PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
1.1.9
1.1.10 FOR
1.1.11
XXXXXXXXXXXXXXX (Title of Procurement)
1.1.12
1.1.13
1.1.14
Reference No: xxxxxxxxxxxx
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
INDEX PAGE
BACKGROUND 3
INSTRUCTIONS FOR COMPLETION 4
QUERIES ABOUT PRE-QUALIFICATION QUESTIONNAIRE 5
EVALUATION 6
ESTIMATED TIMETABLE 7
PRE - QUALIFICATION QUESTIONNAIRE (Core) 8-14
1. BASIC DETAILS OF YOUR ORGANISATION
2. FINANCIAL INFORMATION
3. BUSINESS ACTIVITIES
4. REFERENCES
5. INSURANCE
6. QUALITY ASSURANCE PROCEDURES
7. HEALTH & SAFETY POLICY & PROCEDURES
8. EQUAL OPPORTUNITY POLICY & PROCEDURES
9. ENVIRONMENTAL MANAGEMENT POLICY & PROCEDURES
10.PROFESSIONAL AND BUSINESS STANDING
11.TECHNICAL ABILITY (REQUIREMENT SPECIFIC QUESTIONS)
12.DECLARATION
13. NOTES
Page 2 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
BACKGROUND
Company history, news and community
The company Values:
Currently the company has a requirement for the provision of xxxxxxxxxxx
(title of requirement)
The purpose of this questionnaire is to assist Companyin deciding which
suppliers to short-list to invite to tender for [requirement]. It seeks to
understand the type, capacity and technical capability of those organisations
wishing to undertake this work.
In order to simplify this process, you don’t need to provide supporting
documents, for example, accounts, certificates, statements or policies with
this questionnaire at this stage. However, we may ask to see these
documents at a later stage. You may also be asked to clarify your answers
or provide more details.
INSTRUCTIONS FOR COMPLETION
Please answer every question (by ticking or writing as appropriate in the
boxes provided) as accurately and concisely as possible and supply any
additional information as required. If the question does not apply to you
please write N/A; if you don’t know the answer please write N/K.
Please provide attachments as necessary. All attachments must specifically
make reference to the relevant question number in the questionnaire.
Please do not include any information that is not expressly requested in this
PQQ or subsequently in response to a clarification question. Do note that the
inclusion of an executive summary, general marketing and company literature
or a statement of reasons for selection is not required and will not be
considered in the evaluation of the PQQ.
To be considered for assessment, 2 copies of the completed questionnaire
and any attachments must be returned in paper form and additionally, on CD.
Page 3 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
Please return the completed questionnaire to:
Attn…
Procurement Department
Company address
Not later than: ………… [time and date]
We will contact you again by: ………… [date]
Potential Suppliers are advised to provide a single point of contact in their
organisation with their responses to this PQQ.
All responses received and any communication from prospective Suppliers
will be treated in confidence.
In the event that none of the responses are deemed satisfactory, the Legion
reserves the right to consider alternate procurement options.
Responses should be clearly marked –
“XXXXXXXXXXX (Title of Procurement)” Pre-Qualification Questionnaire
- Strictly Confidential.
Respondents selected to proceed to the next stage will be issued with an
Invitation to Tender (ITT) pack. Those not selected to proceed to the next
stage will be informed in writing.
QUERIES ABOUT THE PRE-QUALIFICATION QUESTIONAIRE
If you have any queries about this questionnaire, please contact:
[Name]……………………….
[Phone]………………………
[Email]………………………
All requests for clarification must be in writing. If the company considers any
question or request for clarification to be of material significance; both the
query and the response will be communicated to all potential suppliers.
However the company will not enter into detailed discussions at this stage.
Please note that if any of the information supplied by you in your response to
the questionnaire changes in the ensuing evaluation period the organisation is
required to notify the company accordingly.
Page 4 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
Please remember to provide a single point of contact in your organisation that
is dealing with the responses to this PQQ.
All responses received and any communication from prospective Suppliers
will be treated in confidence.
EVALUATION CRITERIA
The initial evaluation will be carried out using a set of four Criteria as follows:
Criteria 1; Supplier Acceptability
To pass this review the Supplier must not be bankrupt, insolvent, in
receivership, or be subject to criminal proceedings or have a criminal record
as set out in REGULATION 14 OF THE PUBLIC SERVICES CONTRACT
REGULATIONS 1993 (1 1993 No. 3228).
Criteria 2; Supplier Economic and Financial standing
To pass this review the Supplier must be in a sound financial position to
participate in a contract of this size as set out in REGULATION 15 OF THE
PUBLIC SERVICES CONTRACTS REGULATIONS 1993 (SI 1993 No. 3228).
Criteria 3; Supplier Managerial and Operational Capability
To pass this review the supplier must demonstrate its managerial and
operational staffing capacity and capabilities as well as evidence of standard
policies and procedures and a good record of professional standing.
Page 5 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
Criteria 4; Supplier Technical Ability
To pass this review the Supplier must be able to demonstrate a successful
track record of providing similar services as specified in the scope of work.
The assessment methodology will be a combination of risk based assessment
and weighted scoring approach as follows:
• Criteria 1 – Risk based
• Criteria 2 - Risk based
• Criteria 3 – 50% (score)
• Criteria 4 - 50% (score)
Potential Suppliers who satisfactorily meet the criteria will be issued Invitation
to Tender packs. Those not selected to proceed to the next stage will be
informed in writing
ESTIMATED TIMETABLE
Milestones Date
Dispatch of Pre-Qualification
Questionnaires
Week Commencing………………
Deadline for receipt of Clarification
Questions (CQ) for PQQ
Deadline for receipt of completed
questionnaire
Week Commencing………………
Evaluation of Pre-Qualification
Questionnaires
Week Commencing………………
Dispatch of Invitation to Tender
(ITT) Packs
Week Commencing………………
Deadline for receipt of Clarification
Questions (CQ) for ITT
Page 6 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
Deadline for receipt of tenders
Evaluation of tenders Week Commencing………………
Interviews Week Commencing………………
Clarification/Informal Award
Formal Contract Award TBC
Contract Start Date
Please note that these dates are provisional and may be subject to change
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
1 BASIC DETAILS OF YOUR ORGANISATION
