SUMMARY:
Engineer Consultant, member of SIDIR / FIDIC from 2000
M.Sc. degree, American Welding Society (AWS) member from 1994
38 years’ experience in associated fields as Engineer and Manager
More than 30 years’ experience as Project/ QC/ Welding Engineer at overseas sites
Managing of own Company FTK for independent technical & consulting activities since 1993
Knowledge of drawings, codes and specifications
Ability of preparing quality control procedure and documents for erection, welding, PWHT, QCP, ITP, NDT
Capability to maintain good communication with client / consultant for efficient work performance.
Languages knowledge: English, Czech, Slovak, Russian, (in writing & verbal)
Operation and knowledge of personal computer (MS-Word, MS-Project Manager and MS-Excel)
Experience and ability of managing, leading, co-operation, improving, etc. (see experience list page 2.)
Building Authorities of the steel structure from 1992 and for the heat network from 1993.
EDUCATION:
2000 POSTGRADUATE STUDY Globalmini MBA, PAM Centre – Lódz University
1995 Computer course for Windows and MS-Project Manager
1995 Course: rules of joint prep. for welding and welds symbols on drawings acc. to EN
1994 COURSE OF ENGLISH LANGUAGE–INTERMEDIATE LEVEL, IH Longman School
1993 Course of welded joints quality examination according to European Standards
1993 Training for assembling and welding of pre-insulating pipeline systems
1992 Course of German language – basic level
1985 Pedagogical course for welding instructor
1982 Primary courses of manual arc welding (SMAW) and gas welding (GW)
1981 COURSE OF ORGANISE AND MANAGING FOR MANAGEMENT PERSONNEL
1975 Officer’s School of Mobile Forces in Pila–Poland (1 year) Officer cadet
1969-1974 POLYTECHNIC UNIVERSITY IN GLIWICE – POLAND (5 years)
M.Sc. Mechanical & Welding Engineer
1965-1969 Mechanical Secondary School in Sanok – Poland (5 years) Technician Mechanic
INTERESTS:
Travelling, tourists, ecology, geography, skiing, cycling, gardening, carpentry, computers, cars, …
OBJECTIVE:
Engineering job: Site Manager, Project Manager, Consultant, QA/QC Engineer, Welding Engineer, QC/
Expediting Inspector, Mechanical Engineer.
“I hereby declare my consent to processing of my personal data for the recruitment purposes, as well as to
filing it in the data base for the future use, pursuant to the Act of August 28, 1997 of the Personal Data
Protection (Journal of Laws of 1997, number 133, item 883).”
EXPERIENCE:
01.11.2015 – still; FTK via PROGRESSIVE for SIEMENS QC & Expediting Inspection in Poland
Organize and coordinate of the expediting job and QA/QC inspection in three Poland manufacturers ZRE-
Katowice (pressure pipe spools), Polimex-Siedlce (steel structures), EZW-Zmigrod (skids).
The evaluation of the causes of mechanical failures and the implementation of corrective actions.
Verification Technical Documentation and Inspections Coordination acc. to Inspection Test Programme
including of fabrication items welding, NDT and anticorrosion protection - surface blasting preparation and
the layer of paint thickness checking.
13.07.2015 – 16.10.2015 FTK for BILFINGER Mars Offshore Szczecin/ Poland
Service Supervisor Engineer for production commissioning and consultancy works in welding
industry for factories of Large Structures in the Offshore industry.
05.11.2014 – 10.07.2015 FTK Poland and abroad
Managing the inspection of Technical Consulting company (FTK)
Perform QA/QC inspections and technical consulting activities depending of current contracts.
Ad-hock QA/QC inspections for steel structures components of platforms and rigs manufacturing.
Coordination of inspection and expediting for pressure vessels welding , QA/QC &NDT of pipe spools/ piping
04.11.2013 – 04.11.2014 FTK/ NUKEM Germany/ via SPENCER OGDEN UK
IGNALINA Nuclear Plant Decommissioning Project (Lithuania)
SQCM (Site Quality Control Manager) - Consultant
Release of QA Plans and Reports. Execution of inspections and audits at installation site.
Issue of QA items, Inspection Test Plans, NCR, Control and release of QA/QC documentation.
Elaboration of QCP (Quality Control Plan) and ITP (Inspection Test Plan) for static Equipment, Piping and
Steel structures erected at installation site.
Writing QC Reports and Specification of installed equipment, piping and steel structures.
Checking and verification of subcontractor and supplier quality documentation.
Lead the Quality Control activities and provide coordination of applicable QC inspections at site.
17.09.2012 – 31.10.2013 FTK/ SAIPEM S.A. Poland- erection site of LNG Terminal Project (PL)
Field Quality Mechanical Supervisor - The LNG Installation Equipment Construction works at site.
Consultancy mechanical construction activity in Saipem Quality Control Department.
Organizes and coordinates the assigned part of the job at erection site including HDPE pipelines.
Verification of technical documentation regarding welding (PQR/ WPS) and Inspection Test Plan (ITP).
Raise non-conformances (NCR) in order to improve working methods at site.
Inspection on big package work, especially the large pieces of equipment covered both static and rotational
equipment in particularly inspections of heaters, pumps, compressors, steel structures and Cryogenics piping,
HDPE and GRP underground pipelines, and vessels.
The evaluation of the causes of quality failures and the implementation of corrective actions where
possible.
Quality Control (QA/QC) during realization of assembly the LNG terminal and welding works at site.
Participation in supervision at erection site and necessary improvement implementation.
Cooperation with Vendors/ Subcontractor’s Management and Quality Control personnel at site.
Verification and approval of Non Destructive Tests results of welded joints (NDT & NDE).
Inspection and checks Quality of the work carried out during progress of structures, equipment and piping
erection including onshore and offshore installation activities regarding steel structure of piperack and
pipelines welding and NDT from LNG discharging pirs to storage tanks.
Verification of Subcontractors QCP (Quality Control Plan) and ITP (Inspection Test Plan for static Equipment,
piping and steel structures erected at installation site.
Writing QC Reports and Specification of installed equipment, piping and steel structures.
Checking and verification of subcontractor and supplier quality documentation.
Lead the Quality Control activities and provide applicable QC inspections at site.
Witnesses and approve tests to be carried out in accordance with applicable Specifications.
Supervising the rigging and checking of equipment lifting/erection and transportation at site
Resolve problems and difficulties in discussion with PM, Contractors and Vendors representatives.
Attendance of MoM Meetings, Safety Meetings and other ad hoc meetings as required at site.
Approval of equipment and structures with client representatives.
Verification of Reports and As-built documentation of installed piping and equipment.
15.02.2012 –14.09.2012 FTK/ Burdock for ALSTOM/ ZM-VIKOM/ Croatia, STABAR/ PL and POLIMEX/ PL
QA/QC Inspector/ Welding Engineer– Inspector of Steel Structure, HVAC and Flue Gas Duct (FGD)
fabrication of the Power Boiler / Project Sostanj-6 (Slovenia).
Organization and coordination of welding inspection and quality control welding and NDT of production
welds and also checking of anticorrosion protection (blasting preparation and layer of paint thickness
checking). Verification of technical documentation and quality control reports according to the ITP
(Inspection and Test Plan). Checking and approve the expediting documentation of items for shipment.
01.06.2011 - 14.02.2012 FTK/ KTI Poland for TECNIMONT/ USG Project in Wierzchowice (HRSG Boiler) in PL
QA/QC Welding Inspector (The Installation Piping erection and welding of Construction works at site)
Organize and coordinates the assigned part of the job at erection site as welding, PWHT, NDT.of 13CrMo44,
and 10CrMo910.
Inspection of welders’ qualification tests at site in line with the code requirements and the Project
