FNBE 0414 ICI Project 3 Proposal Report
1. ICI
3
|
THE
PROJECT
BRIEF
1
PROJECT
3:
THE
PROJECT
BRIEF
INTRODUCTION
TO
THE
CONSTRUCTION
INDUSTRY
|
QSB
310105
|
TAN
JADEN
|
0319923
IRYNNA
ANNUAR
|
0317846
FNBE
0414
2. ICI
3
|
THE
PROJECT
BRIEF
2
Table
of
Contents
1.
Project
Introduction
3
2.
Project
Site
4
3.
Project
Concept
7
4.
Project
Plan
9
5.
Rationale
12
6.
Authority
Procedures
16
7.
Approval
Form
21
8.
Conclusion
31
3. ICI
3
|
THE
PROJECT
BRIEF
3
1.
Project
Introduction
1.1 Project
background
Taylor’s
University
is
a
prestigious
private
university
that
has
state-‐of-‐the-‐art
facilities.
Located
in
Subang
Jaya,
the
RM
450
million
Taylor’s
University
Lakeside
Campus
was
completed
in
2010.
Taylor’s
University
offers
a
wide
range
of
courses
with
the
degree
in
architecture
being
a
highly
demanded
course.
The
future
architects
who
work
diligently
often
spend
their
sleepless
nights
in
the
studios.
At
times,
the
students
need
a
few
minutes
of
rest
and
their
only
bed
is
the
cold,
hard
floor.
Thus,
a
proposal
for
a
rest
area
transitions
in
naturally.
4. ICI
3
|
THE
PROJECT
BRIEF
4
2.
Project
Site
2.1 Site
Location
At
the
end
of
the
second
floor
of
Taylor’s
University
is
an
empty
roof
terrace
that
is
rarely
visited
by
the
students.
A
reason
being
the
terrace
is
bare
and
has
literally
nothing
on
it.
It
is
a
waste
of
space
and
thus,
we
have
decided
to
put
it
to
good
use.
5. ICI
3
|
THE
PROJECT
BRIEF
5
ScannedbyCamScanner
2.2 Site
Analysis
Eastern
Winds
Southern
Winds
SOUNDS
hello
Traffic
–
Soft
hello
Construction
-‐
Soft
To
Block
E
6. ICI
3
|
THE
PROJECT
BRIEF
6
Weather
The
sun
rises
from
the
east
and
sets
at
the
west.
But
is
blocked
by
the
building
of
Block
E
thus
only
a
part
of
the
roof
terrace
is
exposed
to
sunlight.
Winds
blow
harshly
from
the
south
and
the
east
at
the
highest
recorded
speed
being
13km/h
and
the
lowest
3
km/h.
In
the
morning,
the
temperature
is
23°C and the highest recorded
temperature is 29°C.
Ambience
Soft
traffic
noises
from
the
east
can
be
heard.
Soft
noises
of
construction
from
the
south
can
be
heard.
The
construction
noise
stops
at
6pm
as
the
working
hours
of
construction
site
ends
at
that
time.
Problem
The
roof
terrace
is
an
empty
space
without
any
furniture.
Because
of
this
it
is
regularly
visited
for
resting.
Other
than
that,
there
is
a
lack
of
roofs.
Thus,
it
when
t
rains,
this
area
becomes
wet
and
unusable.
7. ICI
3
|
THE
PROJECT
BRIEF
7
3. Project
Concept
As
the
students
of
Taylor’s
University
have
hectic
schedules,
the
space
we
will
be
proposing
will
be
a
rest
house
that
incorporates
the
“zen”
concept
into
its
structure.
The
reason
is
that
“zen”
is
a
Japanese
school
of
Mahayana
Buddhism
emphasizing
the
value
of
meditation
and
intuition.
Meditation
soothes
the
mind
and
body.
