No. 12-02-1-CTE-6
Government of India
Central Vigilance Commission
(CTE’s Organisation)
Satarkata Bhavan,
Block A, GPO Complex,
INA, New Delhi – 110 023.
Dated the 17th
December 2002.
OFFICE MEMORANDUM
Subject : - Prequalification criteria (PQ).
The Commission has received complaints regarding discriminatory
prequalification criteria incorporated in the tender documents by various
Deptts./Organisations. It has also been observed during intensive examination of
various works/contracts by CTEO that the prequalification criteria is either not
clearly specified or made very stringent/very lax to restrict/facilitate the entry of
bidders.
2. The prequalification criteria is a yardstick to allow or disallow the firms to
participate in the bids. A vaguely defined PQ criteria results in stalling the
process of finalizing the contract or award of the contract in a non-transparent
manner. It has been noticed that organizations, at times pick up the PQ criteria
from some similar work executed in the past, without appropriately amending the
different parameters according to the requirements of the present work. Very
often it is seen that only contractors known to the officials of the organization and
to the Architects are placed on the select list. This system gives considerable
scope for malpractices, favouritism and corruption. It is, therefore, necessary to
fix in advance the minimum qualification, experience and number of similar works
of a minimum magnitude satisfactorily executed in terms of quality and period of
execution.
3. Some of the common irregularities/lapses observed in this regard are
highlighted as under: -
i) For a work with an estimated cost of Rs.15 crores to be completed in
two years, the criteria for average turnover in the last 5 years was kept
as Rs.15 crores although the amount of work to be executed in one
year was only Rs.7.5 crores. The above resulted in prequalification of
a single firm.
ii) One organization for purchase of Computer hardware kept the criteria
for financial annual turnover of Rs.100 crores although the value of
purchase was less than Rs.10 crores, resulting in disqualification of
reputed computer firms.
Contd….
-: 2 :-
iii) In one case of purchase of Computer hardware, the prequalification
criteria stipulated was that the firms should have made profit in the last
two years and should possess ISO Certification. It resulted in
disqualification of reputed vendors including a PSU.
iv) In a work for supply and installation of A.C. Plant, retendering was
resorted to with diluted prequalification criteria without adequate
justification, to favour selection of a particular firm.
v) An organization invited tenders for hiring of D.G. Sets with eligibility of
having 3 years experience in supplying D.G. Sets. The cut off dates
regarding work experience were not clearly indicated. The above
resulted in qualification of firms which had conducted such business for
3 years, some 20 years back. On account of this vague condition,
some firms that were currently not even in the business were also
qualified.
vi) In many cases, “Similar works” is not clearly defined in the tender
documents. In one such case, the supply and installation of A.C.
ducting and the work of installation of false ceiling were combined
together. Such works are normally not executed together as A.C.
ducting work is normally executed as a part of A.C. work while false
ceiling work is a part of civil construction or interior design works.
Therefore, no firm can possibly qualify for such work with experience of
similar work. The above resulted in qualification of A.C. Contractors
without having any experience of false ceiling work although the major
portion of the work constituted false ceiling work.
4. The above list is illustrative and not exhaustive. While framing the
prequalification criteria, the end purpose of doing so should be kept in view. The
purpose of any selection procedure is to attract the participation of reputed and
capable firms with proper track records. The PQ conditions should be
exhaustive, yet specific. The factors that may be kept in view while framing the
PQ Criteria includes the scope and nature of work, experience of firms in the
same field and financial soundness of firms.
5. The following points must be kept in view while fixing the eligibility criteria:-
Contd….
-: 3 :-
A) For Civil/Electrical Works
i) Average Annual financial turnover during the last 3 years, ending 31st
March of the previous financial year, should be at least 30% of the
estimated cost.
ii) Experience of having successfully completed similar works during last
7 years ending last day of month previous to the one in which
applications are invited should be either of the following: -
a. Three similar completed works costing not less than the amount
equal to 40% of the estimated cost.
or
b. Two similar completed works costing not less than the amount
equal to 50% of the estimated cost.
or
c. One similar completed work costing not less than the amount equal
to 80% of the estimated cost.
iii) Definition of “similar work” should be clearly defined.
In addition to above, the criteria regarding satisfactory performance of
works, personnel, establishment, plant, equipment etc. may be incorporated
according to the requirement of the Project.
B) For Store/Purchase Contracts
Prequalification/Post Qualification shall be based entirely upon the
capability and resources of prospective bidders to perform the particular contract
satisfactorily, taking into account their (i) experience and past performance on
similar contracts for last 2 years (ii) capabilities with respect to personnel,
equipment and manufacturing facilities (iii) financial standing through latest
I.T.C.C., Annual report (balance sheet and Profit & Loss Account) of last 3 years.
The quantity, delivery and value requirement shall be kept in view, while fixing
the PQ criteria. No bidder should be denied prequalification/post qualification for
reasons unrelated to its capability and resources to successfully perform the
contract.
Contd….
-: 4 :-
6. It is suggested that these instructions may be circulated amongst the
concerned officials of your organization for guidance in fixing prequalification
criteria. These instructions are also available on CVC’s website, http://cvc.nic.in.
(M.P. Juneja)
Chief Technical Examiner
To
All CVOs of Ministries/Departments/PSUs/Banks/Insurance Companies/
Autonomous Organisations/Societies/UTs.

