3. About my Beliefs
Design is comfort, functionality & self reflection.
Personal Mission Statement- Always be an enthusiastic, comforting and compassionate person.
Be someone who is approachable & helpful. Regardlesss of the situation always be one who offers
positivity helps others in need.
4. Wendy Fregoso Interior Designer
MissionStatement
I strive to design spaces that meet all needs. As a designer I desire to design
spaces that are complex and diverse to acomidate all people. In addition, design
versitile, comfortable, and unique luxury Spaces that anyone could see them-
selves in over the years. Personally my goal is to maintain being a reliable and
efficent Professional Interior Designer.
Education
West Lyon High School- Blue Ribbon School
Inwood,IA- B Honor Roll
Kirkwood Com.College- 2nd in the state, Meets CIDA & NCIDQ standards
CedarRapids,IA- Dean’s List of 2019
Associations
NEWH(NetworkofexecutiveWomeninHospitality)-Since2018
IIDA(InternationalInteriorDesignAssociation)-Since2018
KSID(KirkwoodStudentsinInteriorDesign)-Since2017
Expirience/References
LazboyFurniture-InteriorDesignAssociate
CedarRapids,IA-January-July 2019
HomeDepot-Kitchen&BathDesigner
SiouxCity,IA-June2019-2020
Phone: 319.393.0928
Email:bkeddley@gmail.com
ContactInformation
712.301.2796
w.fregoso.2014@gmail.com
WendyFregoso
https://designsbywendyfregoso.onfabrik.com/
Personal Qualifications
Spanish
English
Portuguese
Organization
Adaptive
Communitcation
Time Management
Hand Rendering
Design Qualifications
Sales & Marketing
Space Zoning
Model Making
Presentation
Renderings
RFP Preporation
Construction-
Documents
Software Programming
Auto CAD
20/20
SketchUp
Revit
Lumion
InDesign
Photoshop
Google Software
Microsoft Software
Phone: 712.255.5310 x101
Email: sasm2114@Homedepot.com
6. About Project
Duration- 1.5 weeks
Location- Portland.OR
Individual Project
Programs: SketchUp, Revit, Lumion
Materials
The Reddings are a newly-wed couple. The couple
requests high tech and modern contemportary
home. The wife is a involved with the community,
accordingly eco-friendly and energy savings appli-
ances were used throughout the space.
9. About Project
Duration- 2 weeks
Location- Portand,OR
Individual Project
Programs: SketchUp, Revit, Lumion
The newly wed couple requested a high-tech and contempo-
rary home. They do a lot of hosting and don’t plan on having
kids.
Materials
12. New Build- Parade Home Duration- 4 weeks
Location- Dallas, TX
Individual Project
Programs: SketchUp, Revit, 2020, Lumion
Materials
13. About Project
The clients built a new home for their multi-generational family.
The family lives a Modern Farmhouse lifestyle. The family con-
sists of 7 members inlcuding a new born. All generations enjoy
& bond while watching movies.The family also spending plenty
bonding time while prepering dinner all together. The main focus
was to ensure there was enough space of each family member
individually and as a whole.
16. About Project
The clients remodeled a Condo to fit their Feng Shui lifestyle. They
were a couple in their 40’s, with no children. As their careers
were their may focus. The wife is a professor & the husband is a
chef. Both partners suffered with joint problems. Theirs hobbies
mainly consist of hosting friends and enjoy nature. The main fo-
cus was to ensure the space would reflect their lifestyle.
21. About Project
Duration- 4 weeks
Location- Manzanillo, Mexico
Individual Project
Programs: SketchUp, Revit, Lumion
An authentic Mexican restaurant & Bar with stimulating elements and expo-
sure to the Mexico’s nature. Fuego meaning heat in spanish is derived from
the heat of mexican spices and teuila. As there are traditional finsihes &
furniture styles with modern upgrades & arcitecture. Plenty of access to
view Mexico’s terrain and availablity to sit outside on the patio tas well.
Materials
27. About Project
Duration- 2.5 weeks
Location- Denver, CO
Individual Project
Programs: SketchUp, Revit, Lumion
Completely open office areas with all areas to be easily accessed by
all other workers. Thus meeting the goal of easy collaboration. Fin-
ishing with colors to reflect the eco friendly and collaborative style.
Using orange representing cheerfulness, creativity and vibrancy
paired with green representing freshness, sustainability and friend-
ly. Natural surfaces to reflect the the sense of nature and to envoc a
sense of being outdoors.
28. RenderedFloor Plan
Group Rooms
Patio
Workstation Elevation
Bike rack
to motivate
workers to be
actice & convi-
enence.
Entertainment Stage
Vegetables grown on patio garden will be used in the cafe.
Stage is visible from the
game area above on the
right on mezinen.
Waterfall wall on the right
is filled with recycled wa-
ter from building.
30. About Project
Duration- 2.5 weeks
Location- Atlanta, GA
Individual Project
Programs: SketchUp, Revit, Lumion
Pepsi Co. is a global company. The company is seeking to
become recognized healthy life compnay. The design is
layed out to be highly collaborable and accessable to all.
31. Track Sliding White Boards &
Projector screen for presentations
Mail Room
Presentation Room
Marketing Plan
Fire Safety Plan
Break Room
Lounge
Taste Room with
fountain pop taps &
chips dispencers
Orange line
shows were
there is brand-
ing & product
displays
33. About Project
Duration- 2 weeks
Location- Cedar Rapids, IA
Individual Project
Programs: SketchUp, Revit, Lumion
A Spa Dentistry is a dental office where the client can
feel at ease and relax when get a manicure or foot
massage while having dental work done. Diamond Spa
Dentistry has been designed inspired by a diamond.
When looking at the core you see different angles of
cuts.
36. Hand Rendering
Duration- 2 Hours
Individual Project
Materials- Markers, Colored Pencils
The rendering’s media used were
a mix of marker, pen & color
pencil. On average each rending
took 20 minutes to an hour .
37. Stipling Ink
Duration- 10 Hours
Individual Project
Materials- Ink Pen
The entire rendering consists
of purely dots. No lines or
block shading was done. The
projects media was soley Ink
& paper. This project contains
layering, shading & varied pat-
terns. The stippling project
took nealry 10 hours to com-
plete.