3.1
Concept
Images
8. ICI
3
|
THE
PROJECT
BRIEF
8
3.2 Objective
• To
improve
the
level
of
service
at
Taylor’s
University
• To
provide
a
rest
area
accessible
24/7
for
students
• To
ensure
students
take
a
break
after
hours
of
work
• To
let
students
socialize
with
one
another
3.3 Benefits
By
providing
this
space:
• Students
are
able
to
rest
comfortably
• Students
are
able
to
meet
up
freely
• The
open
space
is
put
to
good
use
9. ICI
3
|
THE
PROJECT
BRIEF
9
4. Project
Plan
Project
Elevation
The
inspiration
for
this
project
comes
from
the
Japanese
architecture.
The
material
used
to
make
the
walls
is
pinewood,
the
exact
same
wood
used
to
make
Japanese
houses.
12. ICI
3
|
THE
PROJECT
BRIEF
12
5.
Rationale
Object:
Beanbag
Quantity:
4
Rationale:
Beanbags
are
able
to
follow
the
shape
of
an
individual’s
back,
allowing
full
comfort.
It
is
also
more
comfortable
than
normal
chairs.
Object:
Fake
plant
Quantity:
12
Rationale:
Fake
plants
are
easier
to
maintain.
It
is
also
widely
used
in
Japanese
architecture.
13. ICI
3
|
THE
PROJECT
BRIEF
13
Object:
Wooden
platform
Quantity:
1
Rationale:
A
platform
is
essential
in
this
rest
area
as
it
can
be
used
for
a
wide
range
of
uses
such
as
sleeping
to
resting.
Object:
Sofa
Quantity:
2
Rationale:
The
sofa
is
a
perfect
piece
of
furniture
to
add
into
this
rest
area.
It
is
comfortable
for
the
students
to
rest
on.
Object:
Refreshments
Cabinet
Quantity:
1
Rationale:
The
cabinet
will
be
used
a
storage
for
refreshments
or
as
a
counter
top
for
a
coffee
machine.
14. ICI
3
|
THE
PROJECT
BRIEF
14
Object:
Multi-‐drawer
Cabinet
Quantity:
2
Rationale:
This
cabinet
will
be
used
to
store
books,
magazines,
comics
and
etcetera.
The
concept
used
in
the
reading
corner
is
an
open
library
where
leave
and
borrow
books
for
free.
Object:
Reading
platform
Quantity:
1
Rationale:
It
is
space
for
books
and
a
place
for
students
to
read.
Object:
Stepping
stones
Quantity:
50
Rationale:
Stones
are
widely
used
reflexology.
15. ICI
3
|
THE
PROJECT
BRIEF
15
Object:
Water
features
Quantity:
1
Rationale:
The
water
feature
produces
a
calming
sound
that
helps
those
listening
to
calm
down.
Object:
Japanese
Sliding
Door
Quantity:
1
Rationale:
The
sliding
doors
complete
the
authentic
look
of
Japanese
architecture.
16. ICI
3
|
THE
PROJECT
BRIEF
16
6.
Authority
Procedures
6.1
Step
1
Applicant
submits
application
to
secretariat
of
One
Stop
Centre.
The
One
Stop
Centre
(OSC)
Secretariat
shall
check
and
examine
all
documents
submitted
based
on
the
checklist
prepared.
If
the
application
is
incomplete,
the
OSC
Secretariat
will
request
the
applicant
to
submit
the
necessary
or
addition
documents/plans.
• The
OSC
Secretariat
shall:
• Register
the
application
• Receive
the
receipt
of
processing
fees
• Key
in
data
for
electronic
submission,
if
applicable:
and
• Issue
letter
receipt
application
to
the
applicant
6.2
Step
2
OSC
secretariat
will
distribute
application
to
relevant
departments.
For
submission
of
building
plans,
the
technical
departments/agencies
that
shall
be
referred
to
are
as
below:
• Department
of
Fire
and
Rescue
Services;
• Water
Supply
Corporation;
• Department
of
Sewerage
Services;
• Tenaga
Nasional
Berhad;
• Internal
technical
departments
(Department
of
Planning,
Landscape
Department,
Department
of
Engineering,
Department
of
Health)
• Other
related
technical
departments/agencies
17. ICI
3
|
THE
PROJECT
BRIEF
17
6.3
Step
3
Processing
of
building
plan
Application
by
the
Department
of
Town
Planning
Local
Authority.
