U C I S A I T I L : A G U I D E T O C H A N G E A D V I S O R Y B O A R D M E E T I N G S 1 
ITIL – A guide to Change Advisory Board (CAB) 
meetings 
CAB meetings 
The Change Manager will always act as the Chair of any CAB meetings either virtual or face to face. 
CAB meetings should be called by the Change Manager at appropriate times to ensure the prompt and efficient 
handling of all changes. During high levels of change this could potentially be daily. 
For complex, high risk or high impact changes, or when major projects are due to deliver products a formal CAB 
meeting be would be necessary. 
The meetings can then be used to provide a formal review and authorisation of changes, a review of outstanding 
changes, and, to discuss any impending major changes. Where face to face meetings are appropriate, they should have 
a standard agenda. 
Relevant change information should be circulated in advance to allow CAB members to conduct impact and resource 
assessments prior to the CAB meeting. 
The CAB called by the Change Manager should consist of attendees who are relevant to RFCs being considered. This 
also includes attendees for other groups and parts of the business outside IT. Authorisation at the CAB for each change 
must be given by appropriate representatives from all areas the change will affect. 
The CAB representatives for a significant or major change are at a different level. It is the role of the Change Manager 
to ensure that those who are invited to participate in the CAB meeting are at the appropriate level in the organisation 
as key decision makers. 
A standard CAB agenda 
„„ A review of all failed changes 
„„ A review of all backed out changes 
„„ A list of RFCs to be assessed by CAB members 
„„ A review of all implemented changes 
„„ The change management process – including any amendments made to the process, as well as proposed 
changes to the process (as appropriate) 
„„ Change management successes for the period under discussion, i.e. a review of the business benefits seen as a 
result of the change management process (as appropriate)
U C I S A I T I L : A G U I D E T O C H A N G E A D V I S O R Y B O A R D M E E T I N G S 2 
CAB considerations for each change (prior to authorisation) 
„„ Risk/impact assessment (on the business) 
„„ Effect upon the infrastructure and customer service, as defined in the SLA, and upon the capacity and 
performance, reliability and resilience, contingency plans, and security 
„„ Impact on other services that run on the same infrastructure (or on software development projects) 
„„ Resource assessment – the IT, business and other resources required to implement the change, covering the 
likely costs, the number and availability of people required, the elapsed time, and any new infrastructure 
elements required 
„„ The impact on non-IT infrastructures within the organisation 
„„ Effect/risk/impact of not implementing the change 
„„ Other changes being implemented on the schedule of change 
„„ Technical capability and technical approval 
„„ Financial approval (if required) 
„„ Third party/supplier involvement in the implementation of the change 
„„ Business approval (if required) 
„„ Review/assessment of the change priority 
CAB comments/issues 
All CAB comments on each change and any issues that have been discussed must be documented by the Change 
Manager within the CAB meeting minutes. 
CAB recommendations/decisions 
All CAB recommendations and decision that have been discussed must be documented by the Change Manager 
within the CAB meetings minutes. 
CAB authorisation/approval 
Once all aspect of the change have been considered (as per the CAB considerations for each change information 
above) the CAB will then give authorisation for the change to be progress for scheduling and into the change build 
stage of the process. 
The CAB is an advisory body only. If the CAB cannot make a final decision on the authorisation of a change then the 
change escalation needs to be initiated by the Change Manager to ensure that authorisation is given (via escalation) 
at a higher level. The escalation of change authorisation is documented in the request for change – the Change 
Manager will detail to whom the change was escalated and the final decision that was made either authorised or 
rejected. 
Once a change has been authorised, the status of the change at this stage of the change process will be: AUTHORISED. 
Rejection of a change by the Change Advisory Board 
If the CAB rejects the change, the Change Manager must document, in full, the reasons for the rejection and ensure 
that the decision is communicated to the Change Initiator. 
The Status of the change at this stage of the change process will be: REJECTED BY THE CAB.