1.1 Name of the organisation in
whose name the tender would
be submitted:
1.2 Contact name for enquiries
about this bid:
1.3 Contact position (Job Title):
1.4 Address:
Page 7 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
Post Code:
1.5 Telephone number:
1.6 Fax number:
1.7 E-mail address:
1.8 Website address (if any):
1.9 Company Registration number
(if this applies):
1.10 Charities or Housing
Association or other
Registration number (if this
applies). Please specify
registering body:
1.11 Date of Registration:
1.12 Registered address if different
from the above:
Post Code:
1.13 VAT Registration number:
1.14 Is your organisation:
(Please tick one)
i) a public limited company?
ii) a limited company?
iii) a partnership
iv) a sole trader
v) other (please specify)
1.19 Name of (ultimate) parent company (if
this applies):
1.20 Companies House Registration number
of parent company (if this applies):
1.21 Construction and related businesses
only:
Are you registered with Constructionline?
If “Yes”, what is your registration
number?
Yes / No
Page 8 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
2 FINANCIAL INFORMATION
2.1 What was your turnover in the
last two years (if this applies)?
£………… for
year ended
--/--/----
£……… for year
ended --/--/----
2.2 Has your organisation met the terms of its banking
facilities and loan agreements (if any) during the
past year?
Yes / No
2.3 If “No” what were the reasons, and what has been done to put things
right?
2.4 Has your organisation met all its obligations to pay
its creditors and staff during the past year?
Yes / No
2.5 If “No” please explain why not:
2.6 What is the name and branch
of your bankers (who could
provide a reference)?
Name:
Branch:
Contact details:
2.9 If asked, would you be able to provide at least one of the following?
A copy of your most recent audited accounts (for the
last two years if this applies)
Yes / No
A statement of your turnover, profit & loss account
and cash flow for the most recent year of trading
Yes / No
A statement of your cash flow forecast for the current
year and a bank letter outlining the current cash and
credit position
Yes / No
3 BUSINESS ACTIVITIES
Page 9 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
3.1 What are the main business activities of your organisation?
3.2 How many staff does your organisation have?
(If you are a sole trader, please say so)
4 REFERENCES
Please provide details of three recent contracts that are relevant to the
Authority’s requirement. Where possible at least one should be from
the public or third sector. If you cannot provide three references,
please explain why.
Reference 1 Reference 2 Reference 3
4.1 Customer
Organisation
(name):
4.2 Customer
contact name
and phone
number:
4.3 Date contract
awarded:
4.4 Contract
reference and
brief
description:
4.5 Value:
4.6 Date contract
was completed:
Page 10 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
4.7 Have you had any contracts terminated for poor
performance in the last three years, or any contracts
where damages have been claimed by the
contracting authority?
Yes / No
4.8 If “Yes”, please give details:
5 Y INSURANCE
Please provide details of your current insurance cover Value
5.1 Employer’s Liability: £
5.2 Public Liability: £
5.3 Other (please provide details): £
6 QUALITY ASSURANCE
6.1 Does your organisation hold a recognised quality
management certification for example BS/EN/ISO
9000 or equivalent?
Yes / No
6.2 If not, does your organisation have a quality
management system*?
Yes / No
6.3 If you do not have quality
certification or a quality
management system, please
explain why:
7 HEALTH & SAFETY
Page 11 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
7.1 Does your organisation have a written health and
safety at work policy? (see notes at end of
questionnaire)
Yes / No
7.2 Does your organisation have a health and safety at
work system*?
Yes / No
7.3 If “No”, to either of the above
please explain why:
8 EQUAL OPPORTUNITIES
Does your organisation have a written equal
opportunities policy, to avoid discrimination?
Yes / No
9 ENVIRONMENTAL MANAGEMENT
Does your organisation have an environmental
management system*?
Yes / No
10 PROFESSIONAL AND BUSINESS STANDING
Do any of the following apply to your organisation, or to (any of) the
director(s) / partners / proprietor(s)?
10.1 Is in a state of bankruptcy, insolvency, compulsory
winding up, receivership, composition with creditors,
or subject to relevant proceedings
Yes / No
10.2 Has been convicted of a criminal offence related to
business or professional conduct
Yes / No
10.3 Has committed an act of grave misconduct in the
course of business
Yes / No
10.4 Has not fulfilled obligations related to payment of
social security contributions
Yes / No
Page 12 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
10.5 Has not fulfilled obligations related to payment of
taxes
Yes / No
10.6 Is guilty of serious misrepresentation in supplying
information
Yes / No
10.7 Is not in possession of relevant licences or
membership of an appropriate organisation where
required by law
Yes / No
10.8 If the answer to any of these is “Yes” please give brief details below,
including what has been done to put things right.
11 REQUIREMENT SPECIFIC QUESTIONS
11.1 Q A
11.2 Q A
11.3 Q A
11.4 Q A
12 I declare that to the best of my knowledge the answers submitted in
this PQQ (and any supporting modules) are correct. I understand that
the information will be used in the evaluation process to assess my
organisation’s suitability to be invited to tender for the Authority’s
requirement.
FORM COMPLETED BY
13.1 Name:
13.2 Position (Job
Title):
13.3 Date:
Page 13 of 14
PRE-QUALIFICATION QUESTIONNAIRE (PQQ)
13.4 Telephone
number:
13.5 Signature:
Notes for Suppliers
“Authority” means Companythat is seeking to award this contract.
* “system” means processes and procedures to ensure that the subject is
properly managed. This includes making sure that legal requirements are
met.
Health and Safety Policies
Any business employing five or more people has, by law, to prepare and
bring to the attention of employees a written Health and Safety Policy
Statement.
A Health and Safety Policy usually consists of three distinct sections namely:
General Policy Statement – a short statement outlining the
organisation’s commitment to Health and Safety, signed and dated by
the senior organisation official (for example, the Managing Director).
Organisation – how the organisation addresses health and safety; lines
of communication between managers and staff; and any specific
duties/responsibilities assigned within the organisation - this should be
relatively straightforward for smaller organisations.
Arrangements – the systems and procedures in place for ensuring
employees’ health and safety at work
Page 14 of 14

