Application of SCADA for Controlling Electrical
Power System Network
Rajib Baran Roy1
Abstract : Due to the rapid development in automation system, the remote operation,
control and monitoring are necessary for any modern system. The SCADA
(Supervisory Control and Data Acquisition) facilitates this remote operation, control
and monitoring for industrial automation. The SCADA is also widely used for overall
operation of modern power system. This paper is about the application of SCADA in
overall operation, control and monitoring of transmission and distribution system of
electrical network of Dhaka city, Bangladesh. The paper justifies the suitability of
utilization of SCADA for remote controlling of electrical power system network of
Dhaka city which can be implemented for controlling the overall power system
network of Bangladesh. The 132 and 33KV circuit breakers of power system network
of Dhaka city are generally controlled by SCADA. The daily operation, load
management and system faults are monitored by the SCADA for managing the
overall system with minimum supervision and manpower. The SCADA system
comprises RTU (Remote Telemetry Unit), microwave communication network and
RCS (Remote Control Server). The SPIDER software, which is a open platform for
horizontal and vertical integration of power control center uses UNIX based
operating system is used for SCADA of DPDC.
Introduction
The SCADA stands for Supervisory Control and Data Acquisition. In this study
the application of the SCADA system in controlling the overall electrical
network of Dhaka city, Bangladesh is discussed. The SCADA system becomes
popular in the 1960’s in order to monitor and control remote equipment. The
early SCADA systems used mainframe technology and required human
operators to make actions, decisions and maintain the information systems.
Because of the increased human labor cost, early SCADA systems were very
expensive. Today, SCADA is much more automated and consequently more
cost-efficient. The SCADA is the foundation for the distributed automation
system. The use of the SCADA system in electrical utility companies started in
early sixties for smooth monitor and control of the overall power system. For
remote operation of large power system network by SCADA started first in the
USA in 1962[1]. The interconnection of large power grids in the Midwestern and
the Southern U.S.A was the largest synchronized system in the world. The
blackout of 1965 prompted the U.S. Federal Power Commission to recommend
closer coordination between regional coordination groups and gave impetus to
the subsequent formation of the National Electric Reliability Council which is
formed in 1970. From that time the electrical utility company of the USA gave
emphasis on reliable operation, control and monitor of the power system.
However, the importance and urgency of closer monitoring and coordination of
overall electrical network was emphasized in the USA after the blackout of the
northeast grid network of 2003.
1. Assistant Professor, Department of Electrical and Electronics Engineering,
University of Information Technology and Sciences, Dhaka, Bangladesh, email:
rajib.baran@uits.edu.bd, xy631@yahoo.com
Application of SCADA for Controlling Electrical Power System Network
86
The application of SCADA for industrial automation system in Bangladesh
stared in late 80s and now it is widely used for remote operation, control and
monitoring of industrial automation system. Whereas the use of SCADA in
power system of Bangladesh started in late 90’s and still its application is limited
in controlling the transmission network of power system. Nowadays almost all
critical industrial infrastructures and processes are managed remotely from
central control rooms by using SCADA. The flow of gas and oil through pipes,
the processing and distribution of water, the management of the electricity
network, the operation of chemical plants and the signaling network for railways
are some applications of SCADA [3].
The RTU, microwave communication network and RCS are the backbone of
the SCADA system. The RTU of each substation gathers operational information
of switchgears of the substation and transfers that to the central database through
microwave linkage. Basically the RTU collects all information related to remote
and manual operation. The SCADA master or control station is comprised of
Local Area Network (LAN) of RCS (Remote Communication Server) and
workstations. The RCS stores and processes data according to the system
requirement and generates necessary commands for remote operation of the
substation switchgear. Initially the SCADA software was based on VAX (Virtual
Address Extension) and VMS (Virtual Memory System) and OpenVMS (Alpha)
platforms. However UNIX and Windows platforms are now used for most
SCADA software. Initially SCADA were used for large utility networks having
100,000 to 250,000 service points. However SCADA is now used for large
automation system having many service points. The system is resided on LANs
with communication front end (CFE) processors and user interface (UI) attached
locally either on the same LAN or across a WAN (Wide Area Network) [2].
Basically 132 and 33 kV circuit breakers of substations of Dhaka city are
operated by SCADA system. The SPAIDER, an open source software which is
provided by the vendor, ABB, Switzerland is used as the main operational
software for the SCADA system of electricity network of Dhaka city. This
software is basically based on different programming languages such as C++,
FORTRAN, and Pascal. The UNIX operating system is used for this software.
1. Scada System and its Functions
SCADA is a means of controlling from remote location by using
communication technology. It is used to collect data and control processes at
the supervisory level. The SCADA monitored system could be just about an oil
refinery plant, a power generation system, a communication network or even a
simple switch. To monitor and control the automation system, the SCADA
collects data from the system and issue commands accordingly. By using sensors
(discrete or analog) and control relays, the SCADA collects information about
processes and control individual equipment. The system is supervised by a
SCADA master station which collects data from monitoring devices and issues
controls accordingly (either automatically or at the request of human operators)
[4]. The SCADA system comprises of,
UITS Journal Volume: 1 Issue: 2
ISSN: 2226-3128
87
1. Sensors (either digital or analog): Sensors control relays that directly
interface with the managed system.
2. Remote telemetry units (RTU): These are small computerized units
deployed in the field at specific sites and locations. It serves as local
collection points for gathering information from sensors and delivering
commands to control relays.
3. Communications network: It connects the SCADA master station to the
RTU.
4. SCADA master units: These are larger computer consoles that serve as the
central processor for the SCADA system. Master units provide a human
interface to the system and automatically regulate the managed system in
response to sensor inputs.
5. Remote communication server (RCS): The RCS communicates with the
RTU and collect information which is also called master station. The master
station, an HMI (Human Machine Interface) or an HCI (Human Computer
Interface) performs data processing on information gathered from sensors
[6]. The functions of SCADA are discussed below.
A. Data Acquisition
Since SCADA system monitors a large processing unit or network having
various equipments therefore it collects information hundreds or thousands of
sensors. Some of those sensors measure simple events that can be detected by
on-off switch, called a discrete or digital input. Discrete inputs are used to
measure simple states like whether the equipment is on or off, alarm for
shutdown or tripping of any device or power failure at a critical facility. Some
sensors measure more complex situations where exact measurement is
important. These are analog sensors, which can detect continuous changes in a
voltage or current input. Analog sensors are used to track fluid levels in tanks,
voltage levels in batteries, temperature and other factors that can be measured in
a continuous range of input [1].
A. Data Communication
In supervisory control, it is required to monitor multiple systems from a central
location, so a communication network is required to transport all the data
collected from sensors. In earlier SCADA systems had radio, modem or
dedicated serial lines based communication network. Today the trend is to put
SCADA data on Ethernet and IP (Internet Protocol) over SONET (Synchronous
Optical Networking). For security reasons, SCADA data should be kept on
closed LAN (Local Area Network) or WAN (Wide Area Network) without
exposing sensitive data to the open internet. For data security, data protocol is
maintained. Sensors and control relays can't generate or interpret protocol
communication on their own. Therefore the RTU is needed to provide an
interface between the sensors and the SCADA network. The RTU encodes sensor
inputs into protocol format and forwards them to the SCADA master or central