Procedures and Specification. Participation in pre-commissioning checking and testing of systems.
Maintenance of weld procedure registers and welder qualification registers and local welder
identification.
The evaluation of the causes of welding failures and the implementation of corrective actions.
Elaboration of QCP (Quality Control Plan) and ITP (Inspection Test Plan) for static Equipment, piping and
steel structures erected at installation site.
Writing QC Reports and Specification of installed equipment, piping and steel structures.
Checking and verification of subcontractor and supplier quality documentation.
Lead the Quality Control activities and provide applicable QC inspections at site.
Raise non-conformances (NCR) in order to improve working methods at site.
Verification and controlling all documentation associated with welding procedure specifications (WPS),
procedure qualifications records (POR), welder qualification and submission to the Client for approval
technical documentation of welding and witness of Inspection as per Test Plan (ITP)
Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site.
06.04.2010 – 31.05.2011 FTK/ BURDOCK International for ALSTOM
Welding Inspection Services in the Power generation sector.
Organize and coordinate of the QA/QC inspection and expediting job at Polimex-Mostostal Siedlce - Poland
The evaluation of the causes of welding failures and the implementation of corrective actions.
Verification Technical Documentation including Review and endorsement of all welding consumable
Certification. Inspection of storage facilities and also controls for manufactured steel structures
anticorrosion protection (surface blasting preparation and layer of paint thickness checking).
Inspections Coordination according to Inspection & Test Plan.
03.10.2009 – 01.04.2010 FTK/ INP-Germany for SIEMENS-Vienna, Energy Sector Fossil Power
Generation Division. External Service Provider at Siemens AG (HRSG Casing Panels fabrication)
Organize and coordinate of the QA/QC inspection and expediting job at STABAR Zyrardow – Poland.
Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site.
The evaluation of the causes of welding failures and the implementation of corrective actions.
Verification Technical Documentation and Inspections Coordination acc. to Inspection Test Programme
including of manufactured steel panels insulation and anticorrosion protection (surface blasting preparation
and the layer of paint thickness checking).
01.07.2009 – 30.09.2009 SIEMENS Sp. z o.o. , Warsaw/ EEC Wroclaw - Slovakia
QA/QC Manager (The HRSG Gas Power Plant - construction work at Malzenice/ Slovakia site)
Organize and coordinate the assigned part of the QA/QC managing job.
Inspection of welder’s qualification tests at site in line with the code requirements and the Project
Procedures and Specification.
Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site.
The evaluation of the causes of welding failures and the implementation of corrective actions.
Verification Technical Documentation and Inspections Coordination as per the Inspection Test Plan (ITP)
01.04.09 – 30.06.09 (01.04.09-31.05.09=25% job, since 01.06.09=100% job) ALSTOM Power
Construction, Warsaw - PL
QA/QC Manager Deputy (The Power Plants construction and modification work at PL and EU sites)
Organize and coordinate the assigned part of the QA/QC managing job.
Verification technical documentation and witness inspections as per the Inspection Test Plan (ITP)
09.06.08-30.05.09 FTK/ KTI Poland/ Gdansk LOTOS Refinery Modernization 10+ Project - Poland
QA/QC Welding Inspector (The Installation Equipment Fabrication and Construction works at site)
Organize and coordinates the assigned part of the job at erection site as welding, PWHT and NDT.
Verification and approval technical documentation of welding (PQR/ WPS) and witness of Inspection Test
Plan (ITP) steps: H (hold) and W (witness) .
Participation in pre-commissioning checking and testing of installation piping systems.
Inspection on big package work, especially the large pieces of equipment and cryogenics piping and vessels.
Participation in the Material Inspection Tests and during Pressure Tests of the Vessel acceptance.
Quality Control (QA/QC) during realization of assembly and welding works at site.
Elaboration of QCP (Quality Control Plan) and ITP (Inspection Test Plan for static Equipment, piping and
steel structures erected at installation site.
Writing QC Reports and Specification of installed equipment, piping and steel structures.
Checking and verification of subcontractor and supplier quality documentation.
Lead the Quality Control activities and provide applicable QC inspections at site.
Participation in supervision of HSSE at erection site and necessary improvement implementation.
Cooperation with Vendors/ Subcontractor’s Management and Quality Control personnel at site.
Verification and approval of Non Destructive Tests results of welded joints (NDT & NDE).
The evaluation of the causes of welding failures and the implementation of corrective actions.
Inspection and checks Quality of the work carried out during progress of static and rotational equipment and
piping erection; (16Mo3,13CrMo44, 10CrMo910) including PWHT.
Witnesses and approve tests to be carried out in accordance with applicable Specifications.
23.07.07-26.05.2008 FTK/ J.S. HAMILTON/ WISco Global/ ConocoPhillips/ G&G International Belgium
Resident QC and Expediting Inspector/ Client Representative
QC Inspection as behalf on FLUOR and COP (Conoco Philips) in workshop G&G International - Belgium
during manufacturing the huge pressure vessels Coke Drums (10.7X47.5m) ordered by ConocoPhillips
for W.R.Refinery (USA). Supervision and inspection of all fabrication processes including material checking,
cutting, bending, welding , PWHT, NDT and coating of anticorrosion protection protection (surface blasting
preparation and the layer of paint thickness checking) Attendance of MOM Meetings, Safety Meetings and
other ad hoc meetings as required.The causes of welding failures evaluation and implementation of
corrective actions.Review technical documentation, design specifications, drawings and WPS/ PQR
(10CrMo910 and T24). Supervising the rigging and checking of vessels lifting and preparation for
transportation to site.
23.08.06-17.07.2007 FTK/ SHANAHAN / IHI - MITSUI POWER PROJECTS / FGD-Bulgaria
Lead Quality Control Engineer at installation site of Project Flue Gas Desulphurization at Power Plant
Maritsa East-2. Organizes and coordinates the assigned part of the job at erection site.
Studies technical documentation, design specifications and drawings.
Inspection and checks Quality of the work carried out during progress of equipment and piping erection.
The evaluation of the causes of welding failures and the implementation of corrective actions.
Witnesses and approved tests to be carried out in accordance with applicable Specifications.
Supervising the rigging and checking of equipment lifting/erection and transportation to site.
Participation in supervision of HSSE at erection site and necessary improvement implementation.
Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives.
09.07.06-23.07.06 FTK/ ORION Eng./ Technip-DUCO/ Sandvik, Chomutov - Czech Republic
QC surveillance & Expediting Inspection as behalf on DUCO Ltd Technip (UK) in Sandvik-Chomutov mill
concerning fabrication the Super duplex Steel tubes for umbilical offshore application, for contractor Technip
(USA).
Attendance of inspection Meetings and other ad hoc meetings as required at manufacturer shop.
23.02.06-07.07.06 FTK/ J.S. HAMILTON/ Technip-DUCO/ TOTAL& SaiBOS/ Sandvik-Czech R.
QC & Expediting Inspection as behalf on DUCO Ltd Technip (UK) in Sandvik-Chomutov mill concerning
fabrication the Super duplex Steel tubes for umbilical offshore application, for contractor Technip (USA).
Attendance of inspection Meetings and other ad hoc meetings as required at manufacturer shop.
05.01.06-19.02.06 FTK/ J.S. HAMILTON/ Duco UK/ DMV Stainless, Costa Volpino - Italy
