PELATIHAN GREEN FINANCE.pptx
2. PRINSIP KEUANGAN HIJAU- PELATIHAN GREEN FINANCE.pptx2. PRINSIP KEUANGAN HIJAU- PELATIHAN GREEN FINANCE.pptx
2. PRINSIP KEUANGAN HIJAU- PELATIHAN GREEN FINANCE.pptx
 
MODUL PEGAJARAN ASURANSI BELUM KOMPLIT 1
MODUL PEGAJARAN ASURANSI BELUM KOMPLIT 1MODUL PEGAJARAN ASURANSI BELUM KOMPLIT 1
MODUL PEGAJARAN ASURANSI BELUM KOMPLIT 1
 
1A. INTRODUCTION TO Good corporate governance .ppt
1A. INTRODUCTION TO Good corporate governance .ppt1A. INTRODUCTION TO Good corporate governance .ppt
1A. INTRODUCTION TO Good corporate governance .ppt
 
SV388: Platform Taruhan Sabung Ayam Online yang Populer
SV388: Platform Taruhan Sabung Ayam Online yang PopulerSV388: Platform Taruhan Sabung Ayam Online yang Populer
SV388: Platform Taruhan Sabung Ayam Online yang Populer
 
Manajemen_Risiko_PT_Murni_Sadar_Tbk.pdf man
Manajemen_Risiko_PT_Murni_Sadar_Tbk.pdf manManajemen_Risiko_PT_Murni_Sadar_Tbk.pdf man
Manajemen_Risiko_PT_Murni_Sadar_Tbk.pdf man
 
abortion pills in Kuwait City+966572737505 get Cytotec
abortion pills in Kuwait City+966572737505 get Cytotecabortion pills in Kuwait City+966572737505 get Cytotec
abortion pills in Kuwait City+966572737505 get Cytotec
 
Slide tentang Akuntansi Perpajakan Indonesia
Slide tentang Akuntansi Perpajakan IndonesiaSlide tentang Akuntansi Perpajakan Indonesia
Slide tentang Akuntansi Perpajakan Indonesia
 
ESTETIK!!! WA 0821 7001 0763 (FORTRESS) Bahan Pintu Aluminium Coklat di Denpa...
ESTETIK!!! WA 0821 7001 0763 (FORTRESS) Bahan Pintu Aluminium Coklat di Denpa...ESTETIK!!! WA 0821 7001 0763 (FORTRESS) Bahan Pintu Aluminium Coklat di Denpa...
ESTETIK!!! WA 0821 7001 0763 (FORTRESS) Bahan Pintu Aluminium Coklat di Denpa...
 
UNIKBET : Agen Slot Resmi Pragmatic Play Ada Deposit Sesama Linkaja
UNIKBET : Agen Slot Resmi Pragmatic Play Ada Deposit Sesama LinkajaUNIKBET : Agen Slot Resmi Pragmatic Play Ada Deposit Sesama Linkaja
UNIKBET : Agen Slot Resmi Pragmatic Play Ada Deposit Sesama Linkaja
 
04 AKMEN new.pdf........................
04 AKMEN new.pdf........................04 AKMEN new.pdf........................
04 AKMEN new.pdf........................
 
tugas kelompok Analisis bisnis aplikasi bukalapak
tugas kelompok Analisis bisnis aplikasi bukalapaktugas kelompok Analisis bisnis aplikasi bukalapak
tugas kelompok Analisis bisnis aplikasi bukalapak
 
Perkembangan Perbankan di Indonesia Perkembangan Perbankan di Indonesia
Perkembangan Perbankan di Indonesia Perkembangan Perbankan di IndonesiaPerkembangan Perbankan di Indonesia Perkembangan Perbankan di Indonesia
Perkembangan Perbankan di Indonesia Perkembangan Perbankan di Indonesia
 

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Progress Provsum Geotek Jabung 240123.pptx

