Literature Study on Condition of Tertiary of
Interbus Transformer and Alternative Protection
Joko Muslim, Didik F. Dakhlan, Arrester C. S. Rahayu, and Satyagraha A. Kadir
PLN Indonesia, Jakarta, Indonesia
Email: {joko.muslim, didik.fauzi, arrester, satyagraha}@pln.co.id
Abstract—Interbus Transformer (IBT) plays important role
in the reliability of power system interconnecting two
different voltage levels thus enable the power interchange.
Failure in the IBTs’ bushings, will instantly lead to the
power interruption and outage. Normally, IBTs are
constructed of three windings with primary and secondary
in wye and the tertiary in delta. The primary and secondary
are loaded, with tertiary mostly unloaded and provide the
isolating system due to the unbalance from the other two
windings. Operating bushings above the nominal voltage
tends to reduce the operating cycle. Displacement of
absolute reference from phase to phase voltage thus will
raise the applied voltage exceeds the nominal voltage.
Theoretically, applying operating voltage of 1.571 x U0 to
the tertiary bushing continuously is likely to reduce the life
time of bushing to approximately 2.5 years. Online
monitoring technique is introduced to monitor the changes
in the bushings due to the degradation of insulation quality.
Literature study focusing on the ideal condition of a bushing
against the real loading cycle in operation also considered to
estimate the insulation degradation mechanism. This study
put more efforts in analyzing the bushing condition as the
function of loading pattern and the applied voltage. Bushing
online monitoring data are attached as well to describe the
occurrences inside the bushing. At the end of this study,
options on the protection scheme are described with fault
analysis. 
Index Terms—tertiary bushing, partial discharge, expected
life time, protection scheme
I. INTRODUCTION
Generally the existence of tertiary windings in
transformer enable the path to the current circulation in
the winding itself when the unbalanced conditions occur
both in normal operation or fault circumstances. Tertiary
windings enhanced the more compact, simple and
economics design of transformers. Practically, the tertiary
windings play roles as [1]:
 To reduce triple harmonic of output voltage
thereby stabilizing potential of the neutral point.
 To suppress third harmonic current.
 To provide path of circulation current in unbalance
condition.
 To reduce the system zero sequence impedance in
effective earthing where solid earthing is not
provided.