QC & Expediting Inspection as behalf on DUCO Ltd Technip (UK) in DMV Stainless Italia mill concerning
fabrication the Super duplex Steel tubes for umbilical offshore application, for contractor Technip (USA).
Attendance of inspection Meetings and other ad hoc meetings as required at manufacturer shop.
03.10.05-23.11.05 FTK/ J.S. HAMILTON/ SaiBOS(F)/ Camexip - Romania
QC & Expediting Inspection as behalf on SAIBOS (French Company) in Romania workshop Camexip
fabricating the offshore equipments for subcontractor VETCO (Norway Company) and client Saibos.
Attendance of inspection Meetings and other ad hoc meetings as required at manufacturer shop.
2003.X-2005.IX FTK/ Polimex-SICES Poland in PKN-Orlen/ Basell Polyolefin’s Project (PL)
QA/ QC Welding Inspection Engineer - The HDPE/PP Installation Pressure Equipment Fabrication
&Construction works at site. Performed inspections at fabrication workshop and installation at erection site.
Organizes and coordinates the assigned part of the job at erection site.
Verification and approval of technical documentation regarding welding (PQR/ WPS) and Inspection Test
Plan (ITP). Participation in pre-commissioning checking and testing of systems.
Quality supervision of fabrication the Pressure Vessels acc. to the Procedures and Fabrication Schedules.
Raise non-conformances (NCR) in order to improve working methods at site.
Inspection on big package work, especially the large pieces of equipment covered both static and rotational
equipment in particularly inspections of heaters, pumps, compressors and cryogenics piping and vessels.
The evaluation of the causes of welding failures and the implementation of corrective actions where
possible.
Participation in the Material Inspection Tests and during Pressure Tests of the Vessel acceptance.
Quality Control (QA/QC) during realization of assembly and welding works at site.
Participation in supervision of HSSE at erection site and necessary improvement implementation.
Cooperation with Vendors/ Subcontractor’s Management and Quality Control personnel at site.
Verification and approval of Non Destructive Tests results of welded joints (NDT & NDE).
Inspection and checks Quality of the work carried out during progress of static and rotational equipment and
piping erection;( 13CrMo44 and 10CrMo910) including PWHT supervision.
Witnesses and approve tests to be carried out in accordance with applicable Specifications.
Supervising the rigging and checking of equipment lifting/erection and transportation to site
Resolve problems and difficulties in discussion with PM, Contractors and Vendors representatives.
Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site.
Approval of stationary & rotary equipment and structures with client – BOP & Orlen representatives.
Verification of As-built documentation of installed piping and equipment.
2003.VII- 2003.X FTK/ 3P QUALITY SERVICES b.v. The Netherlands/ GERMANY
Expediting Inspector /Expeditor as Standard Fasel Lentjes (NL) representative for supervising of pipe
spools fabrication by German workshop FINA in Eberswalde for Bechtel Rijnmond Energy Centre.
Review technical documentation, design specifications, drawings and WPS/ PQR (10CrMo910, P91, T24)
Quality inspection of fabrication and PWHT of pipe spools acc. to the Procedures and Fabrication Schedules.
2002.VI- 2003.IV 3P Quality Services b.v./ TECHNIP-COFLEXIP b.v. The NETHERLANDS
QA/QC Engineer - work in QC/AA Department of petrochemical company TECHNIP-COFLEXIP b.v.
Preparation the quality control/assurance documentation according to the international standards.
Verification and approval the as-build quality documents.
Coordination & assignment of quality inspection of the vendors manufacturing workshop.
2001.IV- 2001.X BUREAU VERITAS KUWAIT
QC Welding Inspector
Inspection of Power Plants and Refinery piping, welding, heat treatment (PWHT) and NDE tests. Checking
the procedures and specifications in accordance to ASME Standards.
2000.XII-2001.III. ENERGOSERWIS S.A. Lubliniec - Poland
Project Manager
Organizes and coordinates the assigned part of the job.
Managing of fabrication the Power Generator Modular Frame and co-ordination with Siemens Westinghouse
Power Corporation (USA).
2000.VI-2000.X FTK/ OPT / KTI b.v. Mostostal Slupca (Poland)
Expediting & QC Inspection as behalf on TECHNIP-Benelux b.v for supervising of the Furnace Steel
Structure and Panels fabrication for POLYMIR Refinery site (Belarus).
Supervision and inspection of all fabrication processes including material checking, cutting, bending, welding,
NDT and coating of anticorrosion protection (surface blasting and paint thickness checking)
Supervising the rigging and coordination of prefabricated panels lifting and transportation to site.
1999.XII- still FTK Poland and abroad
Managing the Technical Consulting company (FTK)
Perform QA/QC and technical consulting activities depending of current contracts.
Ad-hock QA/QC inspections for steel structures components of platforms and rigs manufacturing.
Co-operation with 3P Quality Services (NL) for inspection and expediting activities mostly for TECHNIP of
Petrochemical and Refinery concerning pressure vessels welding & QC inspections, pipe spools/ piping.
1998.XI-1999.XI. FTK/ OPT / KTI b.v. Warsaw – Poland
Manager of Technical Consulting Company (FTK)
Organizes and coordinates the assigned part of the job.
Continuation inspection activities in co-operation with KTI b.v., 3P Quality Standard and Moody’s
Co-ordination of vendors regarding schedule during designing, fabrication and expediting activities
Co-operation with Technical Inspection Authority, UDT as well as other Inspection agencies
Project expediting and quality assurance according to ISO-9000 & EN or ASTM Standards.
1998.III-1998.X. OPT / KTI b.v. Warsaw – Poland
Project Engineer
Organizes and coordinates the assigned part of the job.
Studies technical documentation, design specifications and drawings.
Co-ordination of vendors regarding schedule during designing, fabrication and expediting activities
Co-operation with Technical Inspection Authority, UDT as well as other Inspection agencies
Project expediting and quality assurance according to ISO-9000 & EN or ASTM Standards.
1997.X-1998.II REMAK Opole – Poland
Welding Engineer
Supervision of welding and tests of implementation PWHT, WPS/ PQR (13CrMo44, 10CrMo910, X20, P91)
The qualification of weld procedures and compilation of results and documentation for Power Boiler welding
Co-operation with Technical Inspection Authority Offices: UDT, TUV, and SVDB
Performing of the training courses and examination for welders according ISO & EN Standards.
Responsibility for the continual review of welding techniques/procedures and the introduction of
improvements to operations
1996.IV-1997.V DAELIM (Korea) Site: Kerteh / Terengganu – Malaysia
Quality Control - Mechanical Engineer at site Gas Processing Plant, LNG-Project
Organizes and coordinates the assigned part of the job at erection site. Studies technical
documentation, design specifications and drawings. Implementation and execution of the quality system
at site according the Standard ISO 9001
Co-operation with domestic and international Companies regarding to the work quality improves
Supervision of the welding and erection for gas pipelines, rolled & ball tanks, towers, structures etc.
Inspection and checks Quality of the work carried out during progress of equipment and piping erection.
Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site.
Inspection on big package work, especially the large pieces of equipment covered both static and rotational
equipment in particularly inspections of heaters, pumps, compressors and cryogenics piping and vessels.
QA/QC inspections of vendors for steel structures components of offshore platforms and rigs assembly
including onshore and offshore installation activities regarding pre-coated pipelines welding and NDT
from offshore platforms to GGP erection site.
Supervising the rigging and participation in coordination of equipment lifting/ erection at site
Witnesses and approve tests to be carried out in accordance with applicable Specifications.