More Related Content

What's hot

FIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfFIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfsajidkhan82714
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedureayushida
 
Method stm lean concrete
Method stm lean concreteMethod stm lean concrete
Method stm lean concreteMinh Bui Si
 
Writ, service, appearance & judgment in default (2017-2018)
Writ, service, appearance & judgment in default (2017-2018)Writ, service, appearance & judgment in default (2017-2018)
Writ, service, appearance & judgment in default (2017-2018)Intan Muhammad
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industryKheng Hoe Advocates
 
Ppra rules 2004
Ppra rules   2004Ppra rules   2004
Ppra rules 2004dar81b
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-dericSyafiq Zariful
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver bookHani Saad
 

What's hot (20)

Bq floor
Bq floorBq floor
Bq floor
 
FIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfFIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdf
 
ICTAD SBD 01.pdf
ICTAD SBD 01.pdfICTAD SBD 01.pdf
ICTAD SBD 01.pdf
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
 
Pp2 chapter 1 cheeyong & yih shyang
Pp2 chapter 1 cheeyong & yih shyangPp2 chapter 1 cheeyong & yih shyang
Pp2 chapter 1 cheeyong & yih shyang
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Method stm lean concrete
Method stm lean concreteMethod stm lean concrete
Method stm lean concrete
 
Writ, service, appearance & judgment in default (2017-2018)
Writ, service, appearance & judgment in default (2017-2018)Writ, service, appearance & judgment in default (2017-2018)
Writ, service, appearance & judgment in default (2017-2018)
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 
CIDA SBD 04.pdf
CIDA SBD 04.pdfCIDA SBD 04.pdf
CIDA SBD 04.pdf
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
 
Ppra rules 2004
Ppra rules   2004Ppra rules   2004
Ppra rules 2004
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver book
 

Viewers also liked

Pre qualification audit checklist & report
Pre qualification audit checklist & reportPre qualification audit checklist & report
Pre qualification audit checklist & reportfarhanifaisal86
 
Final Year Project Oral Pre PPT
Final Year Project Oral Pre PPTFinal Year Project Oral Pre PPT
Final Year Project Oral Pre PPTShu (Vivian) Nan
 
Cep 822 final project technology proposal
Cep 822 final project technology  proposalCep 822 final project technology  proposal
Cep 822 final project technology proposalNevine Elgazzar
 