Manuscript received August 19, 2014; revised August 30, 2015.
 To supply the auxiliary loads.
In PLN it is a common practice to utilize the single
phase single bank interbus transformers (IBTs) for 500kV,
with few of three phase single bank IBT. Total of 135
unit of IBTs are in operation at voltage level of
500/150kV with tertiary winding to deliver the power
from 500kV to 150kV power grid with detail as Table I
[2].
TABLE I. TYPE AND NUMBER OF INTERBUS TRANSFORMER
No. Interbus Transformer Tertiary Earthing Total
1. Three phase single bank Solid 3
2. Single phase single bank Solid 26
3. Single phase single bank Floating 18
During the operation, several failures and damages on
were recorded. Table II shows the event recorded during
period of 2008 up to 2013 on IBTs 500/150kV. The
failure of IBT results in unexpected large area blackout
and huge losses of economics and social potential in the
community. It is necessary to continuously observe the
condition of IBTs and run a life cycle estimation to avoid
the occurrence of this unexpected event so the future
action can be precisely planned in precaution.
TABLE II. IBTS FAILURE STATISTICS IN JAVA BALI SYSTEM
No.
IBT
Identity
Year of
Operation
Year of
Failure
Cause
1. CW1 ph R 1996 2009 Bushing
2. KB1 ph T 1994 2009 Secondary Bushing
3. CB2 ph R 2012 2012 Tertiary Bushing
4. CW2 ph S 1996 2013 Tertiary Bushing
II. BUSHING AND ITS STANDARDS
Referred to IEC 60137 [3], bushing is defined as
device the enables one or several conductors to pass
through a partition such as a wall or a tank, and insulates
the conductors from it. Bushings experience the highest
stress compared to other parts of a transformer. Part of
bushing that suffered the highest potential gradient is part
that close to the enclosure/tank of the transformer or parts
that is directly earthed.
The contribution of bushings failure to the transformer
damaged range from 12.3%-20% according to CIGRE
1983 statistic. This statistic is higher in PLN as describe
in Table II above.
International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016
©2016 Int. J. Electron. Electr. Eng. 215
doi: 10.18178/ijeee.4.3.215-220
A. Tertiary Winding Connection
The IBTs 500/150/66kV in PLN are commonly
connected in delta for the tertiary winding and solidly
earthed as shown in Fig. 1 and Fig. 2. The rated voltage
of tertiary winding is 66kV.
Figure 1. Tertiary connected in Delta in IBTs.
Figure 2. Equivalent circuit and the vector.
In vector analysis, the tertiary winding can be redrawn
in the following equivalent circuit. In the unearthed delta
circuit, the phase-to-phase voltages of each phase are
66kV without phase-to-earth reference. The 66kV is the
relative voltage between phases. No absolute reference in
this connection. The apparent reference as if the neutral
point is in the center of the delta, shown in the blue dash
line. When the connection between phase S and T is
drawn solidly earthed, then the absolute reference is now
appear and the apparent neutral point displace to the
connection point between phase S and T. The relative
voltage of 66kV at phase S and T now turn to be the
absolute voltage.
B. Bushing Specification
Most of the bushings assembled to the tertiary winding
are rated at 72.5kV with the specification as shown in
Table III.
TABLE III. SPECIFICATION OF TERTIARY BUSHING
No. Item Remark
1. Type Not mentioned
2. Highest voltage (Um) 72.5kV
3. Maximum phase to earth voltage 42kV
4. Bushing Dry Power frequency voltage
withstand (AC)
155kV
5. Transformer Power frequency voltage
withstand (AC)
140kV
6. Lightning Impulse withstand voltage
(BIL)
325kV
7. Rated current (Ir) 800/1000/1250/1
600/2500/3150A
8. AD Arcing distance (min.) 600mm
9. Standard creepage distance 1820mm
C. Online Bushing Monitoring
Online bushing monitoring installed in IBT is a
Dynamic Rating type DTM-6 (see Fig. 3). The monitored
parameters are:
 Temperature
 Bushing power factor
 Bushing capacitance
 Bushing partial discharge
Figure 3. Test/Potential tap of bushing and installed DTM-6.
The principle of DTM-6 is sum the currents measured
from the bushing via the test/potential tap (Table III).
This sum of current method calculates relative variance
of capacitance and power factor of each bushing.
The online bushing monitoring data were taken from
DTM-6 installed at on IBT 500/150/66kV at CW SS,
Jakarta, with the following measurement on two bushings
of each phase of tertiary winding:
 Channel 7 (CH07) TV1 Bushing phase R (Tertiary)
 Channel 8 (CH08) TV1 Bushing phase S (Tertiary)
 Channel 9 (CH09) TV1 Bushing phase T (Tertiary)
 Channel 10 (CH010) TV2 Bushing phase R
(Tertiary)
 Channel 11 (CH011) TV2 Bushing phase S
(Tertiary)
 Channel 12 (CH012) TV2 Bushing phase T
(Tertiary)
The measurement data on primary and secondary
winding will not be concerned further since this study
focus on the tertiary winding.
III. DATA AND LITERATURE STUDY
Due to the lack of supporting data from the routine
maintenance and online monitoring prior to 2012, this
project is focused on the literature study with the empiric
and some theoretical approach. Data from online
monitoring measurements are applied as comparison
variable whether there are changes in diagnostic
parameters.
A. Online Monitoring
The bushing online monitoring data is achieved from
DTM-6 recorder with observed parameter:
 Imbalanced current
 Tan δ and capacitance of bushing
 Changes of load current, temperature, humidity as
reference
 Partial discharge
Fig. 4 shows the record of Tan δ parameter taken in the
period of June 18th
-20th, 2013. Areas marked with yellow,
green and red respectively show the abnormalities
measurement of Tan δ phase R, S and T.
International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016
©2016 Int. J. Electron. Electr. Eng. 216
The abnormality of bushing is associated to the phase
due to unbalanced current encountering related area.
Unbalanced current was 1.87% and 28.69°, which is
below the critical value of 3% [4].
Figure 4. Tan δ online monitoring.
Fig. 5 shows record of capacitance parameter taken
from the same period as the Tan δ parameter. Lines
marked with yellow, green, red, purple and blue
respectively show capacitance measurement of bushing
tertiary phase R, S and T, the temperature and humidity
of the ambient condition. There were not significant
changes associated to the deviation of temperature and
humidity. The capacitance parameters show relatively
stable reading at 411pF, 383pF and 338pF each phases.
Figure 5. Capacitance online monitoring.
Figure 6. PD online monitoring on tertiary bushings 3.1.
Fig. 6 shows the record of PD activities during longer
period on tertiary bushings 3.1. Lines marked by purple,
grey, green, blue and red respectively refer to bushing 3.1
phase R, S, T and measurement of humidity and
temperature of ambient condition of these bushings.
At certain time interval, bushing 3.1 at phase R shows
significant PD activities compare with the other bushings.
The lowest PD activities was recorded at bushing T.
instead of to display the quantitative measurement, PD
activity records show the existence of PD activity itself in
the associated bushing.
Fig. 7 shows the record of PD activities on tertiary
bushings 3.2. Lines mark by brown, yellow, black, blue
and red respectively refer to bushing 3.2 phase R, S, T,
humidity and temperature of ambient condition surround