For
the
building
plan
approval,
the
officer
in
the
Building
Department
shall
undertake
the
following
process
and
procedure:-‐
• Receive
application
letter
with
complete
documents
from
the
One
Stop
Centre
Secretariat
and
open
file;
• Check
fee
payment;
• Check
Form
A
(Schedule
II
Uniform
Building
By
Laws
1984);
• Check
the
building
plan
based
on
detailed
checklist
• Receive
comments
from
technical
departments/agencies
and
coordinate
comments
with
the
agreed
layout
plan;
• Prepare
written
directions
to
the
applicant
and
ensures
applicant
comply
with
conditions;
• Prepare
recommendation
paper
to
the
One
Stop
Centre
Secretariat
• The
Director
of
Building
Department
shall
table
the
recommendation
paper
in
the
OSC
Committee
Meeting
6.4
Step
4
Compilation
and
coordination
of
recommendation
papers
will
be
done.
The
One
Stop
Centre
Secretariat
shall:
• compile
and
coordinate
all
recommendation
papers;
• issue
letter
of
calling
for
meeting
attached
with
meeting
agenda
to
all
members
of
the
OSC
Committee;
and
• distribute
recommendation
papers.
• Should
a
technical
department/agency
not
able
to
provide
comments
within
the
stipulated
time
without
a
valid
reason,
the
One
Stop
Centre
Committee
shall
proceed
to
consider
the
application
and
make
decision.
• For
applications
that
had
submitted
the
pre-‐computation
plan
at
the
early
stage,
any
differences
noted
between
the
pre-‐computation
plan
and
the
layout
plan,
the
OSC
Secretariat
will
have
to
inform
the
applicant
to
make
the
necessary
amendments.
18. ICI
3
|
THE
PROJECT
BRIEF
18
6.5
Step
5
One
Stop
Centre
will
organize
a
committee
meeting.
The
OSC
Committee
Meeting
shall
undertake
to
consider
and
make
decisions
on
the
applications
for:
• planning
permission;
• building
plans;
• earthworks
plans
and
road
and
drainage
plans.
• The
committee
shall
make
recommendations
for:
• pre-‐computation
plan;
• application
for
simultaneous
subdivision
and
conversion
under
section
124A
NLC
in
accordance
with
subparagraph
136
(1)(c)(i)
NLC
or
application
for
surrender
and
re-‐alienation
section
204D
NLC
in
accordance
with
paragraph
204D(1)(d)
NLC.
• The
decision
of
the
planning
permission
in
the
OSC
Committee
Meeting
shall
be
issued
through;
• Form
C1,
Schedule
I
Development
Control
(General)
Rules,
1986
-‐
Award
Planning
Permission
to
Applicant;
and
• Form
B,
Schedule
IV
Development
Control
(General)
Rules,
1986
-‐
Notice
to
Person
who
Object
the
Planning
Permission;
or
• Form
C2,
Schedule
I
Development
Control
(General)
Rules,
1986
-‐
Reject
to
grant
planning
permission
• These
documents
shall
be
signed
by
YDP
or
empowerment
to
the
Director
of
Planning
Department
Local
Authority.
6.6
Step
6
Preparation
of
notification
of
planning
approval
is
sent
to
land
administrator.
The
OSC
Secretariat
shall
prepare
the
necessary
documents
to
be
submitted
to
the
Land
Administrator:
• Approved
documents
• Form
C1,
Schedule
I
Development
Control
(General
Rules),
1986
-‐
planning
permission
approval;
• Letter
of
confirmation
of
approval
19. ICI
3
|
THE
PROJECT
BRIEF
19
6.7
Step
7
Prepare
recommendation
paper
to
the
State
Executive
Council
(EXCO).
The
Land
Administrator
shall
prepare
a
recommendation
paper
to
the
State
Director
of
Lands
and
Mines
to
be
tabled
at
the
meeting
of
the
State
Executive
Council
for
decision.
The
State
Director
for
Lands
and
Mines
shall
inform
the
State's
decision
to
the
Land
Administrator
and
make
copy
of
the
decision
to
the
One
Stop
Centre
Secretariat.