Raise non-conformances (NCR) in order to improve working methods at site.
Participation in supervision of HSSE at erection site and necessary improvement implementation.
Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives.
Supervision of the erection and civil works for: piling, foundation, drainage, and plant houses.
1991.IX-1996.III REMAK Opole – Poland
Manager of The Welders Training Centre
Managing The Welders Training Centre and co-operation with Authority Offices: UDT, TUV, SVDB.
Maintenance of weld procedure registers and welder qualification registers and local welder
identification. Implementation the training courses and examination of welders according ISO & EN
Standards. Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at
site. Supervision of welding and heat treatment (PWHT) tests for POR and WPS implementation.
1989.XII-1991.VII HAMON-SOBELCO (B) Site: Megalopolis – GREECE
Quality Control & Welding Engineer at site 300 MW Coal Power Station
Organizes and coordinates the assigned part of the job at erection site.
Studies technical documentation, design specifications and drawings.
Execution of the quality system at site and co-operation of inspection with Greek Authority (PPC) .
Co-operation with domestic and international Companies regarding to the work quality improves. Supervision
of the welding and PWHT; (16Mo3, 13CrMo44 and 10CrMo910)
and erection of turbine condenser, piping, pressure vessels, structures.
Participate of erection and pre-commissioning for piping, pumps, installations WTP & WWTP
Supervising the rigging and coordination of equipment lifting/erection and transportation to site
Inspection and checks Quality of the work carried out during progress of equipment, HVAC and piping
erection. Participation in pre-commissioning checking and testing of systems.
Inspection on big package work, especially the large pieces of equipment covered both static and rotational
equipment in particularly inspections of Heaters, Pumps, Compressors, piping and vessels.
Witnesses and approved tests to be carried out in accordance with applicable Specifications.
Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives.
1989.IV-1989.XI OPEX Sites: Linoperamata/ Crete & Soroni/ Rhodes – GREECE
Manager of pipelines assembling at site Diesel Power Stations
Organizes and coordinates the assigned part of the job at erection site.
Studies technical documentation, design specifications and drawings.
Supervision of the pipelines assembling of fitting, welding, painting, insulation and pre-commissioning.
Examining of welders and co-ordination of the non-destructive testing / NDT. (16Mo3 and 13CrMo44,)
Managing of teams: fitters, welders, painters and insulators with planning and co-ordination
Supervising the rigging and coordination of equipment lifting/ erection and transportation to site
Inspection and checks Quality of the work carried out during progress of equipment and piping erection.
Inspection on big package work, especially the large pieces of equipment covered both static and rotational
equipment in particularly inspections of heaters, pumps, compressors, piping and vessels.
Participation in pre-commissioning checking and testing of systems.
Witnesses and approved tests to be carried out in accordance with applicable Specifications.
Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives.
1984.VIII-1989.III REMAK Opole – Poland
Manager of The Welding Technology Section
Managing of the Welding Technology Section and elaboration of the welding procedures (WPS)
Maintenance of weld procedure registers and welder qualification registers and local welder
identification. Studies technical documentation, design specifications and drawings.
Supervision of the welding and heat treatment tests (PWHT) for WPS and PQR implementation, (16Mo3,
13CrMo44, 10CrMo910, X20 and P91)
Co-operation with Polish Technical Inspection Office (UDT) and with other foreign authority societies.
1983.II-1984.VII REMAK Sites: J. Bohunice & Dukovany – CZECH REPUBLIC
Project Manager at site of Nuclear Power Plants.
Organizes and coordinates the assigned part of the job at erection sites ((SS welding and HVAC).
Managing the Contract with technical, financial and economical responsibility
Co-ordination with the multinational Companies and Technical Inspection Authority (SVUM)
Examination of welders and co-ordination of the non-destructive testing (NDT).
1981.XII-1983.I REMAK Opole - Poland
Welding Engineer
Controlling the welding procedures (WPS) in accordance to Polish and other Standard
Studies technical documentation, design specifications and drawings.
Maintenance of weld procedure registers and welder qualification registers and local welder
identification. Supervision of the welding and heat treatment tests (PWHT) for WPS and PQR
implementation (13CrMo44, 10CrMo910)
Co-operation with Polish Technical Inspection Office (UDT) and other foreign authority societies.
1981. IX-1981.XI REMAK Site: Plomin - YUGOSLAVIA
Welding Engineer at Power Plant.
Organizes and coordinates replacing the pressure piping and the Main Valve Chamber of Power Boiler
Turbine at erection site. (13CrMo44, 10CrMo910)
Studies technical documentation, design specifications and drawings.
Controlling the welding procedures (WPS and PQR) in accordance to the ASME IX Standard.
Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site.
Supervision of the welding and heat treatment (PWHT) tests for WPS and PQR implementation.
Co-ordination of: fitting, welding, PWHT and NDT during replacement a turbine valve chamber.
1979.X-1981.VIII REMAK Opole - Poland
Manager of the Welding Department
Leading the Welding Department and co-operation with Polish Technical Inspection Office (UDT)
Studies technical documentation, design specifications and drawings.
Maintenance of weld procedure registers and welder qualification registers and local welder identification.
Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required.
Supervision of welding in repair and erection works for the steam boilers of Power Plants (16Mo3, 13CrMo44,
10CrMo910)
Elaboration of the welding procedures (WPS) in accordance to Polish and International Standards
1978.X-1979.IX INSTAL Opole - Poland
Welding Engineer
Organizes and coordinates the assigned part of the job at erection sites. Studies technical documentation,
design specifications and drawings. Supervision of welding and erection of pipeline networks, boilers,
Power Plants cooling system, etc. Supervising the rigging and checking of heavy piping lifting/erection and
transportation to site. Qualification, modification and implementation of the welding procedure
specifications (WPS). Co-operation with Polish Technical Inspection Office (UDT) and other foreign
authority societies.
1976.IX-1978.IX INSTAL Site Prerov - CZECHOSLOVAKIA
Welding Engineer at Sulphuric Acid Factory site.
Organizes and coordinates the assigned part of the job at erection site. Studies technical documentation,
design specifications and drawings. Managing of fitters, welders and insulators with planning and co-
ordination duties at site. Maintenance of weld procedure registers and welder qualification registers and
local welder identification. Supervision of welding and erection of storage tanks, steel structures, piping
systems, boilers, etc. Co-operation with Czech Technical Authority Inspection (SVUM) and with
multinational Companies. Supervising the rigging and checking of equipment lifting/erection and
transportation to site. Inspection and checks Quality of the work carried out during progress of equipment
and piping erection; 16Mo3, 13CrMo44 and 10CrMo910.
Witnesses and approved Tests to be carried out in accordance with applicable Specifications.
Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives.
1974.XI-1976.VIII INSTAL Opole - Poland
Welding Engineer
Examining of welders and co-ordination the non-destructive testing (NDT). Studies technical documentation,
design specifications and drawings.
The welding procedure specifications (WPS) qualification, modification and implementation.

