SlideShare a Scribd company logo
1 of 10
RESUME
1. Personal Bio data
(I) Name -Suresh Kumar Bhikam Chand
(II) E-mail ID - sureshb_fasttrack@yahoo.com; suresh.kumar141010@gmail.com
(III) Skype ID -sureshkb21
(III) Current Telephone - +00-91-9969302703 (India)
(IV) Father’s Name – Bhikam Chand
(V) Date of Birth- 18/03/1968
(VI) Place of birth- Ajmer (Rajasthan)
(VII) Nationality - Indian
(VIII) Permanent Resident - Ajmer (Rajasthan)
(IX) Current location- Mumbai & Hyderabad (India)
(X) Total Experience – 27 years +
(XI) Notice Period – ASAP
(XII) Key Experience
– High Speed Railway Design Coordination, Design Proof Checking, Construction and Maintenance,
- MRTS/Metro Track Design Coordination, Ballastlees Track Construction, Operation & Maintenance.
- Construction and Maintenance of Ballasted Track & Ballastless slab track, Ballastless track laid on RCC
plinth, embedded track, Metro car depot works.
- Conversant with Indian Railway UIC, DIN, FIDIC, EU, Network Rail UK, AREMA Standards,
Specification and Norms for High Speed Railways & Metro Rail System.
2. Educational and professional qualification
(I) PMP PDU Certification, year 2011
(II) ISO-9001 QMS and Documentation, year 2011
(III) Associate Member Institution of Permanent Way Engineers IPWE (INDIA) Government of India,
Ministry of Railways /Affiliate of Institution of Engineers, INDIA (Passing Year 2010)
RESUME
(IV) Diploma in Railway Engineering and Management from Institution of Permanent Way Engineers
IPWE (INDIA) Passing Year 2007
Government of India, Ministry of Railways with following subjects
a) Railway Civil Engineering
b) Railway Rolling Stock &Mechanical Engineering
c) Railway Electrical Engineering
d) Railway Signaling Telecommunication
e) Railway HR Management
f) Railway Financial Management
g) Railway Marketing and Sales Management
h) Railway Material Management
i) Railway Disaster Management
j) Railway Transportation Management
k) Railway General Administration
l) Railway Commercial Management
m) Railway Operational Management
n) Design, Construction, Maintenance and Operation of Railways
(V) T.D.C. (Science) with Physics, Chemistry & Mathematics, Passing Year 1988
(VI) Project Management Professional PDU Certification from Efficacy IT 2011
(VIII) First Aid Training From Saint John Mumbai year 2011
(IX) Documentation QMS Training ISO-9001:2008 year 2011
(X) 60 Days Training In Advance Track Maintenance & Construction, Civil, Accounts, Operation,
Establishment & Stores From Zonal Training Institute, Udaipur, Indian Railways
(XI) One Year Initial Training In Track From Zonal Training Institute Udaipur Indian Railways,
(XII) 3 Months Advance Track Maintenance Training For Track Work From Zonal Training Institute
Udaipur Indian Railways,
(XIII) 4 Session Of Training 45 Days Each ( Total 180 Days) In The Year 1995 & 2007In Railway
Engineering, Civil Engineering, Accounts, Stores, Establishment And Management at Mumbai
Division Indian Railways
(XIV) 2 Days Special Training For Presenting Officer/Public Prosecution In Vigilance/CVC Cases At
Mumbai CST, Indian Railways
(XV) 1 Week Training In Vigilance Management By Ministry of Railways, at Railway Board, New
Delhi, Indian Railways
3. IT skills
(I) MS-office Basics
4. Experience (27years+) in descending order from current to previous positions
(I) General Manger - Railway Projects (From June 2016 to till date)
Sri SCL INFRATECH LIMITED, Hyderabad, India (Leading EPC Company for Railway Projects)
Client – RVNL, Indian Railways, www.rvnl.org
RESUME
Current Projects in Progress- Construction on New High Speed Lines between Haridaspur – Paradip
Port 50 Km New Line Project (Project Cost 1370 Million INR), Vijayawada- Motur New Line Project 52 KM
(Project Cost – 3930 Million INR), Bhimavaram- Nidadvole New Line Project 50 KM (Project Cost- 3200
Million INR)
JOB DESCRIPTION
Head of Overall Planning, Management and Operation of projects for Construction of New High Speed
Railway Lines covering the complete design, procurement, construction, testing and commissioning
phases comprising earthwork, bridge & structures, buildings & stations, power supply, general electrical
works, traction power distribution, over head traction equipments, SCADA works, telecommunication and
signaling works, Bidding & Contract Management, Business Development, Interface& System Integration
management, Testing & Commissioning, Operation and Maintenance.
(II) Corporate Head - Track Works & Alignment, Railway & Metro (From April 2016 to June 2016)
BALAJI RAILROAD SYSTEM LIMITED, HYDERABD, India, www.barsyl.in
High Speed Railway & Metro Track Works Design Coordination, Track Work Construction & Project
Management Consultancy, General Consultancy, Construction Supervision, Interface & Integration
Management, Testing & Commissioning, Operation Maintenance, Preparation of Feasibility Reports,
Detailed Project Reports, Independent Checking Engineer, Preliminary Design, Option Development,
Detailed Engineering, Detailed Design, AFC and Shop Drawings, Bidding & Contract Management,
Business Development, Interface& System Integration management, Testing & Commissioning,
Operation and Maintenance for Railway & Metro Projects.
Client: Indian Metro Rail Projects & Indian Railway Projects
(III) Independent Senior Track Works (P. Way) Expert Railway & Metro (Nov 2015-April 2016)
High Speed Railway & Metro Track Works Design Coordination, Construction & Project Management,
Interface & Integration Management, Testing & Commissioning, Operation & Maintenance
Client: Indian Railways & Metro Rail Corporations for High Speed Projects & Metro Rail Projects
(IV) PMO Manager (Railway & Metro) – (April 2015 to November 2015)
Railways, Metro and High Speed Rail Project upto 250 Kmph Speed (Express CTW320 Project governed
by UIC and AREMA Norms in ) Portfolio, Program and Project Management Maturity Model Framework
and CA Clarity Project Project Management, Bid Documentation For Railway and Metro Sector,
PM Partners Group & P3M Global MENA Riyadh @ Winchester, United Kingdom
www.p3mglobal.com
Client- SAR (Saudi Arabian Railways, Kingdom of Saudi Arabia) Express CTW320 Project
AICC, Riyadh (Al- Ayuni Investment & Contracting Company)
www.alayuni.com, www.expressctw320.com
RESUME
JOB DESCRIPTION
PMO Manager of Railway & Metro sector for Express CTW320 Project (Waad Al Shamal Railway Project
FIDIC, UIC, EU and AREMA Governed Project of Contract Value about 700 Million SAR) The CTW320
Project comprises the construction of Buildings, Civil, and Track works. It comprise of finished rail works
of approximately 192 kilometers traversing the remote desert of Al Jalamid to Waad Al Shamaal in Turaif,
Saudi Arabia. Further the Project comprises of 8 Nos. of Buildings, 56 Nos. of Culverts, 1 no. Bridge, 5
Nos. Camel Crossings. The Track Works totaling 192 Kilometers will require 320,000 Pre-cast sleepers,
359,040m3 of Ballast, and 76 Nos. of Turnouts.
PM Process Preparation & Implementation and Governance, Planning, Scheduling, Execution,
Monitoring, Control and Portfolio Program and Project Management for Construction of 250 KMPH Speed
192 KM Long New Railway System of 1435mm gauge and 32.4 Tones Axle Load.
Preparation of PM Manual, PMO Manual, Process Description, Method Statements, Standard Operating
Procedures, Templates, Matrices and Reporting Registers and Formats, CA Clarity in Performance
Reporting, Matrices and Project Dashboards, Preparation of Technical Documents for Bidding.
Preparation of Project Monthly Review Presentation & Organizing the Monthly PMR Meeting with CEO &
COO & Top Management.
Business Development Planning for Railway & Metro Sector and Technical Support to Project Team in
Organizing Track Design.
Checking and Review of: Baseline Schedule , WBS level or Summary level and detailed
baseline schedule, Schedule with Complete resource loading and further preparation of recovery
schedules, budgeting in liaison with Finance Department, Monitoring the progress of work with reference
to the approved baseline, Weekly or Monthly progress reports with respect to cash flow, Percentage and
actual resource utilization against budgeted resources, S curve and histogram to check monthly budgeted
and cumulative budgeted cost and units, Earned Value Analysis in order to check whether work is behind
