HUMAN RESOURCE PLAN TEMPLATE
<PROJECT NAME>
COMPANY NAME
STREET ADDRESS
CITY, STATE ZIP CODE
DATE
2
TABLE OF CONTENTS
INTRODUCTION.................................................................................................................................... 3
ROLES AND RESPONSIBILITIES.................................................................................................................. 3
PROJECT ORGANIZATIONAL CHARTS......................................................................................................... 4
STAFFING MANAGEMENT ...................................................................................................................... 5
3
INTRODUCTION
Human resources management is an important part of the Software Upgrade Project. The
human resources management plan is a tool which will aid in the management of this project’s
human resource activities throughout the project until closure. The human resources
management plan includes:
 Roles and responsibilities of team members throughout the project
 Project organization charts
 Staffing management plan to include:
a. How resources will be acquired
b. Timeline for resources/skill sets
c. Training required to develop skills
d. How performance reviews will be conducted
e. Recognition and rewards system
The purpose of the human resources management plan is to achieve project success by
ensuring the appropriate human resources are acquired with the necessary skills, resources are
trained if any gaps in skills are identified, team building strategies are clearly defines, and team
activities are effectively managed.
ROLES AND RESPONSIBILITIES
The roles and responsibilities for the Software Upgrade Project are essential to project success.
All team members must clearly understand their roles and responsibilities in order to
successfully perform their portion of the project. For the Software Upgrade Project the
following project team roles and responsibilities have been established:
Project Manager (PM), (1 position): responsible for the overall success of the Software
Upgrade Project. The PM must authorize and approve all project expenditures. The PM is also
responsible for approving that work activities meet established acceptability criteria and fall
within acceptable variances. The PM will be responsible for reporting project status in
accordance with the communications management plan. The PM will evaluate the
performance of all project team members and communicate their performance to functional
managers. The PM is also responsible for acquiring human resources for the project through
coordination with functional managers. The PM must possess the following skills:
leadership/management, budgeting, scheduling, and effective communication.
Design Engineer (DE), (2 positions): responsible for gathering coding requirements for the
Software Upgrade Project. The DEs are responsible for all upgrade design, coding, and testing
of the upgraded software. The DEs will assist the implementation lead in the distribution and
4
monitoring of the software upgrades throughout the network infrastructure. The DEs will be
responsible for timely status reporting to the PM as required by the communications
management plan. The DEs may not authorize any project expenditures nor allocate any
resources without PM approval. DE’s performance will be managed by the PM and
communicated to the Design Technology Group Manager (DE’s Functional Manager). DEs must
be proficient in programming html, C++, and Java programming languages.
Implementation Manager (IM), (1 position): The IMis responsible for the distribution,
implementation, and monitoring of the new software upgrade. The IM is responsible for
working with the DEs to ensure all coding on new software conforms with organizational
security regulations. The IM is responsible for coordination outage windows with each
department to facilitate the rollout of the software upgrades with minimal/no disturbance to
operations. The IM will report status to the PM in accordance with the project’s
communications management plan. The IM’s performance will be evaluated by the PM and
communicated to the IM’s functional manager (Network Manager). The IM must be proficient
in managing network architecture.
Training Lead (TL), (1 position): The TL is responsible for training all network users on the
features provided by the upgrades to the existing software. The TL will coordinate training
times/locations with each department’s training advocate. The TL will provide training status to
