SlideShare a Scribd company logo
1 of 2
Download to read offline
David Modin         Mobile Phone: 949-813-6274 ModinDavid@yahoo.com
23921 Copenhagen St
Mission Viejo, CA 92691

Seeking an electrical engineering position with a medical device company in the Orange County area.

Skills                                                      Proficiency
Electrical Network and Circuit Analysis                     Expert
Mixed Signal Test Concepts                                  Expert
GPIB & VXI (Agilent,Tektronix,Keithley Instruments)         Expert
MS Office, VISIO™, OrCAD, PCAD, Agile                       Intermediate
Adobe Acrobat™                                              Expert
NI LabVIEW™                                                 Expert
Boundary Scan (TSSI to SVF, State Machine, HW)              Expert

Professional Experience

    • 05/2012 – 10/2012 Principal Electrical Engineer, Cardiac Science Laguna Hills, CA
Sustaining product support of hospital monitor and AEDs to implement design enhancements, resolve
component obsolescence issues, and correct supplier quality problems. Electrical circuit analysis, project
management planning, develops and document DVT approaches to verify/validate design changes.
IEC60601-1, IEC60601-2-4, UL260-1, EMC, Mechanical stress testing.
    • 01/2011 – 05/2012 Sr. Electrical Engineer (Contractor) Cardiac Science Laguna Hills, CA.
        Sustaining engineering.
    • 11/2009 – 01/2011 Sr. Electrical Engineer, Medtronic Diabetes Inc | Northridge, CA
Performing failure analysis on new product. Documenting FA results in lab notebook. Test system
validation of new hardware prior to production release. Test system redesign for yield improvement by
replacing combinational logic with a more flexible and observable PIC solution.
    • 04/2008 – 11/2009 Principal Test Engineer, Cameron Health Inc | San Clemente, CA
Providing technical expertise and direction in manufacturing test for a midsize up and coming
implantable medical device company. Develop advanced LabVIEW™ programming projects. Author
various specifications in support of production test for the purpose of defining test requirements and
methodologies. Defined test development process to include creating verification protocols for
LabVIEW™ and C# software solutions against product test requirements specifications.
    • 05/1993 – 11/2006 Principal Test Engineer, Medtronic Inc. | Tempe, AZ
Test Development Team Leader for the IC & Discrete Hybrid Module for four main line Implantable
Pulse Generators (IPGs). Responsibilities include Test Strategy, Design For Testability Requirements,
Test Coverage goals/reqts, Test Design Documents, writing code in LabVIEW or C, developing vector
files (TSSI to Serial Vector Format for Boundary Scan), Test Verification/Validation and release and
maintenance through production ramp up phase. Support consulting for long term program maintenance
throughout the product lifecycle.
David J. Modin                            Page 1                                   5/02/11
Worked with IC designers and test community to define our digital test direction (Boundary
Scan,OVS,IDDq) as a Senior Member of R&D team for Next Generation Hybrid Tester (NGHT) Test
System Development project.
Automated Boundary Scan Serial Vector Format (SVF) file generation and IDDq strobe selection SVF
File Splitter Utility using LabVIEW™ resulting in reduced time-to-market and eliminating human error.
Instituted company wide use of Adobe Acrobat for test release documentation review tool to allow
offline document reviews with ensured capture of all reviewers comments by importing all Acrobat
comments into a single PDF resulting in improved review and documentation.
As Senior member of Test System Development team, led effort to replace Tektronix VXI Boundary
Scan solution with state of the art PC Based PCI Boundary Scan Controller card that sped up vector
throughput, reduced test time, and improved yield due to improved SNR as a result of gated TCK clock.
Developed improved scan methodologies via “peek” and “poke” of DUT I/O addresses by a pseudo
macro method of replacing in a compiled SVF file and later DMA replacement of scan cells to setup
DUT for analog tests resulting in improved observability of DUT scan state and reduced test time.
Taught LabVIEW™ applied test based classes internally.

Defined test strategy for the latest product line which was a cost reduction effort to save Medtronic $30
million per year.

Education
01/1987 – 05/1993 Bachelor’s Degree, Arizona State University / BSEE | Tempe, AZ
   • GPA 3.42, PHI THETA KAPPA Honor Society
   • ETA KAPPA NU Electrical Engineering Honor Society

Professional Memberships
IEEE Member
Awards
   • Individual Customer Focused Quality Award (Medtronic Inc.) Awarded for implementing
       companywide document review strategy based on Adobe Acrobat which contributed to reduction
       of new product line development cycle time from ~5 years on average to 18 months from
       concept to production ramp up.
   • 8 Team Project Development Awards Awarded on completion of new product development.
       These awards are given for innovative test improvement concepts resulting in higher yield,
       improved diagnostic capabilities and/or reduced test time.