  • 1. The Urgent Rehabilitation of Strategic Irrigation Project for Western Region of Indonesia (URSIP) Associates PT. Mitratama Asia Pacific, PT. Cakra Buana Consultants, PT. Supraharmonia Consultindo and PT. Multimera Harapan LAPORAN PROGRESS PELAKSANAAN KEGIATAN PROVSUM PROGRESS GEOTECHNICAL INVESTIGATION (PERIODE: 15 DESEMBER 2022 – 24 JANUARI 2023)
  • 2. Progress Pekerjaan yang telah dilaksanakan pada periode pelaporan tanggal 15 Desember 2022 s/d 24 Januari 2023 adalah sebagai berikut :  Field Investigation For Deep Boring : 100,00 %  Field Investigation For Sondir Test : 100,00 %  Field Investigation For Hand Boring : 100,00 %  Fied Test Hydraulic Conductivity : o Pemasangan Casing : 100,00 % o Pengujian Permeabilitas : 100,00 %  Field Investigation For Test Pit : 97,00 % in progress  Laboratory Test : o Index Properties (29 samples): 69,00 % in progress o Engineering Properties  Triaxial UU & CU (5 samples) : 0,00 % in progress  Direct Shear (20 samples) : 65,00 % in progress  Hydraulic Conduct. (25 samples) : 100,00 %  Consolidation Test (25 samples) : 52,00 % in progress  Compacted Test (4 samples) : 0,00 % in progress PROSENTASE PROGRES PEKERJAAN:
  • 3. BH.1 BH.2 BH.3 BH.4 BH.5 CPT.1 CPT.2 CPT.3 CPT.4 CPT.5 CPT.6 CPT.7 CPT.8 CPT.9 CPT.10 CPT.11 CPT.12 CPT.13 HB.1 HB.2 HB.3 HB.4 HB.5 HB.6 HB.7 HB.8 HB.9 HB.10 HB.11 HB.12 HB.13 HB.14 HB.15 HB.16 HB.17 HB.18 HB.19 HB.20 BH.1 BH.2 BH.3 BH.4 BH.5 CPT.1 CPT.2 CPT.3 CPT.4 CPT.5 CPT.6 CPT.7 CPT.8 CPT.9 CPT.10 CPT.11 CPT.12 CPT.13 HB.1 HB.2 HB.3 HB.4 HB.5 HB.6 HB.7 HB.8 HB.9 HB.10 HB.11 HB.12 HB.13 HB.14 HB.15 HB.16 HB.17 HB.18 HB.19 HB.20 Keterangan: a. Pemboran Dalam : 5 titik (BH.1 sd BH.5) b. Sondir : 13 titik (CPT.1 sd CPT.13) c. Bor Tangan (Hand Bor): 20 titik (HB.1 sd HB.20) d. Test Pit : 4 titik (TP.1,TP.2,TP.3,TP.4) e. Selesai dikerjakan : 13 Sondir, 20 Hand Bor, 5 Drilling 4 Test Pit SOIL INVESTIGATION PROGRESS Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP TP.1 TP.2 TP.3 TP.4 TP.1 TP.2 TP.3 TP.4
  • 5. BH.1 BH.2 BH.3 BH.4 BH.5 HB.5 Keterangan: a. Pemboran Dalam : Finish Drilling DRILLING LOCATION MAP Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP Latitude Longitude 1 BH 1 5°27'37.19"S 105°39'25.07"E Lampung Timur FEEDER CANAL Intake Kanan Jalan Cor menuju Bendung jabung 2 BH 2 5°29'35.63"S 105°38'29.17"E Lampung Selatan FEEDER CANAL Syphone Besar Jalan pematang sawah 3 BH 3 5°32'45.24"S 105°40'37.73"E Lampung Timur PRIMER LEBUNG GAYAU Syhone Jalan pematang sawah Relokasi 5°31'50.02"S 105°37'22.48"E 4 BH 4 5°35'54.29"S 105°41'25.24"E Lampung Selatan PRIMER PULAU TENGAH Syhone Jalan Pematang Sawah Relokasi 5°34'14.48"S 105°39'9.11"E 5 BH 5 5°37'2.55"S 105°43'36.39"E Lampung Selatan PRIMER PULAU TENGAH Syhone Jalan pematang sawah Relokasi 5°29'37.72"S 105°38'27.88"E PEMBORAN DALAM (BH) No. KODE Ordinat Kabutaen Nama Saluran Nama Bangunan Akses Jalan