More Related Content

What's hot

Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.Sukhdarshan Singh
 
An Insight on Supreme Court's Ruling relating to Permanent Establishment in S...
An Insight on Supreme Court's Ruling relating to Permanent Establishment in S...An Insight on Supreme Court's Ruling relating to Permanent Establishment in S...
An Insight on Supreme Court's Ruling relating to Permanent Establishment in S...DVSResearchFoundatio
 
Rupak das , Procurement Head
Rupak das , Procurement HeadRupak das , Procurement Head
Rupak das , Procurement HeadRUPAK DAS
 
Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016deepak thakur
 
Ppt ost
Ppt ostPpt ost
Ppt ostjojisj
 
Enlistment rules2014 07 (1)
Enlistment rules2014 07 (1)Enlistment rules2014 07 (1)
Enlistment rules2014 07 (1)Ptpg Stuc
 
Contractor Prequalification Presentation
Contractor Prequalification PresentationContractor Prequalification Presentation
Contractor Prequalification Presentationcimone
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qumes manandhar
 

What's hot (14)

Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.
 
An Insight on Supreme Court's Ruling relating to Permanent Establishment in S...
An Insight on Supreme Court's Ruling relating to Permanent Establishment in S...An Insight on Supreme Court's Ruling relating to Permanent Establishment in S...
An Insight on Supreme Court's Ruling relating to Permanent Establishment in S...
 
Rupak das , Procurement Head
Rupak das , Procurement HeadRupak das , Procurement Head
Rupak das , Procurement Head
 
Paresh Resume
Paresh Resume Paresh Resume
Paresh Resume
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
 
Section 503 Regulations- Comments to OFCCP
Section 503 Regulations- Comments to OFCCPSection 503 Regulations- Comments to OFCCP
Section 503 Regulations- Comments to OFCCP
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016
 
Ppt ost
Ppt ostPpt ost
Ppt ost
 
Unit 05 small enterprise
Unit 05 small enterpriseUnit 05 small enterprise
Unit 05 small enterprise
 
Enlistment rules2014 07 (1)
Enlistment rules2014 07 (1)Enlistment rules2014 07 (1)
Enlistment rules2014 07 (1)
 
Contractor Prequalification Presentation
Contractor Prequalification PresentationContractor Prequalification Presentation
Contractor Prequalification Presentation
 
License Reinstatement Info
License Reinstatement InfoLicense Reinstatement Info
License Reinstatement Info
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
 

Similar to Cvc guildelines

Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptxssuser4ae21a
 
Rules and regulation of Pakistan Engineering Council (PEC)
Rules and regulation of Pakistan Engineering Council (PEC)Rules and regulation of Pakistan Engineering Council (PEC)
Rules and regulation of Pakistan Engineering Council (PEC)Amir Khan
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptxxego1
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Joy Irman
 
Asbo Vendor Performance Eval Chicago 092509
Asbo Vendor Performance Eval   Chicago   092509Asbo Vendor Performance Eval   Chicago   092509
Asbo Vendor Performance Eval Chicago 092509Richard Gay, CPPO, RSBO
 
Guidelines for preparation of a RFP for e governance projects
Guidelines for preparation of a RFP for e governance projectsGuidelines for preparation of a RFP for e governance projects
Guidelines for preparation of a RFP for e governance projectsAnirban Mukerji
 
Executive compensation march_13_2013
Executive compensation march_13_2013Executive compensation march_13_2013
Executive compensation march_13_2013Hiatus51
 
Icaew advanced level corporate reporting study manual chapter wise interactiv...
Icaew advanced level corporate reporting study manual chapter wise interactiv...Icaew advanced level corporate reporting study manual chapter wise interactiv...
Icaew advanced level corporate reporting study manual chapter wise interactiv...Optimal Management Solution
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guidelineSamsher Singh
 