A project report on whether the decreasing sales of pizza hut can be increase...
A project report on whether the decreasing sales of pizza hut can be increase...A project report on whether the decreasing sales of pizza hut can be increase...
A project report on whether the decreasing sales of pizza hut can be increase...Babasab Patil
 
20080129024931.contract checklists
20080129024931.contract checklists20080129024931.contract checklists
20080129024931.contract checklistsAshraf Javed
 
Table of Truck Driver Turnover Studies
Table of Truck Driver Turnover StudiesTable of Truck Driver Turnover Studies
Table of Truck Driver Turnover StudiesChristopher Ferrell
 
Automation in IT Services procurement by Tender Manager
Automation in IT Services procurement by Tender ManagerAutomation in IT Services procurement by Tender Manager
Automation in IT Services procurement by Tender ManagerpliXos GmbH
 
Bottega Veneta: general overview and new business platform proposal
Bottega Veneta: general overview and new business platform proposalBottega Veneta: general overview and new business platform proposal
Bottega Veneta: general overview and new business platform proposalAlba Romero Villa
 
Strategic Brand Management: Bottega Veneta in China
Strategic Brand Management: Bottega Veneta in ChinaStrategic Brand Management: Bottega Veneta in China
Strategic Brand Management: Bottega Veneta in ChinaVictoria Paskannaya
 
PQQ: Pre Qualification Questionnaire Stage
PQQ: Pre Qualification Questionnaire StagePQQ: Pre Qualification Questionnaire Stage
PQQ: Pre Qualification Questionnaire StageGreen Growth Consulting
 
Case Study: Topshop [NYU]
Case Study: Topshop [NYU]Case Study: Topshop [NYU]
Case Study: Topshop [NYU]Julien Perez
 
Topshop (A Marketing Management Project for MBA)
Topshop (A Marketing Management Project for MBA)Topshop (A Marketing Management Project for MBA)
Topshop (A Marketing Management Project for MBA)mahakhalid1
 
ESP COURSE DESIGN FOR GOVERNMENT TEACHERS
ESP COURSE DESIGN FOR GOVERNMENT TEACHERS ESP COURSE DESIGN FOR GOVERNMENT TEACHERS
ESP COURSE DESIGN FOR GOVERNMENT TEACHERS Hameel Khan
 
Tender Evaluation Process Notes
Tender Evaluation Process NotesTender Evaluation Process Notes
Tender Evaluation Process NotesAlan McSweeney
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house reportHagi Sahib
 
A project report on to study the customers satisfaction towards mrf tyres at...
A project report on  to study the customers satisfaction towards mrf tyres at...A project report on  to study the customers satisfaction towards mrf tyres at...
A project report on to study the customers satisfaction towards mrf tyres at...Babasab Patil
 
Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Akash Jauhari
 

Viewers also liked (20)

Pre qualification audit checklist & report
Pre qualification audit checklist & reportPre qualification audit checklist & report
Pre qualification audit checklist & report
 
Final Year Project Oral Pre PPT
Final Year Project Oral Pre PPTFinal Year Project Oral Pre PPT
Final Year Project Oral Pre PPT
 
Cep 822 final project technology proposal
Cep 822 final project technology  proposalCep 822 final project technology  proposal
Cep 822 final project technology proposal
 
A project report on whether the decreasing sales of pizza hut can be increase...
A project report on whether the decreasing sales of pizza hut can be increase...A project report on whether the decreasing sales of pizza hut can be increase...
A project report on whether the decreasing sales of pizza hut can be increase...
 
20080129024931.contract checklists
20080129024931.contract checklists20080129024931.contract checklists
20080129024931.contract checklists
 
Table of Truck Driver Turnover Studies
Table of Truck Driver Turnover StudiesTable of Truck Driver Turnover Studies
Table of Truck Driver Turnover Studies
 
Automation in IT Services procurement by Tender Manager
Automation in IT Services procurement by Tender ManagerAutomation in IT Services procurement by Tender Manager
Automation in IT Services procurement by Tender Manager
 
Bottega veneta
Bottega venetaBottega veneta
Bottega veneta
 
Bottega Veneta: general overview and new business platform proposal
Bottega Veneta: general overview and new business platform proposalBottega Veneta: general overview and new business platform proposal
Bottega Veneta: general overview and new business platform proposal
 
Strategic Brand Management: Bottega Veneta in China
Strategic Brand Management: Bottega Veneta in ChinaStrategic Brand Management: Bottega Veneta in China
Strategic Brand Management: Bottega Veneta in China
 
PQQ: Pre Qualification Questionnaire Stage
PQQ: Pre Qualification Questionnaire StagePQQ: Pre Qualification Questionnaire Stage
PQQ: Pre Qualification Questionnaire Stage
 
Case Study: Topshop [NYU]
Case Study: Topshop [NYU]Case Study: Topshop [NYU]
Case Study: Topshop [NYU]
 
