SUMMARY
OBJECTIVE:- Senior Engineer/Site-In-Charge with 23+ years experience(including site
management and execution, finance planning and management, managing bills and payments of
subcontractors and vendors and quality and safety compliance) seeking relocation in India and
abroad.
FUNCTIONAL AREA:- High-rise (up to G+29) and multistoried residential and commercial
building projects (including club house, car park, podium/raised garden and shopping mall and project
infrastructure), Irrigation and water related projects (aqueduct, pump house, canal, STP, WTP/UGR,
cofferdam, causeway), roads and infrastructural projects(bitumen road, RCC drain, boundary wall,
sewer & water main line, electrical sub-station), bore pile, driven pile and pile cap and earth-moving
works.
SKILL SET:- Site planning,execution and management; planning,allocation and reconciliation of
resources;budget monitoring, site-financeplanningand optimum fund utilization:measurement of
works, bill preparation and verification; management of bills and payments of subcontractors and
vendors; quality and safety compliance;management of client,vendors, contractors and consultant;
preparation and submission of work-progress reportto superior.
___________________________________________________________________________________
BRIEF WORKHISTORY
A. High-rise, Multistoried buildings/Villas- 12 years.
B. Road & Infrastructure works-4 years.
C. Irrigation & water related structures-3 years 11 months.
D. PILING & PILE CAPS - 2 years 2 months.
E. STP, WTP/UGR, Sewer & Water pipeline network- 1 year
TOTAL EXPERIENCE:- 23 years 1 months (as on February, 2016).
(NOTE- Above statement is approximateas some of the projects were handled simultaneously)
___________________________________________________________________________________
CURRENT EMPLOYMENT
Dhrub Construction, Uttar Pradesh
Senior Engineer/Site-In-Charge
October, 2014 – present (1 year 5 months)
Project- Construction of AQUEDUCT ( atch.-14.59km) on Arjun feeder canal (site- Basaria village,
near Panwari) in Arjun Sahayak Pariyojna,under Mahoba division of dept. of Irrigation,Uttar Pradesh.
Consisting - RCC raft(1500-2000 mm thick), 2 nos. piers(1500 mm thick), 2 nos. abutments(2000 mm
thick), canal deck slab(900 mm thick), foot over-bridge, 4 wing walls each for canal & river, PCC
thrust blocks on u/s & d/s side of river and boulder pitching on river u/s & d/s side.
Achievements- Completed- 1. > 4900cum RCC in raft, piers,abutments.
2. >29000 cum earth cutting/filling for preparation of PCC block bed, canal bed etc and
3. >1300 nos. PCC blocks (1mx1mx1m) includingblock-laying–in about 300 working days (no work
for about 75 days due to shortage of cement & steel).
4. Worked as FinanceManager(simultaneously);responsibilities:-totalmanagement of site
finance including finance planning, optimum fund utilization and reconciliation; budget monitoring,
finance control, cost cutting, optimum utilization of resources; bill preparation and verification;
managing bills and payments of vendors and sub-contractors.
CURRENT SALARY- INR 6,00,000 per annum(CTC) plus free lodging,medical & accidental insurance
EXPECTED SALARY (minimum) - INR 6,50,000 per annum(in India) and INR 12,00,000(for abroad)
NOITICE PERIOD- 15 days
__________________________________________________________________________________
PREVIOUS EMPLOYMENTS
Citystar Infrastructure Ltd.
Senior Engineer/Site-In-Charge
April, 2011 - September, 2014 (3 years 5 months)
Projects-
1. Construction of multistoried buildings up to G+3 and Officers’ club complex (in IOCL,
Paradip, Odisha) – June, 2011-November, 2012 & June, 2013 - September, 2014
2. Construction of cofferdam and causeway over ‘SANTRA CREEK’ in IOCL, Paradip, Odisha -
June, 2011- November, 2012
3. Bore piles and pile caps in IOCL, Paradip, Odisha - July, 2011 - June, 2012
4. Profile making of national highway (Bhubaneshwar/Puri- part) – November, 2012 – June,
2013
5. Construction of pump house in Chillimal, Uttar Pradesh under dept. of Irrigation, Uttar
Pradesh - April, 2011- June, 2011
Achievements- 1.Completed works worth > INR 280 million alongwith sitemanagement,
resourcemanagement, financecontrol,billingand quality & safety compliance.
2. Worked as FinanceManager(simultaneously);responsibilities:- totalmanagement of site
finance including finance planning, optimum fund utilization and reconciliation; budget monitoring,
finance control, cost cutting and optimum utilization of resources; managing bills and payments of
vendors and subcontractors; bill preparation and verification; procurement of payment.
__________________________________________________________________________
Keppel-Magus Development Pvt. Ltd., Kolkata
(jointventure between KEPPEL LAND of Singapore and JATIA GROUP of India)
Senior Engineer
August, 2007- March, 2011 (3 years 8 months)