or ahead of schedule and total estimate to complete remaining work, Updating of Schedule as per actual
progress, Prediction of possible risks involved in a project, their mitigation and analyzing their impact on
C, T, Q, Attending internal meetings to brief higher management about progress of work, In case of
deviation fix the responsibility and sort out the reason of delay, Claiming of EOT in case of delay and
subsequently revising the baseline schedule with entitled EOT.
(V) General Manager & Team Lead / Track Design & Project Management
CES- JACOBS Engineering Group Inc. USA Mumbai (Since April 2012 to 10October 2014)
www.jacobs.com
Client- Network Rail (UK)
Foreign Project Work Experience: May 2014 to July 2014 JACOBS UK, Derby Office
Network Rail UK, LNE Route GRIP 4, Track Design Coordination, Support and Compliance Checking
JOB DESCRIPTION–
Rail Track System Design Coordination & Support to the Track, Signaling and OLE Team as per UK, UIC,
EU, AREMA Standards, Project Planning &Team Building, Business Development for New Design,
General Consultancy, Independent Checking and Project Management Consultancy of Railway & Metro
Projects, Preparation of Design Documents & Forms like Form A, B, C, Gauging Evaluation Reports,
RESUME
Hazard Elimination & Risk reduction Forms, Preparation of Weekly Agenda of Meeting with Client/UK
Team, Checking Compliance of Checking Comments Received from Client, Preparation of Monthly and
Weekly Status Reports for the ongoing Projects.
Mentoring and Support to team in Horizontal and Vertical design of track, design of switches and crossing
and allied track components and features and coordination to signaling and OHE/OLE design team
(VI) Project Coordinator/ Track Installation (Since April 2011 to March 2012)
VNC- Rail One (Germany) VAG Corridor MRTS (Mumbai Metro Rail Project Governed by FIDIC, EU,
UIC, AREMA and DIN Standards & Specification)
Project Cost 23560 Million INR
www.vijaynirman.com, www.railone.com
- Overall planning for execution of Track work of Standard Gauge line with slab track DFF &
Vossloh 336 System ( Ballast less & Ballasted) Mumbai Metro Line1 ( 11.7 Km)
- Flash butt welding of rail panels over viaduct and at base depot
- Check on work of survey & setting out of route alignment and profile levels & gradients
- Check on setting out of vertical and horizontal curves
- Coordination with design team of PB- SYSTRA
- Attending meetings with higher management, client & EPMC on project planning, monitoring and
control & review
- Interface and coordination with Traction of ABB and Signaling team of SIEMENS & Operation
team & managing vendors teams and arrangement & planning of resources
- Preparation of method statement for system of working
- Monitoring quality control team
- Preparation of O & M Manual and other documents
- Coordination in design and supply of track components
- Resolution of all the external environment factors & change management in project
- Training to team on technical aspects of Track
(VII) Manger & Head of Division (Operation & Maintenance -Track and Civil)
Metro One Operation Private Limited an ISO-9001:2008 (Since 28th Sep 2010 to 15th April 2011)
Mumbai Metro Rail Project Governed by FIDIC, EU, UIC, AREMA and DIN Standards &
Specification
Project Cost 23560 Million INR
www.veolia-transport.com, www.raptdev.com
Joint Venture of Reliance ADA Group and Veolia Transport, France& RATP Paris
JOB DESCRIPTION-
Operation &Maintenance planning and Management of Track System ( Ballastless & Ballasted) & Civil
infrastructures ( Station, Buildings, Car Depot, Viaduct, Road Crossing, RCC track plinth, embedded
track, pit lines, wash plants, blow down plant, water supply, drainage)
- Preparation of General Rules for Track, Buildings & Civil Infrastructures
- Preparation of Maintenance Modules for Track, Buildings & Civil Infrastructures
RESUME
- Preparation of Maintenance Management Plan Track, Buildings & Civil Infrastructures
- Preparation of SOPs (Inspection, Maintenance, Safety, Interface, Etc.)Track, Buildings & Civil
Infrastructures and Other Divisions
- Preparation of Maintenance Modules for Track, Buildings & Civil Infrastructures
- Preparation of KRA & KPI for Track, Buildings & Civil Infrastructures
- Preparation of Maintenance Manuals for Track, Buildings & Civil Infrastructures
- Preparation of Training Modules for Track, Buildings & Civil Infrastructures
- Preparation of Interface Documents for Rolling Stock, Signaling, PST & EM, IT and Operation
- Preparation of O & M Budget for Track, Buildings & Civil Infrastructures
- Attending Track & Civil Work Progress Meetings with MMOPL
- Attending Interface Meetings with PST and S&T Works With MMOPL
(VIII) (2010-2006) In INDIAN RAILWAYS www.indianrailways.gov.in
As a Senior Section Engineer (P. Way) in Quality Audit (Track work Projects/Construction &
Maintenance)
JOB DESCRIPTION
a) Quality control & audits in Railway Civil infrastructures projects which includes-buildings, roads,
railway tracks, bridges, other structures and water supply sanitation, land acquisition and
management and conversion and development of land
(Design,planning,estimation,contracts,supply,procurement,execution,testing,commissioning and
operation.
b) Quality control & audits in Railway Electrical infrastructures- distribution, transmission, electro-
mechanical, general services, auxiliary supply, railway electrification and air conditioning(supply,
testing, installation, commissioning and operation and maintenance)
c) Quality control & audits in Railway Rolling Stock &Mechanical infrastructures-machine and plants
(production, procurement, testing, installation, operation and maintenance)
d) Quality control & audits in Railway Signal, Telecommunication and electronics-power supply,
optical Fiber cables, relay and interlocking, micro wave, 4 wire communication, electronic
exchange (supply, installation, testing, construction and maintenance)
e) Quality control & audits in Railway HR management-manpower planning and recruitment and
labor laws, industrial relations, classification of services
f) Quality control & audits in Railway Financial management-budget planning, budget reviews,
audits
g) Quality control & audits in Railway Marketing and sales-management and audits on revenue
generation and business development
h) Quality control & audits in Railway Material management-indenting, tendering, supply, testing,
charging, charging off, Material and stores control, warehousing, issue and receipt, transfer and
disposal of scraps
i) Quality control & audits in Railway Disaster Management system
j) Quality control & audits in Railway Transportation management(planning, construction and
operation and maintenance)
k) Quality control & audits in Track and Civil Works, HR, Finance, Stores, Operation and Other
Technical Check over Construction and Maintenance Works
RESUME
(IX) (2006-1996) As Section Engineer/P. Way (Track construction and Maintenance) INDIAN
RAILWAYS
JOB Description
a) Railway project Planning and land management
b) Railway Surveys and river training and protection work
c) Design& construction of Railway buildings, bridges, roads, railway tracks and other structures
d) Preparation of Railway project Drawing
e) Estimation and valuation for Railway projects
f) Execution and contract management of Railway projects
g) Railway Construction projects
h) Railway Maintenance projects
i) Railway project Administrative management(internal and external)
j) Railway Material Management
k) Railway Disaster Management
l) Railway Financial Management
m) Railway Industrial relation and labor laws
n) Railway Water supply and sanitation system
o) Railway Mining work ore exploration, crushing, testing and transportation
p) Project Experience in Construction, Inspection and Maintenance Works of Track and
Civil Works
i) Borivali to Virar Quadrupling project, new line construction (54 KMs)
ii) Virar to Vaitrna ABS Section Construction, new line construction (8 KMs)
iii) Vasai-Diva Doubling, new line construction (2 KMs)
iv) CTR and Heavy Track Renewal Works Mumbai Suburban Section (50 KMs)
iv) Earthwork, Drainages and Bridge Works
(X) (1993-1996) As a Junior Engineer (Track Maintenance & construction) INDIAN
RAILWAYS
JOB DESCRIPTION
 Planning of new projects
 Estimating and drawing of new projects
 Progress reviews of projects
 Monitoring of equipment failures