Fast fashion
Fast fashionFast fashion
Fast fashion
 
Topshop (A Marketing Management Project for MBA)
Topshop (A Marketing Management Project for MBA)Topshop (A Marketing Management Project for MBA)
Topshop (A Marketing Management Project for MBA)
 
ESP COURSE DESIGN FOR GOVERNMENT TEACHERS
ESP COURSE DESIGN FOR GOVERNMENT TEACHERS ESP COURSE DESIGN FOR GOVERNMENT TEACHERS
ESP COURSE DESIGN FOR GOVERNMENT TEACHERS
 
Tender Evaluation Process Notes
Tender Evaluation Process NotesTender Evaluation Process Notes
Tender Evaluation Process Notes
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house report
 
A project report on to study the customers satisfaction towards mrf tyres at...
A project report on  to study the customers satisfaction towards mrf tyres at...A project report on  to study the customers satisfaction towards mrf tyres at...
A project report on to study the customers satisfaction towards mrf tyres at...
 
Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.
 

Similar to PPQ Template

5 3 6 5   M a e   A n n e   A v e .   S u i t e .docx
5 3 6 5    M a e    A n n e    A v e .    S u i t e .docx5 3 6 5    M a e    A n n e    A v e .    S u i t e .docx
5 3 6 5   M a e   A n n e   A v e .   S u i t e .docxalinainglis
 
Icaew advanced level corporate reporting study manual chapter wise interactiv...
Icaew advanced level corporate reporting study manual chapter wise interactiv...Icaew advanced level corporate reporting study manual chapter wise interactiv...
Icaew advanced level corporate reporting study manual chapter wise interactiv...Optimal Management Solution
 
Understanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesUnderstanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesLloyd Sewell
 
Public Relations Agency RFP
Public Relations Agency RFPPublic Relations Agency RFP
Public Relations Agency RFPDemand Metric
 
ENG 211 Week Three Assignment-Robyn Wolfe
ENG 211 Week Three Assignment-Robyn WolfeENG 211 Week Three Assignment-Robyn Wolfe
ENG 211 Week Three Assignment-Robyn WolfeRobyn Wolfe
 
Entrepreneurship: the final harvest of a new venture
Entrepreneurship: the final harvest of a new ventureEntrepreneurship: the final harvest of a new venture
Entrepreneurship: the final harvest of a new ventureEdcel Eñano
 
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...Samson Lu
 
Vendor selection
Vendor selectionVendor selection
Vendor selectionjanessa24
 
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013Kreischer Miller
 
Pot follows member?
Pot follows member?Pot follows member?
Pot follows member?Henry Tapper
 
Webinar consulting services rfp
Webinar consulting services rfpWebinar consulting services rfp
Webinar consulting services rfpDemand Metric
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSGanesh Bhorkade
 
Ssi application for_fresh_advance_or_renewal_or_enhancement_in_working_capita...
Ssi application for_fresh_advance_or_renewal_or_enhancement_in_working_capita...Ssi application for_fresh_advance_or_renewal_or_enhancement_in_working_capita...
Ssi application for_fresh_advance_or_renewal_or_enhancement_in_working_capita...Vayu Puthra
 
QuestionsNone of these questions has a style component, .docx
QuestionsNone of these questions has a style component, .docxQuestionsNone of these questions has a style component, .docx
QuestionsNone of these questions has a style component, .docxcatheryncouper
 
Advertising Agency RFP Template
Advertising Agency RFP Template Advertising Agency RFP Template
Advertising Agency RFP Template Demand Metric
 

Similar to PPQ Template (20)

5 3 6 5   M a e   A n n e   A v e .   S u i t e .docx
5 3 6 5    M a e    A n n e    A v e .    S u i t e .docx5 3 6 5    M a e    A n n e    A v e .    S u i t e .docx
5 3 6 5   M a e   A n n e   A v e .   S u i t e .docx
 
Icaew advanced level corporate reporting study manual chapter wise interactiv...
Icaew advanced level corporate reporting study manual chapter wise interactiv...Icaew advanced level corporate reporting study manual chapter wise interactiv...
Icaew advanced level corporate reporting study manual chapter wise interactiv...
 
PROCUREMENT.pptx
PROCUREMENT.pptxPROCUREMENT.pptx
PROCUREMENT.pptx
 
Understanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesUnderstanding Pre Qualification Questionnaires
Understanding Pre Qualification Questionnaires
 
Public Relations Agency RFP
Public Relations Agency RFPPublic Relations Agency RFP
Public Relations Agency RFP
 
ENG 211 Week Three Assignment-Robyn Wolfe
ENG 211 Week Three Assignment-Robyn WolfeENG 211 Week Three Assignment-Robyn Wolfe
ENG 211 Week Three Assignment-Robyn Wolfe
 
Entrepreneurship: the final harvest of a new venture
Entrepreneurship: the final harvest of a new ventureEntrepreneurship: the final harvest of a new venture
Entrepreneurship: the final harvest of a new venture
 
HOTEL R
HOTEL R HOTEL R
HOTEL R
 
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
 
Vendor selection
Vendor selectionVendor selection
Vendor selection
 
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
 
0000950170-22-004409.pdf
0000950170-22-004409.pdf0000950170-22-004409.pdf
0000950170-22-004409.pdf
 
Pot follows member?
Pot follows member?Pot follows member?
Pot follows member?
 