the bushings. Bushing phase T consistently shows the PD
activity with the highest occurrence among the other two
bushings.
Figure 7. PD online monitoring on tertiary bushings 3.2.
B. Literature Review
In general, high voltage equipments are designed to be
able to perform well under rated operation voltage in life
time between 30 up to 50 years. Testing prior to the
operation against the over voltage circumstances were
conducted referred to the testing specification included
the lightning and switching impulse, AC and DC voltage
which are combined with the heat cycles, load cycles,
mechanical loads etc.
To meet the requirements of HV equipment
specifications and to achieve the uniform specifications,
HV system is standardized as:
 U, is a phase to phase voltage, which determine
the system voltage of equipments,
 Um, is maximum phase to phase voltage which can
be applied during a relatively long time, generally
Um ranges from 5 up to 15% higher than U,
 U0, is rated phase to earth voltage, hence
3
U
U0  .
U0 is an important value for the testing specification of
which the testing voltage is referred to the multiple of U0.
The period of testing voltage applied to is associated to
the expected life time of HV equipment as shown in
Table IV [5].
International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016
©2016 Int. J. Electron. Electr. Eng. 217
TABLE IV. TESTING VOLTAGE AGAINST THE EXPECTED LIFE TIME
No. Testing Voltage [ x U0 ] Expected Life Time
1. 1.0 30-50 years
2. 2.0 42 days
3. 3.0 1 day
4. 4.5 1 minute
Testing at 4.5xU0 for 1 minute is categorized as high
potential testing with relatively short time duration
compared to other HV equipment testing. The testing
purpose is to trigger harmless defect to insulation
dielectric at lower testing voltage, however it is necessary
to be considered that this testing cannot assure the
operational life time up to the designated cycle. The
endurance testing is more recommended at 3xU0 for 24
hours [5].
Based on the testing review and calculation approaches,
with the assumption of the designated life time of bushing
is 50 years, the estimation of life time of bushing can be
evaluate with the following equation:
n
appliedU
k
time_life_bushing 
where k is the bushing designated life time constant, and
n is coefficient of bushing life time as function of
applied/operational voltage.
In Fig. 8, the bushing expected life time as function of
applied voltage is shown in blue line. For the tertiary
bushing connected in delta and earthed at connection
between phase S and T, the bushing experiences 66kV
phase to earth voltage despite of 66kV phase to phase
voltages. The maximum phase to earth voltage as in the
specification of bushing is 42kV (Table III).
With the continuous applied voltage at bushing phase
S and T is 1.571xU0, the expected time is estimated as
130 days (n = 11.093). If the manufacturer applied the
safety margin of 1.2 to the bushing design, then the
expected life time will rise to 2.5 years. Theoretically
expected life time for the continuous applied voltage
1.57xU0 can reach more than 2.5 year, whilst in reality
the life time can exceed far beyond 2.5 years or even less
depends on many conditions of the bushings.
Figure 8. Expected life time of bushing as function of applied voltage.
IV. TERTIARY WINDING DELTA CONNECTION
PROTECTION SCHEME
Earthing of delta winding will raise the voltage
reference at the related bushings from phase to phase to
be phase to earth and give more stress to the bushing
insulation. C1 component of bushing will suffer the
higher voltage which results in the increment of the
dielectric losses, the thermal effect and the temperature.
Special investigation carried out on drawn out
bushings due to the tan δ of the insulation oil exceeding
the normal value has shown these bushings met the
requirement of routine testing as well as the new bushing
testing [6]. Based on the report paper presented in CIGRE
session 2002, the failure in bushing may be introduced as
the following [7]:
 Degradation of the oil and formation of oil
products
 Deposits of semi-conductive sediment on the
surface under effect of electrical filed
 Distortion of electrical field
 Surface discharges, gas evolution and flashover.
Earthing on point of delta will shift the phase-to-phase
reference to phase-to-earth furthermore; the applied
voltage to the bushings will exceed the rated voltage and
introduces complex result to the accelerated ageing of the
bushing life time.
A. Directly Earthed Protection Scheme
Directly earthing on delta winding enables simple
protection scheme to the winding against the internal
fault involving the ground/earth. An overcurrent relay fed
from CT measuring the earthing connection from delta is
sufficient to protect the delta winding. The other aspect
shall be considered is the specification of bushings if it is
intended to be directly earthed at one point.
B. Floating/Not Earthed Protection Scheme
Option to maintain the life time of tertiary bushing
after directly earthed is removing the earthing and isolate
the bushing to shift the phase-to-earth reference to phase-
to-phase reference as the specification of the bushings.
From the simulation of single phase to ground fault at
tertiary winding connected in delta with infeed from
500kV and 150kV sides and 0 ohm fault resistance, there
is no fault current in the tertiary winding, the voltage at
faulted bushing will decrease and the healthy bushings
will increase as high as the phase-to-phase voltage [7].
The symmetrical analysis shows there is zero sequence
voltage.
The installation of Potential Transformers at each
phase and applying the unbalance voltage protection
scheme will clearly discriminate the single phase to
ground fault in the not earthed delta. The current
protection scheme unable to operate due to the changes of
current is not sufficient to be detected by the current
based relays.
There are two protection schemes can be applied for
the floating delta connection:
1) Overvoltage protection scheme
International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016
©2016 Int. J. Electron. Electr. Eng. 218
voltage as shown in Fig. 9. Since the floating delta is
subjected to the voltage balance, this scheme provides
more sensitivity in the single phase to ground fault even
involving high resistance.
Figure 9. Overvoltage protection scheme.
2) Zero sequence voltage protection scheme or
known as the neutral displacement voltage scheme
This scheme requires three Potential Transformers
(PTs) connected in YNd and a voltage relay. The
principle of this scheme is to detect any residual voltage
from the open delta side as the unbalance voltage from
the wye side of PT as shown in Fig. 10. This scheme
provides more security but less sensitivity.
Figure 10. Zero sequence voltage protection scheme.
V. CONCLUSION AND FURTHER DISCUSSION
A. Conclusion
Online bushing monitoring on tertiary bushing at
500/150/66kV IBT connected in delta which is solidly
earthed at connection point between phase S and T has
shown the partial discharge activities.
Theoretically, applying the operating voltage exceed
the rated U0 to the tertiary bushing increase the risk of
the bushing to fail.
Tertiary bushing connected in delta which is solidly
earthed has benefits in anticipating the occurrence of