6.8
Step
8
The
Land
Administrator
informs
the
applicant
of
the
decision
on
the
Land
Development
Application
Under
section
124A,
the
Land
Administrator
shall
inform
the
applicant
of
the
following:-‐
• the
subdivision
that
has
been
approved;
• for
every
subdivision,
the
category,
conditions
and
expressed
conditions
(if
applicable)
as
directed
by
the
State
Authority;
• additional
premium
rate
and
quit
rent
for
every
subdivision
as
well
as
other
payments
that
need
to
be
made;
• the
period
for
the
payment
of
additional
premium,
quit
rent
and
others;
and
• other
conditions
of
approval
as
imposed
by
the
State
Authority.
At
the
same
time,
the
Land
Administrator
need
to
present
the
notice
in
Form
7G
requesting
the
applicant
to
make
the
necessary
payments
within
the
stipulated
time
as
follows:-‐
• Surveying
fees
if
the
survey
is
to
be
done
by
the
Department
of
Land
Survey;
and
• Payment
for
the
preparation
and
registration
of
the
Qualified
Title
for
every
lot
in
the
subdivision.
20. ICI
3
|
THE
PROJECT
BRIEF
20
For
section
204D,
the
Land
Administrator
shall
inform
the
applicant
of
the
following:
• The
terms
of
the
approval
for
each
unit
that
shall
be
re-‐alienated;
• The
additional
premium
and
tax
rates
for
each
unit
that
shall
be
re-‐
alienated;
• Period
of
payment
of
the
additional
premium,
tax
and
other
payments
that
is
charged;
and
• The
amount
of
premium
in
Form
5A
in
relation
with
each
unit.
The
survey
charges
shall
not
be
included
in
Form
5A
if
the
survey
is
to
be
undertaken
by
a
licensed
surveyor
and
the
Land
Administrator
has
been
given
the
assurance
by
the
Board
of
Surveyors.
6.9
Step
9
Prepare
decision
paper
for
acknowledgement
to
the
Full
Council.
The
OSC
secretariat
shall
prepare
decision
paper
of
the
One
Stop
Centre
Committee
to
be
acknowledged
at
the
Full
Council
Meeting
of
the
Local
Authority.
6.10
Step
10
Inform
the
approval
to
the
applicant.
The
One
Stop
Centre
secretariat
shall:
• collect
the
approved
documents
signed
by
the
YDP
or
through
empowerment
to
the
Director
of
Planning,
Director
of
Building
and
Director
of
Engineering.
• inform
the
applicant
the
on
the
decision
of
the
application
enclosing
the
approved
layout
plan,
building
plan
and
other
related
plans.
• The
total
time
frame
for
the
processing
of
simultaneous
application
is
suggested
as
92
days
(3
months
and
2
days).
• If
the
application
falls
within
an
area
with
the
gazetted
local
plan,
the
normal
time
to
process
shall
be
67
days
(2
months
and
7
days).
21. ICI
3
|
THE
PROJECT
BRIEF
21
7.
Approval
Form
KERAJAAN MALAYSIA
JABATAN KERAJAAN TEMPATAN
KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN
PERSIARAN PERPADUAN USJ 5,
47610 SUBANG JAYA,
SELANGOR DARUL EHSAN.
TEL : 03 – 8026 3131
FAX : 03 – 8026 3295
WEB : www.mpsj.gov.my
FEBRUARI 2013
HAKCIPTA TERPELIHARA
SENARAI SEMAK DOKUMEN DAN SENARAI
SEMAK TERPERINCI AGENSI TEKNIKAL
DALAMAN DAN LUARAN
(PELAN BANGUNAN BARU/SERENTAK)
MPSJ.RK.KPT(OSC)-07
PINDAAN: 01
TARIKH KUATKUASA : 01 MEI 2014
22. ICI
3
|
THE
PROJECT
BRIEF
22
No. Ruj. OSC : MPSJ /____ /_____
No. Ruj. OSC terdahulu (jika ada) :_____________________________
Tarikh Daftar : _____________________________
Masa : _____________________________
Jenis permohonan yang dikemukakan :-
1) Permohonan Kelulusan Pelan Bangunan bagi Skim Perumahan dan Bangunan Perusahaan/
Perniagaan / Kemudahan Awam / Bangunan Ibadat Bukan Islam / Rumah Sesebuah /
Rumah Berkembar.