  • 6. Field Investigation For Drilling (Deep Boring)  Pelaksanaan kegiatan pemboran dalam telah dilaksanakan sebanyak 5 titik, yaitu BH.2 dan BH.5 (Syphon Ketibung) kedalaman mencapai 30 meter. BH 1 (Sand Trap) , BH 3 & BH 4 (Aqueduct BPT 5 & BPT 8) dengan kedalaman 20 meter.  Pelaksanaan kegiatan tes SPT (N-SPT > 50) telah dilaksanakan pada 5 titik bor tersebut, untuk pembuatan peta stratigrafi lapisan tanah & profile dilakukan pengujian SPT dengan ketentuan interval setiap kedalaman 2 meter dilakukan pembacaan, hingga ditemukan N-SPT > 50. Pada kegiatan ini, pengujian SPT pada titik BH.2 telah mencapai N-SPT > 50 pada kedalaman bor mencapai 30 meter dari permukaan tanah, pengujian SPT pada titik BH.5 telah mencapai N-SPT > 60 pada kedalaman bor mencapai 30 meter, pengujian SPT pada titik BH.1 telah mencapai N-SPT > 50 pada kedalaman bor mencapai 20 meter, pengujian SPT pada titik BH.3 telah mencapai N-SPT > 50 pada kedalaman bor mencapai 20 meter, pengujian SPT pada titik BH.4 telah mencapai N-SPT > 60 pada kedalaman bor mencapai 20 meter.  Pelaksanaan kegiatan Field Test Hydraulic Conductivity telah dilaksanakan pada 5 titik bor tersebut dengan Metode Pengujian Permeabilitas Lapangan pada Lubang Bor.  Pelaksanaan pengambilan sampel UDS (undisturbed sampel) telah dilaksanakan sebanyak 5 titik bor tersebut di atas, dengan ketentuan dimana setiap titik bor hole telah dilakukan pengambilan UDS sebanyak 10 sampel tanah untuk pengujian di laboratorium.
  • 7. N: 63 N: 57 Nilai N –SPT, Deskripsi, Klasifikasi BH 1 Depth 10 Meter BH 1 N 60 in 10 meter TITIK DEPTH(m) KLASIFIKASIJENISTANAH BorHole (BH.1) 0,00–6,00 Lempung(Clay/CL)Kemerahan(Reddish) 6,00–10,00 LempungBerpasir(SandyClay/CL)Kecoklatan(Brownish) 10,00–15,00 PasirBerlempung(ClayeySand/SC)Kecoklatan(Brownish) UNDISTURBEDSAMPLE/UDS(10,00–11,45) 15,00–20,00 PasirBerlempung(ClayeySand/SC)Keabuan(Grayish)