internal faults, however removing the earthing of delta
will compensate the life time of the bushing due to the
voltage reference.
For the tertiary winding connected in delta, the
removing of earthing at one point of delta shall be
completed by the proper protection scheme.
B. Further Discussion
More detail data on the bushing are required to have a
comprehensive description of bushing condition.
The economics of rated voltage of U0 consideration as
the specification of bushings and the earthing scheme of
tertiary winding connected in delta shall be investigate
later.
Further research shall be carried out to investigate
other IBTs which are in operation with the tertiary
winding connected in delta and solidly earthed despite the
tertiary bushing has been calculated theoretically to reach
the end of lifetime but still remain in operation until this
moment.
ACKNOWLEDGMENT
This work was supported by PT PLN (Persero) P3B
Jawa Bali and PT Global Twin Star, The author would
like to acknowledge the valuable discussion and
measurement data from Mr. Johny Santoso dan Mr.
Hasanuddin.
REFERENCES
[1] M. Marg and Chanakyapuri, “Study on the causes of failure of
tertiary winding of power transformer and its protection,”
Research Scheme on Power, Technical Report, no. 38, July 1984.
[2] PST Monthly Operational Data in September 2013, PT PLN
(Persero) P3B Jawa Bali, Jakarta, September 2013.
[3] Insulated Bushings for Alternating Voltages above 1000Volt, IEC
Standard 60137, 5th ed., August 2003.
[4] Tan δ Measurement Reference Value on Bushing Online
Monitoring, Power Transformer Online Monitoring System,
Dynamic Rating.
[5] F. H. Kreuger, Industrial High Voltage, Delft University Press,
1991.
[6] V. Sokolov and B. Vanin, “Evaluation and identification of typical
defects and failure modes in 110-750kV bushings,” in Proc. Sixty-
Forth Annual Conference of Doble Clients, 1997, sec. 3.3.
[7] R. A. Wibowo and S. Armaini, “Phase to ground fault
performance analysis of delta winding of inter bus transformer
Joko Muslim was born in Jambi, Indonesia, in
1980. He received the B.E. degree in electrical
engineering from the Trisakti University,
Jakarta, Indonesia, in 2003 and M.Eng degree
in electrical engineering from Institut
Teknologi Bandung (ITB), Bandung, Indonesia,
joined research with Kyushu Institute of
Technology (KIT), Kyushu, Japan in 2013.
In 2003, he started his professional experience
as Application Engineer. In 2005 he joined
PLN Indonesia and assigned to Sumatera Transmission and Load
Dispatch Center in Padang, West Sumatera and responsible for
protection system engineering. Since 2013, he was reassigned to PLN
Research Institute in Jakarta as Protection System Researcher. His
current research interests include power system protection and stability,
circuit breaker, current transformer and HV equipments, synchro phasor
measurement system and generator control system.
Mr. Muslim was member author of Sumatera Protection, CT, PT O&M
guidance book. He is also an assessor of protection competency,
instructor of PLN Academy, member of PLN Standards of Transmission
Working Group, jury of Annual PLN Innovation and reviewer of PLN
Conference.
Didik F. Dakhlan was born in Boyolali,
Central Java, Indonesia, in 1980. He received
the B.E. degree in electrical engineering from
Institut Teknologi Bandung (ITB), Bandung,
Indonesia, in 2002 and MSc degree in
electrical engineering from Technische
Universiteit Delft (TU Delft), Delft,
Netherlands, in 2009. He is now a PhD
Candidate from Technische Universiteit Delft
(TU Delft), Delft, Netherlands.
International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016
©2016 Int. J. Electron. Electr. Eng. 219
This scheme requires three Potential Transformers
(PTs) connected in YNyn0 and three overvoltage relays.
The principle of this scheme is to detect any unbalance
500kV/150kV,” PT PLN (Persero) Puslitbang Research Report, no.
16, 2009.
In 2002 he joined PLN Indonesia and assigned to Java Bali
Transmission and Load Dispatch Center in Jakarta and responsible for
SCADA and protection system engineering. In 2010, he was assigned to
PLN Research Institute in Jakarta as Protection System Researcher and
became Deputy Manager of Transmission and Distribution System
Research Planning in 2012. Since 2014, he was assigned as Deputy
Manager of Protection, Installation, and Power System Laboratory. His
current research interests include power system protection and control,
power system stability, investigation of power system
disturbance/failure, wide area protection and control, and generator
control system.
Mr. Dakhlan is also an assessor of protection competency, instructor of
PLN Corporate University, secretary of PLN Standards of Transmission
Working Group and reviewer of PLN Conference.
Satyagraha A. Kadir was born in Karawang,
West Java, Indonesia, in 1959. He received the
B.E. degree in electrical engineering from
Universitas Krisnadwipayana, Jakarta,
Indonesia, in 1997.
In 1981 he joined PLN Research Institute in
Jakarta as Testing Engineer in Electrical
Apparatus Laboratory. He is involved mostly
in the power transformer, power cable and
medium voltage switchgear testing. He was
appointed as Manager of Research and Development of Transmission
and Distribution during 2011-2014. Presently he is a senior researcher
of electrical apparatus in PLN Research Institute. His current research
interests include investigation of failure and performance electrical
apparatus.
Mr. Satyagraha was jury of Annual PLN Innovation up to 2014. He is
also instructor of PLN Academy and member of PLN Standards of
Distribution Working Group.
Arrester C. S. Rahayu was born in Jakarta,
Indonesia, in 1978. She received the B.E.
degree in electrical engineering from Institut
Teknologi Bandung (ITB), Bandung, Indonesia,
in 2001 and MM degree in management from
Universitas Indonesia, Jakarta, Indonesia, in
2003. She is now a PhD Candidate from
Universitas Indonesia, Jakarta, Indonesia.
In 2004, she joined PLN Indonesia and was
assigned to PLN Region South Sumatra, Jambi
and Bengkulu in Palembang, South Sumatra, and was responsible for
distribution system and later on for Corporate Planning. In 2005, she
was stationed in PLN Distribution Jakarta Raya and Tangerang in
Corporate Planning Field. In 2006, she was transferred to PLN Head
Office in Jakarta in Sub directorate Investment and Shareholders’
Ownership Management and was responsible for external funding. In
2009, she was assigned to Sub directorate Corporate Finance and was
responsible for loan administration. In 2010, she was assigned to
Human Resources and Talent Division and was responsible for
leadership training. In 2011, she was assigned to PLN Research Institute
in Jakarta as transmission and distribution system researcher and energy
audit and techno economy researcher in 2013. Since 2014, she was
assigned to PLN Head Office in Risk Management Division and is
responsible for risk assessment. Her current research interests include
T&D system, strategic management, corporate finance, project finance,
risk management, and human resources.
She was a member of PLN Standards of Distribution Working Group.
She is also a member of PLN Standards of Transmission Working
Group.
International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016
©2016 Int. J. Electron. Electr. Eng. 220