References
Available upon request




David J. Modin                            Page 2                                   5/02/11

More Related Content

What's hot

JDick Resume 9-2015
JDick Resume 9-2015JDick Resume 9-2015
JDick Resume 9-2015
John Dick
 
Praveen_kumar.M_V-updated CV.docx.imp
Praveen_kumar.M_V-updated CV.docx.impPraveen_kumar.M_V-updated CV.docx.imp
Praveen_kumar.M_V-updated CV.docx.imp
Praveen Kumar M V
 
Resume for Lee Hanson
Resume for Lee HansonResume for Lee Hanson
Resume for Lee Hanson
Lee Hanson
 
Jaya_Joshi_Software_Testing
Jaya_Joshi_Software_TestingJaya_Joshi_Software_Testing
Jaya_Joshi_Software_Testing
jaya joshi
 
Craig Bushman logo resume
Craig Bushman logo resumeCraig Bushman logo resume
Craig Bushman logo resume
Craig Bushman
 
011811 Shawn Jackson Professional Profile For Linked In
011811 Shawn Jackson Professional Profile For Linked In011811 Shawn Jackson Professional Profile For Linked In
011811 Shawn Jackson Professional Profile For Linked In
how25longslide
 
papiska_resume_HP_5_16
papiska_resume_HP_5_16papiska_resume_HP_5_16
papiska_resume_HP_5_16
Ron Papiska
 
Doug Leschak-Resume
Doug Leschak-ResumeDoug Leschak-Resume
Doug Leschak-Resume
Doug Leschak
 
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti Mule
 
Jason_Harvey_Resume
Jason_Harvey_ResumeJason_Harvey_Resume
Jason_Harvey_Resume
Jason Harvey
 
Anith R_Software testing CV
Anith R_Software testing CVAnith R_Software testing CV
Anith R_Software testing CV
Anitha Ani
 

What's hot (20)

JDick Resume 9-2015
JDick Resume 9-2015JDick Resume 9-2015
JDick Resume 9-2015
 
pooja_resume
pooja_resumepooja_resume
pooja_resume
 
Praveen_kumar.M_V-updated CV.docx.imp
Praveen_kumar.M_V-updated CV.docx.impPraveen_kumar.M_V-updated CV.docx.imp
Praveen_kumar.M_V-updated CV.docx.imp
 
Resume for Lee Hanson
Resume for Lee HansonResume for Lee Hanson
Resume for Lee Hanson
 
Quality Technician
Quality TechnicianQuality Technician
Quality Technician
 
Jaya_Joshi_Software_Testing
Jaya_Joshi_Software_TestingJaya_Joshi_Software_Testing
Jaya_Joshi_Software_Testing
 
Craig Bushman logo resume
Craig Bushman logo resumeCraig Bushman logo resume
Craig Bushman logo resume
 
How to Determine Appropriate Software Quality
How to Determine Appropriate Software QualityHow to Determine Appropriate Software Quality
How to Determine Appropriate Software Quality
 
Shawn Jackson Professional Profile and Summary
Shawn Jackson Professional Profile and SummaryShawn Jackson Professional Profile and Summary
Shawn Jackson Professional Profile and Summary
 
011711 Shawn Jackson Professional Profile For Linked In
011711 Shawn Jackson Professional Profile For Linked In011711 Shawn Jackson Professional Profile For Linked In
011711 Shawn Jackson Professional Profile For Linked In
 
011811 Shawn Jackson Professional Profile For Linked In
011811 Shawn Jackson Professional Profile For Linked In011811 Shawn Jackson Professional Profile For Linked In
011811 Shawn Jackson Professional Profile For Linked In
 
papiska_resume_HP_5_16
papiska_resume_HP_5_16papiska_resume_HP_5_16
papiska_resume_HP_5_16
 
Resume Todd B. Colin
Resume Todd B. ColinResume Todd B. Colin
Resume Todd B. Colin
 
Sukumar resume
Sukumar resumeSukumar resume
Sukumar resume
 
Doug Leschak-Resume
Doug Leschak-ResumeDoug Leschak-Resume
Doug Leschak-Resume
 
Electrical and control engineer for hammond solution
Electrical and control engineer for hammond  solutionElectrical and control engineer for hammond  solution
Electrical and control engineer for hammond solution
 
Resume2015
Resume2015Resume2015
Resume2015
 
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
 
Jason_Harvey_Resume
Jason_Harvey_ResumeJason_Harvey_Resume
Jason_Harvey_Resume
 
Anith R_Software testing CV
Anith R_Software testing CVAnith R_Software testing CV
Anith R_Software testing CV
 