station. Again the RTU receives control commands in protocol format from the
master station and transmits electrical signals to the appropriate control relays [2,5].
Application of SCADA for Controlling Electrical Power System Network
88
A. Data Presentation
The data presentation or display in SCADA system is mostly in visual or audio
form. A SCADA system interacts with human operators through work station
computers which are commended by RCS. The master station continuously
monitors all sensors and alerts the operator by visual display or sound. The
master station presents a comprehensive view of the entire managed system and
also provides details operation of the system according to the requests of user. It
maintains report logs and summarizes historical trends of daily operation of any
system [5].
A. Data Presentation
The SCADA system automatically controls the overall system with minimum
human interference. In case of sophisticated master station, these controls can
run completely automatically without the need of human intervention. For
example, if too much pressure is building up in a gas pipeline, the SCADA
system can automatically open a release valve. In modern power system
network, the overall control is performed by SCADA without the human
intervention [5].
2. Electrical Network Operation by Using SCADA
All 132/33 kV and 33/11 kV substations of the electricity network of Dhaka city
are controlled by the SCADA system. The SCADA central control room
manages the electricity network by coordinating with the central load dispatch
center and other related electricity authorities of Bangladesh. The SCADA
manages the load demand of Dhaka city according to the power generation of
Bangladesh. It also keeps proper coordination within the system and the
regulating authority during any emergency situation in order to avoid overall
system failure. The power flow status within the overall system, daily and
monthly power supply report and overall system operation are main functions of
the SCADA system [6].
A. Functional Steps of SCADA
The functional steps for managing the overall power system network of Dhaka
city are briefly described below.
1. All data points at the substation equipment are connected with the RTU card
by using wire. The figure 1 shows the block diagram of RTU. When any
substation is remote or manually operated, the RTU gathers operational
information in the central database through microwave linkage which is
transferred to the RCS later. This RTU is installed at every 132/33 kV and
33/11 kV substation of Dhaka city. For collecting information circuit
breaker and other switchgears of any substation are connected to the RTU
card at a specific point. The installed data in the database of the RTU is
transferred to outstation radio through modem.
UITS Journal Volume: 1 Issue: 2
ISSN: 2226-3128
89
Fig. 1. Block diagram of RTU
2. The data from the outstation radio is conveyed to the nearby base station
either by pilot cable or radio communication unit. The SCADA system
which controls the electricity network of Dhaka city has six base stations.
The base stations are Dhanmondi, Fatullah, New Mirpur, Tongi 2, Bhulta
and Narshingdi. Sixty six grid and distribution substations are connected
with six base stations. Each base station receives data from the substation
RTU as UHF signal. The base station transforms the UHF signal into
microwave signal. Each base station is associated with the microwave trans-
receiver. These microwave trans-receivers form a communication ring and
the master station receives data from the microwave ring. The microwave
ring and the linkage between the microwave ring and the master station are
shown in the figure 2.
Fig. 2. Microwave communication ring
CL-3(1/3)
Narsingdi Bhulta CL-7(1/2)
CL-6
Fatulla
ī‚§ Bhulta
CL-3(2/3)
ī‚§ Narsingdi
ī‚ˇ Madhabdi
ī‚ˇ Kaliganj
ī‚ˇ Ghorashal
ī‚ˇ Ghorsahal
Local
ī‚ˇ Polash
ī‚§ Kanchan
Tongi 2
CL-5(2/2)
ī‚§ Tongi 2CL-5(1/2)
ī‚§ Burulla
ī‚§ Joydevpur
ī‚§ Rajendropur
ī‚§ Sreepur
ī‚§ Kabirpur
CL-4
ī‚§ Tongi Grid
ī‚§ Tongi 1
ī‚§ Tongi 3
ī‚§ Dakshinkhan
ī‚§ Ada
ī‚§ Uttara
New
Mirpur
CL-2(1/2)
ī‚§ Kafrul
ī‚§ Agargaon
ī‚§ Kallyanpur
CL-1
CL-2(2/2)
ī‚§ New Mirpur
CL-1
ī‚§ Basundhara
ī‚§ Banani
ī‚§ Baridhara
ī‚ˇ Haripur
ī‚ˇ Haripur
ī‚ˇ Haripu
P/S
ī‚ˇ Demra
ī‚ˇ Siddhirg
anj
Dhanmondi
CC
CL-7(2/2)
ī‚§ Fatulla
CL-10
ī‚§ Khilgaon
ī‚§ Dhanmondi
ī‚§ Kakrail
ī‚§ Taltala
ī‚§ Ulon
ī‚§ Kawran
Bazar
ī‚§ Ramna
CL-8
ī‚§ Tejgaon
ī‚§ Jigatola
ī‚§ Satmasjid
ī‚§ Magbazar
ī‚§ Madartek
ī‚§ Lalgah
Fort
ī‚§ Zinzira
CL-9
ī‚§ Kazla
ī‚§ Narinda
ī‚§ Saidabad
ī‚§ Bangabhaban
ī‚§ Kurmitully
ī‚§ Gulshan
ī‚§ Naubganj
Siddhirganj
LDC
CL-3(3/3)
ī‚§ Nayarhat
ī‚§ Savar
ī‚§ Mirpur Old
ī‚§ Manikganj
Old
ī‚§ Manikganj
ī‚ˇ Mirkadim
ī‚ˇ Narayangnaj
ī‚ˇ Madanganj
ī‚ˇ Shuampur
ī‚ˇ Hasnabad
ī‚ˇ Postogola
ī‚ˇ Srinagar
DATABASE REMOTETERMINALUNIT
ON
OFF
L1-S POWER
SYSTEM
(Process)
SERVER COMMUNICATION MO
DIGITAL
INPUT
CENTRALPROCESSING
UNIT
COMMUNICATION
L1–S
CONTROLSYSTEM
DATABASE
DIGITAL
INPUT
Central
Processing
Unit
Database
Modem
Outstation
Radio
Application of SCADA for Controlling Electrical Power System Network
90
3. The master station receives data through microwave receiving antenna and
later data are processed by RCS according to the status. The RCS of the
master station collects all information regarding to switchgear operation of
any substation. This information is processed cyclically, which is then sent
to the application server. All information of the application server is stored
in the database. The figure 3 shows the block diagram of the database
system. The SCADA master station comprises a LAN network of a server
and workstation comcomputers. The coordination between the LAN and the
RTU is carried out through the communication network. The remote
operation of the substation is performed by the work station pc according to
the status of the single line diagram of that sub-station which is shown in the
figure 4. The single line diagram generally shows the status of circuit
breakers of any substation. The control room of the master station has
overall single line diagram of the power system network of Dhaka city. The
single line diagram visually indicates and displays the operation of circuit
breaker, active line, system voltage, frequency and power factor [7, 8].
Fig.3. Block diagram of database system
DATABASE REMOTE TERMINAL UNIT
ON
OFF
L1-S POWER
SYSTEM
(Process)
SERVER COMMUNICATION MODEM
DIGITAL
INPUT
CENTRAL PROCESSING
UNIT
COMMUNICATION MODEM
L1 – S
CONTROL SYSTEM
DATABASE
UITS Journal Volume: 1 Issue: 2
ISSN: 2226-3128
91
Fig. 4. Single line diagram of substation
3. Operation of Electrical Network
The daily operation and supervision is maintained by DPDC for overall
operation of the electrical network. For proper operation, the coordination
between the manual and remote operation of the overall system is required.
Besides that the maintenance schedule plan of equipments is required for
uninterrupted supply of electricity [12]. The tasks which are performed for daily
network operation are mentioned below,
ī‚ˇ Supervision of network conditions
ī‚ˇ Switching and regulation of components
ī‚ˇ Maintenance and servicing of equipment
ī‚ˇ Preventive and corrective action against disturbances
ī‚ˇ Co-ordination with other utilities
ī‚ˇ Buying and selling electricity
ī‚ˇ Planning of the daily work schedule
ī‚ˇ Calculation, setting and testing of protection equipment.
ī‚ˇ Electricity billing and customer service
ī‚ˇ Employee administration
ī‚ˇ System design, dimensioning of expansions
ī‚ˇ System expansion projects
ī‚ˇ Purchase and construction
Application of SCADA for Controlling Electrical Power System Network
92
Fig. 5. On Screen Command Mode for Circuit Breaker Operation
The daily operation and supervision is maintained by DPDC for overall
operation of the electrical network. For proper operation, the coordination
between the manual and remote operation of the overall system is required.
Besides that the maintenance schedule plan of equipments is required for
uninterrupted supply of electricity [12]. The tasks which are performed for daily
network operation are mentioned below,
ī‚ˇ Supervision of network conditions
ī‚ˇ Switching and regulation of components
ī‚ˇ Maintenance and servicing of equipment
ī‚ˇ Preventive and corrective action against disturbances
ī‚ˇ Co-ordination with other utilities
ī‚ˇ Buying and selling electricity
ī‚ˇ Planning of the daily work schedule
ī‚ˇ Calculation, setting and testing of protection equipment.
ī‚ˇ Electricity billing and customer service
ī‚ˇ Employee administration
ī‚ˇ System design, dimensioning of expansions
ī‚ˇ System expansion projects
ī‚ˇ Purchase and construction
UITS Journal Volume: 1 Issue: 2
ISSN: 2226-3128
93
It is to be mentioned that the operation, control and monitoring of the overall
system along with the managerial tasks are performed by HMI (Human-Machine
Interface) or an HCI (Human-Computer Interface) with the help of SCADA
system. Generally 132, 33 and 11 kV circuit breakers are operated remotely by
using SCADA system [9]. Figure 5 shows the on screen command mode in the
work station computer during circuit breaker operation of any substation. Some
operational steps or commands are generally followed for circuit breaker
operation which are mentioned below,