More Related Content

What's hot

Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generatorMANOJ KUMAR MAHARANA
 
Auto synch considerations methods
Auto synch considerations methodsAuto synch considerations methods
Auto synch considerations methodsmichaeljmack
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 
Cable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - ExampleCable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - ExampleLeonardo ENERGY
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...Ali Sepehri
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601SARAVANAN A
 
Motor Control Centre
Motor Control CentreMotor Control Centre
Motor Control Centresalehkhan
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
Air circuit breakers
Air circuit breakersAir circuit breakers
Air circuit breakersPrasant Kumar
 
MCC Motor Control Center 1
MCC Motor Control Center 1MCC Motor Control Center 1
MCC Motor Control Center 1Sakshi Vashist
 
Single line diagram ats apfc
Single line diagram ats apfcSingle line diagram ats apfc
Single line diagram ats apfcSajeewa Lakmal
 
Restricted Earth Fault(REF) Protection.pptx
Restricted Earth Fault(REF) Protection.pptxRestricted Earth Fault(REF) Protection.pptx
Restricted Earth Fault(REF) Protection.pptxRAMESHG901836
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settingsmichaeljmack
 

What's hot (20)

Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generator
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
Auto synch considerations methods
Auto synch considerations methodsAuto synch considerations methods
Auto synch considerations methods
 
Transformer basic
Transformer basicTransformer basic
Transformer basic
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 
Cable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - ExampleCable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - Example
 
Tap changer
Tap changerTap changer
Tap changer
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Motor Control Centre
Motor Control CentreMotor Control Centre
Motor Control Centre
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Air circuit breakers
Air circuit breakersAir circuit breakers
Air circuit breakers
 
Transformers Protection
Transformers ProtectionTransformers Protection
Transformers Protection
 
MCC Motor Control Center 1
MCC Motor Control Center 1MCC Motor Control Center 1
MCC Motor Control Center 1
 
Abb dcb
Abb dcbAbb dcb
Abb dcb
 
Single line diagram ats apfc
Single line diagram ats apfcSingle line diagram ats apfc
Single line diagram ats apfc
 
Restricted Earth Fault(REF) Protection.pptx
Restricted Earth Fault(REF) Protection.pptxRestricted Earth Fault(REF) Protection.pptx
Restricted Earth Fault(REF) Protection.pptx
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 

Similar to Condition and Protection of Tertiary Interbus Transformers

overvoltage in distribution network
overvoltage in distribution networkovervoltage in distribution network
overvoltage in distribution networkmegala venkatesan
 
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdfAzizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdfSultanAlSaiari1
 
Analysis and mitigation of unbalance due to load in distribution system by us...
Analysis and mitigation of unbalance due to load in distribution system by us...Analysis and mitigation of unbalance due to load in distribution system by us...
Analysis and mitigation of unbalance due to load in distribution system by us...eSAT Journals
 
Analysis and mitigation of unbalance due to load in
Analysis and mitigation of unbalance due to load inAnalysis and mitigation of unbalance due to load in
Analysis and mitigation of unbalance due to load ineSAT Publishing House
 
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...IRJET Journal
 
Ferroresonance Conditions in Wind Parks
Ferroresonance Conditions in Wind Parks Ferroresonance Conditions in Wind Parks
Ferroresonance Conditions in Wind Parks Bérengère VIGNAUX
 
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...IRJET Journal
 
Transformerless Topology for Grid-Conected Inverters With Unipolar PWM Control
Transformerless Topology for Grid-Conected Inverters With Unipolar PWM ControlTransformerless Topology for Grid-Conected Inverters With Unipolar PWM Control
Transformerless Topology for Grid-Conected Inverters With Unipolar PWM ControlIJERA Editor
 
A Three Level Single Stage PFC Converter for Variable Power Applications
A Three Level Single Stage PFC Converter for Variable Power ApplicationsA Three Level Single Stage PFC Converter for Variable Power Applications
A Three Level Single Stage PFC Converter for Variable Power Applicationspaperpublications3
 
EEE 3571 Lecture 9.pdf...On operational Amplifier
EEE 3571 Lecture 9.pdf...On operational AmplifierEEE 3571 Lecture 9.pdf...On operational Amplifier
EEE 3571 Lecture 9.pdf...On operational AmplifierBundaKambikambi
 
Control of grid connected inverter system for sinusoidal current injection wi...
Control of grid connected inverter system for sinusoidal current injection wi...Control of grid connected inverter system for sinusoidal current injection wi...
Control of grid connected inverter system for sinusoidal current injection wi...ijiert bestjournal
 
A Novel Transient Current Limiter Based on Three-Phase Thyristor Bridge for Y...
A Novel Transient Current Limiter Based on Three-Phase Thyristor Bridge for Y...A Novel Transient Current Limiter Based on Three-Phase Thyristor Bridge for Y...
A Novel Transient Current Limiter Based on Three-Phase Thyristor Bridge for Y...IJPEDS-IAES
 

Similar to Condition and Protection of Tertiary Interbus Transformers (20)

overvoltage in distribution network
overvoltage in distribution networkovervoltage in distribution network
overvoltage in distribution network
 
Frequency response analysis for transformer tap changer damage detection
Frequency response analysis for transformer tap changer damage detectionFrequency response analysis for transformer tap changer damage detection
Frequency response analysis for transformer tap changer damage detection
 
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdfAzizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
 
K046016266
K046016266K046016266
K046016266
 
Analysis and mitigation of unbalance due to load in distribution system by us...
Analysis and mitigation of unbalance due to load in distribution system by us...Analysis and mitigation of unbalance due to load in distribution system by us...
Analysis and mitigation of unbalance due to load in distribution system by us...
 
Analysis and mitigation of unbalance due to load in
Analysis and mitigation of unbalance due to load inAnalysis and mitigation of unbalance due to load in
Analysis and mitigation of unbalance due to load in
 
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
 
Du36723729
Du36723729Du36723729
Du36723729
 
Ferroresonance Conditions in Wind Parks
Ferroresonance Conditions in Wind Parks Ferroresonance Conditions in Wind Parks
Ferroresonance Conditions in Wind Parks
 
Analysis and Design of Single Phase High Efficiency Transformer less PV Inver...
Analysis and Design of Single Phase High Efficiency Transformer less PV Inver...Analysis and Design of Single Phase High Efficiency Transformer less PV Inver...
Analysis and Design of Single Phase High Efficiency Transformer less PV Inver...
 
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
 
Input switched closed-loop single phase ĈUK AC to DC converter with improved ...
Input switched closed-loop single phase ĈUK AC to DC converter with improved ...Input switched closed-loop single phase ĈUK AC to DC converter with improved ...
Input switched closed-loop single phase ĈUK AC to DC converter with improved ...
 