Kategori Permohonan :
a) Permohonan secara Konvensional
b) Permohonan Serentak (KM, KT & INFRA, PB)
c) Permohonan Serentak (KT & INFRA , PB)
SENARAI SEMAK PENERIMAAN DOKUMEN BAGI PERMOHONAN PELAN BANGUNAN
Tajuk Permohonan : .........................................................................................................................................................................
................................................................................................................................................................................
................................................................................................................................................................................
................................................................................................................................................................................
...............................................................................................................................................................................
................................................................................................................................................................................
................................................................................................................................................................................
Pemilik / Pemaju : ..........................................................................................................................................................................
Alamat Pemilik/Pemaju : ..........................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
Tel. & Fax : ..........................................................................................................................................................................
Perunding : ..........................................................................................................................................................................
Alamat Perunding : ..........................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
Tel. & Fax : ..........................................................................................................................................................................
Nama : ..........................................................................................................................................................................
PUSAT SETEMPAT (OSC)
MAJLIS PERBANDARAN SUBANG JAYA (MPSJ)
Persiaran Perpaduan USJ 5,
47610 Subang Jaya,
Selangor Darul Ehsan.
Tel : 03 – 8026 3131
Fax : 03 – 8026 3295
Web : www.mpsj.gov.my
23. ICI
3
|
THE
PROJECT
BRIEF
23
Perakuan Pemohon/Perunding:
Saya bagi pihak Pemohon/Perunding dengan ini membuat perakuan bahawa semua dokumen-dokumen yang disertakan adalah benar serta
mematuhi keperluan permohonan pembangunan di Majlis Perbandaran Subang Jaya (MPSJ)
MAKLUMAN
Selaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5 Tahun 2009 (rujukan KPKT(02)799/6
Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai Semak Semak Terperinci Agensi Teknikal Luaran Untuk Proses Kelulusan
Pemajuan Melalui Pusat Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya mulai 1hb Mei 2011.
Sebarang pertanyaan dan penjelasan lanjut berhubung pekeliling ini boleh dikemukakan kepada:
KETUA PENGARAH
Jabatan Kerajaan Tempatan
Kementerian Perumahan & Kerajaan Tempatan
Aras 4, Blok K, Pusat Bandara Damansara,
50782 Kuala Lumpur
(u.p.: Bahagian Penyelidikan dan Perundangan Teknikal)
No. Telefon : 03-20947033 / 2087 4501
No. Fax : 03-2095 5180 / 2095 3717
Sebarang pertanyaan dan penjelasan lanjut berhubung Senarai Semak dan perinciannya, sila hubungi agensi / jabatan teknikal yang berkaitan.
.......................…………………………….
Nama, Tandatangan & Cop Pemohon /
Perunding
.......................…………………………….
Nama, Tandatangan &
Cop Pegawai OSC 1
.......................…………………………….
Nama, Tandatangan &
Cop Pegawai OSC 2
Tarikh : …………………… Tarikh : ……………………… Tarikh : ……………………..