ī‚ˇ The circuit breaker to be operated is selected from the on line
application server.
ī‚ˇ The remote control is not blocked.
ī‚ˇ The breaker is marked as updated.
ī‚ˇ Each breaker is connected with the RTU.
ī‚ˇ Remote control authority for the action is established.
ī‚ˇ Breaker is not controlled from any other work station.
ī‚ˇ The interlocking of breaker must be in proper sequence.
If any of these prerequisites is not met, a message box explains the present status
of the circuit breaker. An alarm is also issued on a command sequence error. The
error message can be seen in error message box and also in the event list. If no
command acknowledgement is returned within a certain time, an alarm is issued.
A circuit that needs to be operated is selected by using password and later the
operator operates that by using workstation pc [11]. The overall operation of the
power system network and intercommunication within the system is shown in
figure 6.
Figure 6: Power system operation
Application of SCADA for Controlling Electrical Power System Network
94
A. Load Shedding Procedure
In case of shortage of electricity generation according to the load demand, load
shedding is required. The load shedding schedule is generally done according to
the deficiency of the system power shortage. The circuit breakers on the 11 kV
sides are operated according to the daily load shedding schedule [11].
Table1. Status of a Load Shedding Group
Status Meaning of the Status
Free This is the default status which means the load shed group is
not used
Execute The load shed group is executing
Restore The load shed group is restoring
Wait for
execute return
The load shed group is waiting for object return after restore
Edit The load shed group is in edit mode. In this mode objects can
be added or removed
Set Execution is completed
Return
completed
Return is completed
The work station computer displays all available load shedding (LS) groups and
their group status within the electrical network. The status of a LS group is
mentioned in tabular form in table 1. The identities of the LS groups can be
changed from the load shedding menu of the display in the workstation
computer. Generally one load shedding group shows its status, restores delay and
the time of the load shedding. A maximum of 50 load shedding groups exists at
the same time but one LS group can be executed at any stipulated time according
to the load shedding schedule. From edit mode of the display menu any object in
a load shedding group can be added or deleted according to the system
requirement. In order to add or delete an object (a line or breaker) from a LS
group it is required to open a new WS400 (work station) window and then select
that object from the corresponding single line diagram [1, 2, 7, 11].
B. Trend Curve, Tag and System Redundancy
Trend curves are used for presenting voltage, current, power factor, frequency
and daily system demand of any power system. SCADA software provides daily
operational trend curve as well as pervious trend curves which is stored in the
database of the server and can be retrieved according to the requirement [11].
UITS Journal Volume: 1 Issue: 2
ISSN: 2226-3128
95
B. Tagging (Safety Document Function)
TABLE 2. Priority, graphical symbol and meaning of tags
The single line diagram is marked by using tags for proper operation and safety
during operation. A tag is used to indicate the status of an object in the single line
diagram. It is possible to set more than one tag on the same object. Only the tag
with the highest priority is presented in the screen of the workstation computer.
The table 2 represents the priority, graphical symbol and meaning of different
tag.
C. Tagging Fault Record and Event List
The fault record generally keeps information about the fault while the even list
keeps all information regarding fault and normal operation of any system. If a
circuit breaker in a substation trips the fault record list records the tripping time
of that breaker. However any change in voltage level and current level, circuit
breaker on and off etc are recorded in the event list. The event list also provides
information regarding to the system fault.
C. Data Security and Redundancy
The SPIDER software is used by the SCADA system of DPDC which is installed
by ABB, Sweden. Data security and redundancy are realized on several levels in
the SPIDER concept. The system will automatically take the suitable input for
processing from one of two redundant inputs. Though the RTUs of DPDC
system is not configured for data redundancy however it is possible to have
redundant RTU in SPIDER configuration. The communication servers are
commonly found in pairs where they share the system from the connected RTU
lines. The switch over between lines is done by connecting each RTU line
through a line splitting board in communication server pair. If a failure occurs in
one board, a switch over is initiated and the new on-line board continues to
communication with the system. The system configuration by SPIDER for
electricity network is shown in figure 7.
Priority Text Graphics symbol Meaning
1 PtW P Permit to work
2 Sf T S Sanction for test
3 LoA A Limitation of access
4 LLW W Live line work certificate
Application of SCADA for Controlling Electrical Power System Network
96
Fig. 7. Designed system configuration by SPIDER
The degree of reliability of operation depends on the application which is
executing the server. The switch over of a redundant server pair is performed
within 10 seconds without any loss of data. All non-empty message queues are
restarted from the not treated message in the new line server after a switch over.
By defining the sequence for database update, a full security for data loss during
switch over can be achieved. There is a back up console in the SCADA system
which automatically takes over the responsibility if one HMI or HCI server fails
[4].All updated data is secured in the database of an application server. But
database security is not sufficient for temporarily stored data in message queues
during power failure. Therefore SPIDER saves the current status of the massage
queues in the stand by computers. All non empty massage queues are restarted
from the non treated massage in the new on line server after a switch over. By
defining the sequence of database update, massage sent and massage treated, a
full security for data loss during the switch over is achieved [7, 10].
4. Conclusion
The SCADA system helps in monitoring and controlling of the overall electricity
network of Dhaka city which provides uninterrupted electricity supply to the
consumer. It keeps record of the system operation which is helpful for getting a
clear picture of the overall status of the system. Since the status of the overall
system network can be understood within few seconds, the daily load demand
can determine according to the requirement. The application of SCADA has
simplified the managing of the electricity network of Dhaka city with minimum
human interference. From this study it can be said that in order to improve the
UITS Journal Volume: 1 Issue: 2
ISSN: 2226-3128
97
overall system performance, reliability and stability it is necessary to implement
the SCADA system for controlling the whole electricity network of Bangladesh.
The manual operation of power system in Bangladesh requires huge manpower
which increases the overall system cost. Moreover quick decision making
becomes difficult in manual system during system failure or unbalanced
situation. For proper operation, control and monitoring of the overall power
system of Bangladesh it is necessary to implement the SCADA system.
References
[1] D. Baiely and E. Wright, Practical SCADA for Industry, Third Edition, 2003. G and GM
Publishing Co., USA, pp. 51-65, 120-130
[2] W. T. Shaw, Cyber Security for SCADA Systems, Second Edition, 2006, McGraw-
HillPublishing Company Limited, USA, pp. 35-50, 66-80, 100-105
[3] Hadi Saadat., Power System Analysis, 1999, Tada McGraw-Hill Publishing
Company Limited, p.p. 78-85, 212-250
[4] I. McKenzie Smith. Hughes, Electrical Technology, Seventh Edition, 1993, Tada
McGraw-Hill Publishing Company Limited, pp. 65-80, 95-105
[5] Salivahanan, S.Suresh, N., and Vallavaraj, A., Electronic Devices and Circuit, Fourth
Edition, Tada Seventh Edition, 2000, McGraw-Hill Publishing Company Limited,
USA, pp. 70-90, 187, 200-300
[6] Floyed, T., Electronic Devices, Fourth Edition, 1996, Prentice Hall International, Inc,
pp. 40-85, 95-150
[7] J. D. Glover, M.S. Sharma and T.J. Overbye, Power System Analaysis and Design,
Fourth Edition, 2008, Thomson Learning, Thomson Corporation, USA, pp. 60- 85,
120-150, 210-300
[8] J. J. Grainger and W. D. Stevenson, Power System Analysis, International Edition,
1994,McGraw-Hill Book Co., Singapore, pp. 105-180,350-400, 512-516
[9] W. D. Stevenson, Elements of Power System Analysis, International Edition, 1994,
MacGraw Hill Book Co., Singapore, pp. 45-60, 90-120, 220-250
[10] R. H. Miller, Power System Operation, Sixth Edition, 1994 Prentice-Hall Inc, India,
pp. 50-80, 95-120
[11] Operational manual of SCADA system, ABB network partner, 1998, ABB, Sweden, pp.
22-50, 60-85
[12] Official Website of Dhaka Power Distribution Company Limited, Dhaka,
Bangladesh, http://www.dpdc.org.bd.