More Related Content

What's hot

IT Change Management Process Guide & Standards v4.0
IT Change Management Process Guide & Standards v4.0IT Change Management Process Guide & Standards v4.0
IT Change Management Process Guide & Standards v4.0
Edward Paul Pagsanhan
 
Ensure network migration success with Change Management
Ensure network migration success with Change ManagementEnsure network migration success with Change Management
Ensure network migration success with Change Management
Comms Connect
 
ITIL v3 Foundation Presentation
ITIL v3 Foundation PresentationITIL v3 Foundation Presentation
ITIL v3 Foundation Presentation
Wajahat Rajab
 
COBIT 5 as an IT Management Best Practices Framework - by Goh Boon Nam
COBIT 5 as an IT Management Best Practices Framework - by Goh Boon NamCOBIT 5 as an IT Management Best Practices Framework - by Goh Boon Nam
COBIT 5 as an IT Management Best Practices Framework - by Goh Boon Nam
NUS-ISS
 
IT Service Catalogue Overview
IT Service Catalogue OverviewIT Service Catalogue Overview
IT Service Catalogue Overview
cesilia_123
 
Review of Information Technology Function Critical Capability Models
Review of Information Technology Function Critical Capability ModelsReview of Information Technology Function Critical Capability Models
Review of Information Technology Function Critical Capability Models
Alan McSweeney
 

What's hot (20)

ITIL Introduction
ITIL IntroductionITIL Introduction
ITIL Introduction
 
DISTINGUISH BETWEEN WALSH TRANSFORM AND HAAR TRANSFORMDip transforms
DISTINGUISH BETWEEN WALSH TRANSFORM AND HAAR TRANSFORMDip transformsDISTINGUISH BETWEEN WALSH TRANSFORM AND HAAR TRANSFORMDip transforms
DISTINGUISH BETWEEN WALSH TRANSFORM AND HAAR TRANSFORMDip transforms
 
Innovation Pay 2017 - CIP
Innovation Pay 2017 - CIPInnovation Pay 2017 - CIP
Innovation Pay 2017 - CIP
 
ITSM- Process-Guidelines to update a ticket
ITSM- Process-Guidelines to update a ticketITSM- Process-Guidelines to update a ticket
ITSM- Process-Guidelines to update a ticket
 
OSS Service Assurance -Concept Presentation by Biju M Rr
OSS Service Assurance  -Concept Presentation by Biju M RrOSS Service Assurance  -Concept Presentation by Biju M Rr
OSS Service Assurance -Concept Presentation by Biju M Rr
 
IT Change Management Process Guide & Standards v4.0
IT Change Management Process Guide & Standards v4.0IT Change Management Process Guide & Standards v4.0
IT Change Management Process Guide & Standards v4.0
 
IT - Enterprise Service Operation Center
IT - Enterprise Service Operation CenterIT - Enterprise Service Operation Center
IT - Enterprise Service Operation Center
 
Ensure network migration success with Change Management
Ensure network migration success with Change ManagementEnsure network migration success with Change Management
Ensure network migration success with Change Management
 
Digital Signal Processing[ECEG-3171]-Ch1_L06
Digital Signal Processing[ECEG-3171]-Ch1_L06Digital Signal Processing[ECEG-3171]-Ch1_L06
Digital Signal Processing[ECEG-3171]-Ch1_L06
 
Math*4 Laplace and Inverse laplace transform
Math*4 Laplace and Inverse laplace transformMath*4 Laplace and Inverse laplace transform
Math*4 Laplace and Inverse laplace transform
 
ITIL v3 Foundation Presentation
ITIL v3 Foundation PresentationITIL v3 Foundation Presentation
ITIL v3 Foundation Presentation
 
Digital transmission new unit 3
Digital transmission new unit 3Digital transmission new unit 3
Digital transmission new unit 3
 
Incident Management
Incident Management Incident Management
Incident Management
 
COBIT 5 as an IT Management Best Practices Framework - by Goh Boon Nam
COBIT 5 as an IT Management Best Practices Framework - by Goh Boon NamCOBIT 5 as an IT Management Best Practices Framework - by Goh Boon Nam
COBIT 5 as an IT Management Best Practices Framework - by Goh Boon Nam
 