Webinar consulting services rfp
Webinar consulting services rfpWebinar consulting services rfp
Webinar consulting services rfp
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
 
Ssi application for_fresh_advance_or_renewal_or_enhancement_in_working_capita...
Ssi application for_fresh_advance_or_renewal_or_enhancement_in_working_capita...Ssi application for_fresh_advance_or_renewal_or_enhancement_in_working_capita...
Ssi application for_fresh_advance_or_renewal_or_enhancement_in_working_capita...
 
Media brief request for quote
Media brief request for quoteMedia brief request for quote
Media brief request for quote
 
QuestionsNone of these questions has a style component, .docx
QuestionsNone of these questions has a style component, .docxQuestionsNone of these questions has a style component, .docx
QuestionsNone of these questions has a style component, .docx
 
Advertising Agency RFP Template
Advertising Agency RFP Template Advertising Agency RFP Template
Advertising Agency RFP Template
 
Tpt's tendering process at a glance
Tpt's tendering process at a glanceTpt's tendering process at a glance
Tpt's tendering process at a glance
 

More from Samantha Coombs BSc CIPS (6)

Procurement Workflows
Procurement WorkflowsProcurement Workflows
Procurement Workflows
 
Non-disclosure Agreement
Non-disclosure AgreementNon-disclosure Agreement
Non-disclosure Agreement
 
Strategic sourcing
Strategic sourcingStrategic sourcing
Strategic sourcing
 
Supplier due dilligence
Supplier due dilligenceSupplier due dilligence
Supplier due dilligence
 
Procurement Presentation rbl
Procurement Presentation rblProcurement Presentation rbl
Procurement Presentation rbl
 
Procurement Presentation
Procurement PresentationProcurement Presentation
Procurement Presentation
 

Recently uploaded

High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingAggregage
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneCall girls in Ahmedabad High profile
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...makika9823
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of Reporting
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 