  • 8. N: 62 N: 61 Depth 8 Meter Depth 12 Meter BH 2 N 62 in 8 meter Bor Hole (BH.2) 0,00 – 2,00 Lempung Lunak (Soft Clay/CH) Coklat Keabuan (Grayish Brown) 2,00 – 5,00 Lempung Berpasir (Sandy Clay/CL) Coklat Keabuan (Grayish Brown) UNDISTURBED SAMPLE/ UDS (3,55 – 5,00) 5,00 – 9,00 Lempung Berpasir (Sandy Clay/CL) Coklat Keabuan (Grayish Brown) 9,00 – 14,00 Pasir Berlempung (Clayey Sand/SC) Coklat Keabuan (Grayish Brown) UNDISTURBED SAMPLE/ UDS (10,45 – 11,55) 14,00 – 25,00 Pasir Kasar (Coarse Sand/SP) Coklat Keabuan (Grayish Brown) 25,00 – 30,00 Pasir Kasar Berlempung (Coarse Clayey Sand/SP) Coklat Keabuan (Grayish Brown) Nilai N –SPT, Deskripsi, Klasifikasi BH 2
  • 9. N: 62 Depth 14 Meter BH 3 N 58 in 14 meter BorHole (BH.3) 0,00–12,00 Lanau(SoftSilt/MH)HitamPekat(PicthBlack) 12,00–20,00 LempungBerpasir(SandyClay/CL)AbuGelap(DarkGray) UNDISTURBEDSAMPLE/UDS(10,45–11,90) Nilai N –SPT, Deskripsi, Klasifikasi BH 3
  • 10. N 50 in 12 meter Depth 12 Meter Nilai N –SPT, Deskripsi, Klasifikasi BH 4 BorHole (BH.4) 0,00–1,00 LempungBerpasir(SandyClay/CL)CoklatKekuningan(YellowishBrown)-FillMaterial 1,00–2,50 Lempung(Clay/CL)Kecoklatan(Brownish)–FillMaterial 2,50–9,00 LempungBerpasir(SandyClay/CL)CoklatKeabuan(GrayishBrown)-FillMaterial UNDISTURBEDSAMPLE/UDS(6,55–7,45) 9,00–20,00 PasirKasar(CoarseSand/SP)CoklatKekuningan(YellowishBrown) BH 4
  • 11. N: 60 N: 60-63 Depth 26 Meter Depth 6 Meter BH 5 N 60 in 6 meter Nilai N –SPT, Deskripsi, Klasifikasi BH 5 BorHole (BH.5) 0,00–4,00 LempungLunak(SoftClay/CH)CoklatKeabuan(GrayishBrown) UNDISTURBEDSAMPLE/UDS(3,55–4,00) 4,00–11,00 LempungBerpasir(SandyClay/CL)CoklatKeabuan(GrayishBrown) UNDISTURBEDSAMPLE/UDS(4,00–5,00) 11,00–20,00 LempungBerpasir(SandyClay/CL)CoklatKeabuan(GrayishBrown) 20,00–23,00 PasirKasar(CoarseSand/SP)CoklatKeabuan(GrayishBrown) 23,00–25,00 PasirKasarBerlempung(CoarseClayeySand/SP)CoklatKeabuan(GrayishBrown) 25,00–30,00 PasirKasarBerkerikil(GravellySand/SP)AbuGelap(DarkGray)
  • 12. BH.1 10 m BH.2 8 m BH.3 14 m BH.4 12 m BH.5 6 m HB.5 Keterangan: a. Pemboran Dalam : Finish Drilling DRILLING LOCATION MAP Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP N > 50 value distribution map based on depth:
  • 14. CPT.1 CPT.2 CPT.3 CPT.4 CPT.5 CPT.6 CPT.7 CPT.8 CPT.9 CPT.10 CPT.11 CPT.12 CPT.13 Keterangan: a. Sondir : 13 titik (CPT.1 sd CPT.13) SONDIR LOCATION MAP Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP CPT.14 CPT.15 Latitude Longitude 1 CPT 1 5°27'30.10"S 105°39'21.77"E Lampung Timur FEEDER CANAL Intake Kanan Jalan Cor menuju Bendung jabung 2 CPT 2 5°30'9.06"S 105°37'45.17"E Lampung Selatan FEEDER CANAL Syphone Besar Jalan Pematang Sawah 3 CPT 3 5°31'9.56"S 105°37'16.44"E Lampung Selatan PRIMER LEBUNG GAYAU Bangunan bagi Jalan Tanah 4 CPT 4 5°31'50.02"S 105°37'22.48"E Lampung Selatan PRIMER LEBUNG GAYAU Bangunan bagi Jalan Pengerasan