24. ICI
3
|
THE
PROJECT
BRIEF
24
SENARAI SEMAK DOKUMEN BAGI PERMOHONAN PELAN BANGUNAN
1) JABATAN PERANCANGAN BANDAR
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1
Surat Permohonan Rasmi Ke Perancangan Bandar
MPSJ (Cover Letter) 1
2
Pelan Bangunan dalam skala Metric
1
3
Sesalinan Pelan Kebenaran Merancang yang
disahkan oleh Jabatan Perancangan Bandar MPSJ
ATAU Borang C1
1
2) JABATAN BANGUNAN
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1 Borang A /Borang Pindaan Kepada Pelan yang
Telah Diluluskan
(Di Peraku oleh Arkitek/Jurutera/Pelukis Pelan
Berdaftar)- Dapatkan di Kaunter OSC. ( Jadual
Kedua UKBS 1984 )
1
2 Surat Permohonan yang ditandatangani oleh
perunding berdaftar ( Cover letter )
2
3 Salinan geran atau surat hakmilik tanah asal
yang telah disahkan atau Salinan bukti
permohonan berimilik tanah yang telah
dikemukakan oleh agensi perlaksanaan kepada
PTD/PTG
1
4 Salinan resit semasa cukai pintu
Januari-Jun
Julai-Disember
2
5 Salinan surat “Power Of Attorney”
(Perlu sekiranya pemilik tanah dan pemaju tidak
sama)
2
JABATAN/AGENSI TEKNIKAL DALAMAN
25. ICI
3
|
THE
PROJECT
BRIEF
25
6 Dokumen sokongan bagi permohonan Pelan
Bangunan secara Konvensional:
2 salinan Pelan Susunatur yang disahkan oleh
Jabatan Perancangan Bandar, MPSJ
2 set Pelan Pra Hitungan yang disahkan
Jabatan Perancangan Bandar MPSJ
2 salinan surat kelulusan Kebenaran
Merancang daripada Jabatan Perancangan
Bandar, MPSJ
2 salinan surat kelulusan Kerjatanah daripada
Jabatan Kejuruteraan, MPSJ
2 salinan surat kelulusan Pelan Jalan dan
Perparitan daripada Jabatan
Kejuruteraan,MPSJ
2 salinan surat kelulusan Tukar Syarat Tanah
daripada pejabat tanah petaling (jika Berkaitan)
2 salinan resit premium tanah (tidak diperlukan
sekiranya telah mempunyai hakmilik)
Surat perakuan IWK bersama “ Cover Letter”
mengikut format di Lampiran 1 Yang perlu
dikemukakan oleh PSP/SP dan di Cop Oleh
Pesuruhjaya Sumpah ATAU surat kelulusan
IWK
Surat perakuan SYABAS bersama “ Cover
Letter” mengikut format di Lampiran 1 Yang
perlu dikemukakan oleh PSP/SP dan di Cop
Oleh Pesuruhjaya Sumpah ATAU surat
kelulusan SYABAS
Surat perakuan SKMM bersama “ Cover
Letter” mengikut format di Lampiran 1 Yang
perlu dikemukakan oleh PSP/SP dan di Cop
Oleh Pesuruhjaya Sumpah ATAU surat
kelulusan SKMM
2 salinan surat “Power of Attorney”(perlu sekiranya
pemilik tanah dan pemaju tidak sama)
1
( Asal dan
salinan)
7 Dokumen Sokongan bagi permohonan Pelan
Bangunan secara serentak 2 kombinasi (Kerja
Tanah dan Pelan Bangunan)
2 salinan Pelan Susunatur yang telah disahkan
oleh Jabatan Perancangan Bandar MPSJ
2 set Pelan Pra-Hitungan yang disahkan oleh
Jabatan Perancangan Bandar, MPSJ
2 salinan surat kelulusan Kebenaran
Merancang daripada Jabatan Perancangan
Bandar, MPSJ
2 salinan *akuan terima/surat kelulusan Pelan
Jalan dan Perparitan daripada Jabatan
Kejuruteraan, MPSJ
2 salinan surat “Power Of Attorney”
26. ICI
3
|
THE
PROJECT
BRIEF
26
Surat perakuan IWK bersama “ Cover Letter”
mengikut format di Lampiran 1 Yang perlu
dikemukakan oleh PSP/SP dan di Cop Oleh
Pesuruhjaya Sumpah ATAU surat kelulusan
IWK
Surat perakuan SYABAS bersama “ Cover
Letter” mengikut format di Lampiran 1 Yang
perlu dikemukakan oleh PSP/SP dan di Cop
Oleh Pesuruhjaya Sumpah ATAU surat
kelulusan SYABAS
Surat perakuan SKMM bersama “ Cover
Letter” mengikut format di Lampiran 1 Yang
perlu dikemukakan oleh PSP/SP dan di Cop
Oleh Pesuruhjaya Sumpah ATAU surat
kelulusan SKMM
1
( Asal dan
salinan)
8 Dokumen sokongan bagi permohonan Pelan
Bangunan secara serentak 3 kombinasi
(Kebenaran Merancang, Kerja Tanah, Pelan
Bangunan:
2 salinan surat Power of Attorney
Surat perakuan IWK bersama “ Cover Letter”
mengikut format di Lampiran 1 Yang perlu
dikemukakan oleh PSP/SP dan di Cop Oleh
Pesuruhjaya Sumpah ATAU surat kelulusan
IWK
Surat perakuan SYABAS bersama “ Cover
Letter” mengikut format di Lampiran 1 Yang
perlu dikemukakan oleh PSP/SP dan di Cop
Oleh Pesuruhjaya Sumpah ATAU surat
kelulusan SYABAS
Surat perakuan SKMM bersama “ Cover
Letter” mengikut format di Lampiran 1 Yang
perlu dikemukakan oleh PSP/SP dan di Cop
Oleh Pesuruhjaya Sumpah ATAU surat
kelulusan SKMM
1
( Asal dan
salinan)
9 Pengenalan seperti Nama,Jawatan, (jika
berkenaan) alamat terkini,No.Kad Pengenalan dan
Nombor pendaftaran Setiap Perunding
(Jurutera/Arkitek/Pelukis Pelan) Pemilik dan
Pemaju hendaklah ditulis atas setiap helaian pelan.