More Related Content

What's hot

Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Chandra ABS IV
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
Santosh Gurajada
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
Chandra Battu
 
BNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspector
narasimha murthy
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
MUHAMMAD ASIF
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
Murugan Pillai
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CV
Ghulam Hassan
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
Vijay Raghavan
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Sangilimuthu Samiayyah
 
Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14
Saravana Konar
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
idris lawal
 
AKSHAY BOGS CV
AKSHAY BOGS CVAKSHAY BOGS CV
AKSHAY BOGS CV
AKSHAY M
 

What's hot (20)

Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
qc welding inspector resume
qc welding inspector resumeqc welding inspector resume
qc welding inspector resume
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
BNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspector
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CV
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
YOGARAJ CV
YOGARAJ CVYOGARAJ CV
YOGARAJ CV
 
Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
AKSHAY BOGS CV
AKSHAY BOGS CVAKSHAY BOGS CV
AKSHAY BOGS CV
 
Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 

Similar to CV_GB_XI-2015[3]

CV-Vuong Tatthang
CV-Vuong TatthangCV-Vuong Tatthang
CV-Vuong Tatthang
Vuong Thang
 
CV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOCCV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOC
shaju palissery
 
CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)
Komkrit Choompol
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
Zubair Noor
 
Ahmed CV (1) (1)
Ahmed CV (1) (1)Ahmed CV (1) (1)
Ahmed CV (1) (1)
Ahmed Malik
 

Similar to CV_GB_XI-2015[3] (20)

mechanical cv
mechanical cvmechanical cv
mechanical cv
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 
PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
CV-Vuong Tatthang
CV-Vuong TatthangCV-Vuong Tatthang
CV-Vuong Tatthang
 
LINGAM
LINGAMLINGAM
LINGAM
 
CV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOCCV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOC
 
CV TWO
CV TWOCV TWO
CV TWO
 
Kazi nazmul cv with all attachments
Kazi nazmul cv with all attachments Kazi nazmul cv with all attachments
Kazi nazmul cv with all attachments
 
RESUME 26 JAN
RESUME 26 JANRESUME 26 JAN
RESUME 26 JAN
 
qaiser shahzad cv
qaiser shahzad cvqaiser shahzad cv
qaiser shahzad cv
 
CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)
 
TARIQUE ALSTOM
TARIQUE ALSTOMTARIQUE ALSTOM
TARIQUE ALSTOM
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
 
BIO_Data
BIO_DataBIO_Data
BIO_Data
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
Ahmed CV (1) (1)
Ahmed CV (1) (1)Ahmed CV (1) (1)
Ahmed CV (1) (1)
 

CV_GB_XI-2015[3]