IT Service Catalogue Overview
IT Service Catalogue OverviewIT Service Catalogue Overview
IT Service Catalogue Overview
 
TOGAF ITIL & COBIT
TOGAF ITIL & COBITTOGAF ITIL & COBIT
TOGAF ITIL & COBIT
 
Review of Information Technology Function Critical Capability Models
Review of Information Technology Function Critical Capability ModelsReview of Information Technology Function Critical Capability Models
Review of Information Technology Function Critical Capability Models
 
Togaf – architecture development method (adm)
Togaf – architecture development method (adm)Togaf – architecture development method (adm)
Togaf – architecture development method (adm)
 
Lufthansa Reference Architecture for the OpenGroup
Lufthansa Reference Architecture for the OpenGroupLufthansa Reference Architecture for the OpenGroup
Lufthansa Reference Architecture for the OpenGroup
 
What is the Risk in Steering Committee?
What is the Risk in Steering Committee?What is the Risk in Steering Committee?
What is the Risk in Steering Committee?
 

Similar to Itil a guide to cab meetings pdf

IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
OmnaCool
 
Assisit with devlopment.pptx
Assisit with devlopment.pptxAssisit with devlopment.pptx
Assisit with devlopment.pptx
TadeseBeyene
 
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxCHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
cravennichole326
 
Project change management plan template
Project change management plan templateProject change management plan template
Project change management plan template
Vivek Srivastava
 
Change%20control%20plan%20preparation%20guidelines
Change%20control%20plan%20preparation%20guidelinesChange%20control%20plan%20preparation%20guidelines
Change%20control%20plan%20preparation%20guidelines
ruwani.ars
 
Lesson 4 Homework 100 points totalDue Tuesday October 18th, .docx
Lesson 4 Homework 100 points totalDue  Tuesday October 18th, .docxLesson 4 Homework 100 points totalDue  Tuesday October 18th, .docx
Lesson 4 Homework 100 points totalDue Tuesday October 18th, .docx
LaticiaGrissomzz
 
Effective Change Management
Effective Change ManagementEffective Change Management
Effective Change Management
Invensis Learning
 
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
kndnewguade
 

Similar to Itil a guide to cab meetings pdf (20)

Itil a guide to cab meetings pdf
Itil a guide to cab meetings pdfItil a guide to cab meetings pdf
Itil a guide to cab meetings pdf
 
Numara change & approval mgmt
Numara change & approval mgmtNumara change & approval mgmt
Numara change & approval mgmt
 
SFHDI presents: Numara Software - Change & Approval Management
SFHDI presents: Numara  Software - Change & Approval ManagementSFHDI presents: Numara  Software - Change & Approval Management
SFHDI presents: Numara Software - Change & Approval Management
 
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
 
Assisit with devlopment.pptx
Assisit with devlopment.pptxAssisit with devlopment.pptx
Assisit with devlopment.pptx
 
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxCHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
 
Project change management plan template
Project change management plan templateProject change management plan template
Project change management plan template
 
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
 
Change management process 17.01.15
Change management process 17.01.15Change management process 17.01.15
Change management process 17.01.15
 
Optimize your Change Management Process
Optimize your Change Management ProcessOptimize your Change Management Process
Optimize your Change Management Process
 
Itil prc review
Itil prc reviewItil prc review
Itil prc review
 
Change%20control%20plan%20preparation%20guidelines
Change%20control%20plan%20preparation%20guidelinesChange%20control%20plan%20preparation%20guidelines
Change%20control%20plan%20preparation%20guidelines
 
Lesson 4 Homework 100 points totalDue Tuesday October 18th, .docx
Lesson 4 Homework 100 points totalDue  Tuesday October 18th, .docxLesson 4 Homework 100 points totalDue  Tuesday October 18th, .docx
Lesson 4 Homework 100 points totalDue Tuesday October 18th, .docx
 
Change Management ITIL
Change Management ITILChange Management ITIL
Change Management ITIL
 
Presentation on-change-control
Presentation on-change-controlPresentation on-change-control
Presentation on-change-control
 