 Monitoring of efficiency in maintenance and operation
 Database programming and Management in Dos, dbase-III, fox pro, Word star 5.5,
COBOL, Lotus and AutoCAD
RESUME
(XI) (1993-1989) as a Junior Engineer/Track Maintenance & Construction INDIAN
RAILWAYS
JOB DESCRIPTION
 Collection of field data
 Supervision at end user maintenance and construction team
 Preparation of progress data
 Arrangement resources for site
 Working in damage control cell
 Making interface with different field teams
 Assisting seniors in day to day work
 Attending various foundation courses in Civil Engineering
Project Experience in Construction, Inspection and Maintenance Works of Track and Civil
Works
i) Mahim to Elphinston 5th Line Construction (5KMs)
ii) Bandra Terminus Construction Works station, yards & track work (10 Kms)
iii) Bandra to Andheri Harbour Lines construction (12 Kms)
(XII) (1989-1988) As a Maintainer in Signaling &Telecommunication INDIAN RAILWAYS
JOB DESCRIPTION
 Working in field with construction team
 Power cabling work and distribution system
 Communication cable laying work
 Working in electronics repair workshop
 Working in electronics exchange
 Working in micro wave stations
 Attending various trainings in electronics and communications.
SUMMARY OF OVER ALL DEPARTMENT WISE EXPERIENCE IN RAILWAY WORKS (27 years+)
a) TRACK WORKS:
Design, Construction, Inspection Of Ballasted And Ballast Less Track With Respect To Track
Parameters And Track Components ( Gauge, Twist, Alignment, Curvature( Horizontal And
Vertical Curves , Gradients), Turnouts, Cant, Longitudinal Level Of Track, Rail Wear, Corrosion,
Toe Load Of Track Fittings, Elasticity Of Track, Lubrication Of Rails And Track Components,
Ultrasonic Testing Of Rail And Welded Rails, Manual And Mechanized Maintenance Of Track By
Mechanical And Hydraulic Track Machine And By On Track Heavy Tie Tamping Machines Like
Ballast Cleaning Machine, Ballast Regulating Machines, Tie Tamping Machines, DTS Machines,
Alumino Thermit And Flash Butt Welding Of Rails, De Stressing Of Welded Rails, Mechanized
Laying Of Track And Turnout Plasser’s Quick Relaying System, Design And Surveying For New
Track Laying Including Earthwork In Bank And Cuttings, Tunnels, Bridge Work, Track Recording
By Oscillograph Monitoring System, Track Recording By Oscillograph Car, Calculation Of
Complete Track Record Index And Track Geometry Index Etc. I Have Executed All Type Of Track
RESUME
Works Including Design, Planning, Construction, Maintenance Of All Type Of Ballasted And
Ballast less Track.
b) BUILDING WORKS :
Design, Construction, Inspection And Maintenance Of Depot And Station Buildings With Respect
To House Keeping, Track Cleaning, Water Supply, Drainage And Sewage Disposal And Sewage
Treatment Work, Interior And Exterior Painting, Flooring Work, Repair To Leakage And Water
Proofing, Maintenance Doors, Windows, Furniture And Fixtures, Inspection And Maintenance Of
Steel Structures Roofs And Trusses, Horticulture, Gardening And Rail Water Harvesting, Water
Recycling, RCC Works, Road Works, Façade And Glazing Work, Exterior And Interior Decoration
Of Buildings, Pest Control Services And All Other Works On Inspection, Maintenance And
Construction Related To Industrial, Institutional And Residential Building Related To Railway
Industries Etc.
c) BRIDGE , UNDER PASSES & TUNNEL WORKS :
Design, Inspection, Construction & Maintenance Of Major And Minors Bridges & Tunnel Boring
Girder Launching & Construction of Under passes by Horizontal Directional Drilling method &
Hydraulic and Mechanical tunnel boring by Pushing Method, Laying of Under Ground Pipe lines
by HDD Method ,Elevated Viaduct, Piers, Pier Cap And Bearings, Structural Repair and
Launching of Steel Girder And RCC Bridges, Anti Corrosive Painting, Repair To Bed Blocks Of
Piers, Epoxy Grouting, Cement Pressure Grouting, Maintenance Of Viaduct Fencing And Crash
Barrier, Inspection And Maintenance Of Tunnels And Open Cut Etc.
d) ROLLING STOCK WORKS :
Inspection And Maintenance Of Wheel Set, Wheel Gauge, Wheel Diameter, Wheel Tread
Profile, Axle And Bearings, Suspension And Damping System, Braking System, Coupling And
Buffers, Bogie Rotation, Corrosion Repair, Sheet Metal Work, Denting, Periodic And Regular
Overhauling Of Rolling Stock Etc.
e) SIGNALING & TELECOMMUNICATION WORKS :
Inspection Of Track Circuits Insulated Rail Joints, Track Insulation And Isolation, AFTC,
Inspection And Maintenance Of Turn Outs And Diamond Crossings And Diamond With Slips And
Scissor Crossovers, Lubrication Of Switch Blades And Frogs Maintenance, Earth Leakage
Detection In Track Circuits, Measurement Of Voltage And Phase Angle In Track Circuits,
Maintenance Of Auxiliary Warning System, ATC, ATP And ATO Etc.
f) OVER HEAD CATENARY SYSTEM WORKS :
Inspection And Maintenance Of OCS Masts, Up Right And Booms, Staggers, Droppers,
Measurement Of Diameter Of OCS Contact Wire, Height And Centerline Of OCS System,
Traction Return Bonds Through Rails, Cross Bonds And Jumpers Etc.
g) OPERATION AND SAFETY WORKS :
Preparation Of Working Time Tables Of Trains, Operational Control From OCC, Station Working
Rules, Imposition Of Permanent And Temporary Speed Restrictions, Regulation And Diversion Of
Trains In Degraded Mode, Convoy Operation, Analysis Of Speed, Simulation, Coasting,
Punctuality, Safety And Equipment Failures, Investigation Of Equipment Failures And
Derailments And Coordinating To Maintenance Works In Non-Revenue Hours, Granting And
Cancellation Of Track Possessions, Restoration Of Services In Case Of Emergencies
h) GENERAL ADMINISTRATIVE WORKS( HR, FINANCE & ADMINISTRATION) :
Preparation Of Objectives And Management Plan Of Organization, Recruitment, Selection,
Training And Medical Examinations Of Subordinate Employees, Maintaining Data Of Staff Duty,
Salary And Allowances, Statutory Inspection Of Government Bodies, Industrial Safety, Labor
Laws, Environment, Health And Safety, Preparation Of Maintenance Modules, Maintenance And
Operation Plans, Manuals, General Rules, Standard Operating Procedures, Training Modules,
Preparation Of Operation And Maintenance Budget, Budget Reviews, Budget Audits, Allocation
And Appropriation Of Funds, Cost Efficiency, Monitoring & Review Of Sales And Marketing Data ,
Commercial Advertising, Generating Of Sundry Revenues, Coordinating To External Agencies,
Vendor Selection And Appointment Of Vendors For Supply, Services And Maintenance.
i) STORES WORKS :
Classification Of Stores, Calculation And Analysis Of Indents, Fixing Criteria And Specification &
Rate Analysis Of Stores Items To Be Procured/Purchase, Testing Of Material Procured And
RESUME
Purchased, Warehousing And Transportation Of Material, Issue And Charging And Monitoring Of
Material, Tools, Plants And Consumables, Audit And Stock Verification Tools, Plant,
Consumables, Disposal Of Surplus, Outdated And Scrap Material
j) PROJECT MANAGEMENT
- Project Integration Management
- Project Scope Management
- Project Time Management
- Project Cost Management
- Project Quality Management
- Project Human Resource Management
- Project Communication Management
- Project Risk Management
- Project Procurement Management
k) CONTRACT MANAGEMENT
- Basics of Contracts
- Tendering Process
- Condition of Contract
- Consideration of Tenders
- Contract Administration in Execution of Work
- Dispute Management in Contracts
- Use of Computers in Contract Management
- Vigilance in Contracts
- Arbitration in Contracts
l) ENVIRONMENT, HEALTH & SAFETY MANAGEMENT
- Plan & Implement Safety of Personals
- Safety of System and Installation
- Safety of Surrounding
- Pollution Control
- Noise Control
- Energy Efficiency
- Effective Utilization of Resources
- Conservation of Resources
- Recycling of Material
- Environment Protection
m) HR MANAGEMENT
- Recruiting and Staffing
- Organizational and Scope Planning
- Performance Management and Improvement Systems
- Organization Development
- Employment and Compliance to Regulatory Concerned
- Employee Orientation, Development and Training
- Policy Development and Documentation
- Employee Relations
- Company –Wide Committee Facilitation
- Company Employee and Community Communication
- Compensation and Benefit Administration
- Employee Safety, welfare, Wellness and Health
- Charitable Giving
- Employee Service and Counseling