Project- Ellita Garden Vista (New Town, Kolkata)High rise residential building project Consisting -
15 nos. residential apartment blocks (G+14 to G+29), one club house, RCC covered car park(at GL),
raised garden/podium above car park of 29000sqm area, shopping mall and project infrastructure
works.
Achievements- Completed:- 1.construction of model flat
2. Property survey, block layout and pile-point layout with surveyors
3.>1450 nos. driven cast-in-situ RCC piles, >255 nos. pile caps (1 pileto 56 piles),
4. Grade slab of 4 blocks, RCC structure, brickwork and finishingof one G+24 block (jointly with
another engineer)
5. (i)>250nos. RCC piles & 36 nos. RCC columns in CLUB HOUSE.
(ii)>750nos.RCC columns foundations, > 840nos. RCC columns (300x500),> 95000m long RCC
tie-beam(300x600),aprox.29000sq m RCC slab(200 thick) & aprox.7500m long1-1.2m high RCC wall
in CAR-PARK & PODIUM.
(iii) Totalquantity of RCC > 26,000cum
- Completed the whole work in (aprox.) 480 working days
6. (i)>2.5km of RCC drain (600mmx600mm) and
(ii)>1.5 km of boundary wall in about 100 working days
(iii) >2.0km of road profile consisting- box cutting(of earth), sand filling,doublelayer B.F.S & WBM in
aprox.65 workingdays
7. civil works of 4 nos. electrical sub-station
8. RCC structureof 3nos. UGR/WTP (-40,000 lit.water storagetank+ filtration plant,pumps etc. in two
adjoining chambers at 8.50m below G.L and 1no. STP ( -80,000 lit. sludge storage tank+ filtration plant,
pump etc. in two adjoiningchambers at8.0m below G.L)
9.layingof-(I)>2.0 km swear main line (600mm dia.HDPE Main linewith 200/300mm dia.HDPE
Branch lines) alongwith manholes;and (ii)>1.5km water main line
10. total > 46000 cum RCC in 3 years 8 months and all other works as mentioned above; total bill
generated > Rs.56,00,00000
11. worked as Deputy Quality-In-charge time to time
12. provided technical and practical inputs for cost-cutting resulting saving of >INR 25 millions.
___________________________________________________________________________________
Pradip Construction,Durgapur,WestBengal
Site Engineer
January, 2002 - February, 2007 (5 years 1 months)
Projects- residential,commercial & industrial constructions
Achievements- Completed:- 1. Numerous residential,commercial and industrial construction
works includingQS & billing.
2. Construction of several residential and commercial buildings.
3. Systemized construction procedure, billingand material reconciliation.
4. Total billed amount of completed works >Rs.12,50,00000.
___________________________________________________________________________________
Durgapur Municipal Corporation, WestBengal
Licensed building planner and Estimator
April, 1993-March – 2001 (8 years)
Project- Preparation and (getting) approval of plans & estimates of multistoried buildings and villas
and supervision of construction works.
Achievements-1.Completed plans of >180 nos. residential, > 25nos. commercial & 5 nos.
industrial buildings and one stadium includingapproval.
2. Prepared cost& material estimateof all abovementioned works
3. Supervised construction of all abovementioned works
___________________________________________________________________________________
Chandak Engineering Works,Durgapur,WestBengal
Site Engineer
February, 1991-August, 1991 (6 months)
Project- Earth-moving works in 220kv/400kv sub-station under NTPC (Mithan TL) and Haldia
Petrochemical Ltd.
Achievements- 1. Completed works valued > Rs.2,50,00000 includingoverall supervision of
works; planning,deployment & controllingall machineries,consumables and manpower; survey
works; soil testing& billing.
2. Provided technical help in preparation of tender-quotation, negotiated contractand disputes in
works several times.
Dept. of Irrigation & Waterways, Govt.of West Bengal
Trainee Apprenticeship Engineer
September, 1989 -September, 1990 (1year)
Project- Trainingin differentirrigation structures and systems
Achievements- 1. Supervised construction of PCC canal lining of RBMC & LBMC of Durgapur
Barrage.
2. Prepared daily reportof water intakeand outflow of differentirrigation structures.
3. Getting familiarized with different irrigation structures by visitingtheseseveral times with
superiors.
___________________________________________________________________________________
PERSONAL INFORMATION
EDUCATION
1. Diploma in Civil Engineering from State Council for Engineering and Technical Education, Govt. of
West Bengal (1984-1987) with 75%.
2. Higher Secondary Certificate (12th standard science) from West Bengal Council for Higher
Secondary Education (1982-1984) with 54%.
3. Secondary Certificate (10th standard) from West Bengal board of Secondary Education with 66%.
ADDRESS
Present- site & office-vill.-Basaria, P.S- Mahukanth(near Panwari),Dist.-Banda, Utter
Pradesh.
Permanent- C-11 Amarabati Colony,Durgapur,WestBengal.PIN-713214.
Passport no.- K8122701, valid up to -05.03.2023