PPQ Template

  • 1. 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 PRE-QUALIFICATION QUESTIONNAIRE (PQQ) 1.1.9 1.1.10 FOR 1.1.11 XXXXXXXXXXXXXXX (Title of Procurement) 1.1.12 1.1.13 1.1.14 Reference No: xxxxxxxxxxxx
  • 2. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) INDEX PAGE BACKGROUND 3 INSTRUCTIONS FOR COMPLETION 4 QUERIES ABOUT PRE-QUALIFICATION QUESTIONNAIRE 5 EVALUATION 6 ESTIMATED TIMETABLE 7 PRE - QUALIFICATION QUESTIONNAIRE (Core) 8-14 1. BASIC DETAILS OF YOUR ORGANISATION 2. FINANCIAL INFORMATION 3. BUSINESS ACTIVITIES 4. REFERENCES 5. INSURANCE 6. QUALITY ASSURANCE PROCEDURES 7. HEALTH & SAFETY POLICY & PROCEDURES 8. EQUAL OPPORTUNITY POLICY & PROCEDURES 9. ENVIRONMENTAL MANAGEMENT POLICY & PROCEDURES 10.PROFESSIONAL AND BUSINESS STANDING 11.TECHNICAL ABILITY (REQUIREMENT SPECIFIC QUESTIONS) 12.DECLARATION 13. NOTES Page 2 of 14
  • 3. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) BACKGROUND Company history, news and community The company Values: Currently the company has a requirement for the provision of xxxxxxxxxxx (title of requirement) The purpose of this questionnaire is to assist Companyin deciding which suppliers to short-list to invite to tender for [requirement]. It seeks to understand the type, capacity and technical capability of those organisations wishing to undertake this work. In order to simplify this process, you don’t need to provide supporting documents, for example, accounts, certificates, statements or policies with this questionnaire at this stage. However, we may ask to see these documents at a later stage. You may also be asked to clarify your answers or provide more details. INSTRUCTIONS FOR COMPLETION Please answer every question (by ticking or writing as appropriate in the boxes provided) as accurately and concisely as possible and supply any additional information as required. If the question does not apply to you please write N/A; if you don’t know the answer please write N/K. Please provide attachments as necessary. All attachments must specifically make reference to the relevant question number in the questionnaire. Please do not include any information that is not expressly requested in this PQQ or subsequently in response to a clarification question. Do note that the inclusion of an executive summary, general marketing and company literature or a statement of reasons for selection is not required and will not be considered in the evaluation of the PQQ. To be considered for assessment, 2 copies of the completed questionnaire and any attachments must be returned in paper form and additionally, on CD. Page 3 of 14
  • 4. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) Please return the completed questionnaire to: Attn… Procurement Department Company address Not later than: ………… [time and date] We will contact you again by: ………… [date] Potential Suppliers are advised to provide a single point of contact in their organisation with their responses to this PQQ. All responses received and any communication from prospective Suppliers will be treated in confidence. In the event that none of the responses are deemed satisfactory, the Legion reserves the right to consider alternate procurement options. Responses should be clearly marked – “XXXXXXXXXXX (Title of Procurement)” Pre-Qualification Questionnaire - Strictly Confidential. Respondents selected to proceed to the next stage will be issued with an Invitation to Tender (ITT) pack. Those not selected to proceed to the next stage will be informed in writing. QUERIES ABOUT THE PRE-QUALIFICATION QUESTIONAIRE If you have any queries about this questionnaire, please contact: [Name]………………………. [Phone]……………………… [Email]……………………… All requests for clarification must be in writing. If the company considers any question or request for clarification to be of material significance; both the query and the response will be communicated to all potential suppliers. However the company will not enter into detailed discussions at this stage. Please note that if any of the information supplied by you in your response to the questionnaire changes in the ensuing evaluation period the organisation is required to notify the company accordingly. Page 4 of 14
  • 5. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) Please remember to provide a single point of contact in your organisation that is dealing with the responses to this PQQ. All responses received and any communication from prospective Suppliers will be treated in confidence. EVALUATION CRITERIA The initial evaluation will be carried out using a set of four Criteria as follows: Criteria 1; Supplier Acceptability To pass this review the Supplier must not be bankrupt, insolvent, in receivership, or be subject to criminal proceedings or have a criminal record as set out in REGULATION 14 OF THE PUBLIC SERVICES CONTRACT REGULATIONS 1993 (1 1993 No. 3228). Criteria 2; Supplier Economic and Financial standing To pass this review the Supplier must be in a sound financial position to participate in a contract of this size as set out in REGULATION 15 OF THE PUBLIC SERVICES CONTRACTS REGULATIONS 1993 (SI 1993 No. 3228). Criteria 3; Supplier Managerial and Operational Capability To pass this review the supplier must demonstrate its managerial and operational staffing capacity and capabilities as well as evidence of standard policies and procedures and a good record of professional standing. Page 5 of 14
  • 6. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) Criteria 4; Supplier Technical Ability To pass this review the Supplier must be able to demonstrate a successful track record of providing similar services as specified in the scope of work. The assessment methodology will be a combination of risk based assessment and weighted scoring approach as follows: • Criteria 1 – Risk based • Criteria 2 - Risk based • Criteria 3 – 50% (score) • Criteria 4 - 50% (score) Potential Suppliers who satisfactorily meet the criteria will be issued Invitation to Tender packs. Those not selected to proceed to the next stage will be informed in writing ESTIMATED TIMETABLE Milestones Date Dispatch of Pre-Qualification Questionnaires Week Commencing……………… Deadline for receipt of Clarification Questions (CQ) for PQQ Deadline for receipt of completed questionnaire Week Commencing……………… Evaluation of Pre-Qualification Questionnaires Week Commencing……………… Dispatch of Invitation to Tender (ITT) Packs Week Commencing……………… Deadline for receipt of Clarification Questions (CQ) for ITT Page 6 of 14
  • 7. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) Deadline for receipt of tenders Evaluation of tenders Week Commencing……………… Interviews Week Commencing……………… Clarification/Informal Award Formal Contract Award TBC Contract Start Date Please note that these dates are provisional and may be subject to change PRE-QUALIFICATION QUESTIONNAIRE (PQQ) 1 BASIC DETAILS OF YOUR ORGANISATION 1.1 Name of the organisation in whose name the tender would be submitted: 1.2 Contact name for enquiries about this bid: 1.3 Contact position (Job Title): 1.4 Address: Page 7 of 14