More Related Content

What's hot

CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh FinalYogesh V.K
 
Narendra@working reliance CV
Narendra@working reliance CVNarendra@working reliance CV
Narendra@working reliance CVNARENDRA CHAROLA
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionBathla Tuition Centre
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniPrasad Kulkarni
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarGowrijayashankar S V
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEAKSHAY SHARMA
 
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...Bharat Badre
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Nandan Shandilya
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
RAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRavi D
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro projectAkshathaBhandary
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....Hossam Shafiq I
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptxBalpreetSingh47890
 
PAVEMENT DESIGN BY USING GEOTEXTILE
 PAVEMENT DESIGN BY USING GEOTEXTILE  PAVEMENT DESIGN BY USING GEOTEXTILE
PAVEMENT DESIGN BY USING GEOTEXTILE IAEME Publication
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 

What's hot (20)

CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh Final
 
Narendra@working reliance CV
Narendra@working reliance CVNarendra@working reliance CV
Narendra@working reliance CV
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUME
 
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
 
Instrument Technician CV
Instrument Technician CVInstrument Technician CV
Instrument Technician CV
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
.Chennai metro rail-2
.Chennai metro rail-2.Chennai metro rail-2
.Chennai metro rail-2
 
RAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument Technician
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro project
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptx
 
PAVEMENT DESIGN BY USING GEOTEXTILE
 PAVEMENT DESIGN BY USING GEOTEXTILE  PAVEMENT DESIGN BY USING GEOTEXTILE
PAVEMENT DESIGN BY USING GEOTEXTILE
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 

Viewers also liked

CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPsureshrenu1996
 
Effect of train operation on Rail,Paper Published and Presented National Tehn...
Effect of train operation on Rail,Paper Published and Presented National Tehn...Effect of train operation on Rail,Paper Published and Presented National Tehn...
Effect of train operation on Rail,Paper Published and Presented National Tehn...Qazi Mairaj Ahmad
 
RPS CV of Simon Hua
RPS CV of Simon HuaRPS CV of Simon Hua
RPS CV of Simon HuaSimon Hua
 

Viewers also liked (6)

CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 
LVS Varma
LVS VarmaLVS Varma
LVS Varma
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Effect of train operation on Rail,Paper Published and Presented National Tehn...
Effect of train operation on Rail,Paper Published and Presented National Tehn...Effect of train operation on Rail,Paper Published and Presented National Tehn...
Effect of train operation on Rail,Paper Published and Presented National Tehn...
 