More Related Content

Viewers also liked

Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Samuel Joseph
 
RESUME_Santanu Das Majumdar-27.04.2016
RESUME_Santanu Das Majumdar-27.04.2016RESUME_Santanu Das Majumdar-27.04.2016
RESUME_Santanu Das Majumdar-27.04.2016SANTANU DAS MAJUMDAR
 
Chandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & materialChandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & materialChandresh Gupta
 
Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma
 
VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH M
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande
 
CV SCGupta Nov 15-1
CV SCGupta Nov 15-1CV SCGupta Nov 15-1
CV SCGupta Nov 15-1Suresh Gupta
 

Viewers also liked (17)

Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Profile_SamuelJaideep_05
Profile_SamuelJaideep_05
 
RESUME_Santanu Das Majumdar-27.04.2016
RESUME_Santanu Das Majumdar-27.04.2016RESUME_Santanu Das Majumdar-27.04.2016
RESUME_Santanu Das Majumdar-27.04.2016
 
RESUME-01
RESUME-01RESUME-01
RESUME-01
 
Naveen_Resume (2)
Naveen_Resume (2)Naveen_Resume (2)
Naveen_Resume (2)
 
Chandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & materialChandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & material
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)
 
Pratiksha Jadhav_ Resume
Pratiksha Jadhav_ ResumePratiksha Jadhav_ Resume
Pratiksha Jadhav_ Resume
 
VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)
 
Akhil_CV
Akhil_CVAkhil_CV
Akhil_CV
 
CV-Shipyard
CV-ShipyardCV-Shipyard
CV-Shipyard
 
MAINTENANCE C V
MAINTENANCE C V MAINTENANCE C V
MAINTENANCE C V
 
PUSPENDU UPDATED
PUSPENDU UPDATED PUSPENDU UPDATED
PUSPENDU UPDATED
 
CV-NKN-09.05.16
CV-NKN-09.05.16CV-NKN-09.05.16
CV-NKN-09.05.16
 
Resume
ResumeResume
Resume
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
 
CV SCGupta Nov 15-1
CV SCGupta Nov 15-1CV SCGupta Nov 15-1
CV SCGupta Nov 15-1
 

Similar to S mukherjee resume march 3 (20)

Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
RS Resume
RS ResumeRS Resume
RS Resume
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
 
Resume140515
Resume140515Resume140515
Resume140515
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumar
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
RETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - CopyRETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - Copy
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
MAINTENANCE MANAGER
MAINTENANCE MANAGERMAINTENANCE MANAGER
MAINTENANCE MANAGER
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Chandra Sekhar Reddy
Chandra Sekhar ReddyChandra Sekhar Reddy
Chandra Sekhar Reddy
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
CV of Purushotham (1)
CV of Purushotham (1)CV of Purushotham (1)
CV of Purushotham (1)
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 

Recently uploaded

S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 

Recently uploaded (20)