More Related Content

What's hot

SCADA Implementation Based on wireless RF Technology
SCADA Implementation Based on wireless RF TechnologySCADA Implementation Based on wireless RF Technology
SCADA Implementation Based on wireless RF TechnologyPatnam Shruthi
 
Jassim al hamad open substation automation system for oil & gas industry
Jassim al hamad  open substation automation system for oil & gas industryJassim al hamad  open substation automation system for oil & gas industry
Jassim al hamad open substation automation system for oil & gas industrysarah7887
 
Scada Based Online Circuit Breaker Monitoring System
Scada Based Online Circuit Breaker Monitoring SystemScada Based Online Circuit Breaker Monitoring System
Scada Based Online Circuit Breaker Monitoring SystemIOSR Journals
 
an introduction to scada.
an introduction to scada.an introduction to scada.
an introduction to scada.Rishabh Srivastava
 
Scada system architecture, types and applications
Scada system architecture, types and applicationsScada system architecture, types and applications
Scada system architecture, types and applicationsUchi Pou
 
Scada systems automating electrical distribution
Scada systems automating electrical distributionScada systems automating electrical distribution
Scada systems automating electrical distributionSHUBHAM SAINI
 
Power system automation
Power system automationPower system automation
Power system automationGuider Lee
 
Reliable, cheaper, and modular new scada 1
Reliable, cheaper, and modular new scada 1Reliable, cheaper, and modular new scada 1
Reliable, cheaper, and modular new scada 1Mohamed Zahran
 
SCADA (Supervisory Control & data Acquisation) PPT
SCADA (Supervisory Control & data Acquisation) PPTSCADA (Supervisory Control & data Acquisation) PPT
SCADA (Supervisory Control & data Acquisation) PPTDeepeshK4
 
A presentation on scada system
A presentation on scada systemA presentation on scada system
A presentation on scada systemIIT INDORE
 
Scada architecture
Scada architectureScada architecture
Scada architectureinvincibleneo
 
SCADA
SCADASCADA
SCADAalmuamar
 
Power system automation
Power system automationPower system automation
Power system automationAbbas Ali
 
Paradigm Shift In Power System Scada
Paradigm Shift In Power System ScadaParadigm Shift In Power System Scada
Paradigm Shift In Power System ScadaP K Agarwal
 
Scada
ScadaScada
Scadahamada13
 
Samiullah final ppt sacda
Samiullah final ppt sacdaSamiullah final ppt sacda
Samiullah final ppt sacdaSAMIULLAH SHAIKH
 
TSE SCADA Design presentation new
TSE SCADA Design presentation newTSE SCADA Design presentation new
TSE SCADA Design presentation newMohamed ElSirsy
 
Power system automation
Power system automationPower system automation
Power system automationsatyam11
 
Dhiraj seminar # power system automation
Dhiraj seminar # power system automationDhiraj seminar # power system automation
Dhiraj seminar # power system automationvision2d16
 

What's hot (20)

SCADA Implementation Based on wireless RF Technology
SCADA Implementation Based on wireless RF TechnologySCADA Implementation Based on wireless RF Technology
SCADA Implementation Based on wireless RF Technology
 
Jassim al hamad open substation automation system for oil & gas industry
Jassim al hamad  open substation automation system for oil & gas industryJassim al hamad  open substation automation system for oil & gas industry
Jassim al hamad open substation automation system for oil & gas industry
 
Scada Based Online Circuit Breaker Monitoring System
Scada Based Online Circuit Breaker Monitoring SystemScada Based Online Circuit Breaker Monitoring System
Scada Based Online Circuit Breaker Monitoring System
 
an introduction to scada.
an introduction to scada.an introduction to scada.
an introduction to scada.
 
Scada system architecture, types and applications
Scada system architecture, types and applicationsScada system architecture, types and applications
Scada system architecture, types and applications
 
Scada systems automating electrical distribution
Scada systems automating electrical distributionScada systems automating electrical distribution
Scada systems automating electrical distribution
 
Power system automation
Power system automationPower system automation
Power system automation
 
Reliable, cheaper, and modular new scada 1
Reliable, cheaper, and modular new scada 1Reliable, cheaper, and modular new scada 1
Reliable, cheaper, and modular new scada 1
 
SCADA (Supervisory Control & data Acquisation) PPT
SCADA (Supervisory Control & data Acquisation) PPTSCADA (Supervisory Control & data Acquisation) PPT
SCADA (Supervisory Control & data Acquisation) PPT
 
A presentation on scada system
A presentation on scada systemA presentation on scada system
A presentation on scada system
 
Scada architecture
Scada architectureScada architecture
Scada architecture
 
SCADA
SCADASCADA
SCADA
 
Power system automation
Power system automationPower system automation
Power system automation
 
A SCADA System Using Mobile Agents for a Next-Generation Distribution System
A SCADA System Using Mobile Agents for a Next-Generation Distribution SystemA SCADA System Using Mobile Agents for a Next-Generation Distribution System
A SCADA System Using Mobile Agents for a Next-Generation Distribution System
 
Paradigm Shift In Power System Scada
Paradigm Shift In Power System ScadaParadigm Shift In Power System Scada
Paradigm Shift In Power System Scada
 
Scada
ScadaScada
Scada
 
Samiullah final ppt sacda
Samiullah final ppt sacdaSamiullah final ppt sacda
Samiullah final ppt sacda
 
TSE SCADA Design presentation new
TSE SCADA Design presentation newTSE SCADA Design presentation new
TSE SCADA Design presentation new
 
Power system automation
Power system automationPower system automation
Power system automation
 
Dhiraj seminar # power system automation
Dhiraj seminar # power system automationDhiraj seminar # power system automation
Dhiraj seminar # power system automation
 

Viewers also liked

automation slides,plc,scada,HMI
automation slides,plc,scada,HMIautomation slides,plc,scada,HMI
automation slides,plc,scada,HMIBOSCH
 
Scada and power system automation
Scada and power system automationScada and power system automation
Scada and power system automationShubham Kapoor
 
ā¸ā¸˛ā¸Ŗā¸¨ā¸ļā¸ā¸Šā¸˛ā¸žā¸ąā¸™ā¸˜ā¸¸ā¸¨ā¸˛ā¸Ēā¸•ā¸ŖāšŒā¸‚ā¸­ā¸‡āš€ā¸Ąā¸™āš€ā¸”ā¸Ĩ
ā¸ā¸˛ā¸Ŗā¸¨ā¸ļā¸ā¸Šā¸˛ā¸žā¸ąā¸™ā¸˜ā¸¸ā¸¨ā¸˛ā¸Ēā¸•ā¸ŖāšŒā¸‚ā¸­ā¸‡āš€ā¸Ąā¸™āš€ā¸”ā¸Ĩā¸ā¸˛ā¸Ŗā¸¨ā¸ļā¸ā¸Šā¸˛ā¸žā¸ąā¸™ā¸˜ā¸¸ā¸¨ā¸˛ā¸Ēā¸•ā¸ŖāšŒā¸‚ā¸­ā¸‡āš€ā¸Ąā¸™āš€ā¸”ā¸Ĩ
ā¸ā¸˛ā¸Ŗā¸¨ā¸ļā¸ā¸Šā¸˛ā¸žā¸ąā¸™ā¸˜ā¸¸ā¸¨ā¸˛ā¸Ēā¸•ā¸ŖāšŒā¸‚ā¸­ā¸‡āš€ā¸Ąā¸™āš€ā¸”ā¸ĨBhongsadhorn Bhansamdaeng
 
戒除į”œéŖŸīŧŒäēĢ受åĨåēˇ
戒除į”œéŖŸīŧŒäēĢ受åĨåēˇæˆ’除į”œéŖŸīŧŒäēĢ受åĨåēˇ
戒除į”œéŖŸīŧŒäēĢ受åĨåēˇå…Ģæ­Ŗ 文化
 
Iso 9001 lead auditor course
Iso 9001 lead auditor courseIso 9001 lead auditor course
Iso 9001 lead auditor coursepogerita
 
HOC 22x28 Foam Board Signs
HOC 22x28 Foam Board SignsHOC 22x28 Foam Board Signs
HOC 22x28 Foam Board SignsErin Lazaro
 