  • 1. /8 T a d e u s z K A L I N O W S K I ul. Galczynskiego 3 45-523 Opole, POLAND Tel: + 48 (0)77 4567826 Mobile:+48 783081088 e-mail: ftk@wp.pl, ftk777@gmail.com, ftk77@hotmail.com SUMMARY: Engineer Consultant, member of SIDIR / FIDIC from 2000 M.Sc. degree, American Welding Society (AWS) member from 1994 38 years’ experience in associated fields as Engineer and Manager More than 30 years’ experience as Project/ QC/ Welding Engineer at overseas sites Managing of own Company FTK for independent technical & consulting activities since 1993 Knowledge of drawings, codes and specifications Ability of preparing quality control procedure and documents for erection, welding, PWHT, QCP, ITP, NDT Capability to maintain good communication with client / consultant for efficient work performance. Languages knowledge: English, Czech, Slovak, Russian, (in writing & verbal) Operation and knowledge of personal computer (MS-Word, MS-Project Manager and MS-Excel) Experience and ability of managing, leading, co-operation, improving, etc. (see experience list page 2.) Building Authorities of the steel structure from 1992 and for the heat network from 1993. EDUCATION: 2000 POSTGRADUATE STUDY Globalmini MBA, PAM Centre – Lódz University 1995 Computer course for Windows and MS-Project Manager 1995 Course: rules of joint prep. for welding and welds symbols on drawings acc. to EN 1994 COURSE OF ENGLISH LANGUAGE–INTERMEDIATE LEVEL, IH Longman School 1993 Course of welded joints quality examination according to European Standards 1993 Training for assembling and welding of pre-insulating pipeline systems 1992 Course of German language – basic level 1985 Pedagogical course for welding instructor 1982 Primary courses of manual arc welding (SMAW) and gas welding (GW) 1981 COURSE OF ORGANISE AND MANAGING FOR MANAGEMENT PERSONNEL 1975 Officer’s School of Mobile Forces in Pila–Poland (1 year) Officer cadet 1969-1974 POLYTECHNIC UNIVERSITY IN GLIWICE – POLAND (5 years) M.Sc. Mechanical & Welding Engineer 1965-1969 Mechanical Secondary School in Sanok – Poland (5 years) Technician Mechanic INTERESTS: Travelling, tourists, ecology, geography, skiing, cycling, gardening, carpentry, computers, cars, … OBJECTIVE: Engineering job: Site Manager, Project Manager, Consultant, QA/QC Engineer, Welding Engineer, QC/ Expediting Inspector, Mechanical Engineer. “I hereby declare my consent to processing of my personal data for the recruitment purposes, as well as to filing it in the data base for the future use, pursuant to the Act of August 28, 1997 of the Personal Data Protection (Journal of Laws of 1997, number 133, item 883).” EXPERIENCE: 01.11.2015 – still; FTK via PROGRESSIVE for SIEMENS QC & Expediting Inspection in Poland Organize and coordinate of the expediting job and QA/QC inspection in three Poland manufacturers ZRE- Katowice (pressure pipe spools), Polimex-Siedlce (steel structures), EZW-Zmigrod (skids). The evaluation of the causes of mechanical failures and the implementation of corrective actions. Verification Technical Documentation and Inspections Coordination acc. to Inspection Test Programme including of fabrication items welding, NDT and anticorrosion protection - surface blasting preparation and the layer of paint thickness checking.
  • 2. 13.07.2015 – 16.10.2015 FTK for BILFINGER Mars Offshore Szczecin/ Poland Service Supervisor Engineer for production commissioning and consultancy works in welding industry for factories of Large Structures in the Offshore industry. 05.11.2014 – 10.07.2015 FTK Poland and abroad Managing the inspection of Technical Consulting company (FTK) Perform QA/QC inspections and technical consulting activities depending of current contracts. Ad-hock QA/QC inspections for steel structures components of platforms and rigs manufacturing. Coordination of inspection and expediting for pressure vessels welding , QA/QC &NDT of pipe spools/ piping 04.11.2013 – 04.11.2014 FTK/ NUKEM Germany/ via SPENCER OGDEN UK IGNALINA Nuclear Plant Decommissioning Project (Lithuania) SQCM (Site Quality Control Manager) - Consultant Release of QA Plans and Reports. Execution of inspections and audits at installation site. Issue of QA items, Inspection Test Plans, NCR, Control and release of QA/QC documentation. Elaboration of QCP (Quality Control Plan) and ITP (Inspection Test Plan) for static Equipment, Piping and Steel structures erected at installation site. Writing QC Reports and Specification of installed equipment, piping and steel structures. Checking and verification of subcontractor and supplier quality documentation. Lead the Quality Control activities and provide coordination of applicable QC inspections at site. 17.09.2012 – 31.10.2013 FTK/ SAIPEM S.A. Poland- erection site of LNG Terminal Project (PL) Field Quality Mechanical Supervisor - The LNG Installation Equipment Construction works at site. Consultancy mechanical construction activity in Saipem Quality Control Department. Organizes and coordinates the assigned part of the job at erection site including HDPE pipelines. Verification of technical documentation regarding welding (PQR/ WPS) and Inspection Test Plan (ITP). Raise non-conformances (NCR) in order to improve working methods at site. Inspection on big package work, especially the large pieces of equipment covered both static and rotational equipment in particularly inspections of heaters, pumps, compressors, steel structures and Cryogenics piping, HDPE and GRP underground pipelines, and vessels. The evaluation of the causes of quality failures and the implementation of corrective actions where possible. Quality Control (QA/QC) during realization of assembly the LNG terminal and welding works at site. Participation in supervision at erection site and necessary improvement implementation. Cooperation with Vendors/ Subcontractor’s Management and Quality Control personnel at site. Verification and approval of Non Destructive Tests results of welded joints (NDT & NDE). Inspection and checks Quality of the work carried out during progress of structures, equipment and piping erection including onshore and offshore installation activities regarding steel structure of piperack and pipelines welding and NDT from LNG discharging pirs to storage tanks. Verification of Subcontractors QCP (Quality Control Plan) and ITP (Inspection Test Plan for static Equipment, piping and steel structures erected at installation site. Writing QC Reports and Specification of installed equipment, piping and steel structures. Checking and verification of subcontractor and supplier quality documentation. Lead the Quality Control activities and provide applicable QC inspections at site. Witnesses and approve tests to be carried out in accordance with applicable Specifications. Supervising the rigging and checking of equipment lifting/erection and transportation at site Resolve problems and difficulties in discussion with PM, Contractors and Vendors representatives. Attendance of MoM Meetings, Safety Meetings and other ad hoc meetings as required at site. Approval of equipment and structures with client representatives. Verification of Reports and As-built documentation of installed piping and equipment. 15.02.2012 –14.09.2012 FTK/ Burdock for ALSTOM/ ZM-VIKOM/ Croatia, STABAR/ PL and POLIMEX/ PL QA/QC Inspector/ Welding Engineer– Inspector of Steel Structure, HVAC and Flue Gas Duct (FGD) fabrication of the Power Boiler / Project Sostanj-6 (Slovenia). Organization and coordination of welding inspection and quality control welding and NDT of production welds and also checking of anticorrosion protection (blasting preparation and layer of paint thickness checking). Verification of technical documentation and quality control reports according to the ITP (Inspection and Test Plan). Checking and approve the expediting documentation of items for shipment.
  • 3. 01.06.2011 - 14.02.2012 FTK/ KTI Poland for TECNIMONT/ USG Project in Wierzchowice (HRSG Boiler) in PL QA/QC Welding Inspector (The Installation Piping erection and welding of Construction works at site) Organize and coordinates the assigned part of the job at erection site as welding, PWHT, NDT.of 13CrMo44, and 10CrMo910. Inspection of welders’ qualification tests at site in line with the code requirements and the Project Procedures and Specification. Participation in pre-commissioning checking and testing of systems. Maintenance of weld procedure registers and welder qualification registers and local welder identification. The evaluation of the causes of welding failures and the implementation of corrective actions. Elaboration of QCP (Quality Control Plan) and ITP (Inspection Test Plan) for static Equipment, piping and steel structures erected at installation site. Writing QC Reports and Specification of installed equipment, piping and steel structures. Checking and verification of subcontractor and supplier quality documentation. Lead the Quality Control activities and provide applicable QC inspections at site. Raise non-conformances (NCR) in order to improve working methods at site. Verification and controlling all documentation associated with welding procedure specifications (WPS), procedure qualifications records (POR), welder qualification and submission to the Client for approval technical documentation of welding and witness of Inspection as per Test Plan (ITP) Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site. 06.04.2010 – 31.05.2011 FTK/ BURDOCK International for ALSTOM Welding Inspection Services in the Power generation sector. Organize and coordinate of the QA/QC inspection and expediting job at Polimex-Mostostal Siedlce - Poland The evaluation of the causes of welding failures and the implementation of corrective actions. Verification Technical Documentation including Review and endorsement of all welding consumable Certification. Inspection of storage facilities and also controls for manufactured steel structures anticorrosion protection (surface blasting preparation and layer of paint thickness checking). Inspections Coordination according to Inspection & Test Plan. 03.10.2009 – 01.04.2010 FTK/ INP-Germany for SIEMENS-Vienna, Energy Sector Fossil Power Generation Division. External Service Provider at Siemens AG (HRSG Casing Panels fabrication) Organize and coordinate of the QA/QC inspection and expediting job at STABAR Zyrardow – Poland. Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site. The evaluation of the causes of welding failures and the implementation of corrective actions. Verification Technical Documentation and Inspections Coordination acc. to Inspection Test Programme including of manufactured steel panels insulation and anticorrosion protection (surface blasting preparation and the layer of paint thickness checking). 01.07.2009 – 30.09.2009 SIEMENS Sp. z o.o. , Warsaw/ EEC Wroclaw - Slovakia QA/QC Manager (The HRSG Gas Power Plant - construction work at Malzenice/ Slovakia site) Organize and coordinate the assigned part of the QA/QC managing job. Inspection of welder’s qualification tests at site in line with the code requirements and the Project Procedures and Specification. Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site. The evaluation of the causes of welding failures and the implementation of corrective actions. Verification Technical Documentation and Inspections Coordination as per the Inspection Test Plan (ITP) 01.04.09 – 30.06.09 (01.04.09-31.05.09=25% job, since 01.06.09=100% job) ALSTOM Power Construction, Warsaw - PL QA/QC Manager Deputy (The Power Plants construction and modification work at PL and EU sites) Organize and coordinate the assigned part of the QA/QC managing job. Verification technical documentation and witness inspections as per the Inspection Test Plan (ITP) 09.06.08-30.05.09 FTK/ KTI Poland/ Gdansk LOTOS Refinery Modernization 10+ Project - Poland QA/QC Welding Inspector (The Installation Equipment Fabrication and Construction works at site) Organize and coordinates the assigned part of the job at erection site as welding, PWHT and NDT. Verification and approval technical documentation of welding (PQR/ WPS) and witness of Inspection Test Plan (ITP) steps: H (hold) and W (witness) . Participation in pre-commissioning checking and testing of installation piping systems.