Proforma Contract Bid Requirements
Proforma Contract Bid RequirementsProforma Contract Bid Requirements
Proforma Contract Bid RequirementsGibson Ali Holemba
 
sevottam certification 21112022.pptx
sevottam certification 21112022.pptxsevottam certification 21112022.pptx
sevottam certification 21112022.pptxGauravDhanda5
 
audit-charts-by-pankaj-garg.pdf
audit-charts-by-pankaj-garg.pdfaudit-charts-by-pankaj-garg.pdf
audit-charts-by-pankaj-garg.pdfKhushal3898
 
Beyond Contract Series Article One
Beyond Contract Series   Article OneBeyond Contract Series   Article One
Beyond Contract Series Article OneMy own
 
Internal control
Internal controlInternal control
Internal controlKriza Matro
 
Government Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentGovernment Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentRaffa Learning Community
 
Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industrieszeeshanabdullateef
 
The Scoop on the Incurred Cost Submission
The Scoop on the Incurred Cost SubmissionThe Scoop on the Incurred Cost Submission
The Scoop on the Incurred Cost SubmissionUnanet
 
A Contract Bidding Process in Construction Industry
A Contract Bidding Process in Construction IndustryA Contract Bidding Process in Construction Industry
A Contract Bidding Process in Construction IndustryIRJET Journal
 

Similar to Cvc guildelines (20)

Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 
Rules and regulation of Pakistan Engineering Council (PEC)
Rules and regulation of Pakistan Engineering Council (PEC)Rules and regulation of Pakistan Engineering Council (PEC)
Rules and regulation of Pakistan Engineering Council (PEC)
 
Pricing-Related Current Events, Trends & Coming Attractions
Pricing-Related Current Events, Trends & Coming Attractions Pricing-Related Current Events, Trends & Coming Attractions
Pricing-Related Current Events, Trends & Coming Attractions
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptx
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
Asbo Vendor Performance Eval Chicago 092509
Asbo Vendor Performance Eval   Chicago   092509Asbo Vendor Performance Eval   Chicago   092509
Asbo Vendor Performance Eval Chicago 092509
 
Guidelines for preparation of a RFP for e governance projects
Guidelines for preparation of a RFP for e governance projectsGuidelines for preparation of a RFP for e governance projects
Guidelines for preparation of a RFP for e governance projects
 
Executive compensation march_13_2013
Executive compensation march_13_2013Executive compensation march_13_2013
Executive compensation march_13_2013
 
Icaew advanced level corporate reporting study manual chapter wise interactiv...
Icaew advanced level corporate reporting study manual chapter wise interactiv...Icaew advanced level corporate reporting study manual chapter wise interactiv...
Icaew advanced level corporate reporting study manual chapter wise interactiv...
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guideline
 
Proforma Contract Bid Requirements
Proforma Contract Bid RequirementsProforma Contract Bid Requirements
Proforma Contract Bid Requirements
 
sevottam certification 21112022.pptx
sevottam certification 21112022.pptxsevottam certification 21112022.pptx
sevottam certification 21112022.pptx
 
audit-charts-by-pankaj-garg.pdf
audit-charts-by-pankaj-garg.pdfaudit-charts-by-pankaj-garg.pdf
audit-charts-by-pankaj-garg.pdf
 
Beyond Contract Series Article One
Beyond Contract Series   Article OneBeyond Contract Series   Article One
Beyond Contract Series Article One
 
Internal control
Internal controlInternal control
Internal control
 
Government Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentGovernment Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory Environment
 
Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industries
 
The Scoop on the Incurred Cost Submission
The Scoop on the Incurred Cost SubmissionThe Scoop on the Incurred Cost Submission
The Scoop on the Incurred Cost Submission
 
A Contract Bidding Process in Construction Industry
A Contract Bidding Process in Construction IndustryA Contract Bidding Process in Construction Industry
A Contract Bidding Process in Construction Industry
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Cvc guildelines