Relokasi 5°32'45.25"S 105°40'37.73"E 5 CPT 5 5°34'14.48"S 105°39'9.11"E Lampung Selatan PRIMER LEBUNG GAYAU Syphone Jalan Pengerasan Relokasi 5°35'54.29"S 105°41'25.24" 6 CPT 6 5°35'2.83"S 105°39'24.78"E Lampung Selatan PRIMER PULAU TENGAH Bangunan bagi Jalan Pematang Sawah 7 CPT 7 5°35'56.63"S 105°40'49.39"E Lampung Selatan PRIMER PULAU TENGAH Bangunan bagi Jalan Pematang Sawah 8 CPT 8 5°36'43.82"S 105°41'43.95"E Lampung Selatan PRIMER PULAU TENGAH Syphone Jalan Pengerasan 5°36'43.84" 105°41'43.93"E 9 CPT 9 5°37'0.97"S 105°43'34.84"E Lampung Selatan PRIMER PULAU TENGAH Syphone Jalan Pematang Sawah Relokasi 5°35'26.64"S 105°42'55.64"E 10 CPT 10 5°33'30.00"S 105°41'11.37"E Lampung Timur PRIMER PULAU TENGAH Syphone Jalan Pematang Sawah 11 CPT 11 5°33'12.84"S 105°40'4.82"E Lampung Timur PRIMER PULAU TENGAH Syphone Jalan Pematang sawah 12 CPT 12 5°31'2.98"S 105°40'11.55"E Lampung Timur PRIMER PULAU TENGAH Syphone Jalan Pematang sawah 13 CPT 13 5°29'27.33"S 105°38'35.39"E Lampung Selatan PRIMER PULAU TENGAH Box tersier Jalan tanggul pematang sawah SONDIR (CPT) No. KODE Ordinat Kabutaen Nama Saluran Nama Bangunan Akses Jalan
  • 15. Field Investigation For Sondir Test (CPT): Pelaksanaan kegiatan sondir/CPT telah dilaksanakan sebanyak 13 titik, yaitu CPT.1 s/d CPT.13, dengan kedalaman tanah keras atau qc ≥ 200 kg/cm2 yang bervariatif mulai dari kedalaman 5,8 meter hingga maksimum kedalaman pengujian 20 meter. Adapun rincian data sondir (CPT) yang telah dilaksanakan adalah sebagai berikut: CPT.1 : Nilai qc = 210 kg/cm2 pada kedalaman maks. 11,6 meter. CPT.2 : Nilai qc = 70 kg/cm2 pada kedalaman maks. 20,0 meter. CPT.3 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 12,4 meter. CPT.4 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 14,0 meter. CPT.5 : Nilai qc = 205 kg/cm2 pada kedalaman maks. 8,0 meter. CPT.6 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 7,8 meter. CPT.7 : Nilai qc = 205 kg/cm2 pada kedalaman maks. 6,8 meter. CPT.8 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 7,6 meter. CPT.9 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 13,8 meter. CPT.10 : Nilai qc = 140 kg/cm2 pada kedalaman maks. 20,0 meter. CPT.11 : Nilai qc = 122 kg/cm2 pada kedalaman maks. 20,0 meter. CPT.12 : Nilai qc = 205 kg/cm2 pada kedalaman maks. 19,6 meter. CPT.13 : Nilai qc = 200 kg/cm2 pada kedalaman maks. 5,8 meter.
  • 16. CPT.1 11,6m CPT.2 > 20m CPT.3 12,4 m CPT.4 14m CPT.5 8m CPT.6 7,8m CPT.7 6,8m CPT.8 7,6m CPT.9 13,8m CPT.10 > 20m CPT.11 >20m CPT.12 19,6m CPT.13 5,8m Keterangan: a. Sondir : 13 titik (CPT.1 sd CPT.13) SONDIR LOCATION MAP Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP Qc 200 kg/cm2 distribution map based on depth:
  • 18. HB.1 HB.3 HB.5 HB.6 HB.7 HB.8 HB.9 HB.10 HB.11 HB.12 HB.13 HB.14 HB.15 HB.16 HB.17 HB.18 HB.19 HB.20 Keterangan: a. Bor Tangan (Hand Bor): 20 titik (HB.1 sd HB.20) Pengembangan DI. Rawa Sragi 1 dan Rawa Pisang, Kabupaten Lampung Selatan dan Kabupaten Lampung Timur, Provinsi Lampung - URSIP HAND AUGER LOCATION MAP HB.4 HB.2 Latitude Longitude 1 HB 1 5°30'44.89"S 105°37'22.28"E Lampung Selatan FEEDER CANAL Intake Kanan Jalan Pengerasan Desa 2 HB 2 5°33'38.72"S 105°38'4.82"E Lampung Selatan FEEDER CANAL Syphone Besar Jalan tanggul pematang sawah 3 HB 3 5°35'47.09"S 105°40'15.52"E Lampung Selatan PRIMER LEBUNG GAYAU Bangunan bagi Jalan Tanah Desa 4 HB 4 5°37'2.92"S 105°42'10.56"E Lampung Selatan PRIMER LEBUNG GAYAU Bangunan bagi Jalan Pengersan Desa 5 HB 5 5°37'17.48"S 105°42'38.77"E Lampung Selatan PRIMER LEBUNG GAYAU Bangunan bagi Jalan Pengersan Desa 6 HB 6 5°37'26.01"S 105°44'25.17"E Lampung Selatan PRIMER LEBUNG GAYAU Bangunan bagi Jalan pematang sawah Relokasi 5°34'24.64"S 105°40'35.25"E 7 HB 7 5°37'32.55"S 105°45'18.18"E Lampung Selatan PRIMER LEBUNG GAYAU Bangunan bagi Jalan pematang sawah Relokasi 5°32'9.40"S 105°39'7.05"E 8 HB 8 5°34'16.79"S 105°42'2.74"E Lampung Timur PRIMER LEBUNG GAYAU Bangunan bagi Jalan pematang sawah 9 HB 9 5°32'45.71"S 105°40'38.49"E Lampung Timur PRIMER LEBUNG GAYAU Box tersier Jalan Tanggul Sungai 10 HB 10 5°31'53.54"S 105°40'34.41"E Lampung Timur PRIMER PULAU TENGAH Syphone Jalan pematang sawah 11 HB 11 5°30'23.63"S 105°40'1.78"E Lampung Timur PRIMER PULAU TENGAH Syphone Jalan tanah/ Desa 12 HB 12 5°30'0.90"S 105°38'52.17"E Lampung Selatan PRIMER PULAU TENGAH Syphone Jalan pematang sawah 13 HB 13 5°28'23.66"S 105°39'0.66"E Lampung Timur PRIMER PULAU TENGAH Syphone Jalan kebun Desa 14 HB 14 5°27'49.37"S 105°39'5.77"E Lampung Timur PRIMER PULAU TENGAH Syphone Jalan Kebun Karet 15 HB 15 5°29'33.20"S 105°37'23.39"E Lampung Selatan PRIMER PULAU TENGAH Syphone Jalan pematang sawah 16 HB 16 5°31'16.69"S 105°38'5.21"E Lampung Selatan PRIMER PULAU TENGAH Syphone Jalan pematang sawah 17 HB 17 5°30'47.44"S 105°39'27.15"E Lampung Selatan PRIMER PULAU TENGAH Syphone Jalan pematang sawah 18 HB 18 5°32'15.22"S 105°40'5.69"E Lampung Timur PRIMER PULAU TENGAH Box tersier Jalan pematang sawah 19 HB 19 5°32'6.64"S 105°38'26.76"E Lampung Selatan PRIMER PULAU TENGAH Box tersier Jalan Tanggul Saluran 20 HB 20 5°33'18.47"S 105°39'8.34"E Lampung Selatan PRIMER PULAU TENGAH Box tersier Jalan pematang sawah BOR TANGAN (HB) No. KODE Ordinat Kabutaen Nama Saluran Nama Bangunan Akses Jalan