  • 4. Inspection on big package work, especially the large pieces of equipment and cryogenics piping and vessels. Participation in the Material Inspection Tests and during Pressure Tests of the Vessel acceptance. Quality Control (QA/QC) during realization of assembly and welding works at site. Elaboration of QCP (Quality Control Plan) and ITP (Inspection Test Plan for static Equipment, piping and steel structures erected at installation site. Writing QC Reports and Specification of installed equipment, piping and steel structures. Checking and verification of subcontractor and supplier quality documentation. Lead the Quality Control activities and provide applicable QC inspections at site. Participation in supervision of HSSE at erection site and necessary improvement implementation. Cooperation with Vendors/ Subcontractor’s Management and Quality Control personnel at site. Verification and approval of Non Destructive Tests results of welded joints (NDT & NDE). The evaluation of the causes of welding failures and the implementation of corrective actions. Inspection and checks Quality of the work carried out during progress of static and rotational equipment and piping erection; (16Mo3,13CrMo44, 10CrMo910) including PWHT. Witnesses and approve tests to be carried out in accordance with applicable Specifications. 23.07.07-26.05.2008 FTK/ J.S. HAMILTON/ WISco Global/ ConocoPhillips/ G&G International Belgium Resident QC and Expediting Inspector/ Client Representative QC Inspection as behalf on FLUOR and COP (Conoco Philips) in workshop G&G International - Belgium during manufacturing the huge pressure vessels Coke Drums (10.7X47.5m) ordered by ConocoPhillips for W.R.Refinery (USA). Supervision and inspection of all fabrication processes including material checking, cutting, bending, welding , PWHT, NDT and coating of anticorrosion protection protection (surface blasting preparation and the layer of paint thickness checking) Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required.The causes of welding failures evaluation and implementation of corrective actions.Review technical documentation, design specifications, drawings and WPS/ PQR (10CrMo910 and T24). Supervising the rigging and checking of vessels lifting and preparation for transportation to site. 23.08.06-17.07.2007 FTK/ SHANAHAN / IHI - MITSUI POWER PROJECTS / FGD-Bulgaria Lead Quality Control Engineer at installation site of Project Flue Gas Desulphurization at Power Plant Maritsa East-2. Organizes and coordinates the assigned part of the job at erection site. Studies technical documentation, design specifications and drawings. Inspection and checks Quality of the work carried out during progress of equipment and piping erection. The evaluation of the causes of welding failures and the implementation of corrective actions. Witnesses and approved tests to be carried out in accordance with applicable Specifications. Supervising the rigging and checking of equipment lifting/erection and transportation to site. Participation in supervision of HSSE at erection site and necessary improvement implementation. Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives. 09.07.06-23.07.06 FTK/ ORION Eng./ Technip-DUCO/ Sandvik, Chomutov - Czech Republic QC surveillance & Expediting Inspection as behalf on DUCO Ltd Technip (UK) in Sandvik-Chomutov mill concerning fabrication the Super duplex Steel tubes for umbilical offshore application, for contractor Technip (USA). Attendance of inspection Meetings and other ad hoc meetings as required at manufacturer shop. 23.02.06-07.07.06 FTK/ J.S. HAMILTON/ Technip-DUCO/ TOTAL& SaiBOS/ Sandvik-Czech R. QC & Expediting Inspection as behalf on DUCO Ltd Technip (UK) in Sandvik-Chomutov mill concerning fabrication the Super duplex Steel tubes for umbilical offshore application, for contractor Technip (USA). Attendance of inspection Meetings and other ad hoc meetings as required at manufacturer shop. 05.01.06-19.02.06 FTK/ J.S. HAMILTON/ Duco UK/ DMV Stainless, Costa Volpino - Italy QC & Expediting Inspection as behalf on DUCO Ltd Technip (UK) in DMV Stainless Italia mill concerning fabrication the Super duplex Steel tubes for umbilical offshore application, for contractor Technip (USA). Attendance of inspection Meetings and other ad hoc meetings as required at manufacturer shop. 03.10.05-23.11.05 FTK/ J.S. HAMILTON/ SaiBOS(F)/ Camexip - Romania QC & Expediting Inspection as behalf on SAIBOS (French Company) in Romania workshop Camexip fabricating the offshore equipments for subcontractor VETCO (Norway Company) and client Saibos. Attendance of inspection Meetings and other ad hoc meetings as required at manufacturer shop.
  • 5. 2003.X-2005.IX FTK/ Polimex-SICES Poland in PKN-Orlen/ Basell Polyolefin’s Project (PL) QA/ QC Welding Inspection Engineer - The HDPE/PP Installation Pressure Equipment Fabrication &Construction works at site. Performed inspections at fabrication workshop and installation at erection site. Organizes and coordinates the assigned part of the job at erection site. Verification and approval of technical documentation regarding welding (PQR/ WPS) and Inspection Test Plan (ITP). Participation in pre-commissioning checking and testing of systems. Quality supervision of fabrication the Pressure Vessels acc. to the Procedures and Fabrication Schedules. Raise non-conformances (NCR) in order to improve working methods at site. Inspection on big package work, especially the large pieces of equipment covered both static and rotational equipment in particularly inspections of heaters, pumps, compressors and cryogenics piping and vessels. The evaluation of the causes of welding failures and the implementation of corrective actions where possible. Participation in the Material Inspection Tests and during Pressure Tests of the Vessel acceptance. Quality Control (QA/QC) during realization of assembly and welding works at site. Participation in supervision of HSSE at erection site and necessary improvement implementation. Cooperation with Vendors/ Subcontractor’s Management and Quality Control personnel at site. Verification and approval of Non Destructive Tests results of welded joints (NDT & NDE). Inspection and checks Quality of the work carried out during progress of static and rotational equipment and piping erection;( 13CrMo44 and 10CrMo910) including PWHT supervision. Witnesses and approve tests to be carried out in accordance with applicable Specifications. Supervising the rigging and checking of equipment lifting/erection and transportation to site Resolve problems and difficulties in discussion with PM, Contractors and Vendors representatives. Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site. Approval of stationary & rotary equipment and structures with client – BOP & Orlen representatives. Verification of As-built documentation of installed piping and equipment. 2003.VII- 2003.X FTK/ 3P QUALITY SERVICES b.v. The Netherlands/ GERMANY Expediting Inspector /Expeditor as Standard Fasel Lentjes (NL) representative for supervising of pipe spools fabrication by German workshop FINA in Eberswalde for Bechtel Rijnmond Energy Centre. Review technical documentation, design specifications, drawings and WPS/ PQR (10CrMo910, P91, T24) Quality inspection of fabrication and PWHT of pipe spools acc. to the Procedures and Fabrication Schedules. 2002.VI- 2003.IV 3P Quality Services b.v./ TECHNIP-COFLEXIP b.v. The NETHERLANDS QA/QC Engineer - work in QC/AA Department of petrochemical company TECHNIP-COFLEXIP b.v. Preparation the quality control/assurance documentation according to the international standards. Verification and approval the as-build quality documents. Coordination & assignment of quality inspection of the vendors manufacturing workshop. 2001.IV- 2001.X BUREAU VERITAS KUWAIT QC Welding Inspector Inspection of Power Plants and Refinery piping, welding, heat treatment (PWHT) and NDE tests. Checking the procedures and specifications in accordance to ASME Standards. 2000.XII-2001.III. ENERGOSERWIS S.A. Lubliniec - Poland Project Manager Organizes and coordinates the assigned part of the job. Managing of fabrication the Power Generator Modular Frame and co-ordination with Siemens Westinghouse Power Corporation (USA). 2000.VI-2000.X FTK/ OPT / KTI b.v. Mostostal Slupca (Poland) Expediting & QC Inspection as behalf on TECHNIP-Benelux b.v for supervising of the Furnace Steel Structure and Panels fabrication for POLYMIR Refinery site (Belarus). Supervision and inspection of all fabrication processes including material checking, cutting, bending, welding, NDT and coating of anticorrosion protection (surface blasting and paint thickness checking) Supervising the rigging and coordination of prefabricated panels lifting and transportation to site. 1999.XII- still FTK Poland and abroad Managing the Technical Consulting company (FTK) Perform QA/QC and technical consulting activities depending of current contracts. Ad-hock QA/QC inspections for steel structures components of platforms and rigs manufacturing.