S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 

S mukherjee resume march 3

  • 1. SUBRATOMUKHERJEE Senior Engineer/Site-In-Charge at Dhrub Construction, U.P, India E-mail: subratom89@gmail.com & smukherjee_2009@yahoo.in Mobile: 919163210262 & 919198637206 Passport No.- K8122701 _____________________________________________________________________________________________ SUMMARY OBJECTIVE:- Senior Engineer/Site-In-Charge with 23+ years experience(including site management and execution, finance planning and management, managing bills and payments of subcontractors and vendors and quality and safety compliance) seeking relocation in India and abroad. FUNCTIONAL AREA:- High-rise (up to G+29) and multistoried residential and commercial building projects (including club house, car park, podium/raised garden and shopping mall and project infrastructure), Irrigation and water related projects (aqueduct, pump house, canal, STP, WTP/UGR, cofferdam, causeway), roads and infrastructural projects(bitumen road, RCC drain, boundary wall, sewer & water main line, electrical sub-station), bore pile, driven pile and pile cap and earth-moving works. SKILL SET:- Site planning,execution and management; planning,allocation and reconciliation of resources;budget monitoring, site-financeplanningand optimum fund utilization:measurement of works, bill preparation and verification; management of bills and payments of subcontractors and vendors; quality and safety compliance;management of client,vendors, contractors and consultant; preparation and submission of work-progress reportto superior. ___________________________________________________________________________________ BRIEF WORKHISTORY A. High-rise, Multistoried buildings/Villas- 12 years. B. Road & Infrastructure works-4 years. C. Irrigation & water related structures-3 years 11 months. D. PILING & PILE CAPS - 2 years 2 months. E. STP, WTP/UGR, Sewer & Water pipeline network- 1 year TOTAL EXPERIENCE:- 23 years 1 months (as on February, 2016). (NOTE- Above statement is approximateas some of the projects were handled simultaneously) ___________________________________________________________________________________ CURRENT EMPLOYMENT Dhrub Construction, Uttar Pradesh Senior Engineer/Site-In-Charge October, 2014 – present (1 year 5 months) Project- Construction of AQUEDUCT ( atch.-14.59km) on Arjun feeder canal (site- Basaria village, near Panwari) in Arjun Sahayak Pariyojna,under Mahoba division of dept. of Irrigation,Uttar Pradesh. Consisting - RCC raft(1500-2000 mm thick), 2 nos. piers(1500 mm thick), 2 nos. abutments(2000 mm
  • 2. thick), canal deck slab(900 mm thick), foot over-bridge, 4 wing walls each for canal & river, PCC thrust blocks on u/s & d/s side of river and boulder pitching on river u/s & d/s side. Achievements- Completed- 1. > 4900cum RCC in raft, piers,abutments. 2. >29000 cum earth cutting/filling for preparation of PCC block bed, canal bed etc and 3. >1300 nos. PCC blocks (1mx1mx1m) includingblock-laying–in about 300 working days (no work for about 75 days due to shortage of cement & steel). 4. Worked as FinanceManager(simultaneously);responsibilities:-totalmanagement of site finance including finance planning, optimum fund utilization and reconciliation; budget monitoring, finance control, cost cutting, optimum utilization of resources; bill preparation and verification; managing bills and payments of vendors and sub-contractors. CURRENT SALARY- INR 6,00,000 per annum(CTC) plus free lodging,medical & accidental insurance EXPECTED SALARY (minimum) - INR 6,50,000 per annum(in India) and INR 12,00,000(for abroad) NOITICE PERIOD- 15 days __________________________________________________________________________________ PREVIOUS EMPLOYMENTS Citystar Infrastructure Ltd. Senior Engineer/Site-In-Charge April, 2011 - September, 2014 (3 years 5 months) Projects- 1. Construction of multistoried buildings up to G+3 and Officers’ club complex (in IOCL, Paradip, Odisha) – June, 2011-November, 2012 & June, 2013 - September, 2014 2. Construction of cofferdam and causeway over ‘SANTRA CREEK’ in IOCL, Paradip, Odisha - June, 2011- November, 2012 3. Bore piles and pile caps in IOCL, Paradip, Odisha - July, 2011 - June, 2012 4. Profile making of national highway (Bhubaneshwar/Puri- part) – November, 2012 – June, 2013 5. Construction of pump house in Chillimal, Uttar Pradesh under dept. of Irrigation, Uttar Pradesh - April, 2011- June, 2011 Achievements- 1.Completed works worth > INR 280 million alongwith sitemanagement, resourcemanagement, financecontrol,billingand quality & safety compliance. 2. Worked as FinanceManager(simultaneously);responsibilities:- totalmanagement of site finance including finance planning, optimum fund utilization and reconciliation; budget monitoring, finance control, cost cutting and optimum utilization of resources; managing bills and payments of vendors and subcontractors; bill preparation and verification; procurement of payment. __________________________________________________________________________ Keppel-Magus Development Pvt. Ltd., Kolkata (jointventure between KEPPEL LAND of Singapore and JATIA GROUP of India) Senior Engineer August, 2007- March, 2011 (3 years 8 months) Project- Ellita Garden Vista (New Town, Kolkata)High rise residential building project Consisting - 15 nos. residential apartment blocks (G+14 to G+29), one club house, RCC covered car park(at GL), raised garden/podium above car park of 29000sqm area, shopping mall and project infrastructure works.