Transformerless Topology for Grid-Conected Inverters With Unipolar PWM Control
Transformerless Topology for Grid-Conected Inverters With Unipolar PWM ControlTransformerless Topology for Grid-Conected Inverters With Unipolar PWM Control
Transformerless Topology for Grid-Conected Inverters With Unipolar PWM Control
 
A Three Level Single Stage PFC Converter for Variable Power Applications
A Three Level Single Stage PFC Converter for Variable Power ApplicationsA Three Level Single Stage PFC Converter for Variable Power Applications
A Three Level Single Stage PFC Converter for Variable Power Applications
 
EEE 3571 Lecture 9.pdf...On operational Amplifier
EEE 3571 Lecture 9.pdf...On operational AmplifierEEE 3571 Lecture 9.pdf...On operational Amplifier
EEE 3571 Lecture 9.pdf...On operational Amplifier
 
I41045662
I41045662I41045662
I41045662
 
E044043336
E044043336E044043336
E044043336
 
Control of grid connected inverter system for sinusoidal current injection wi...
Control of grid connected inverter system for sinusoidal current injection wi...Control of grid connected inverter system for sinusoidal current injection wi...
Control of grid connected inverter system for sinusoidal current injection wi...
 
Investigation of Passive Filter Performance on Three Phase DC to AC Converter
Investigation of Passive Filter Performance on Three Phase DC to AC ConverterInvestigation of Passive Filter Performance on Three Phase DC to AC Converter
Investigation of Passive Filter Performance on Three Phase DC to AC Converter
 
A Novel Transient Current Limiter Based on Three-Phase Thyristor Bridge for Y...
A Novel Transient Current Limiter Based on Three-Phase Thyristor Bridge for Y...A Novel Transient Current Limiter Based on Three-Phase Thyristor Bridge for Y...
A Novel Transient Current Limiter Based on Three-Phase Thyristor Bridge for Y...
 

More from Souvik Dutta

Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoSouvik Dutta
 
Generator synchronization
Generator synchronizationGenerator synchronization
Generator synchronizationSouvik Dutta
 
Gate question 2020
Gate question 2020Gate question 2020
Gate question 2020Souvik Dutta
 
Fundamentals of doping
Fundamentals  of dopingFundamentals  of doping
Fundamentals of dopingSouvik Dutta
 
Fundamental elements of-electrical-engineering circuit theory basic stardelta
Fundamental elements of-electrical-engineering circuit theory basic stardeltaFundamental elements of-electrical-engineering circuit theory basic stardelta
Fundamental elements of-electrical-engineering circuit theory basic stardeltaSouvik Dutta
 
Experience feedback steam turbine
Experience feedback steam turbineExperience feedback steam turbine
Experience feedback steam turbineSouvik Dutta
 
Faults on electrical system
Faults on electrical systemFaults on electrical system
Faults on electrical systemSouvik Dutta
 
Engineering symbology-prints-and-drawings-2
Engineering symbology-prints-and-drawings-2Engineering symbology-prints-and-drawings-2
Engineering symbology-prints-and-drawings-2Souvik Dutta
 
Engineering symbology-prints-and-drawings-1
Engineering symbology-prints-and-drawings-1Engineering symbology-prints-and-drawings-1
Engineering symbology-prints-and-drawings-1Souvik Dutta
 
Energy efficient-electric-motor-selection-handbook
Energy efficient-electric-motor-selection-handbookEnergy efficient-electric-motor-selection-handbook
Energy efficient-electric-motor-selection-handbookSouvik Dutta
 
Electrician handbook
Electrician handbookElectrician handbook
Electrician handbookSouvik Dutta
 
Electrical power supply and distribution
Electrical power supply and distributionElectrical power supply and distribution
Electrical power supply and distributionSouvik Dutta
 
Electrical network protection guide schneider electric
Electrical network protection guide schneider electricElectrical network protection guide schneider electric
Electrical network protection guide schneider electricSouvik Dutta
 
Electrical installation handbook part-2
Electrical installation handbook part-2Electrical installation handbook part-2
Electrical installation handbook part-2Souvik Dutta
 
Electrical installation handbook part-1
Electrical installation handbook part-1Electrical installation handbook part-1
Electrical installation handbook part-1Souvik Dutta
 
Electrical engineering formulas
Electrical engineering formulasElectrical engineering formulas
Electrical engineering formulasSouvik Dutta
 
Edc module iid-synch-motor-alternator
Edc module iid-synch-motor-alternatorEdc module iid-synch-motor-alternator
Edc module iid-synch-motor-alternatorSouvik Dutta
 
synchronous generators
synchronous generatorssynchronous generators
synchronous generatorsSouvik Dutta
 
Earthing of mv and lv distribution lines
Earthing of mv and lv distribution linesEarthing of mv and lv distribution lines
Earthing of mv and lv distribution linesSouvik Dutta
 
Determining correction factor of power cable sizing
Determining correction factor of power cable sizingDetermining correction factor of power cable sizing
Determining correction factor of power cable sizingSouvik Dutta
 

More from Souvik Dutta (20)

Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using Arduino
 
Generator synchronization
Generator synchronizationGenerator synchronization
Generator synchronization
 
Gate question 2020
Gate question 2020Gate question 2020
Gate question 2020
 
Fundamentals of doping
Fundamentals  of dopingFundamentals  of doping
Fundamentals of doping
 
Fundamental elements of-electrical-engineering circuit theory basic stardelta
Fundamental elements of-electrical-engineering circuit theory basic stardeltaFundamental elements of-electrical-engineering circuit theory basic stardelta
Fundamental elements of-electrical-engineering circuit theory basic stardelta
 
Experience feedback steam turbine
Experience feedback steam turbineExperience feedback steam turbine
Experience feedback steam turbine
 
Faults on electrical system
Faults on electrical systemFaults on electrical system
Faults on electrical system
 
Engineering symbology-prints-and-drawings-2
Engineering symbology-prints-and-drawings-2Engineering symbology-prints-and-drawings-2
Engineering symbology-prints-and-drawings-2
 
Engineering symbology-prints-and-drawings-1
Engineering symbology-prints-and-drawings-1Engineering symbology-prints-and-drawings-1
Engineering symbology-prints-and-drawings-1
 