10 Sekiranya Pemilik / Pemaju adalah syarikat
berdaftar, Salinan Borang 49 hendaklah
disertakan.
1
27. ICI
3
|
THE
PROJECT
BRIEF
27
11 Pelan Tapak ( mengandungi lokasi tapak yang
ditandakan, tunjuk arah utara)
Penyediaan Pelan dalam skala metric
(Termasuk 1 set linen)
Pelan perlu ditandatangani oleh Pemilik/ Pemaju &
Perunding/ Arkitek/Jurutera/ Pelukis Pelan Berdaftar
Pelan Dikemukakan dalam lipatan A4
Memanjang
Pelan-pelan perlu diwarnakan
5
12 Template perkiraan “Fee” yuran proses mengikut
Jadual Pertama UKBS 1984
(yang Telah Di Sahkan oleh Jabatan Bangunan)
1
13 Laporan Teknikal bersaiz A3 – ‘Hard Copy’
beserta 1 salinan dalam bentuk CD dan
‘menggunakan format Powerpoint
10
14 Pelan perspektif bersaiz A4 – ‘Hard Copy’ dan
dalam bentuk CD –serta gambar tapak berwarna –
jpeg (jika berkaitan)
1
15 Salinan surat permohonan daripada Perunding
Jurutera (C & S)-Cover Letter. (Jika Berkaitan)
1
16 Borang A Di Peraku Oleh Perunding Jurutera
C&S- Dapatkan di Kaunter OSC. ( Jadual Kedua
UKBS 1984 )- (Jika Berkaitan)
1
17 Pelan Struktur lengkap ditandatangani oleh
Pemilik/Pemaju & Perunding Jurutera C & S/
Pelukis Pelan Berdaftar dan di perakui oleh
perunding Jurutera C & S- (Jika Berkaitan)
1 (Linen)
18 Pelan Sanitary lengkap ditandatangani oleh
Pemilik/Pemaju & Perunding Jurutera C & S/
Pelukis Pelan Berdaftar dan di perakui oleh
perunding Jurutera C & S- (Jika Berkaitan)
1(linen)
28. ICI
3
|
THE
PROJECT
BRIEF
28
3) JABATAN KEJURUTERAAN
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1
Surat Permohonan Rasmi Ke Jabatan Kejuruteraan
(Cover Letter) 1
2
Pelan Bangunan dalam skala Metric
1
3 Sesalinan surat kelulusan Kerja Tanah/jalan Parit
yang disahkan oleh Jabatan Kejuruteraan MPSJ
1
1) JABATAN BOMBA DAN PENYELAMAT
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1 Surat Permohonan Rasmi
(Cover Letter) 2
2 Pelan Bangunan dalam skala Metric 2
3 Pelan Lantai 2
4 Pelan Keratan Rentas 2
5 Pelan Pandangan Sisi 2
6 Tajuk Cadangan Pemajuan Dengan Tepat
7 Skala Pelan hendaklah 1:100 atau 1:200 ( skala
lain dengan kebenaran )
8 Perakuan Tanggungjawab , Tandatangan Dan
Cop Rasmi ‘Orang Yang Berkelayakan’ di
setiap helaian pelan.