  • 1. No. 12-02-1-CTE-6 Government of India Central Vigilance Commission (CTE’s Organisation) Satarkata Bhavan, Block A, GPO Complex, INA, New Delhi – 110 023. Dated the 17th December 2002. OFFICE MEMORANDUM Subject : - Prequalification criteria (PQ). The Commission has received complaints regarding discriminatory prequalification criteria incorporated in the tender documents by various Deptts./Organisations. It has also been observed during intensive examination of various works/contracts by CTEO that the prequalification criteria is either not clearly specified or made very stringent/very lax to restrict/facilitate the entry of bidders. 2. The prequalification criteria is a yardstick to allow or disallow the firms to participate in the bids. A vaguely defined PQ criteria results in stalling the process of finalizing the contract or award of the contract in a non-transparent manner. It has been noticed that organizations, at times pick up the PQ criteria from some similar work executed in the past, without appropriately amending the different parameters according to the requirements of the present work. Very often it is seen that only contractors known to the officials of the organization and to the Architects are placed on the select list. This system gives considerable scope for malpractices, favouritism and corruption. It is, therefore, necessary to fix in advance the minimum qualification, experience and number of similar works of a minimum magnitude satisfactorily executed in terms of quality and period of execution. 3. Some of the common irregularities/lapses observed in this regard are highlighted as under: - i) For a work with an estimated cost of Rs.15 crores to be completed in two years, the criteria for average turnover in the last 5 years was kept as Rs.15 crores although the amount of work to be executed in one year was only Rs.7.5 crores. The above resulted in prequalification of a single firm. ii) One organization for purchase of Computer hardware kept the criteria for financial annual turnover of Rs.100 crores although the value of purchase was less than Rs.10 crores, resulting in disqualification of reputed computer firms. Contd….
  • 2. -: 2 :- iii) In one case of purchase of Computer hardware, the prequalification criteria stipulated was that the firms should have made profit in the last two years and should possess ISO Certification. It resulted in disqualification of reputed vendors including a PSU. iv) In a work for supply and installation of A.C. Plant, retendering was resorted to with diluted prequalification criteria without adequate justification, to favour selection of a particular firm. v) An organization invited tenders for hiring of D.G. Sets with eligibility of having 3 years experience in supplying D.G. Sets. The cut off dates regarding work experience were not clearly indicated. The above resulted in qualification of firms which had conducted such business for 3 years, some 20 years back. On account of this vague condition, some firms that were currently not even in the business were also qualified. vi) In many cases, “Similar works” is not clearly defined in the tender documents. In one such case, the supply and installation of A.C. ducting and the work of installation of false ceiling were combined together. Such works are normally not executed together as A.C. ducting work is normally executed as a part of A.C. work while false ceiling work is a part of civil construction or interior design works. Therefore, no firm can possibly qualify for such work with experience of similar work. The above resulted in qualification of A.C. Contractors without having any experience of false ceiling work although the major portion of the work constituted false ceiling work. 4. The above list is illustrative and not exhaustive. While framing the prequalification criteria, the end purpose of doing so should be kept in view. The purpose of any selection procedure is to attract the participation of reputed and capable firms with proper track records. The PQ conditions should be exhaustive, yet specific. The factors that may be kept in view while framing the PQ Criteria includes the scope and nature of work, experience of firms in the same field and financial soundness of firms. 5. The following points must be kept in view while fixing the eligibility criteria:- Contd….
  • 3. -: 3 :- A) For Civil/Electrical Works i) Average Annual financial turnover during the last 3 years, ending 31st March of the previous financial year, should be at least 30% of the estimated cost. ii) Experience of having successfully completed similar works during last 7 years ending last day of month previous to the one in which applications are invited should be either of the following: - a. Three similar completed works costing not less than the amount equal to 40% of the estimated cost. or b. Two similar completed works costing not less than the amount equal to 50% of the estimated cost. or c. One similar completed work costing not less than the amount equal to 80% of the estimated cost. iii) Definition of “similar work” should be clearly defined. In addition to above, the criteria regarding satisfactory performance of works, personnel, establishment, plant, equipment etc. may be incorporated according to the requirement of the Project. B) For Store/Purchase Contracts Prequalification/Post Qualification shall be based entirely upon the capability and resources of prospective bidders to perform the particular contract satisfactorily, taking into account their (i) experience and past performance on similar contracts for last 2 years (ii) capabilities with respect to personnel, equipment and manufacturing facilities (iii) financial standing through latest I.T.C.C., Annual report (balance sheet and Profit & Loss Account) of last 3 years. The quantity, delivery and value requirement shall be kept in view, while fixing the PQ criteria. No bidder should be denied prequalification/post qualification for reasons unrelated to its capability and resources to successfully perform the contract. Contd….
  • 4. -: 4 :- 6. It is suggested that these instructions may be circulated amongst the concerned officials of your organization for guidance in fixing prequalification criteria. These instructions are also available on CVC’s website, http://cvc.nic.in. (M.P. Juneja) Chief Technical Examiner To All CVOs of Ministries/Departments/PSUs/Banks/Insurance Companies/ Autonomous Organisations/Societies/UTs.