GameChanger Presentation
GameChanger PresentationGameChanger Presentation
GameChanger PresentationGriffin S
 
Intro to SSDP - West Virginia University Chapter
Intro to SSDP - West Virginia University ChapterIntro to SSDP - West Virginia University Chapter
Intro to SSDP - West Virginia University ChapterTheStacia
 
ForAsi
ForAsiForAsi
ForAsinesstech1
 
The Real Profits Program
The Real Profits ProgramThe Real Profits Program
The Real Profits ProgramDaryl Urbanski
 
Workplace Monitoring After Stengart v. Loving Care Agency, April 14, 2010
Workplace Monitoring After Stengart v. Loving Care Agency, April 14, 2010Workplace Monitoring After Stengart v. Loving Care Agency, April 14, 2010
Workplace Monitoring After Stengart v. Loving Care Agency, April 14, 2010Employers Association of New Jersey
 
Certification Lr
Certification   LrCertification   Lr
Certification Lrhengtong
 
Project Management Workshop Overview
Project Management Workshop OverviewProject Management Workshop Overview
Project Management Workshop Overviewsundong
 
ReseÃąa bibliografica, apartheid del siglo xxi
ReseÃąa bibliografica, apartheid del siglo xxiReseÃąa bibliografica, apartheid del siglo xxi
ReseÃąa bibliografica, apartheid del siglo xxiZaibet Caceres
 
3Com 3C13821
3Com 3C138213Com 3C13821
3Com 3C13821savomir
 

Viewers also liked (18)

automation slides,plc,scada,HMI
automation slides,plc,scada,HMIautomation slides,plc,scada,HMI
automation slides,plc,scada,HMI
 
Scada and power system automation
Scada and power system automationScada and power system automation
Scada and power system automation
 
ā¸ā¸˛ā¸Ŗā¸¨ā¸ļā¸ā¸Šā¸˛ā¸žā¸ąā¸™ā¸˜ā¸¸ā¸¨ā¸˛ā¸Ēā¸•ā¸ŖāšŒā¸‚ā¸­ā¸‡āš€ā¸Ąā¸™āš€ā¸”ā¸Ĩ
ā¸ā¸˛ā¸Ŗā¸¨ā¸ļā¸ā¸Šā¸˛ā¸žā¸ąā¸™ā¸˜ā¸¸ā¸¨ā¸˛ā¸Ēā¸•ā¸ŖāšŒā¸‚ā¸­ā¸‡āš€ā¸Ąā¸™āš€ā¸”ā¸Ĩā¸ā¸˛ā¸Ŗā¸¨ā¸ļā¸ā¸Šā¸˛ā¸žā¸ąā¸™ā¸˜ā¸¸ā¸¨ā¸˛ā¸Ēā¸•ā¸ŖāšŒā¸‚ā¸­ā¸‡āš€ā¸Ąā¸™āš€ā¸”ā¸Ĩ
ā¸ā¸˛ā¸Ŗā¸¨ā¸ļā¸ā¸Šā¸˛ā¸žā¸ąā¸™ā¸˜ā¸¸ā¸¨ā¸˛ā¸Ēā¸•ā¸ŖāšŒā¸‚ā¸­ā¸‡āš€ā¸Ąā¸™āš€ā¸”ā¸Ĩ
 
戒除į”œéŖŸīŧŒäēĢ受åĨåēˇ
戒除į”œéŖŸīŧŒäēĢ受åĨåēˇæˆ’除į”œéŖŸīŧŒäēĢ受åĨåēˇ
戒除į”œéŖŸīŧŒäēĢ受åĨåēˇ
 
Iso 9001 lead auditor course
Iso 9001 lead auditor courseIso 9001 lead auditor course
Iso 9001 lead auditor course
 
RPT
RPTRPT
RPT
 
HOC 22x28 Foam Board Signs
HOC 22x28 Foam Board SignsHOC 22x28 Foam Board Signs
HOC 22x28 Foam Board Signs
 
GameChanger Presentation
GameChanger PresentationGameChanger Presentation
GameChanger Presentation
 
Intro to SSDP - West Virginia University Chapter
Intro to SSDP - West Virginia University ChapterIntro to SSDP - West Virginia University Chapter
Intro to SSDP - West Virginia University Chapter
 
ForAsi
ForAsiForAsi
ForAsi
 
The Real Profits Program
The Real Profits ProgramThe Real Profits Program
The Real Profits Program
 
Workplace Monitoring After Stengart v. Loving Care Agency, April 14, 2010
Workplace Monitoring After Stengart v. Loving Care Agency, April 14, 2010Workplace Monitoring After Stengart v. Loving Care Agency, April 14, 2010
Workplace Monitoring After Stengart v. Loving Care Agency, April 14, 2010
 
Certification Lr
Certification   LrCertification   Lr
Certification Lr
 
Project Management Workshop Overview
Project Management Workshop OverviewProject Management Workshop Overview
Project Management Workshop Overview
 
ReseÃąa bibliografica, apartheid del siglo xxi
ReseÃąa bibliografica, apartheid del siglo xxiReseÃąa bibliografica, apartheid del siglo xxi
ReseÃąa bibliografica, apartheid del siglo xxi
 
Cassandra At Wize Commerce
Cassandra At Wize CommerceCassandra At Wize Commerce
Cassandra At Wize Commerce
 
3Com 3C13821
3Com 3C138213Com 3C13821
3Com 3C13821
 
lzonepsu
lzonepsu lzonepsu
lzonepsu
 

Similar to 8 scada

Semester syllabus
Semester syllabusSemester syllabus
Semester syllabusbramesh316
 
Airtificial Intelligence in Power System
Airtificial Intelligence in Power SystemAirtificial Intelligence in Power System
Airtificial Intelligence in Power SystemPratik Doshi
 
Scada systems basics winnie mbau
Scada systems basics winnie mbauScada systems basics winnie mbau
Scada systems basics winnie mbauwinnie15
 
SCADA only for the advance version of the module
SCADA only for the advance version of the moduleSCADA only for the advance version of the module
SCADA only for the advance version of the moduleAJITTHAKUR68
 
Scada presentation (group 10)
Scada presentation (group 10)Scada presentation (group 10)
Scada presentation (group 10)Ritvik Bhatia
 
SCADA.pptx supervisory control and data aquasition
SCADA.pptx supervisory control and data aquasitionSCADA.pptx supervisory control and data aquasition
SCADA.pptx supervisory control and data aquasitionRapidAcademy
 
SCADA Assignment.pptx
SCADA Assignment.pptxSCADA Assignment.pptx
SCADA Assignment.pptxssuser1831ba
 
SCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionSCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionManohar Tatwawadi
 
Scada System
Scada  SystemScada  System
Scada SystemArifbhatti
 
elements of scada.pptx
elements of scada.pptxelements of scada.pptx
elements of scada.pptxchetanharihar2
 
Training manual on scada
Training manual on scadaTraining manual on scada
Training manual on scadabhavuksharma10
 
Paper id 37201531
Paper id 37201531Paper id 37201531
Paper id 37201531IJRAT
 

Similar to 8 scada (20)

Fps scada
Fps scadaFps scada
Fps scada
 
Semester syllabus
Semester syllabusSemester syllabus
Semester syllabus
 
Airtificial Intelligence in Power System
Airtificial Intelligence in Power SystemAirtificial Intelligence in Power System
Airtificial Intelligence in Power System
 
Scada systems basics winnie mbau
Scada systems basics winnie mbauScada systems basics winnie mbau
Scada systems basics winnie mbau
 
SCADA only for the advance version of the module
SCADA only for the advance version of the moduleSCADA only for the advance version of the module
SCADA only for the advance version of the module
 
Scada presentation (group 10)
Scada presentation (group 10)Scada presentation (group 10)
Scada presentation (group 10)
 
Scada slide
Scada slideScada slide
Scada slide
 
SCADA.pptx supervisory control and data aquasition
SCADA.pptx supervisory control and data aquasitionSCADA.pptx supervisory control and data aquasition
SCADA.pptx supervisory control and data aquasition
 
SCADA Assignment.pptx
SCADA Assignment.pptxSCADA Assignment.pptx
SCADA Assignment.pptx
 
SCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionSCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisition
 