P2 how to develop an it change management program
P2 how to develop an it change management programP2 how to develop an it change management program
P2 how to develop an it change management program
 
Effective Change Management
Effective Change ManagementEffective Change Management
Effective Change Management
 
It change management
It change managementIt change management
It change management
 
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
 
5 steps project change control process
5 steps project change control process5 steps project change control process
5 steps project change control process
 

Itil a guide to cab meetings pdf

  • 1. U C I S A I T I L : A G U I D E T O C H A N G E A D V I S O R Y B O A R D M E E T I N G S 1 ITIL – A guide to Change Advisory Board (CAB) meetings CAB meetings The Change Manager will always act as the Chair of any CAB meetings either virtual or face to face. CAB meetings should be called by the Change Manager at appropriate times to ensure the prompt and efficient handling of all changes. During high levels of change this could potentially be daily. For complex, high risk or high impact changes, or when major projects are due to deliver products a formal CAB meeting be would be necessary. The meetings can then be used to provide a formal review and authorisation of changes, a review of outstanding changes, and, to discuss any impending major changes. Where face to face meetings are appropriate, they should have a standard agenda. Relevant change information should be circulated in advance to allow CAB members to conduct impact and resource assessments prior to the CAB meeting. The CAB called by the Change Manager should consist of attendees who are relevant to RFCs being considered. This also includes attendees for other groups and parts of the business outside IT. Authorisation at the CAB for each change must be given by appropriate representatives from all areas the change will affect. The CAB representatives for a significant or major change are at a different level. It is the role of the Change Manager to ensure that those who are invited to participate in the CAB meeting are at the appropriate level in the organisation as key decision makers. A standard CAB agenda „„ A review of all failed changes „„ A review of all backed out changes „„ A list of RFCs to be assessed by CAB members „„ A review of all implemented changes „„ The change management process – including any amendments made to the process, as well as proposed changes to the process (as appropriate) „„ Change management successes for the period under discussion, i.e. a review of the business benefits seen as a result of the change management process (as appropriate)
  • 2. U C I S A I T I L : A G U I D E T O C H A N G E A D V I S O R Y B O A R D M E E T I N G S 2 CAB considerations for each change (prior to authorisation) „„ Risk/impact assessment (on the business) „„ Effect upon the infrastructure and customer service, as defined in the SLA, and upon the capacity and performance, reliability and resilience, contingency plans, and security „„ Impact on other services that run on the same infrastructure (or on software development projects) „„ Resource assessment – the IT, business and other resources required to implement the change, covering the likely costs, the number and availability of people required, the elapsed time, and any new infrastructure elements required „„ The impact on non-IT infrastructures within the organisation „„ Effect/risk/impact of not implementing the change „„ Other changes being implemented on the schedule of change „„ Technical capability and technical approval „„ Financial approval (if required) „„ Third party/supplier involvement in the implementation of the change „„ Business approval (if required) „„ Review/assessment of the change priority CAB comments/issues All CAB comments on each change and any issues that have been discussed must be documented by the Change Manager within the CAB meeting minutes. CAB recommendations/decisions All CAB recommendations and decision that have been discussed must be documented by the Change Manager within the CAB meetings minutes. CAB authorisation/approval Once all aspect of the change have been considered (as per the CAB considerations for each change information above) the CAB will then give authorisation for the change to be progress for scheduling and into the change build stage of the process. The CAB is an advisory body only. If the CAB cannot make a final decision on the authorisation of a change then the change escalation needs to be initiated by the Change Manager to ensure that authorisation is given (via escalation) at a higher level. The escalation of change authorisation is documented in the request for change – the Change Manager will detail to whom the change was escalated and the final decision that was made either authorised or rejected. Once a change has been authorised, the status of the change at this stage of the change process will be: AUTHORISED. Rejection of a change by the Change Advisory Board If the CAB rejects the change, the Change Manager must document, in full, the reasons for the rejection and ensure that the decision is communicated to the Change Initiator. The Status of the change at this stage of the change process will be: REJECTED BY THE CAB.