  • 6. Co-operation with 3P Quality Services (NL) for inspection and expediting activities mostly for TECHNIP of Petrochemical and Refinery concerning pressure vessels welding & QC inspections, pipe spools/ piping. 1998.XI-1999.XI. FTK/ OPT / KTI b.v. Warsaw – Poland Manager of Technical Consulting Company (FTK) Organizes and coordinates the assigned part of the job. Continuation inspection activities in co-operation with KTI b.v., 3P Quality Standard and Moody’s Co-ordination of vendors regarding schedule during designing, fabrication and expediting activities Co-operation with Technical Inspection Authority, UDT as well as other Inspection agencies Project expediting and quality assurance according to ISO-9000 & EN or ASTM Standards. 1998.III-1998.X. OPT / KTI b.v. Warsaw – Poland Project Engineer Organizes and coordinates the assigned part of the job. Studies technical documentation, design specifications and drawings. Co-ordination of vendors regarding schedule during designing, fabrication and expediting activities Co-operation with Technical Inspection Authority, UDT as well as other Inspection agencies Project expediting and quality assurance according to ISO-9000 & EN or ASTM Standards. 1997.X-1998.II REMAK Opole – Poland Welding Engineer Supervision of welding and tests of implementation PWHT, WPS/ PQR (13CrMo44, 10CrMo910, X20, P91) The qualification of weld procedures and compilation of results and documentation for Power Boiler welding Co-operation with Technical Inspection Authority Offices: UDT, TUV, and SVDB Performing of the training courses and examination for welders according ISO & EN Standards. Responsibility for the continual review of welding techniques/procedures and the introduction of improvements to operations 1996.IV-1997.V DAELIM (Korea) Site: Kerteh / Terengganu – Malaysia Quality Control - Mechanical Engineer at site Gas Processing Plant, LNG-Project Organizes and coordinates the assigned part of the job at erection site. Studies technical documentation, design specifications and drawings. Implementation and execution of the quality system at site according the Standard ISO 9001 Co-operation with domestic and international Companies regarding to the work quality improves Supervision of the welding and erection for gas pipelines, rolled & ball tanks, towers, structures etc. Inspection and checks Quality of the work carried out during progress of equipment and piping erection. Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site. Inspection on big package work, especially the large pieces of equipment covered both static and rotational equipment in particularly inspections of heaters, pumps, compressors and cryogenics piping and vessels. QA/QC inspections of vendors for steel structures components of offshore platforms and rigs assembly including onshore and offshore installation activities regarding pre-coated pipelines welding and NDT from offshore platforms to GGP erection site. Supervising the rigging and participation in coordination of equipment lifting/ erection at site Witnesses and approve tests to be carried out in accordance with applicable Specifications. Raise non-conformances (NCR) in order to improve working methods at site. Participation in supervision of HSSE at erection site and necessary improvement implementation. Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives. Supervision of the erection and civil works for: piling, foundation, drainage, and plant houses. 1991.IX-1996.III REMAK Opole – Poland Manager of The Welders Training Centre Managing The Welders Training Centre and co-operation with Authority Offices: UDT, TUV, SVDB. Maintenance of weld procedure registers and welder qualification registers and local welder identification. Implementation the training courses and examination of welders according ISO & EN Standards. Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site. Supervision of welding and heat treatment (PWHT) tests for POR and WPS implementation. 1989.XII-1991.VII HAMON-SOBELCO (B) Site: Megalopolis – GREECE
  • 7. Quality Control & Welding Engineer at site 300 MW Coal Power Station Organizes and coordinates the assigned part of the job at erection site. Studies technical documentation, design specifications and drawings. Execution of the quality system at site and co-operation of inspection with Greek Authority (PPC) . Co-operation with domestic and international Companies regarding to the work quality improves. Supervision of the welding and PWHT; (16Mo3, 13CrMo44 and 10CrMo910) and erection of turbine condenser, piping, pressure vessels, structures. Participate of erection and pre-commissioning for piping, pumps, installations WTP & WWTP Supervising the rigging and coordination of equipment lifting/erection and transportation to site Inspection and checks Quality of the work carried out during progress of equipment, HVAC and piping erection. Participation in pre-commissioning checking and testing of systems. Inspection on big package work, especially the large pieces of equipment covered both static and rotational equipment in particularly inspections of Heaters, Pumps, Compressors, piping and vessels. Witnesses and approved tests to be carried out in accordance with applicable Specifications. Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives. 1989.IV-1989.XI OPEX Sites: Linoperamata/ Crete & Soroni/ Rhodes – GREECE Manager of pipelines assembling at site Diesel Power Stations Organizes and coordinates the assigned part of the job at erection site. Studies technical documentation, design specifications and drawings. Supervision of the pipelines assembling of fitting, welding, painting, insulation and pre-commissioning. Examining of welders and co-ordination of the non-destructive testing / NDT. (16Mo3 and 13CrMo44,) Managing of teams: fitters, welders, painters and insulators with planning and co-ordination Supervising the rigging and coordination of equipment lifting/ erection and transportation to site Inspection and checks Quality of the work carried out during progress of equipment and piping erection. Inspection on big package work, especially the large pieces of equipment covered both static and rotational equipment in particularly inspections of heaters, pumps, compressors, piping and vessels. Participation in pre-commissioning checking and testing of systems. Witnesses and approved tests to be carried out in accordance with applicable Specifications. Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives. 1984.VIII-1989.III REMAK Opole – Poland Manager of The Welding Technology Section Managing of the Welding Technology Section and elaboration of the welding procedures (WPS) Maintenance of weld procedure registers and welder qualification registers and local welder identification. Studies technical documentation, design specifications and drawings. Supervision of the welding and heat treatment tests (PWHT) for WPS and PQR implementation, (16Mo3, 13CrMo44, 10CrMo910, X20 and P91) Co-operation with Polish Technical Inspection Office (UDT) and with other foreign authority societies. 1983.II-1984.VII REMAK Sites: J. Bohunice & Dukovany – CZECH REPUBLIC Project Manager at site of Nuclear Power Plants. Organizes and coordinates the assigned part of the job at erection sites ((SS welding and HVAC). Managing the Contract with technical, financial and economical responsibility Co-ordination with the multinational Companies and Technical Inspection Authority (SVUM) Examination of welders and co-ordination of the non-destructive testing (NDT). 1981.XII-1983.I REMAK Opole - Poland Welding Engineer Controlling the welding procedures (WPS) in accordance to Polish and other Standard Studies technical documentation, design specifications and drawings. Maintenance of weld procedure registers and welder qualification registers and local welder identification. Supervision of the welding and heat treatment tests (PWHT) for WPS and PQR implementation (13CrMo44, 10CrMo910)
  • 8. Co-operation with Polish Technical Inspection Office (UDT) and other foreign authority societies. 1981. IX-1981.XI REMAK Site: Plomin - YUGOSLAVIA Welding Engineer at Power Plant. Organizes and coordinates replacing the pressure piping and the Main Valve Chamber of Power Boiler Turbine at erection site. (13CrMo44, 10CrMo910) Studies technical documentation, design specifications and drawings. Controlling the welding procedures (WPS and PQR) in accordance to the ASME IX Standard. Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required at site. Supervision of the welding and heat treatment (PWHT) tests for WPS and PQR implementation. Co-ordination of: fitting, welding, PWHT and NDT during replacement a turbine valve chamber. 1979.X-1981.VIII REMAK Opole - Poland Manager of the Welding Department Leading the Welding Department and co-operation with Polish Technical Inspection Office (UDT) Studies technical documentation, design specifications and drawings. Maintenance of weld procedure registers and welder qualification registers and local welder identification. Attendance of MOM Meetings, Safety Meetings and other ad hoc meetings as required. Supervision of welding in repair and erection works for the steam boilers of Power Plants (16Mo3, 13CrMo44, 10CrMo910) Elaboration of the welding procedures (WPS) in accordance to Polish and International Standards 1978.X-1979.IX INSTAL Opole - Poland Welding Engineer Organizes and coordinates the assigned part of the job at erection sites. Studies technical documentation, design specifications and drawings. Supervision of welding and erection of pipeline networks, boilers, Power Plants cooling system, etc. Supervising the rigging and checking of heavy piping lifting/erection and transportation to site. Qualification, modification and implementation of the welding procedure specifications (WPS). Co-operation with Polish Technical Inspection Office (UDT) and other foreign authority societies. 1976.IX-1978.IX INSTAL Site Prerov - CZECHOSLOVAKIA Welding Engineer at Sulphuric Acid Factory site. Organizes and coordinates the assigned part of the job at erection site. Studies technical documentation, design specifications and drawings. Managing of fitters, welders and insulators with planning and co- ordination duties at site. Maintenance of weld procedure registers and welder qualification registers and local welder identification. Supervision of welding and erection of storage tanks, steel structures, piping systems, boilers, etc. Co-operation with Czech Technical Authority Inspection (SVUM) and with multinational Companies. Supervising the rigging and checking of equipment lifting/erection and transportation to site. Inspection and checks Quality of the work carried out during progress of equipment and piping erection; 16Mo3, 13CrMo44 and 10CrMo910. Witnesses and approved Tests to be carried out in accordance with applicable Specifications. Resolved problems and difficulties in discussion with PM, Contractors and Vendors representatives. 1974.XI-1976.VIII INSTAL Opole - Poland Welding Engineer Examining of welders and co-ordination the non-destructive testing (NDT). Studies technical documentation, design specifications and drawings. The welding procedure specifications (WPS) qualification, modification and implementation.