B43050518
B43050518B43050518
B43050518
 
P1111141868
P1111141868P1111141868
P1111141868
 
SCADA
SCADASCADA
SCADA
 
Introduction-II.pptx
Introduction-II.pptxIntroduction-II.pptx
Introduction-II.pptx
 
Scada System
Scada  SystemScada  System
Scada System
 
elements of scada.pptx
elements of scada.pptxelements of scada.pptx
elements of scada.pptx
 
Training manual on scada
Training manual on scadaTraining manual on scada
Training manual on scada
 
Scada primer
Scada primerScada primer
Scada primer
 
Scada primer
Scada primerScada primer
Scada primer
 
Paper id 37201531
Paper id 37201531Paper id 37201531
Paper id 37201531
 

Recently uploaded

Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 

Recently uploaded (20)

Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 

8 scada

  • 1. UITS Journal Volume: 1 Issue: 2 ISSN: 2226-3128 85 Application of SCADA for Controlling Electrical Power System Network Rajib Baran Roy1 Abstract : Due to the rapid development in automation system, the remote operation, control and monitoring are necessary for any modern system. The SCADA (Supervisory Control and Data Acquisition) facilitates this remote operation, control and monitoring for industrial automation. The SCADA is also widely used for overall operation of modern power system. This paper is about the application of SCADA in overall operation, control and monitoring of transmission and distribution system of electrical network of Dhaka city, Bangladesh. The paper justifies the suitability of utilization of SCADA for remote controlling of electrical power system network of Dhaka city which can be implemented for controlling the overall power system network of Bangladesh. The 132 and 33KV circuit breakers of power system network of Dhaka city are generally controlled by SCADA. The daily operation, load management and system faults are monitored by the SCADA for managing the overall system with minimum supervision and manpower. The SCADA system comprises RTU (Remote Telemetry Unit), microwave communication network and RCS (Remote Control Server). The SPIDER software, which is a open platform for horizontal and vertical integration of power control center uses UNIX based operating system is used for SCADA of DPDC. Introduction The SCADA stands for Supervisory Control and Data Acquisition. In this study the application of the SCADA system in controlling the overall electrical network of Dhaka city, Bangladesh is discussed. The SCADA system becomes popular in the 1960’s in order to monitor and control remote equipment. The early SCADA systems used mainframe technology and required human operators to make actions, decisions and maintain the information systems. Because of the increased human labor cost, early SCADA systems were very expensive. Today, SCADA is much more automated and consequently more cost-efficient. The SCADA is the foundation for the distributed automation system. The use of the SCADA system in electrical utility companies started in early sixties for smooth monitor and control of the overall power system. For remote operation of large power system network by SCADA started first in the USA in 1962[1]. The interconnection of large power grids in the Midwestern and the Southern U.S.A was the largest synchronized system in the world. The blackout of 1965 prompted the U.S. Federal Power Commission to recommend closer coordination between regional coordination groups and gave impetus to the subsequent formation of the National Electric Reliability Council which is formed in 1970. From that time the electrical utility company of the USA gave emphasis on reliable operation, control and monitor of the power system. However, the importance and urgency of closer monitoring and coordination of overall electrical network was emphasized in the USA after the blackout of the northeast grid network of 2003. 1. Assistant Professor, Department of Electrical and Electronics Engineering, University of Information Technology and Sciences, Dhaka, Bangladesh, email: rajib.baran@uits.edu.bd, xy631@yahoo.com
  • 2. Application of SCADA for Controlling Electrical Power System Network 86 The application of SCADA for industrial automation system in Bangladesh stared in late 80s and now it is widely used for remote operation, control and monitoring of industrial automation system. Whereas the use of SCADA in power system of Bangladesh started in late 90’s and still its application is limited in controlling the transmission network of power system. Nowadays almost all critical industrial infrastructures and processes are managed remotely from central control rooms by using SCADA. The flow of gas and oil through pipes, the processing and distribution of water, the management of the electricity network, the operation of chemical plants and the signaling network for railways are some applications of SCADA [3]. The RTU, microwave communication network and RCS are the backbone of the SCADA system. The RTU of each substation gathers operational information of switchgears of the substation and transfers that to the central database through microwave linkage. Basically the RTU collects all information related to remote and manual operation. The SCADA master or control station is comprised of Local Area Network (LAN) of RCS (Remote Communication Server) and workstations. The RCS stores and processes data according to the system requirement and generates necessary commands for remote operation of the substation switchgear. Initially the SCADA software was based on VAX (Virtual Address Extension) and VMS (Virtual Memory System) and OpenVMS (Alpha) platforms. However UNIX and Windows platforms are now used for most SCADA software. Initially SCADA were used for large utility networks having 100,000 to 250,000 service points. However SCADA is now used for large automation system having many service points. The system is resided on LANs with communication front end (CFE) processors and user interface (UI) attached locally either on the same LAN or across a WAN (Wide Area Network) [2]. Basically 132 and 33 kV circuit breakers of substations of Dhaka city are operated by SCADA system. The SPAIDER, an open source software which is provided by the vendor, ABB, Switzerland is used as the main operational software for the SCADA system of electricity network of Dhaka city. This software is basically based on different programming languages such as C++, FORTRAN, and Pascal. The UNIX operating system is used for this software. 1. Scada System and its Functions SCADA is a means of controlling from remote location by using communication technology. It is used to collect data and control processes at the supervisory level. The SCADA monitored system could be just about an oil refinery plant, a power generation system, a communication network or even a simple switch. To monitor and control the automation system, the SCADA collects data from the system and issue commands accordingly. By using sensors (discrete or analog) and control relays, the SCADA collects information about processes and control individual equipment. The system is supervised by a SCADA master station which collects data from monitoring devices and issues controls accordingly (either automatically or at the request of human operators) [4]. The SCADA system comprises of,
  • 3. UITS Journal Volume: 1 Issue: 2 ISSN: 2226-3128 87 1. Sensors (either digital or analog): Sensors control relays that directly interface with the managed system. 2. Remote telemetry units (RTU): These are small computerized units deployed in the field at specific sites and locations. It serves as local collection points for gathering information from sensors and delivering commands to control relays. 3. Communications network: It connects the SCADA master station to the RTU. 4. SCADA master units: These are larger computer consoles that serve as the central processor for the SCADA system. Master units provide a human interface to the system and automatically regulate the managed system in response to sensor inputs. 5. Remote communication server (RCS): The RCS communicates with the RTU and collect information which is also called master station. The master station, an HMI (Human Machine Interface) or an HCI (Human Computer Interface) performs data processing on information gathered from sensors [6]. The functions of SCADA are discussed below. A. Data Acquisition Since SCADA system monitors a large processing unit or network having various equipments therefore it collects information hundreds or thousands of sensors. Some of those sensors measure simple events that can be detected by on-off switch, called a discrete or digital input. Discrete inputs are used to measure simple states like whether the equipment is on or off, alarm for shutdown or tripping of any device or power failure at a critical facility. Some sensors measure more complex situations where exact measurement is important. These are analog sensors, which can detect continuous changes in a voltage or current input. Analog sensors are used to track fluid levels in tanks, voltage levels in batteries, temperature and other factors that can be measured in a continuous range of input [1]. A. Data Communication In supervisory control, it is required to monitor multiple systems from a central location, so a communication network is required to transport all the data collected from sensors. In earlier SCADA systems had radio, modem or dedicated serial lines based communication network. Today the trend is to put SCADA data on Ethernet and IP (Internet Protocol) over SONET (Synchronous Optical Networking). For security reasons, SCADA data should be kept on closed LAN (Local Area Network) or WAN (Wide Area Network) without exposing sensitive data to the open internet. For data security, data protocol is maintained. Sensors and control relays can't generate or interpret protocol communication on their own. Therefore the RTU is needed to provide an interface between the sensors and the SCADA network. The RTU encodes sensor inputs into protocol format and forwards them to the SCADA master or central station. Again the RTU receives control commands in protocol format from the master station and transmits electrical signals to the appropriate control relays [2,5].