the PM in accordance with the project communications management plan.
Functional Managers (FM), (2 positions): While not part of the project team, functional
managers are responsible for providing resources for the project in accordance with the project
staffing plan. Functional managers are responsible for working with the PM to determine skill
sets required and approving resource assignments. Functional managers are also responsible
for conducting performance appraisals of assigned resources based, in part, on the PM’s
feedback regarding project performance.
PROJECT ORGANIZATIONALCHARTS
The following RACI chart shows the relationship between project tasks and team members.
Any proposed changes to project responsibilities must be reviewed and approved by the
project manager. Changes will be proposed in accordance with the project’s change control
process. As changes are made all project documents will be updated and redistributed
accordingly.
Project
Manager
Design
Engineers
Implementation
Manager
Training
Leads
Functional
Managers
Department
Managers
Requirements
Gathering
A R R C C I
5
Coding Design A R C C I
Coding Input A R
Software Testing A R C I I
Network
Preparation
A C R I I
Implementation A C R C C C
Conduct Training A R C C
Key:
R – Responsible for completing the work
A – Accountable for ensuring task completion/signoff
C – Consultedbefore anydecisions are made
I – Informedof whenanaction/decisionhasbeen made
STAFFING MANAGEMENT
Staff Acquisition:
For the Software Upgrade Project the project staff will consist entirely of internal resources.
There will be no outsourcing/contracting performed within the scope of this project. The
Project Manager will negotiate with functional and department managers in order to identify
and assign resources in accordance with the project organizational structure. All resources
must be approved by the appropriate functional/department manager before the resource may
begin any project work. The project team will not be co-located for this project and all
resources will remain in their current workspace.
Resource Calendars:
The Software Upgrade Project will last for five weeks. All resources are required before the
project can begin. The resource histogram below illustrates that design engineers are required
to perform 40 hours per week per engineer for the first three weeks of the project. Their
requirements are then scaled back to 5 hours per engineer in the fourth week. After the fourth
week the design engineers will be released from the project. The implementation manager will
also be released from the project after week 4. The training lead will be required to perform 15
hours of work in the first week and a full 40 hours of training during week 5.
Training:
There is currently no training scheduled with regards to the Software Upgrade Project since the
organization has adequate staff with required skill sets. However, if training requirements are
identified, funding will be provided from the project reserve.
Performance Reviews:
6
The project manager will review each team member’s assigned work activities at the onset of
the project and communicate all expectations of work to be performed. The project manager
will then evaluate each team member throughout the project to evaluate their performance
and how effectively they are completing their assigned work. Prior to releasing project
resources, the project manager will meet with the appropriate functional manager and provide
feedback on employee project performance. The functional managers will then perform a
formal performance review on each team member.
Recognition and Rewards:
Although the scope of this project does not allow for ample time to provide cross-training or
potential for monetary rewards there are several planned recognition and reward items for
project team members.
 Upon successful completion of the Software Upgrade Project, a party will be held to
celebrate the success of each team member with the team members’ families present.
 Upon successful completion of the project, any team member who satisfactorily
completed all assigned work packages on time will receive a certificate of thanks from
the CEO.
 Team members who successfully complete all of their assigned tasks will have their
photo taken for inclusion in the company newsletter.
 The company will provide free family movie tickets for the top two performers on each
project.
SPONSOR ACCEPTANCE
Approved by the Project Sponsor:
__________________________________________ Date: ___________________
<Project Sponsor>
<Project Sponsor Title>