RPS CV of Simon Hua
RPS CV of Simon HuaRPS CV of Simon Hua
RPS CV of Simon Hua
 
QA QC Engineer CV
QA QC Engineer CVQA QC Engineer CV
QA QC Engineer CV
 

Similar to CV Suresh44UIC

Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani TyagiAshwani Tyagi
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailIRJET Journal
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet TrainIRJET Journal
 
QRTS Corporate Presentation V2.pptx
QRTS Corporate Presentation V2.pptxQRTS Corporate Presentation V2.pptx
QRTS Corporate Presentation V2.pptxSaad Al Hassan
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction Manish Barwal
 
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_Ajay singh
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
RDSO training report -NAVIN DIXIT
RDSO training report -NAVIN DIXITRDSO training report -NAVIN DIXIT
RDSO training report -NAVIN DIXITNavin Dixit
 

Similar to CV Suresh44UIC (20)

Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
 
Kalindee Rail Nirman Engineers
Kalindee Rail Nirman EngineersKalindee Rail Nirman Engineers
Kalindee Rail Nirman Engineers
 
Vijay banga
Vijay banga Vijay banga
Vijay banga
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani Tyagi
 
Vijay banga
Vijay banga Vijay banga
Vijay banga
 
Resume
ResumeResume
Resume
 
Resume sk tyagi
Resume sk tyagiResume sk tyagi
Resume sk tyagi
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Resume
ResumeResume
Resume
 
Shibendra_Kumar_Patel.
Shibendra_Kumar_Patel.Shibendra_Kumar_Patel.
Shibendra_Kumar_Patel.
 
Indian railways
Indian railwaysIndian railways
Indian railways
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet Train
 
QRTS Corporate Presentation V2.pptx
QRTS Corporate Presentation V2.pptxQRTS Corporate Presentation V2.pptx
QRTS Corporate Presentation V2.pptx
 
Ravi_Shenker2014
Ravi_Shenker2014Ravi_Shenker2014
Ravi_Shenker2014
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction
 
USM-28-6-16
USM-28-6-16USM-28-6-16
USM-28-6-16
 
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
RDSO training report -NAVIN DIXIT
RDSO training report -NAVIN DIXITRDSO training report -NAVIN DIXIT
RDSO training report -NAVIN DIXIT
 