  • 4. Application of SCADA for Controlling Electrical Power System Network 88 A. Data Presentation The data presentation or display in SCADA system is mostly in visual or audio form. A SCADA system interacts with human operators through work station computers which are commended by RCS. The master station continuously monitors all sensors and alerts the operator by visual display or sound. The master station presents a comprehensive view of the entire managed system and also provides details operation of the system according to the requests of user. It maintains report logs and summarizes historical trends of daily operation of any system [5]. A. Data Presentation The SCADA system automatically controls the overall system with minimum human interference. In case of sophisticated master station, these controls can run completely automatically without the need of human intervention. For example, if too much pressure is building up in a gas pipeline, the SCADA system can automatically open a release valve. In modern power system network, the overall control is performed by SCADA without the human intervention [5]. 2. Electrical Network Operation by Using SCADA All 132/33 kV and 33/11 kV substations of the electricity network of Dhaka city are controlled by the SCADA system. The SCADA central control room manages the electricity network by coordinating with the central load dispatch center and other related electricity authorities of Bangladesh. The SCADA manages the load demand of Dhaka city according to the power generation of Bangladesh. It also keeps proper coordination within the system and the regulating authority during any emergency situation in order to avoid overall system failure. The power flow status within the overall system, daily and monthly power supply report and overall system operation are main functions of the SCADA system [6]. A. Functional Steps of SCADA The functional steps for managing the overall power system network of Dhaka city are briefly described below. 1. All data points at the substation equipment are connected with the RTU card by using wire. The figure 1 shows the block diagram of RTU. When any substation is remote or manually operated, the RTU gathers operational information in the central database through microwave linkage which is transferred to the RCS later. This RTU is installed at every 132/33 kV and 33/11 kV substation of Dhaka city. For collecting information circuit breaker and other switchgears of any substation are connected to the RTU card at a specific point. The installed data in the database of the RTU is transferred to outstation radio through modem.
  • 5. UITS Journal Volume: 1 Issue: 2 ISSN: 2226-3128 89 Fig. 1. Block diagram of RTU 2. The data from the outstation radio is conveyed to the nearby base station either by pilot cable or radio communication unit. The SCADA system which controls the electricity network of Dhaka city has six base stations. The base stations are Dhanmondi, Fatullah, New Mirpur, Tongi 2, Bhulta and Narshingdi. Sixty six grid and distribution substations are connected with six base stations. Each base station receives data from the substation RTU as UHF signal. The base station transforms the UHF signal into microwave signal. Each base station is associated with the microwave trans- receiver. These microwave trans-receivers form a communication ring and the master station receives data from the microwave ring. The microwave ring and the linkage between the microwave ring and the master station are shown in the figure 2. Fig. 2. Microwave communication ring CL-3(1/3) Narsingdi Bhulta CL-7(1/2) CL-6 Fatulla ī‚§ Bhulta CL-3(2/3) ī‚§ Narsingdi ī‚ˇ Madhabdi ī‚ˇ Kaliganj ī‚ˇ Ghorashal ī‚ˇ Ghorsahal Local ī‚ˇ Polash ī‚§ Kanchan Tongi 2 CL-5(2/2) ī‚§ Tongi 2CL-5(1/2) ī‚§ Burulla ī‚§ Joydevpur ī‚§ Rajendropur ī‚§ Sreepur ī‚§ Kabirpur CL-4 ī‚§ Tongi Grid ī‚§ Tongi 1 ī‚§ Tongi 3 ī‚§ Dakshinkhan ī‚§ Ada ī‚§ Uttara New Mirpur CL-2(1/2) ī‚§ Kafrul ī‚§ Agargaon ī‚§ Kallyanpur CL-1 CL-2(2/2) ī‚§ New Mirpur CL-1 ī‚§ Basundhara ī‚§ Banani ī‚§ Baridhara ī‚ˇ Haripur ī‚ˇ Haripur ī‚ˇ Haripu P/S ī‚ˇ Demra ī‚ˇ Siddhirg anj Dhanmondi CC CL-7(2/2) ī‚§ Fatulla CL-10 ī‚§ Khilgaon ī‚§ Dhanmondi ī‚§ Kakrail ī‚§ Taltala ī‚§ Ulon ī‚§ Kawran Bazar ī‚§ Ramna CL-8 ī‚§ Tejgaon ī‚§ Jigatola ī‚§ Satmasjid ī‚§ Magbazar ī‚§ Madartek ī‚§ Lalgah Fort ī‚§ Zinzira CL-9 ī‚§ Kazla ī‚§ Narinda ī‚§ Saidabad ī‚§ Bangabhaban ī‚§ Kurmitully ī‚§ Gulshan ī‚§ Naubganj Siddhirganj LDC CL-3(3/3) ī‚§ Nayarhat ī‚§ Savar ī‚§ Mirpur Old ī‚§ Manikganj Old ī‚§ Manikganj ī‚ˇ Mirkadim ī‚ˇ Narayangnaj ī‚ˇ Madanganj ī‚ˇ Shuampur ī‚ˇ Hasnabad ī‚ˇ Postogola ī‚ˇ Srinagar DATABASE REMOTETERMINALUNIT ON OFF L1-S POWER SYSTEM (Process) SERVER COMMUNICATION MO DIGITAL INPUT CENTRALPROCESSING UNIT COMMUNICATION L1–S CONTROLSYSTEM DATABASE DIGITAL INPUT Central Processing Unit Database Modem Outstation Radio
  • 6. Application of SCADA for Controlling Electrical Power System Network 90 3. The master station receives data through microwave receiving antenna and later data are processed by RCS according to the status. The RCS of the master station collects all information regarding to switchgear operation of any substation. This information is processed cyclically, which is then sent to the application server. All information of the application server is stored in the database. The figure 3 shows the block diagram of the database system. The SCADA master station comprises a LAN network of a server and workstation comcomputers. The coordination between the LAN and the RTU is carried out through the communication network. The remote operation of the substation is performed by the work station pc according to the status of the single line diagram of that sub-station which is shown in the figure 4. The single line diagram generally shows the status of circuit breakers of any substation. The control room of the master station has overall single line diagram of the power system network of Dhaka city. The single line diagram visually indicates and displays the operation of circuit breaker, active line, system voltage, frequency and power factor [7, 8]. Fig.3. Block diagram of database system DATABASE REMOTE TERMINAL UNIT ON OFF L1-S POWER SYSTEM (Process) SERVER COMMUNICATION MODEM DIGITAL INPUT CENTRAL PROCESSING UNIT COMMUNICATION MODEM L1 – S CONTROL SYSTEM DATABASE
  • 7. UITS Journal Volume: 1 Issue: 2 ISSN: 2226-3128 91 Fig. 4. Single line diagram of substation 3. Operation of Electrical Network The daily operation and supervision is maintained by DPDC for overall operation of the electrical network. For proper operation, the coordination between the manual and remote operation of the overall system is required. Besides that the maintenance schedule plan of equipments is required for uninterrupted supply of electricity [12]. The tasks which are performed for daily network operation are mentioned below, ī‚ˇ Supervision of network conditions ī‚ˇ Switching and regulation of components ī‚ˇ Maintenance and servicing of equipment ī‚ˇ Preventive and corrective action against disturbances ī‚ˇ Co-ordination with other utilities ī‚ˇ Buying and selling electricity ī‚ˇ Planning of the daily work schedule ī‚ˇ Calculation, setting and testing of protection equipment. ī‚ˇ Electricity billing and customer service ī‚ˇ Employee administration ī‚ˇ System design, dimensioning of expansions ī‚ˇ System expansion projects ī‚ˇ Purchase and construction
  • 8. Application of SCADA for Controlling Electrical Power System Network 92 Fig. 5. On Screen Command Mode for Circuit Breaker Operation The daily operation and supervision is maintained by DPDC for overall operation of the electrical network. For proper operation, the coordination between the manual and remote operation of the overall system is required. Besides that the maintenance schedule plan of equipments is required for uninterrupted supply of electricity [12]. The tasks which are performed for daily network operation are mentioned below, ī‚ˇ Supervision of network conditions ī‚ˇ Switching and regulation of components ī‚ˇ Maintenance and servicing of equipment ī‚ˇ Preventive and corrective action against disturbances ī‚ˇ Co-ordination with other utilities ī‚ˇ Buying and selling electricity ī‚ˇ Planning of the daily work schedule ī‚ˇ Calculation, setting and testing of protection equipment. ī‚ˇ Electricity billing and customer service ī‚ˇ Employee administration ī‚ˇ System design, dimensioning of expansions ī‚ˇ System expansion projects ī‚ˇ Purchase and construction