More Related Content

What's hot

Assignment 2 : People in Projects
Assignment 2 : People in Projects Assignment 2 : People in Projects
Assignment 2 : People in Projects Emre Dirlik
 
Requirements management-plan template
Requirements management-plan templateRequirements management-plan template
Requirements management-plan templateVivek Srivastava
 
Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan templateVivek Srivastava
 
Project Plan template
Project Plan templateProject Plan template
Project Plan templateDemand Metric
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan templateVivek Srivastava
 
Sample project plan
Sample project planSample project plan
Sample project planmamoonnift
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment helpassignmenthelpp
 
JC-Real-Time-Operational-Readiness
JC-Real-Time-Operational-ReadinessJC-Real-Time-Operational-Readiness
JC-Real-Time-Operational-ReadinessTiago Vilela
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOEGlen Alleman
 
Project management report project 1
Project management report project 1Project management report project 1
Project management report project 1Afiq Knick
 
Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Robert Retsch
 
Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Jim Whittaker
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad Samir
 
Project Management Plan Template
Project Management Plan TemplateProject Management Plan Template
Project Management Plan TemplateSimplilearn
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey BuildingIRJET Journal
 
Project management-plan
Project management-planProject management-plan
Project management-planTran Tien
 

What's hot (20)

Assignment 2 : People in Projects
Assignment 2 : People in Projects Assignment 2 : People in Projects
Assignment 2 : People in Projects
 
Requirements management-plan template
Requirements management-plan templateRequirements management-plan template
Requirements management-plan template
 
Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan template
 
Project Plan template
Project Plan templateProject Plan template
Project Plan template
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan template
 
Sample project plan
Sample project planSample project plan
Sample project plan
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
JC-Real-Time-Operational-Readiness
JC-Real-Time-Operational-ReadinessJC-Real-Time-Operational-Readiness
JC-Real-Time-Operational-Readiness
 
Primavera trainer
Primavera trainerPrimavera trainer
Primavera trainer
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOE
 
Project management report project 1
Project management report project 1Project management report project 1
Project management report project 1
 
Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015
 
Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Nunn Internship Summary - 2015
Nunn Internship Summary - 2015
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
 
Project Management Plan Template
Project Management Plan TemplateProject Management Plan Template
Project Management Plan Template
 
Making a project plan
Making a project planMaking a project plan
Making a project plan
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Project management-plan
Project management-planProject management-plan
Project management-plan
 
Ch3 proj.mgt
Ch3 proj.mgtCh3 proj.mgt
Ch3 proj.mgt
 

Similar to Human resource-plan template

Roles and responsibilities of a dedicated development team.pdf
Roles and responsibilities of a dedicated development team.pdfRoles and responsibilities of a dedicated development team.pdf
Roles and responsibilities of a dedicated development team.pdfNuvento Systems Pvt Ltd
 
Software project planning
Software project planningSoftware project planning
Software project planningrajvir_kaur
 
Communications management-plan-template
Communications management-plan-templateCommunications management-plan-template
Communications management-plan-templateVivek Srivastava
 
Pm610 1103 b-02-schwappach-loren-p3-ip3
Pm610 1103 b-02-schwappach-loren-p3-ip3Pm610 1103 b-02-schwappach-loren-p3-ip3
Pm610 1103 b-02-schwappach-loren-p3-ip3Loren Schwappach
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The informSilvaGraf83
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The informMartineMccracken314
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software EngineeringFáber D. Giraldo
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.pptDeepgaichor1
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group
 
Project Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxProject Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxwkyra78
 
SE18_Lec 13_ Project Planning
SE18_Lec 13_ Project PlanningSE18_Lec 13_ Project Planning
SE18_Lec 13_ Project PlanningAmr E. Mohamed
 
Project typed
Project typedProject typed
Project typedRahul
 
04. Project planning and management.pptx
04. Project planning and management.pptx04. Project planning and management.pptx
04. Project planning and management.pptxALI2H
 
Human Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docxHuman Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docxwellesleyterresa
 
Pm 430 develop a quality management/tutorialoutlet
Pm 430 develop a quality management/tutorialoutletPm 430 develop a quality management/tutorialoutlet
Pm 430 develop a quality management/tutorialoutletPlunkettz
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfTanzeelShahid5
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptxgarkapifye
 

Similar to Human resource-plan template (20)

Roles and responsibilities of a dedicated development team.pdf
Roles and responsibilities of a dedicated development team.pdfRoles and responsibilities of a dedicated development team.pdf
Roles and responsibilities of a dedicated development team.pdf
 
Software project planning
Software project planningSoftware project planning
Software project planning
 
Communications management-plan-template
Communications management-plan-templateCommunications management-plan-template
Communications management-plan-template
 
Pm610 1103 b-02-schwappach-loren-p3-ip3
Pm610 1103 b-02-schwappach-loren-p3-ip3Pm610 1103 b-02-schwappach-loren-p3-ip3
Pm610 1103 b-02-schwappach-loren-p3-ip3
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The inform
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The inform
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
 
Project Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxProject Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docx
 