9 Mencatitkan Kehendak-Kehendak Kelengkapan
Menentang Kebakaran Atau Perpasangan
Keselamatan Kebakaran Di Muka Hadapan
Setiap Perenggan Pelan
* NOTA: Dokumen Perlu Diasingkan Dan Diikat Mengikut Susunan Setiap Jabatan Yang Di tetapkan.
JABATAN/AGENSI TEKNIKAL LUARAN
29. ICI
3
|
THE
PROJECT
BRIEF
29
Pengarah,
Jabatan Bomba & Penyelamat, Malaysia,
No. 3 Persiaran Tebar Layar,
Bukit Jelutung, Seksyen U8,
40150 Shah Alam,
Selangor Darul Ehsan.
Pejabat Zon Petaling,
Balai Bomba dan Penyelamat Puchong,
Jalan Bandar 2, Pusat Bandar Puchong
47100 Puchong Selangor D.E
SENARAI SEMAKAN PERMOHONAN UNTUK JABATAN BOMBA DAN PENYELAMAT
MALAYSIA
BIL DOKUMEN BILANGAN
SET
SEMAKAN
KAUNTER
SENARAI SEMAKAN PERMOHONAN UNTUK KELULUSAN PELAN ARKITEKTURAL
1 Surat Permohonan Rasmi 1
2 Pelan Arkitektural Lengkap 2
3 Pernyataan Tajuk Projek Dengan Jelas / Betul -
4 Pengiraan Beban Mengikut UBBL 1984 1
5 Skala Pelan Hendaklah 1:100 Atau 1:200( Skala Lain
Dengan Kebenaran)
-
6 Pengiraan Isipadu Bangunan Bagi Penentuan Akses
Perkakasan Bomba
1
7 Menunjukkan Dan Mengadakan Akses Perkakas Bomba
Mengikut UBBL 1984 (Diwarnakan Kuning)
-
8 Mencatatkan Kedudukan Pili Bomba Jarak Tidak Lebih
Daripada 91.5m (Antara Satu Pili Bomba Dengan Yang
Lain) Dan Diwarnakan Merah.
-
9 Mengemukakan Pengiraan Hitungan Had Yang Dibenarkan
Bagi Kawasan Tak Terlindung (Jadual Ke 6 UBBL 1984)
1
10 Pelan Arkitektural Perubahan/Tambahan Struktur Di
Warnakan Merah
-
11 Pelan Arkitektural Struktur Diruntuhkan (Jika Ada)
Diwarnakan Biru
-
12 Perakuan, Tanggungjawab Dan Cop Rasmi Orang
Berkelayakan Di Setiap Helaian Pelan Arkitektural
-
13 Mencatitkan “Senarai Syor-Syor Kebombaan” Di Muka
Hadapan Setiap Set Pelan Arkitektural.
-
14
Keperluan Kehendak-Kehendak Menentang Dan Mencegah
Kebakaran Aktif Dan Pasif Mengikut UBBL 1984 Hendaklah
Diwarnakan Merah
-
30. ICI
3
|
THE
PROJECT
BRIEF
30
Tandatangan :
Nama Pemohon : ……………………………………………………
Nama Syarikat : ……………………………………………………
……………………………………………………
……………………………………………………
……………………………………………………
No Telefon : ……………………………………………………
SEMAKAN JBPM – DITERIMA / TOLAK *
COP JBPM
PEGAWAI PENERIMA : ……………………………………………………..
TARIKH : ………………………………………………………
* Potong Yang Tidak Berkaitan
31. ICI
3
|
THE
PROJECT
BRIEF
31
8.
Conclusion
The
rest
area
will
be
a
wholesome
and
conducive
area
in
which
the
students
can
find
peace
and
serenity.
This
will
help
with
their
mental
stability
emotional
stability.
For
students
who
pull
on
all-‐nighters,
this
space
will
allow
them
to
have
at
least
a
few
minutes
of
rest.
Students
should
not
be
sacrificing
sleep,
as
even
a
few
minutes
of
it
can
suffice
for
a
whole
day.