  • 19. NO. DESCRIPTION HB 1 HB 2 HB 3 BH 5 HB 8 HB 9 HB 10 HB 11 HB 12 HB 15 HB 16 HB 17 HB 18 HB 20 SAMPEL TABUNG (UNDISTURBED SAMPLE) 1 Kadar Air (Water Content) % 149,76 81,2 49,97 27,42 85,63 177,73 113,67 39,72 36,25 52,19 122,42 72,98 140,82 142,78 2 Berat Volume(Density) gr/ cm 1,262 1,313 1,564 1,544 1,289 0,992 1,204 1,696 1,646 1,523 1,194 1,291 1,187 1,086 3 Berat Jenis (Specific gravity) (Gs) 2,026 2,031 2,349 2,277 2,335 1,629 2,042 2,532 2,677 2,364 2,202 1,964 1,755 1,615 4 Persen Lolos (Percent Passed) No. 200% 74,71 71,62 48,1 32,99 69,64 70,52 73,07 76,97 44,8 75,82 79,05 81,64 67,91 77,49 5 Atterberg(Atterberg Limit) LL % 139,78 102,19 51,74 49,32 102,24 220,56 134,55 75,85 52,18 94,18 136,5 101,18 155,74 221,17 PL % 64,29 69,16 41,08 31,82 66,41 187,5 67,67 40,99 29,72 52,41 70,02 55,34 71,28 184,23 PI % 75,49 33,02 10,66 17,49 35,83 33,06 66,88 34,86 22,46 41,77 66,48 45,84 84,45 36,93 6 Direct Shear (Direct Shear Test) Kohesi (Cohesion) ( c) kg/ cm 0,078 0,058 0,065 0,124 0,058 0,039 0,058 0,209 0,058 0,124 0,049 0,045 0,022 0,013 Sudut Geser Dalam (Internal Friction Angle) ... 11,1 11,1 16,4 30,5 11,1 11,1 11,1 26,1 11,1 16,4 5,6 16,4 8,4 8,4 7 Konsolidasi (Consolidation) Cvcm2/ s 0,032 0,056 0,07 0,072 0,061 0,1 0,069 0,041 0,101 0,034 0,012 0,154 0,028 0,075 Cc 0,825 0,63 0,155 0,093 0,581 1,928 0,669 0,163 0,209 0,193 1,204 0,278 0,769 1,029 Pt MH - OH Pt Pt Pt KLASIFIKASI TANAH Test Laboratorium : Index Properties Enginering Properties
  • 20. Test Pit : Quarry and Borrow
  • 21. Lokasi Test Pit: 1. Marga Batin (TP.1, TP.2) 2. Beringin Kencana (TP.3, TP.4) TEST PIT LOCATION MAP (BORROW) 1. Marga Batin 2. Beringin Kencana
  • 22. Lokasi Marga Batin Estimasi luasan sekitar 1,2 ha Lokasi Beringin Kencana 1,3 Ha
  • 23. Quarry Map with Government Permits (IUP-OP) at North of Jabung Weir Location source: website geoportal.esdm.co.id (ESDM One Map). QUARRY LOCATION MAP
  • 25.
  • 26.
  • 27.
  • 28. Drilling equipment moving from Trimo Mukti to Bumi Restu (Last point BH 4 – Aqueduct BPT 8)
  • 29. Test Pit TP 3 Beringin Kencana – Soil Description Test Pit TP 4 Beringin Kencana – GWL measurement Test Pit TP 3 Laboratory Test – Soil Sampling Test Pit TP 4 Laboratory Test – Soil Sampling
  • 30. Start from December 15 th, 2022: PKM 1 December January February January 24, 2023 2023 2023 2022 ahead of schedule