  • 8. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) Post Code: 1.5 Telephone number: 1.6 Fax number: 1.7 E-mail address: 1.8 Website address (if any): 1.9 Company Registration number (if this applies): 1.10 Charities or Housing Association or other Registration number (if this applies). Please specify registering body: 1.11 Date of Registration: 1.12 Registered address if different from the above: Post Code: 1.13 VAT Registration number: 1.14 Is your organisation: (Please tick one) i) a public limited company? ii) a limited company? iii) a partnership iv) a sole trader v) other (please specify) 1.19 Name of (ultimate) parent company (if this applies): 1.20 Companies House Registration number of parent company (if this applies): 1.21 Construction and related businesses only: Are you registered with Constructionline? If “Yes”, what is your registration number? Yes / No Page 8 of 14
  • 9. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) 2 FINANCIAL INFORMATION 2.1 What was your turnover in the last two years (if this applies)? £………… for year ended --/--/---- £……… for year ended --/--/---- 2.2 Has your organisation met the terms of its banking facilities and loan agreements (if any) during the past year? Yes / No 2.3 If “No” what were the reasons, and what has been done to put things right? 2.4 Has your organisation met all its obligations to pay its creditors and staff during the past year? Yes / No 2.5 If “No” please explain why not: 2.6 What is the name and branch of your bankers (who could provide a reference)? Name: Branch: Contact details: 2.9 If asked, would you be able to provide at least one of the following? A copy of your most recent audited accounts (for the last two years if this applies) Yes / No A statement of your turnover, profit & loss account and cash flow for the most recent year of trading Yes / No A statement of your cash flow forecast for the current year and a bank letter outlining the current cash and credit position Yes / No 3 BUSINESS ACTIVITIES Page 9 of 14
  • 10. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) 3.1 What are the main business activities of your organisation? 3.2 How many staff does your organisation have? (If you are a sole trader, please say so) 4 REFERENCES Please provide details of three recent contracts that are relevant to the Authority’s requirement. Where possible at least one should be from the public or third sector. If you cannot provide three references, please explain why. Reference 1 Reference 2 Reference 3 4.1 Customer Organisation (name): 4.2 Customer contact name and phone number: 4.3 Date contract awarded: 4.4 Contract reference and brief description: 4.5 Value: 4.6 Date contract was completed: Page 10 of 14
  • 11. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) 4.7 Have you had any contracts terminated for poor performance in the last three years, or any contracts where damages have been claimed by the contracting authority? Yes / No 4.8 If “Yes”, please give details: 5 Y INSURANCE Please provide details of your current insurance cover Value 5.1 Employer’s Liability: £ 5.2 Public Liability: £ 5.3 Other (please provide details): £ 6 QUALITY ASSURANCE 6.1 Does your organisation hold a recognised quality management certification for example BS/EN/ISO 9000 or equivalent? Yes / No 6.2 If not, does your organisation have a quality management system*? Yes / No 6.3 If you do not have quality certification or a quality management system, please explain why: 7 HEALTH & SAFETY Page 11 of 14
  • 12. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) 7.1 Does your organisation have a written health and safety at work policy? (see notes at end of questionnaire) Yes / No 7.2 Does your organisation have a health and safety at work system*? Yes / No 7.3 If “No”, to either of the above please explain why: 8 EQUAL OPPORTUNITIES Does your organisation have a written equal opportunities policy, to avoid discrimination? Yes / No 9 ENVIRONMENTAL MANAGEMENT Does your organisation have an environmental management system*? Yes / No 10 PROFESSIONAL AND BUSINESS STANDING Do any of the following apply to your organisation, or to (any of) the director(s) / partners / proprietor(s)? 10.1 Is in a state of bankruptcy, insolvency, compulsory winding up, receivership, composition with creditors, or subject to relevant proceedings Yes / No 10.2 Has been convicted of a criminal offence related to business or professional conduct Yes / No 10.3 Has committed an act of grave misconduct in the course of business Yes / No 10.4 Has not fulfilled obligations related to payment of social security contributions Yes / No Page 12 of 14
  • 13. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) 10.5 Has not fulfilled obligations related to payment of taxes Yes / No 10.6 Is guilty of serious misrepresentation in supplying information Yes / No 10.7 Is not in possession of relevant licences or membership of an appropriate organisation where required by law Yes / No 10.8 If the answer to any of these is “Yes” please give brief details below, including what has been done to put things right. 11 REQUIREMENT SPECIFIC QUESTIONS 11.1 Q A 11.2 Q A 11.3 Q A 11.4 Q A 12 I declare that to the best of my knowledge the answers submitted in this PQQ (and any supporting modules) are correct. I understand that the information will be used in the evaluation process to assess my organisation’s suitability to be invited to tender for the Authority’s requirement. FORM COMPLETED BY 13.1 Name: 13.2 Position (Job Title): 13.3 Date: Page 13 of 14
  • 14. PRE-QUALIFICATION QUESTIONNAIRE (PQQ) 13.4 Telephone number: 13.5 Signature: Notes for Suppliers “Authority” means Companythat is seeking to award this contract. * “system” means processes and procedures to ensure that the subject is properly managed. This includes making sure that legal requirements are met. Health and Safety Policies Any business employing five or more people has, by law, to prepare and bring to the attention of employees a written Health and Safety Policy Statement. A Health and Safety Policy usually consists of three distinct sections namely: General Policy Statement – a short statement outlining the organisation’s commitment to Health and Safety, signed and dated by the senior organisation official (for example, the Managing Director). Organisation – how the organisation addresses health and safety; lines of communication between managers and staff; and any specific duties/responsibilities assigned within the organisation - this should be relatively straightforward for smaller organisations. Arrangements – the systems and procedures in place for ensuring employees’ health and safety at work Page 14 of 14