ToR
ToRToR
ToR
 

CV Suresh44UIC

  • 1. RESUME 1. Personal Bio data (I) Name -Suresh Kumar Bhikam Chand (II) E-mail ID - sureshb_fasttrack@yahoo.com; suresh.kumar141010@gmail.com (III) Skype ID -sureshkb21 (III) Current Telephone - +00-91-9969302703 (India) (IV) Father’s Name – Bhikam Chand (V) Date of Birth- 18/03/1968 (VI) Place of birth- Ajmer (Rajasthan) (VII) Nationality - Indian (VIII) Permanent Resident - Ajmer (Rajasthan) (IX) Current location- Mumbai & Hyderabad (India) (X) Total Experience – 27 years + (XI) Notice Period – ASAP (XII) Key Experience – High Speed Railway Design Coordination, Design Proof Checking, Construction and Maintenance, - MRTS/Metro Track Design Coordination, Ballastlees Track Construction, Operation & Maintenance. - Construction and Maintenance of Ballasted Track & Ballastless slab track, Ballastless track laid on RCC plinth, embedded track, Metro car depot works. - Conversant with Indian Railway UIC, DIN, FIDIC, EU, Network Rail UK, AREMA Standards, Specification and Norms for High Speed Railways & Metro Rail System. 2. Educational and professional qualification (I) PMP PDU Certification, year 2011 (II) ISO-9001 QMS and Documentation, year 2011 (III) Associate Member Institution of Permanent Way Engineers IPWE (INDIA) Government of India, Ministry of Railways /Affiliate of Institution of Engineers, INDIA (Passing Year 2010)
  • 2. RESUME (IV) Diploma in Railway Engineering and Management from Institution of Permanent Way Engineers IPWE (INDIA) Passing Year 2007 Government of India, Ministry of Railways with following subjects a) Railway Civil Engineering b) Railway Rolling Stock &Mechanical Engineering c) Railway Electrical Engineering d) Railway Signaling Telecommunication e) Railway HR Management f) Railway Financial Management g) Railway Marketing and Sales Management h) Railway Material Management i) Railway Disaster Management j) Railway Transportation Management k) Railway General Administration l) Railway Commercial Management m) Railway Operational Management n) Design, Construction, Maintenance and Operation of Railways (V) T.D.C. (Science) with Physics, Chemistry & Mathematics, Passing Year 1988 (VI) Project Management Professional PDU Certification from Efficacy IT 2011 (VIII) First Aid Training From Saint John Mumbai year 2011 (IX) Documentation QMS Training ISO-9001:2008 year 2011 (X) 60 Days Training In Advance Track Maintenance & Construction, Civil, Accounts, Operation, Establishment & Stores From Zonal Training Institute, Udaipur, Indian Railways (XI) One Year Initial Training In Track From Zonal Training Institute Udaipur Indian Railways, (XII) 3 Months Advance Track Maintenance Training For Track Work From Zonal Training Institute Udaipur Indian Railways, (XIII) 4 Session Of Training 45 Days Each ( Total 180 Days) In The Year 1995 & 2007In Railway Engineering, Civil Engineering, Accounts, Stores, Establishment And Management at Mumbai Division Indian Railways (XIV) 2 Days Special Training For Presenting Officer/Public Prosecution In Vigilance/CVC Cases At Mumbai CST, Indian Railways (XV) 1 Week Training In Vigilance Management By Ministry of Railways, at Railway Board, New Delhi, Indian Railways 3. IT skills (I) MS-office Basics 4. Experience (27years+) in descending order from current to previous positions (I) General Manger - Railway Projects (From June 2016 to till date) Sri SCL INFRATECH LIMITED, Hyderabad, India (Leading EPC Company for Railway Projects) Client – RVNL, Indian Railways, www.rvnl.org
  • 3. RESUME Current Projects in Progress- Construction on New High Speed Lines between Haridaspur – Paradip Port 50 Km New Line Project (Project Cost 1370 Million INR), Vijayawada- Motur New Line Project 52 KM (Project Cost – 3930 Million INR), Bhimavaram- Nidadvole New Line Project 50 KM (Project Cost- 3200 Million INR) JOB DESCRIPTION Head of Overall Planning, Management and Operation of projects for Construction of New High Speed Railway Lines covering the complete design, procurement, construction, testing and commissioning phases comprising earthwork, bridge & structures, buildings & stations, power supply, general electrical works, traction power distribution, over head traction equipments, SCADA works, telecommunication and signaling works, Bidding & Contract Management, Business Development, Interface& System Integration management, Testing & Commissioning, Operation and Maintenance. (II) Corporate Head - Track Works & Alignment, Railway & Metro (From April 2016 to June 2016) BALAJI RAILROAD SYSTEM LIMITED, HYDERABD, India, www.barsyl.in High Speed Railway & Metro Track Works Design Coordination, Track Work Construction & Project Management Consultancy, General Consultancy, Construction Supervision, Interface & Integration Management, Testing & Commissioning, Operation Maintenance, Preparation of Feasibility Reports, Detailed Project Reports, Independent Checking Engineer, Preliminary Design, Option Development, Detailed Engineering, Detailed Design, AFC and Shop Drawings, Bidding & Contract Management, Business Development, Interface& System Integration management, Testing & Commissioning, Operation and Maintenance for Railway & Metro Projects. Client: Indian Metro Rail Projects & Indian Railway Projects (III) Independent Senior Track Works (P. Way) Expert Railway & Metro (Nov 2015-April 2016) High Speed Railway & Metro Track Works Design Coordination, Construction & Project Management, Interface & Integration Management, Testing & Commissioning, Operation & Maintenance Client: Indian Railways & Metro Rail Corporations for High Speed Projects & Metro Rail Projects (IV) PMO Manager (Railway & Metro) – (April 2015 to November 2015) Railways, Metro and High Speed Rail Project upto 250 Kmph Speed (Express CTW320 Project governed by UIC and AREMA Norms in ) Portfolio, Program and Project Management Maturity Model Framework and CA Clarity Project Project Management, Bid Documentation For Railway and Metro Sector, PM Partners Group & P3M Global MENA Riyadh @ Winchester, United Kingdom www.p3mglobal.com Client- SAR (Saudi Arabian Railways, Kingdom of Saudi Arabia) Express CTW320 Project AICC, Riyadh (Al- Ayuni Investment & Contracting Company) www.alayuni.com, www.expressctw320.com
  • 4. RESUME JOB DESCRIPTION PMO Manager of Railway & Metro sector for Express CTW320 Project (Waad Al Shamal Railway Project FIDIC, UIC, EU and AREMA Governed Project of Contract Value about 700 Million SAR) The CTW320 Project comprises the construction of Buildings, Civil, and Track works. It comprise of finished rail works of approximately 192 kilometers traversing the remote desert of Al Jalamid to Waad Al Shamaal in Turaif, Saudi Arabia. Further the Project comprises of 8 Nos. of Buildings, 56 Nos. of Culverts, 1 no. Bridge, 5 Nos. Camel Crossings. The Track Works totaling 192 Kilometers will require 320,000 Pre-cast sleepers, 359,040m3 of Ballast, and 76 Nos. of Turnouts. PM Process Preparation & Implementation and Governance, Planning, Scheduling, Execution, Monitoring, Control and Portfolio Program and Project Management for Construction of 250 KMPH Speed 192 KM Long New Railway System of 1435mm gauge and 32.4 Tones Axle Load. Preparation of PM Manual, PMO Manual, Process Description, Method Statements, Standard Operating Procedures, Templates, Matrices and Reporting Registers and Formats, CA Clarity in Performance Reporting, Matrices and Project Dashboards, Preparation of Technical Documents for Bidding. Preparation of Project Monthly Review Presentation & Organizing the Monthly PMR Meeting with CEO & COO & Top Management. Business Development Planning for Railway & Metro Sector and Technical Support to Project Team in Organizing Track Design. Checking and Review of: Baseline Schedule , WBS level or Summary level and detailed baseline schedule, Schedule with Complete resource loading and further preparation of recovery schedules, budgeting in liaison with Finance Department, Monitoring the progress of work with reference to the approved baseline, Weekly or Monthly progress reports with respect to cash flow, Percentage and actual resource utilization against budgeted resources, S curve and histogram to check monthly budgeted and cumulative budgeted cost and units, Earned Value Analysis in order to check whether work is behind or ahead of schedule and total estimate to complete remaining work, Updating of Schedule as per actual progress, Prediction of possible risks involved in a project, their mitigation and analyzing their impact on C, T, Q, Attending internal meetings to brief higher management about progress of work, In case of deviation fix the responsibility and sort out the reason of delay, Claiming of EOT in case of delay and subsequently revising the baseline schedule with entitled EOT. (V) General Manager & Team Lead / Track Design & Project Management CES- JACOBS Engineering Group Inc. USA Mumbai (Since April 2012 to 10October 2014) www.jacobs.com Client- Network Rail (UK) Foreign Project Work Experience: May 2014 to July 2014 JACOBS UK, Derby Office Network Rail UK, LNE Route GRIP 4, Track Design Coordination, Support and Compliance Checking JOB DESCRIPTION– Rail Track System Design Coordination & Support to the Track, Signaling and OLE Team as per UK, UIC, EU, AREMA Standards, Project Planning &Team Building, Business Development for New Design, General Consultancy, Independent Checking and Project Management Consultancy of Railway & Metro Projects, Preparation of Design Documents & Forms like Form A, B, C, Gauging Evaluation Reports,