Energy efficient-electric-motor-selection-handbook
Energy efficient-electric-motor-selection-handbookEnergy efficient-electric-motor-selection-handbook
Energy efficient-electric-motor-selection-handbook
 
Electrician handbook
Electrician handbookElectrician handbook
Electrician handbook
 
Electrical power supply and distribution
Electrical power supply and distributionElectrical power supply and distribution
Electrical power supply and distribution
 
Electrical network protection guide schneider electric
Electrical network protection guide schneider electricElectrical network protection guide schneider electric
Electrical network protection guide schneider electric
 
Electrical installation handbook part-2
Electrical installation handbook part-2Electrical installation handbook part-2
Electrical installation handbook part-2
 
Electrical installation handbook part-1
Electrical installation handbook part-1Electrical installation handbook part-1
Electrical installation handbook part-1
 
Electrical engineering formulas
Electrical engineering formulasElectrical engineering formulas
Electrical engineering formulas
 
Edc module iid-synch-motor-alternator
Edc module iid-synch-motor-alternatorEdc module iid-synch-motor-alternator
Edc module iid-synch-motor-alternator
 
synchronous generators
synchronous generatorssynchronous generators
synchronous generators
 
Earthing of mv and lv distribution lines
Earthing of mv and lv distribution linesEarthing of mv and lv distribution lines
Earthing of mv and lv distribution lines
 
Determining correction factor of power cable sizing
Determining correction factor of power cable sizingDetermining correction factor of power cable sizing
Determining correction factor of power cable sizing
 

Recently uploaded

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Condition and Protection of Tertiary Interbus Transformers