  • 9. UITS Journal Volume: 1 Issue: 2 ISSN: 2226-3128 93 It is to be mentioned that the operation, control and monitoring of the overall system along with the managerial tasks are performed by HMI (Human-Machine Interface) or an HCI (Human-Computer Interface) with the help of SCADA system. Generally 132, 33 and 11 kV circuit breakers are operated remotely by using SCADA system [9]. Figure 5 shows the on screen command mode in the work station computer during circuit breaker operation of any substation. Some operational steps or commands are generally followed for circuit breaker operation which are mentioned below, ī‚ˇ The circuit breaker to be operated is selected from the on line application server. ī‚ˇ The remote control is not blocked. ī‚ˇ The breaker is marked as updated. ī‚ˇ Each breaker is connected with the RTU. ī‚ˇ Remote control authority for the action is established. ī‚ˇ Breaker is not controlled from any other work station. ī‚ˇ The interlocking of breaker must be in proper sequence. If any of these prerequisites is not met, a message box explains the present status of the circuit breaker. An alarm is also issued on a command sequence error. The error message can be seen in error message box and also in the event list. If no command acknowledgement is returned within a certain time, an alarm is issued. A circuit that needs to be operated is selected by using password and later the operator operates that by using workstation pc [11]. The overall operation of the power system network and intercommunication within the system is shown in figure 6. Figure 6: Power system operation
  • 10. Application of SCADA for Controlling Electrical Power System Network 94 A. Load Shedding Procedure In case of shortage of electricity generation according to the load demand, load shedding is required. The load shedding schedule is generally done according to the deficiency of the system power shortage. The circuit breakers on the 11 kV sides are operated according to the daily load shedding schedule [11]. Table1. Status of a Load Shedding Group Status Meaning of the Status Free This is the default status which means the load shed group is not used Execute The load shed group is executing Restore The load shed group is restoring Wait for execute return The load shed group is waiting for object return after restore Edit The load shed group is in edit mode. In this mode objects can be added or removed Set Execution is completed Return completed Return is completed The work station computer displays all available load shedding (LS) groups and their group status within the electrical network. The status of a LS group is mentioned in tabular form in table 1. The identities of the LS groups can be changed from the load shedding menu of the display in the workstation computer. Generally one load shedding group shows its status, restores delay and the time of the load shedding. A maximum of 50 load shedding groups exists at the same time but one LS group can be executed at any stipulated time according to the load shedding schedule. From edit mode of the display menu any object in a load shedding group can be added or deleted according to the system requirement. In order to add or delete an object (a line or breaker) from a LS group it is required to open a new WS400 (work station) window and then select that object from the corresponding single line diagram [1, 2, 7, 11]. B. Trend Curve, Tag and System Redundancy Trend curves are used for presenting voltage, current, power factor, frequency and daily system demand of any power system. SCADA software provides daily operational trend curve as well as pervious trend curves which is stored in the database of the server and can be retrieved according to the requirement [11].
  • 11. UITS Journal Volume: 1 Issue: 2 ISSN: 2226-3128 95 B. Tagging (Safety Document Function) TABLE 2. Priority, graphical symbol and meaning of tags The single line diagram is marked by using tags for proper operation and safety during operation. A tag is used to indicate the status of an object in the single line diagram. It is possible to set more than one tag on the same object. Only the tag with the highest priority is presented in the screen of the workstation computer. The table 2 represents the priority, graphical symbol and meaning of different tag. C. Tagging Fault Record and Event List The fault record generally keeps information about the fault while the even list keeps all information regarding fault and normal operation of any system. If a circuit breaker in a substation trips the fault record list records the tripping time of that breaker. However any change in voltage level and current level, circuit breaker on and off etc are recorded in the event list. The event list also provides information regarding to the system fault. C. Data Security and Redundancy The SPIDER software is used by the SCADA system of DPDC which is installed by ABB, Sweden. Data security and redundancy are realized on several levels in the SPIDER concept. The system will automatically take the suitable input for processing from one of two redundant inputs. Though the RTUs of DPDC system is not configured for data redundancy however it is possible to have redundant RTU in SPIDER configuration. The communication servers are commonly found in pairs where they share the system from the connected RTU lines. The switch over between lines is done by connecting each RTU line through a line splitting board in communication server pair. If a failure occurs in one board, a switch over is initiated and the new on-line board continues to communication with the system. The system configuration by SPIDER for electricity network is shown in figure 7. Priority Text Graphics symbol Meaning 1 PtW P Permit to work 2 Sf T S Sanction for test 3 LoA A Limitation of access 4 LLW W Live line work certificate
  • 12. Application of SCADA for Controlling Electrical Power System Network 96 Fig. 7. Designed system configuration by SPIDER The degree of reliability of operation depends on the application which is executing the server. The switch over of a redundant server pair is performed within 10 seconds without any loss of data. All non-empty message queues are restarted from the not treated message in the new line server after a switch over. By defining the sequence for database update, a full security for data loss during switch over can be achieved. There is a back up console in the SCADA system which automatically takes over the responsibility if one HMI or HCI server fails [4].All updated data is secured in the database of an application server. But database security is not sufficient for temporarily stored data in message queues during power failure. Therefore SPIDER saves the current status of the massage queues in the stand by computers. All non empty massage queues are restarted from the non treated massage in the new on line server after a switch over. By defining the sequence of database update, massage sent and massage treated, a full security for data loss during the switch over is achieved [7, 10]. 4. Conclusion The SCADA system helps in monitoring and controlling of the overall electricity network of Dhaka city which provides uninterrupted electricity supply to the consumer. It keeps record of the system operation which is helpful for getting a clear picture of the overall status of the system. Since the status of the overall system network can be understood within few seconds, the daily load demand can determine according to the requirement. The application of SCADA has simplified the managing of the electricity network of Dhaka city with minimum human interference. From this study it can be said that in order to improve the
  • 13. UITS Journal Volume: 1 Issue: 2 ISSN: 2226-3128 97 overall system performance, reliability and stability it is necessary to implement the SCADA system for controlling the whole electricity network of Bangladesh. The manual operation of power system in Bangladesh requires huge manpower which increases the overall system cost. Moreover quick decision making becomes difficult in manual system during system failure or unbalanced situation. For proper operation, control and monitoring of the overall power system of Bangladesh it is necessary to implement the SCADA system. References [1] D. Baiely and E. Wright, Practical SCADA for Industry, Third Edition, 2003. G and GM Publishing Co., USA, pp. 51-65, 120-130 [2] W. T. Shaw, Cyber Security for SCADA Systems, Second Edition, 2006, McGraw- HillPublishing Company Limited, USA, pp. 35-50, 66-80, 100-105 [3] Hadi Saadat., Power System Analysis, 1999, Tada McGraw-Hill Publishing Company Limited, p.p. 78-85, 212-250 [4] I. McKenzie Smith. Hughes, Electrical Technology, Seventh Edition, 1993, Tada McGraw-Hill Publishing Company Limited, pp. 65-80, 95-105 [5] Salivahanan, S.Suresh, N., and Vallavaraj, A., Electronic Devices and Circuit, Fourth Edition, Tada Seventh Edition, 2000, McGraw-Hill Publishing Company Limited, USA, pp. 70-90, 187, 200-300 [6] Floyed, T., Electronic Devices, Fourth Edition, 1996, Prentice Hall International, Inc, pp. 40-85, 95-150 [7] J. D. Glover, M.S. Sharma and T.J. Overbye, Power System Analaysis and Design, Fourth Edition, 2008, Thomson Learning, Thomson Corporation, USA, pp. 60- 85, 120-150, 210-300 [8] J. J. Grainger and W. D. Stevenson, Power System Analysis, International Edition, 1994,McGraw-Hill Book Co., Singapore, pp. 105-180,350-400, 512-516 [9] W. D. Stevenson, Elements of Power System Analysis, International Edition, 1994, MacGraw Hill Book Co., Singapore, pp. 45-60, 90-120, 220-250 [10] R. H. Miller, Power System Operation, Sixth Edition, 1994 Prentice-Hall Inc, India, pp. 50-80, 95-120 [11] Operational manual of SCADA system, ABB network partner, 1998, ABB, Sweden, pp. 22-50, 60-85 [12] Official Website of Dhaka Power Distribution Company Limited, Dhaka, Bangladesh, http://www.dpdc.org.bd.