  • 5. RESUME Hazard Elimination & Risk reduction Forms, Preparation of Weekly Agenda of Meeting with Client/UK Team, Checking Compliance of Checking Comments Received from Client, Preparation of Monthly and Weekly Status Reports for the ongoing Projects. Mentoring and Support to team in Horizontal and Vertical design of track, design of switches and crossing and allied track components and features and coordination to signaling and OHE/OLE design team (VI) Project Coordinator/ Track Installation (Since April 2011 to March 2012) VNC- Rail One (Germany) VAG Corridor MRTS (Mumbai Metro Rail Project Governed by FIDIC, EU, UIC, AREMA and DIN Standards & Specification) Project Cost 23560 Million INR www.vijaynirman.com, www.railone.com - Overall planning for execution of Track work of Standard Gauge line with slab track DFF & Vossloh 336 System ( Ballast less & Ballasted) Mumbai Metro Line1 ( 11.7 Km) - Flash butt welding of rail panels over viaduct and at base depot - Check on work of survey & setting out of route alignment and profile levels & gradients - Check on setting out of vertical and horizontal curves - Coordination with design team of PB- SYSTRA - Attending meetings with higher management, client & EPMC on project planning, monitoring and control & review - Interface and coordination with Traction of ABB and Signaling team of SIEMENS & Operation team & managing vendors teams and arrangement & planning of resources - Preparation of method statement for system of working - Monitoring quality control team - Preparation of O & M Manual and other documents - Coordination in design and supply of track components - Resolution of all the external environment factors & change management in project - Training to team on technical aspects of Track (VII) Manger & Head of Division (Operation & Maintenance -Track and Civil) Metro One Operation Private Limited an ISO-9001:2008 (Since 28th Sep 2010 to 15th April 2011) Mumbai Metro Rail Project Governed by FIDIC, EU, UIC, AREMA and DIN Standards & Specification Project Cost 23560 Million INR www.veolia-transport.com, www.raptdev.com Joint Venture of Reliance ADA Group and Veolia Transport, France& RATP Paris JOB DESCRIPTION- Operation &Maintenance planning and Management of Track System ( Ballastless & Ballasted) & Civil infrastructures ( Station, Buildings, Car Depot, Viaduct, Road Crossing, RCC track plinth, embedded track, pit lines, wash plants, blow down plant, water supply, drainage) - Preparation of General Rules for Track, Buildings & Civil Infrastructures - Preparation of Maintenance Modules for Track, Buildings & Civil Infrastructures
  • 6. RESUME - Preparation of Maintenance Management Plan Track, Buildings & Civil Infrastructures - Preparation of SOPs (Inspection, Maintenance, Safety, Interface, Etc.)Track, Buildings & Civil Infrastructures and Other Divisions - Preparation of Maintenance Modules for Track, Buildings & Civil Infrastructures - Preparation of KRA & KPI for Track, Buildings & Civil Infrastructures - Preparation of Maintenance Manuals for Track, Buildings & Civil Infrastructures - Preparation of Training Modules for Track, Buildings & Civil Infrastructures - Preparation of Interface Documents for Rolling Stock, Signaling, PST & EM, IT and Operation - Preparation of O & M Budget for Track, Buildings & Civil Infrastructures - Attending Track & Civil Work Progress Meetings with MMOPL - Attending Interface Meetings with PST and S&T Works With MMOPL (VIII) (2010-2006) In INDIAN RAILWAYS www.indianrailways.gov.in As a Senior Section Engineer (P. Way) in Quality Audit (Track work Projects/Construction & Maintenance) JOB DESCRIPTION a) Quality control & audits in Railway Civil infrastructures projects which includes-buildings, roads, railway tracks, bridges, other structures and water supply sanitation, land acquisition and management and conversion and development of land (Design,planning,estimation,contracts,supply,procurement,execution,testing,commissioning and operation. b) Quality control & audits in Railway Electrical infrastructures- distribution, transmission, electro- mechanical, general services, auxiliary supply, railway electrification and air conditioning(supply, testing, installation, commissioning and operation and maintenance) c) Quality control & audits in Railway Rolling Stock &Mechanical infrastructures-machine and plants (production, procurement, testing, installation, operation and maintenance) d) Quality control & audits in Railway Signal, Telecommunication and electronics-power supply, optical Fiber cables, relay and interlocking, micro wave, 4 wire communication, electronic exchange (supply, installation, testing, construction and maintenance) e) Quality control & audits in Railway HR management-manpower planning and recruitment and labor laws, industrial relations, classification of services f) Quality control & audits in Railway Financial management-budget planning, budget reviews, audits g) Quality control & audits in Railway Marketing and sales-management and audits on revenue generation and business development h) Quality control & audits in Railway Material management-indenting, tendering, supply, testing, charging, charging off, Material and stores control, warehousing, issue and receipt, transfer and disposal of scraps i) Quality control & audits in Railway Disaster Management system j) Quality control & audits in Railway Transportation management(planning, construction and operation and maintenance) k) Quality control & audits in Track and Civil Works, HR, Finance, Stores, Operation and Other Technical Check over Construction and Maintenance Works
  • 7. RESUME (IX) (2006-1996) As Section Engineer/P. Way (Track construction and Maintenance) INDIAN RAILWAYS JOB Description a) Railway project Planning and land management b) Railway Surveys and river training and protection work c) Design& construction of Railway buildings, bridges, roads, railway tracks and other structures d) Preparation of Railway project Drawing e) Estimation and valuation for Railway projects f) Execution and contract management of Railway projects g) Railway Construction projects h) Railway Maintenance projects i) Railway project Administrative management(internal and external) j) Railway Material Management k) Railway Disaster Management l) Railway Financial Management m) Railway Industrial relation and labor laws n) Railway Water supply and sanitation system o) Railway Mining work ore exploration, crushing, testing and transportation p) Project Experience in Construction, Inspection and Maintenance Works of Track and Civil Works i) Borivali to Virar Quadrupling project, new line construction (54 KMs) ii) Virar to Vaitrna ABS Section Construction, new line construction (8 KMs) iii) Vasai-Diva Doubling, new line construction (2 KMs) iv) CTR and Heavy Track Renewal Works Mumbai Suburban Section (50 KMs) iv) Earthwork, Drainages and Bridge Works (X) (1993-1996) As a Junior Engineer (Track Maintenance & construction) INDIAN RAILWAYS JOB DESCRIPTION  Planning of new projects  Estimating and drawing of new projects  Progress reviews of projects  Monitoring of equipment failures  Monitoring of efficiency in maintenance and operation  Database programming and Management in Dos, dbase-III, fox pro, Word star 5.5, COBOL, Lotus and AutoCAD