  • 3. Achievements- Completed:- 1.construction of model flat 2. Property survey, block layout and pile-point layout with surveyors 3.>1450 nos. driven cast-in-situ RCC piles, >255 nos. pile caps (1 pileto 56 piles), 4. Grade slab of 4 blocks, RCC structure, brickwork and finishingof one G+24 block (jointly with another engineer) 5. (i)>250nos. RCC piles & 36 nos. RCC columns in CLUB HOUSE. (ii)>750nos.RCC columns foundations, > 840nos. RCC columns (300x500),> 95000m long RCC tie-beam(300x600),aprox.29000sq m RCC slab(200 thick) & aprox.7500m long1-1.2m high RCC wall in CAR-PARK & PODIUM. (iii) Totalquantity of RCC > 26,000cum - Completed the whole work in (aprox.) 480 working days 6. (i)>2.5km of RCC drain (600mmx600mm) and (ii)>1.5 km of boundary wall in about 100 working days (iii) >2.0km of road profile consisting- box cutting(of earth), sand filling,doublelayer B.F.S & WBM in aprox.65 workingdays 7. civil works of 4 nos. electrical sub-station 8. RCC structureof 3nos. UGR/WTP (-40,000 lit.water storagetank+ filtration plant,pumps etc. in two adjoining chambers at 8.50m below G.L and 1no. STP ( -80,000 lit. sludge storage tank+ filtration plant, pump etc. in two adjoiningchambers at8.0m below G.L) 9.layingof-(I)>2.0 km swear main line (600mm dia.HDPE Main linewith 200/300mm dia.HDPE Branch lines) alongwith manholes;and (ii)>1.5km water main line 10. total > 46000 cum RCC in 3 years 8 months and all other works as mentioned above; total bill generated > Rs.56,00,00000 11. worked as Deputy Quality-In-charge time to time 12. provided technical and practical inputs for cost-cutting resulting saving of >INR 25 millions. ___________________________________________________________________________________ Pradip Construction,Durgapur,WestBengal Site Engineer January, 2002 - February, 2007 (5 years 1 months) Projects- residential,commercial & industrial constructions Achievements- Completed:- 1. Numerous residential,commercial and industrial construction works includingQS & billing. 2. Construction of several residential and commercial buildings. 3. Systemized construction procedure, billingand material reconciliation. 4. Total billed amount of completed works >Rs.12,50,00000. ___________________________________________________________________________________ Durgapur Municipal Corporation, WestBengal Licensed building planner and Estimator April, 1993-March – 2001 (8 years) Project- Preparation and (getting) approval of plans & estimates of multistoried buildings and villas and supervision of construction works. Achievements-1.Completed plans of >180 nos. residential, > 25nos. commercial & 5 nos. industrial buildings and one stadium includingapproval. 2. Prepared cost& material estimateof all abovementioned works
  • 4. 3. Supervised construction of all abovementioned works ___________________________________________________________________________________ Chandak Engineering Works,Durgapur,WestBengal Site Engineer February, 1991-August, 1991 (6 months) Project- Earth-moving works in 220kv/400kv sub-station under NTPC (Mithan TL) and Haldia Petrochemical Ltd. Achievements- 1. Completed works valued > Rs.2,50,00000 includingoverall supervision of works; planning,deployment & controllingall machineries,consumables and manpower; survey works; soil testing& billing. 2. Provided technical help in preparation of tender-quotation, negotiated contractand disputes in works several times. Dept. of Irrigation & Waterways, Govt.of West Bengal Trainee Apprenticeship Engineer September, 1989 -September, 1990 (1year) Project- Trainingin differentirrigation structures and systems Achievements- 1. Supervised construction of PCC canal lining of RBMC & LBMC of Durgapur Barrage. 2. Prepared daily reportof water intakeand outflow of differentirrigation structures. 3. Getting familiarized with different irrigation structures by visitingtheseseveral times with superiors. ___________________________________________________________________________________ PERSONAL INFORMATION EDUCATION 1. Diploma in Civil Engineering from State Council for Engineering and Technical Education, Govt. of West Bengal (1984-1987) with 75%. 2. Higher Secondary Certificate (12th standard science) from West Bengal Council for Higher Secondary Education (1982-1984) with 54%. 3. Secondary Certificate (10th standard) from West Bengal board of Secondary Education with 66%. ADDRESS Present- site & office-vill.-Basaria, P.S- Mahukanth(near Panwari),Dist.-Banda, Utter Pradesh. Permanent- C-11 Amarabati Colony,Durgapur,WestBengal.PIN-713214. Passport no.- K8122701, valid up to -05.03.2023