Viewers also liked (8)

ICT End of Year Reflection PPT
ICT End of Year Reflection PPTICT End of Year Reflection PPT
ICT End of Year Reflection PPT
 
List Of Accomplishments
List Of AccomplishmentsList Of Accomplishments
List Of Accomplishments
 
Rpms accomplishment journal
Rpms accomplishment journalRpms accomplishment journal
Rpms accomplishment journal
 
Grade 1 Examples
Grade 1 ExamplesGrade 1 Examples
Grade 1 Examples
 
Accomplishment report
Accomplishment reportAccomplishment report
Accomplishment report
 
ICT Strategic Planning
ICT Strategic PlanningICT Strategic Planning
ICT Strategic Planning
 
ICT Strategic Planning
ICT Strategic PlanningICT Strategic Planning
ICT Strategic Planning
 
school accomplishment report per month
school accomplishment report per monthschool accomplishment report per month
school accomplishment report per month
 

Similar to Electrical Engineer (David Modin)

Naveen_Reddy_Resume
Naveen_Reddy_ResumeNaveen_Reddy_Resume
Naveen_Reddy_Resume
reddhun
 
Carlos Espino - Resume
Carlos Espino - ResumeCarlos Espino - Resume
Carlos Espino - Resume
Carlos Espino
 
Todd Watson Resume
Todd Watson ResumeTodd Watson Resume
Todd Watson Resume
mtwatson
 
John Allen - Resume
John Allen - ResumeJohn Allen - Resume
John Allen - Resume
John Allen
 
Scott Jenney resume 5JUL2106
Scott Jenney resume 5JUL2106Scott Jenney resume 5JUL2106
Scott Jenney resume 5JUL2106
Scott Jenney
 
Kevin Hiller Resume.Reliability.Quality
Kevin Hiller Resume.Reliability.QualityKevin Hiller Resume.Reliability.Quality
Kevin Hiller Resume.Reliability.Quality
Kevin Hiller
 
W.Hall_Resume_4_11_16
W.Hall_Resume_4_11_16W.Hall_Resume_4_11_16
W.Hall_Resume_4_11_16
Warren Hall
 
William Petcher_sat
William Petcher_satWilliam Petcher_sat
William Petcher_sat
Bill Petcher
 

Similar to Electrical Engineer (David Modin) (20)

Khan Umair Resume Feb2010
Khan Umair Resume Feb2010Khan Umair Resume Feb2010
Khan Umair Resume Feb2010
 
Naveen_Reddy_Resume
Naveen_Reddy_ResumeNaveen_Reddy_Resume
Naveen_Reddy_Resume
 
Updated New Sar3
Updated New Sar3Updated New Sar3
Updated New Sar3
 
Joel Amzallag
Joel AmzallagJoel Amzallag
Joel Amzallag
 
Process Control & CV history
Process Control & CV historyProcess Control & CV history
Process Control & CV history
 
EntryLevel Resume
EntryLevel ResumeEntryLevel Resume
EntryLevel Resume
 
Carlos Espino - Resume
Carlos Espino - ResumeCarlos Espino - Resume
Carlos Espino - Resume
 
Todd Watson Resume
Todd Watson ResumeTodd Watson Resume
Todd Watson Resume
 
Resume_LI
Resume_LIResume_LI
Resume_LI
 
Anirban chakraborty(m eng., cssgb)
Anirban chakraborty(m eng., cssgb)Anirban chakraborty(m eng., cssgb)
Anirban chakraborty(m eng., cssgb)
 
John Allen - Resume
John Allen - ResumeJohn Allen - Resume
John Allen - Resume
 
Brad rust resume
Brad rust resumeBrad rust resume
Brad rust resume
 
Current_Resume
Current_ResumeCurrent_Resume
Current_Resume
 
Mathew Bibin_2016
Mathew Bibin_2016Mathew Bibin_2016
Mathew Bibin_2016
 
Scott Jenney resume 5JUL2106
Scott Jenney resume 5JUL2106Scott Jenney resume 5JUL2106
Scott Jenney resume 5JUL2106
 
Final Resume
Final Resume Final Resume
Final Resume
 
Kevin Hiller Resume.Reliability.Quality
Kevin Hiller Resume.Reliability.QualityKevin Hiller Resume.Reliability.Quality
Kevin Hiller Resume.Reliability.Quality
 
W.Hall_Resume_4_11_16
W.Hall_Resume_4_11_16W.Hall_Resume_4_11_16
W.Hall_Resume_4_11_16
 