  • 8. RESUME (XI) (1993-1989) as a Junior Engineer/Track Maintenance & Construction INDIAN RAILWAYS JOB DESCRIPTION  Collection of field data  Supervision at end user maintenance and construction team  Preparation of progress data  Arrangement resources for site  Working in damage control cell  Making interface with different field teams  Assisting seniors in day to day work  Attending various foundation courses in Civil Engineering Project Experience in Construction, Inspection and Maintenance Works of Track and Civil Works i) Mahim to Elphinston 5th Line Construction (5KMs) ii) Bandra Terminus Construction Works station, yards & track work (10 Kms) iii) Bandra to Andheri Harbour Lines construction (12 Kms) (XII) (1989-1988) As a Maintainer in Signaling &Telecommunication INDIAN RAILWAYS JOB DESCRIPTION  Working in field with construction team  Power cabling work and distribution system  Communication cable laying work  Working in electronics repair workshop  Working in electronics exchange  Working in micro wave stations  Attending various trainings in electronics and communications. SUMMARY OF OVER ALL DEPARTMENT WISE EXPERIENCE IN RAILWAY WORKS (27 years+) a) TRACK WORKS: Design, Construction, Inspection Of Ballasted And Ballast Less Track With Respect To Track Parameters And Track Components ( Gauge, Twist, Alignment, Curvature( Horizontal And Vertical Curves , Gradients), Turnouts, Cant, Longitudinal Level Of Track, Rail Wear, Corrosion, Toe Load Of Track Fittings, Elasticity Of Track, Lubrication Of Rails And Track Components, Ultrasonic Testing Of Rail And Welded Rails, Manual And Mechanized Maintenance Of Track By Mechanical And Hydraulic Track Machine And By On Track Heavy Tie Tamping Machines Like Ballast Cleaning Machine, Ballast Regulating Machines, Tie Tamping Machines, DTS Machines, Alumino Thermit And Flash Butt Welding Of Rails, De Stressing Of Welded Rails, Mechanized Laying Of Track And Turnout Plasser’s Quick Relaying System, Design And Surveying For New Track Laying Including Earthwork In Bank And Cuttings, Tunnels, Bridge Work, Track Recording By Oscillograph Monitoring System, Track Recording By Oscillograph Car, Calculation Of Complete Track Record Index And Track Geometry Index Etc. I Have Executed All Type Of Track
  • 9. RESUME Works Including Design, Planning, Construction, Maintenance Of All Type Of Ballasted And Ballast less Track. b) BUILDING WORKS : Design, Construction, Inspection And Maintenance Of Depot And Station Buildings With Respect To House Keeping, Track Cleaning, Water Supply, Drainage And Sewage Disposal And Sewage Treatment Work, Interior And Exterior Painting, Flooring Work, Repair To Leakage And Water Proofing, Maintenance Doors, Windows, Furniture And Fixtures, Inspection And Maintenance Of Steel Structures Roofs And Trusses, Horticulture, Gardening And Rail Water Harvesting, Water Recycling, RCC Works, Road Works, Façade And Glazing Work, Exterior And Interior Decoration Of Buildings, Pest Control Services And All Other Works On Inspection, Maintenance And Construction Related To Industrial, Institutional And Residential Building Related To Railway Industries Etc. c) BRIDGE , UNDER PASSES & TUNNEL WORKS : Design, Inspection, Construction & Maintenance Of Major And Minors Bridges & Tunnel Boring Girder Launching & Construction of Under passes by Horizontal Directional Drilling method & Hydraulic and Mechanical tunnel boring by Pushing Method, Laying of Under Ground Pipe lines by HDD Method ,Elevated Viaduct, Piers, Pier Cap And Bearings, Structural Repair and Launching of Steel Girder And RCC Bridges, Anti Corrosive Painting, Repair To Bed Blocks Of Piers, Epoxy Grouting, Cement Pressure Grouting, Maintenance Of Viaduct Fencing And Crash Barrier, Inspection And Maintenance Of Tunnels And Open Cut Etc. d) ROLLING STOCK WORKS : Inspection And Maintenance Of Wheel Set, Wheel Gauge, Wheel Diameter, Wheel Tread Profile, Axle And Bearings, Suspension And Damping System, Braking System, Coupling And Buffers, Bogie Rotation, Corrosion Repair, Sheet Metal Work, Denting, Periodic And Regular Overhauling Of Rolling Stock Etc. e) SIGNALING & TELECOMMUNICATION WORKS : Inspection Of Track Circuits Insulated Rail Joints, Track Insulation And Isolation, AFTC, Inspection And Maintenance Of Turn Outs And Diamond Crossings And Diamond With Slips And Scissor Crossovers, Lubrication Of Switch Blades And Frogs Maintenance, Earth Leakage Detection In Track Circuits, Measurement Of Voltage And Phase Angle In Track Circuits, Maintenance Of Auxiliary Warning System, ATC, ATP And ATO Etc. f) OVER HEAD CATENARY SYSTEM WORKS : Inspection And Maintenance Of OCS Masts, Up Right And Booms, Staggers, Droppers, Measurement Of Diameter Of OCS Contact Wire, Height And Centerline Of OCS System, Traction Return Bonds Through Rails, Cross Bonds And Jumpers Etc. g) OPERATION AND SAFETY WORKS : Preparation Of Working Time Tables Of Trains, Operational Control From OCC, Station Working Rules, Imposition Of Permanent And Temporary Speed Restrictions, Regulation And Diversion Of Trains In Degraded Mode, Convoy Operation, Analysis Of Speed, Simulation, Coasting, Punctuality, Safety And Equipment Failures, Investigation Of Equipment Failures And Derailments And Coordinating To Maintenance Works In Non-Revenue Hours, Granting And Cancellation Of Track Possessions, Restoration Of Services In Case Of Emergencies h) GENERAL ADMINISTRATIVE WORKS( HR, FINANCE & ADMINISTRATION) : Preparation Of Objectives And Management Plan Of Organization, Recruitment, Selection, Training And Medical Examinations Of Subordinate Employees, Maintaining Data Of Staff Duty, Salary And Allowances, Statutory Inspection Of Government Bodies, Industrial Safety, Labor Laws, Environment, Health And Safety, Preparation Of Maintenance Modules, Maintenance And Operation Plans, Manuals, General Rules, Standard Operating Procedures, Training Modules, Preparation Of Operation And Maintenance Budget, Budget Reviews, Budget Audits, Allocation And Appropriation Of Funds, Cost Efficiency, Monitoring & Review Of Sales And Marketing Data , Commercial Advertising, Generating Of Sundry Revenues, Coordinating To External Agencies, Vendor Selection And Appointment Of Vendors For Supply, Services And Maintenance. i) STORES WORKS : Classification Of Stores, Calculation And Analysis Of Indents, Fixing Criteria And Specification & Rate Analysis Of Stores Items To Be Procured/Purchase, Testing Of Material Procured And
  • 10. RESUME Purchased, Warehousing And Transportation Of Material, Issue And Charging And Monitoring Of Material, Tools, Plants And Consumables, Audit And Stock Verification Tools, Plant, Consumables, Disposal Of Surplus, Outdated And Scrap Material j) PROJECT MANAGEMENT - Project Integration Management - Project Scope Management - Project Time Management - Project Cost Management - Project Quality Management - Project Human Resource Management - Project Communication Management - Project Risk Management - Project Procurement Management k) CONTRACT MANAGEMENT - Basics of Contracts - Tendering Process - Condition of Contract - Consideration of Tenders - Contract Administration in Execution of Work - Dispute Management in Contracts - Use of Computers in Contract Management - Vigilance in Contracts - Arbitration in Contracts l) ENVIRONMENT, HEALTH & SAFETY MANAGEMENT - Plan & Implement Safety of Personals - Safety of System and Installation - Safety of Surrounding - Pollution Control - Noise Control - Energy Efficiency - Effective Utilization of Resources - Conservation of Resources - Recycling of Material - Environment Protection m) HR MANAGEMENT - Recruiting and Staffing - Organizational and Scope Planning - Performance Management and Improvement Systems - Organization Development - Employment and Compliance to Regulatory Concerned - Employee Orientation, Development and Training - Policy Development and Documentation - Employee Relations - Company –Wide Committee Facilitation - Company Employee and Community Communication - Compensation and Benefit Administration - Employee Safety, welfare, Wellness and Health - Charitable Giving - Employee Service and Counseling