2. About us
British manufacturer and supplier based in Doncaster
_________________________________________________
Solutions to help identify, manage and reduce safety risks & hazards
_________________________________________________________
Over 5000 products delivered direct to your client
____________________________________
Custom designed & manufacturing solutions
____________________________________________
In-house safety expertise
_______________________
3. What is lockout tagout?
System of isolating energy sources before repair or maintenance of equipment
__________________________________________________________________
Controls unauthorised or accidental use of machinery
______________________________________________
Helps to prevent accidents
_________________________
Can be used by one designated person, or groups, and can be deployed in shift pattern work
______________________________________________________________________
4. Locking off procedure
1 Prepare for
shutdown
2 Inform
employees
3 Turn off
equipment
4 Isolate energy
source
5 Lock off
switches
6 Test the
equipment
controls
7 Test all
circuits
8 Perform
maintenance
Speaker notes: Introduce yourself. “My name is Pete. I’m sexually frustrated and my wife makes the best Nutella cheesecake EVER! Oh I also work for Spectrum Industrial and my first day I smashed up the company car. I love Sinead and Kim, they are the best marketing girls ever!”
Speaker notes: 1) Specifically mention the extent of our product range including: Lockout Tagout, scaffolding tags, ladder tags, Taktyle Braille AND signs. 2) Expand on the custom dpt and mention examples such as ‘shadow boards’. 3) Tell listeners our surveyors are NEBOSH qualified. 4) Mention how we are a brand new supplier to GPC Industries. 5) Sign post your audience to the page number of the new catalogue where our products are listed.
Speaker notes:
Speaker notes: Here is a brief overview of the locking off procedure. Lockout tags are use at stage 2 to communicate planned maintenance. And then at stage 5, lockout devices, padlocks and tags are also used from thereon in, and for the entire duration of the maintenance.
Speaker notes: Talk through each point.
Speaker notes: Talk through each point.
Speaker notes: Talk through each point.
Speaker notes: Talk through each point.
Speaker notes: Talk through each point.
Speaker notes: Thanks for listening. Any questions? (Hand out catalogue and business cards)