ResumeAug14
ResumeAug14ResumeAug14
ResumeAug14
 
William Petcher_sat
William Petcher_satWilliam Petcher_sat
William Petcher_sat
 

Electrical Engineer (David Modin)

  • 1. David Modin Mobile Phone: 949-813-6274 ModinDavid@yahoo.com 23921 Copenhagen St Mission Viejo, CA 92691 Seeking an electrical engineering position with a medical device company in the Orange County area. Skills Proficiency Electrical Network and Circuit Analysis Expert Mixed Signal Test Concepts Expert GPIB & VXI (Agilent,Tektronix,Keithley Instruments) Expert MS Office, VISIO™, OrCAD, PCAD, Agile Intermediate Adobe Acrobat™ Expert NI LabVIEW™ Expert Boundary Scan (TSSI to SVF, State Machine, HW) Expert Professional Experience • 05/2012 – 10/2012 Principal Electrical Engineer, Cardiac Science Laguna Hills, CA Sustaining product support of hospital monitor and AEDs to implement design enhancements, resolve component obsolescence issues, and correct supplier quality problems. Electrical circuit analysis, project management planning, develops and document DVT approaches to verify/validate design changes. IEC60601-1, IEC60601-2-4, UL260-1, EMC, Mechanical stress testing. • 01/2011 – 05/2012 Sr. Electrical Engineer (Contractor) Cardiac Science Laguna Hills, CA. Sustaining engineering. • 11/2009 – 01/2011 Sr. Electrical Engineer, Medtronic Diabetes Inc | Northridge, CA Performing failure analysis on new product. Documenting FA results in lab notebook. Test system validation of new hardware prior to production release. Test system redesign for yield improvement by replacing combinational logic with a more flexible and observable PIC solution. • 04/2008 – 11/2009 Principal Test Engineer, Cameron Health Inc | San Clemente, CA Providing technical expertise and direction in manufacturing test for a midsize up and coming implantable medical device company. Develop advanced LabVIEW™ programming projects. Author various specifications in support of production test for the purpose of defining test requirements and methodologies. Defined test development process to include creating verification protocols for LabVIEW™ and C# software solutions against product test requirements specifications. • 05/1993 – 11/2006 Principal Test Engineer, Medtronic Inc. | Tempe, AZ Test Development Team Leader for the IC & Discrete Hybrid Module for four main line Implantable Pulse Generators (IPGs). Responsibilities include Test Strategy, Design For Testability Requirements, Test Coverage goals/reqts, Test Design Documents, writing code in LabVIEW or C, developing vector files (TSSI to Serial Vector Format for Boundary Scan), Test Verification/Validation and release and maintenance through production ramp up phase. Support consulting for long term program maintenance throughout the product lifecycle. David J. Modin Page 1 5/02/11
  • 2. Worked with IC designers and test community to define our digital test direction (Boundary Scan,OVS,IDDq) as a Senior Member of R&D team for Next Generation Hybrid Tester (NGHT) Test System Development project. Automated Boundary Scan Serial Vector Format (SVF) file generation and IDDq strobe selection SVF File Splitter Utility using LabVIEW™ resulting in reduced time-to-market and eliminating human error. Instituted company wide use of Adobe Acrobat for test release documentation review tool to allow offline document reviews with ensured capture of all reviewers comments by importing all Acrobat comments into a single PDF resulting in improved review and documentation. As Senior member of Test System Development team, led effort to replace Tektronix VXI Boundary Scan solution with state of the art PC Based PCI Boundary Scan Controller card that sped up vector throughput, reduced test time, and improved yield due to improved SNR as a result of gated TCK clock. Developed improved scan methodologies via “peek” and “poke” of DUT I/O addresses by a pseudo macro method of replacing in a compiled SVF file and later DMA replacement of scan cells to setup DUT for analog tests resulting in improved observability of DUT scan state and reduced test time. Taught LabVIEW™ applied test based classes internally. Defined test strategy for the latest product line which was a cost reduction effort to save Medtronic $30 million per year. Education 01/1987 – 05/1993 Bachelor’s Degree, Arizona State University / BSEE | Tempe, AZ • GPA 3.42, PHI THETA KAPPA Honor Society • ETA KAPPA NU Electrical Engineering Honor Society Professional Memberships IEEE Member Awards • Individual Customer Focused Quality Award (Medtronic Inc.) Awarded for implementing companywide document review strategy based on Adobe Acrobat which contributed to reduction of new product line development cycle time from ~5 years on average to 18 months from concept to production ramp up. • 8 Team Project Development Awards Awarded on completion of new product development. These awards are given for innovative test improvement concepts resulting in higher yield, improved diagnostic capabilities and/or reduced test time. References Available upon request David J. Modin Page 2 5/02/11