SE18_Lec 13_ Project Planning
SE18_Lec 13_ Project PlanningSE18_Lec 13_ Project Planning
SE18_Lec 13_ Project Planning
 
Project typed
Project typedProject typed
Project typed
 
04. Project planning and management.pptx
04. Project planning and management.pptx04. Project planning and management.pptx
04. Project planning and management.pptx
 
Human Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docxHuman Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docx
 
Pm 430 develop a quality management/tutorialoutlet
Pm 430 develop a quality management/tutorialoutletPm 430 develop a quality management/tutorialoutlet
Pm 430 develop a quality management/tutorialoutlet
 
Ch23
Ch23Ch23
Ch23
 
Bini
BiniBini
Bini
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdf
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx
 

More from Vivek Srivastava

Schedule management-plan template
Schedule management-plan templateSchedule management-plan template
Schedule management-plan templateVivek Srivastava
 
Root cause-analysis template
Root cause-analysis templateRoot cause-analysis template
Root cause-analysis templateVivek Srivastava
 
Relationship management-plan template
Relationship management-plan templateRelationship management-plan template
Relationship management-plan templateVivek Srivastava
 
Quality management-plan template
Quality management-plan templateQuality management-plan template
Quality management-plan templateVivek Srivastava
 
Project status-report template
Project status-report templateProject status-report template
Project status-report templateVivek Srivastava
 
Project change management plan template
Project change management plan templateProject change management plan template
Project change management plan templateVivek Srivastava
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan templateVivek Srivastava
 
Process improvement-plan template
Process improvement-plan templateProcess improvement-plan template
Process improvement-plan templateVivek Srivastava
 
Cost management-plan template
Cost management-plan templateCost management-plan template
Cost management-plan templateVivek Srivastava
 
Configuration management-plan template
Configuration management-plan templateConfiguration management-plan template
Configuration management-plan templateVivek Srivastava
 
Tableau desktop 10 (simplilearn)
Tableau desktop 10 (simplilearn)Tableau desktop 10 (simplilearn)
Tableau desktop 10 (simplilearn)Vivek Srivastava
 
Machine learning advanced certification training (Simplilearn)
Machine learning advanced certification training (Simplilearn)Machine learning advanced certification training (Simplilearn)
Machine learning advanced certification training (Simplilearn)Vivek Srivastava
 
Data Scientist Master Program
Data Scientist Master ProgramData Scientist Master Program
Data Scientist Master ProgramVivek Srivastava
 
Data science with R (simplilearn)
Data science with R (simplilearn)Data science with R (simplilearn)
Data science with R (simplilearn)Vivek Srivastava
 
Big data hadoop and spark developer (simplilearn)
Big data hadoop and spark developer  (simplilearn)Big data hadoop and spark developer  (simplilearn)
Big data hadoop and spark developer (simplilearn)Vivek Srivastava
 
Master Program in Data Science
Master Program in Data ScienceMaster Program in Data Science
Master Program in Data ScienceVivek Srivastava
 
Sample usecase educationdetails
Sample usecase educationdetailsSample usecase educationdetails
Sample usecase educationdetailsVivek Srivastava
 

More from Vivek Srivastava (18)

Schedule management-plan template
Schedule management-plan templateSchedule management-plan template
Schedule management-plan template
 
Root cause-analysis template
Root cause-analysis templateRoot cause-analysis template
Root cause-analysis template
 
Relationship management-plan template
Relationship management-plan templateRelationship management-plan template
Relationship management-plan template
 
Quality management-plan template
Quality management-plan templateQuality management-plan template
Quality management-plan template
 
Project status-report template
Project status-report templateProject status-report template
Project status-report template
 
Project change management plan template
Project change management plan templateProject change management plan template
Project change management plan template
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan template
 
Process improvement-plan template
Process improvement-plan templateProcess improvement-plan template
Process improvement-plan template
 
Cost management-plan template
Cost management-plan templateCost management-plan template
Cost management-plan template
 
Configuration management-plan template
Configuration management-plan templateConfiguration management-plan template
Configuration management-plan template
 
Tableau desktop 10 (simplilearn)
Tableau desktop 10 (simplilearn)Tableau desktop 10 (simplilearn)
Tableau desktop 10 (simplilearn)
 
Machine learning advanced certification training (Simplilearn)
Machine learning advanced certification training (Simplilearn)Machine learning advanced certification training (Simplilearn)
Machine learning advanced certification training (Simplilearn)
 
Data Scientist Master Program
Data Scientist Master ProgramData Scientist Master Program
Data Scientist Master Program
 
Data science with R (simplilearn)
Data science with R (simplilearn)Data science with R (simplilearn)
Data science with R (simplilearn)
 
Data science capstone
Data science capstoneData science capstone
Data science capstone
 
Big data hadoop and spark developer (simplilearn)
Big data hadoop and spark developer  (simplilearn)Big data hadoop and spark developer  (simplilearn)
Big data hadoop and spark developer (simplilearn)
 
Master Program in Data Science
Master Program in Data ScienceMaster Program in Data Science
Master Program in Data Science
 
Sample usecase educationdetails
Sample usecase educationdetailsSample usecase educationdetails
Sample usecase educationdetails
 

Recently uploaded

situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 

Recently uploaded (20)

situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 

Human resource-plan template

  • 1. 1 HUMAN RESOURCE PLAN TEMPLATE <PROJECT NAME> COMPANY NAME STREET ADDRESS CITY, STATE ZIP CODE DATE
  • 2. 2 TABLE OF CONTENTS INTRODUCTION.................................................................................................................................... 3 ROLES AND RESPONSIBILITIES.................................................................................................................. 3 PROJECT ORGANIZATIONAL CHARTS......................................................................................................... 4 STAFFING MANAGEMENT ...................................................................................................................... 5
  • 3. 3 INTRODUCTION Human resources management is an important part of the Software Upgrade Project. The human resources management plan is a tool which will aid in the management of this project’s human resource activities throughout the project until closure. The human resources management plan includes:  Roles and responsibilities of team members throughout the project  Project organization charts  Staffing management plan to include: a. How resources will be acquired b. Timeline for resources/skill sets c. Training required to develop skills d. How performance reviews will be conducted e. Recognition and rewards system The purpose of the human resources management plan is to achieve project success by ensuring the appropriate human resources are acquired with the necessary skills, resources are trained if any gaps in skills are identified, team building strategies are clearly defines, and team activities are effectively managed. ROLES AND RESPONSIBILITIES The roles and responsibilities for the Software Upgrade Project are essential to project success. All team members must clearly understand their roles and responsibilities in order to successfully perform their portion of the project. For the Software Upgrade Project the following project team roles and responsibilities have been established: Project Manager (PM), (1 position): responsible for the overall success of the Software Upgrade Project. The PM must authorize and approve all project expenditures. The PM is also responsible for approving that work activities meet established acceptability criteria and fall within acceptable variances. The PM will be responsible for reporting project status in accordance with the communications management plan. The PM will evaluate the performance of all project team members and communicate their performance to functional managers. The PM is also responsible for acquiring human resources for the project through coordination with functional managers. The PM must possess the following skills: leadership/management, budgeting, scheduling, and effective communication. Design Engineer (DE), (2 positions): responsible for gathering coding requirements for the Software Upgrade Project. The DEs are responsible for all upgrade design, coding, and testing of the upgraded software. The DEs will assist the implementation lead in the distribution and
  • 4. 4 monitoring of the software upgrades throughout the network infrastructure. The DEs will be responsible for timely status reporting to the PM as required by the communications management plan. The DEs may not authorize any project expenditures nor allocate any resources without PM approval. DE’s performance will be managed by the PM and communicated to the Design Technology Group Manager (DE’s Functional Manager). DEs must be proficient in programming html, C++, and Java programming languages. Implementation Manager (IM), (1 position): The IMis responsible for the distribution, implementation, and monitoring of the new software upgrade. The IM is responsible for working with the DEs to ensure all coding on new software conforms with organizational security regulations. The IM is responsible for coordination outage windows with each department to facilitate the rollout of the software upgrades with minimal/no disturbance to operations. The IM will report status to the PM in accordance with the project’s communications management plan. The IM’s performance will be evaluated by the PM and communicated to the IM’s functional manager (Network Manager). The IM must be proficient in managing network architecture. Training Lead (TL), (1 position): The TL is responsible for training all network users on the features provided by the upgrades to the existing software. The TL will coordinate training times/locations with each department’s training advocate. The TL will provide training status to the PM in accordance with the project communications management plan. Functional Managers (FM), (2 positions): While not part of the project team, functional managers are responsible for providing resources for the project in accordance with the project staffing plan. Functional managers are responsible for working with the PM to determine skill sets required and approving resource assignments. Functional managers are also responsible for conducting performance appraisals of assigned resources based, in part, on the PM’s feedback regarding project performance. PROJECT ORGANIZATIONALCHARTS The following RACI chart shows the relationship between project tasks and team members. Any proposed changes to project responsibilities must be reviewed and approved by the project manager. Changes will be proposed in accordance with the project’s change control process. As changes are made all project documents will be updated and redistributed accordingly. Project Manager Design Engineers Implementation Manager Training Leads Functional Managers Department Managers Requirements Gathering A R R C C I
  • 5. 5 Coding Design A R C C I Coding Input A R Software Testing A R C I I Network Preparation A C R I I Implementation A C R C C C Conduct Training A R C C Key: R – Responsible for completing the work A – Accountable for ensuring task completion/signoff C – Consultedbefore anydecisions are made I – Informedof whenanaction/decisionhasbeen made STAFFING MANAGEMENT Staff Acquisition: For the Software Upgrade Project the project staff will consist entirely of internal resources. There will be no outsourcing/contracting performed within the scope of this project. The Project Manager will negotiate with functional and department managers in order to identify and assign resources in accordance with the project organizational structure. All resources must be approved by the appropriate functional/department manager before the resource may begin any project work. The project team will not be co-located for this project and all resources will remain in their current workspace. Resource Calendars: The Software Upgrade Project will last for five weeks. All resources are required before the project can begin. The resource histogram below illustrates that design engineers are required to perform 40 hours per week per engineer for the first three weeks of the project. Their requirements are then scaled back to 5 hours per engineer in the fourth week. After the fourth week the design engineers will be released from the project. The implementation manager will also be released from the project after week 4. The training lead will be required to perform 15 hours of work in the first week and a full 40 hours of training during week 5. Training: There is currently no training scheduled with regards to the Software Upgrade Project since the organization has adequate staff with required skill sets. However, if training requirements are identified, funding will be provided from the project reserve. Performance Reviews:
  • 6. 6 The project manager will review each team member’s assigned work activities at the onset of the project and communicate all expectations of work to be performed. The project manager will then evaluate each team member throughout the project to evaluate their performance and how effectively they are completing their assigned work. Prior to releasing project resources, the project manager will meet with the appropriate functional manager and provide feedback on employee project performance. The functional managers will then perform a formal performance review on each team member. Recognition and Rewards: Although the scope of this project does not allow for ample time to provide cross-training or potential for monetary rewards there are several planned recognition and reward items for project team members.  Upon successful completion of the Software Upgrade Project, a party will be held to celebrate the success of each team member with the team members’ families present.  Upon successful completion of the project, any team member who satisfactorily completed all assigned work packages on time will receive a certificate of thanks from the CEO.  Team members who successfully complete all of their assigned tasks will have their photo taken for inclusion in the company newsletter.  The company will provide free family movie tickets for the top two performers on each project. SPONSOR ACCEPTANCE Approved by the Project Sponsor: __________________________________________ Date: ___________________ <Project Sponsor> <Project Sponsor Title>