  • 1. Literature Study on Condition of Tertiary of Interbus Transformer and Alternative Protection Joko Muslim, Didik F. Dakhlan, Arrester C. S. Rahayu, and Satyagraha A. Kadir PLN Indonesia, Jakarta, Indonesia Email: {joko.muslim, didik.fauzi, arrester, satyagraha}@pln.co.id Abstract—Interbus Transformer (IBT) plays important role in the reliability of power system interconnecting two different voltage levels thus enable the power interchange. Failure in the IBTs’ bushings, will instantly lead to the power interruption and outage. Normally, IBTs are constructed of three windings with primary and secondary in wye and the tertiary in delta. The primary and secondary are loaded, with tertiary mostly unloaded and provide the isolating system due to the unbalance from the other two windings. Operating bushings above the nominal voltage tends to reduce the operating cycle. Displacement of absolute reference from phase to phase voltage thus will raise the applied voltage exceeds the nominal voltage. Theoretically, applying operating voltage of 1.571 x U0 to the tertiary bushing continuously is likely to reduce the life time of bushing to approximately 2.5 years. Online monitoring technique is introduced to monitor the changes in the bushings due to the degradation of insulation quality. Literature study focusing on the ideal condition of a bushing against the real loading cycle in operation also considered to estimate the insulation degradation mechanism. This study put more efforts in analyzing the bushing condition as the function of loading pattern and the applied voltage. Bushing online monitoring data are attached as well to describe the occurrences inside the bushing. At the end of this study, options on the protection scheme are described with fault analysis.  Index Terms—tertiary bushing, partial discharge, expected life time, protection scheme I. INTRODUCTION Generally the existence of tertiary windings in transformer enable the path to the current circulation in the winding itself when the unbalanced conditions occur both in normal operation or fault circumstances. Tertiary windings enhanced the more compact, simple and economics design of transformers. Practically, the tertiary windings play roles as [1]:  To reduce triple harmonic of output voltage thereby stabilizing potential of the neutral point.  To suppress third harmonic current.  To provide path of circulation current in unbalance condition.  To reduce the system zero sequence impedance in effective earthing where solid earthing is not provided.  Manuscript received August 19, 2014; revised August 30, 2015.  To supply the auxiliary loads. In PLN it is a common practice to utilize the single phase single bank interbus transformers (IBTs) for 500kV, with few of three phase single bank IBT. Total of 135 unit of IBTs are in operation at voltage level of 500/150kV with tertiary winding to deliver the power from 500kV to 150kV power grid with detail as Table I [2]. TABLE I. TYPE AND NUMBER OF INTERBUS TRANSFORMER No. Interbus Transformer Tertiary Earthing Total 1. Three phase single bank Solid 3 2. Single phase single bank Solid 26 3. Single phase single bank Floating 18 During the operation, several failures and damages on were recorded. Table II shows the event recorded during period of 2008 up to 2013 on IBTs 500/150kV. The failure of IBT results in unexpected large area blackout and huge losses of economics and social potential in the community. It is necessary to continuously observe the condition of IBTs and run a life cycle estimation to avoid the occurrence of this unexpected event so the future action can be precisely planned in precaution. TABLE II. IBTS FAILURE STATISTICS IN JAVA BALI SYSTEM No. IBT Identity Year of Operation Year of Failure Cause 1. CW1 ph R 1996 2009 Bushing 2. KB1 ph T 1994 2009 Secondary Bushing 3. CB2 ph R 2012 2012 Tertiary Bushing 4. CW2 ph S 1996 2013 Tertiary Bushing II. BUSHING AND ITS STANDARDS Referred to IEC 60137 [3], bushing is defined as device the enables one or several conductors to pass through a partition such as a wall or a tank, and insulates the conductors from it. Bushings experience the highest stress compared to other parts of a transformer. Part of bushing that suffered the highest potential gradient is part that close to the enclosure/tank of the transformer or parts that is directly earthed. The contribution of bushings failure to the transformer damaged range from 12.3%-20% according to CIGRE 1983 statistic. This statistic is higher in PLN as describe in Table II above. International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016 ©2016 Int. J. Electron. Electr. Eng. 215 doi: 10.18178/ijeee.4.3.215-220
  • 2. A. Tertiary Winding Connection The IBTs 500/150/66kV in PLN are commonly connected in delta for the tertiary winding and solidly earthed as shown in Fig. 1 and Fig. 2. The rated voltage of tertiary winding is 66kV. Figure 1. Tertiary connected in Delta in IBTs. Figure 2. Equivalent circuit and the vector. In vector analysis, the tertiary winding can be redrawn in the following equivalent circuit. In the unearthed delta circuit, the phase-to-phase voltages of each phase are 66kV without phase-to-earth reference. The 66kV is the relative voltage between phases. No absolute reference in this connection. The apparent reference as if the neutral point is in the center of the delta, shown in the blue dash line. When the connection between phase S and T is drawn solidly earthed, then the absolute reference is now appear and the apparent neutral point displace to the connection point between phase S and T. The relative voltage of 66kV at phase S and T now turn to be the absolute voltage. B. Bushing Specification Most of the bushings assembled to the tertiary winding are rated at 72.5kV with the specification as shown in Table III. TABLE III. SPECIFICATION OF TERTIARY BUSHING No. Item Remark 1. Type Not mentioned 2. Highest voltage (Um) 72.5kV 3. Maximum phase to earth voltage 42kV 4. Bushing Dry Power frequency voltage withstand (AC) 155kV 5. Transformer Power frequency voltage withstand (AC) 140kV 6. Lightning Impulse withstand voltage (BIL) 325kV 7. Rated current (Ir) 800/1000/1250/1 600/2500/3150A 8. AD Arcing distance (min.) 600mm 9. Standard creepage distance 1820mm C. Online Bushing Monitoring Online bushing monitoring installed in IBT is a Dynamic Rating type DTM-6 (see Fig. 3). The monitored parameters are:  Temperature  Bushing power factor  Bushing capacitance  Bushing partial discharge Figure 3. Test/Potential tap of bushing and installed DTM-6. The principle of DTM-6 is sum the currents measured from the bushing via the test/potential tap (Table III). This sum of current method calculates relative variance of capacitance and power factor of each bushing. The online bushing monitoring data were taken from DTM-6 installed at on IBT 500/150/66kV at CW SS, Jakarta, with the following measurement on two bushings of each phase of tertiary winding:  Channel 7 (CH07) TV1 Bushing phase R (Tertiary)  Channel 8 (CH08) TV1 Bushing phase S (Tertiary)  Channel 9 (CH09) TV1 Bushing phase T (Tertiary)  Channel 10 (CH010) TV2 Bushing phase R (Tertiary)  Channel 11 (CH011) TV2 Bushing phase S (Tertiary)  Channel 12 (CH012) TV2 Bushing phase T (Tertiary) The measurement data on primary and secondary winding will not be concerned further since this study focus on the tertiary winding. III. DATA AND LITERATURE STUDY Due to the lack of supporting data from the routine maintenance and online monitoring prior to 2012, this project is focused on the literature study with the empiric and some theoretical approach. Data from online monitoring measurements are applied as comparison variable whether there are changes in diagnostic parameters. A. Online Monitoring The bushing online monitoring data is achieved from DTM-6 recorder with observed parameter:  Imbalanced current  Tan δ and capacitance of bushing  Changes of load current, temperature, humidity as reference  Partial discharge Fig. 4 shows the record of Tan δ parameter taken in the period of June 18th -20th, 2013. Areas marked with yellow, green and red respectively show the abnormalities measurement of Tan δ phase R, S and T. International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016 ©2016 Int. J. Electron. Electr. Eng. 216
  • 3. The abnormality of bushing is associated to the phase due to unbalanced current encountering related area. Unbalanced current was 1.87% and 28.69°, which is below the critical value of 3% [4]. Figure 4. Tan δ online monitoring. Fig. 5 shows record of capacitance parameter taken from the same period as the Tan δ parameter. Lines marked with yellow, green, red, purple and blue respectively show capacitance measurement of bushing tertiary phase R, S and T, the temperature and humidity of the ambient condition. There were not significant changes associated to the deviation of temperature and humidity. The capacitance parameters show relatively stable reading at 411pF, 383pF and 338pF each phases. Figure 5. Capacitance online monitoring. Figure 6. PD online monitoring on tertiary bushings 3.1. Fig. 6 shows the record of PD activities during longer period on tertiary bushings 3.1. Lines marked by purple, grey, green, blue and red respectively refer to bushing 3.1 phase R, S, T and measurement of humidity and temperature of ambient condition of these bushings. At certain time interval, bushing 3.1 at phase R shows significant PD activities compare with the other bushings. The lowest PD activities was recorded at bushing T. instead of to display the quantitative measurement, PD activity records show the existence of PD activity itself in the associated bushing. Fig. 7 shows the record of PD activities on tertiary bushings 3.2. Lines mark by brown, yellow, black, blue and red respectively refer to bushing 3.2 phase R, S, T, humidity and temperature of ambient condition surround the bushings. Bushing phase T consistently shows the PD activity with the highest occurrence among the other two bushings. Figure 7. PD online monitoring on tertiary bushings 3.2. B. Literature Review In general, high voltage equipments are designed to be able to perform well under rated operation voltage in life time between 30 up to 50 years. Testing prior to the operation against the over voltage circumstances were conducted referred to the testing specification included the lightning and switching impulse, AC and DC voltage which are combined with the heat cycles, load cycles, mechanical loads etc. To meet the requirements of HV equipment specifications and to achieve the uniform specifications, HV system is standardized as:  U, is a phase to phase voltage, which determine the system voltage of equipments,  Um, is maximum phase to phase voltage which can be applied during a relatively long time, generally Um ranges from 5 up to 15% higher than U,  U0, is rated phase to earth voltage, hence 3 U U0  . U0 is an important value for the testing specification of which the testing voltage is referred to the multiple of U0. The period of testing voltage applied to is associated to the expected life time of HV equipment as shown in Table IV [5]. International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016 ©2016 Int. J. Electron. Electr. Eng. 217
  • 4. TABLE IV. TESTING VOLTAGE AGAINST THE EXPECTED LIFE TIME No. Testing Voltage [ x U0 ] Expected Life Time 1. 1.0 30-50 years 2. 2.0 42 days 3. 3.0 1 day 4. 4.5 1 minute Testing at 4.5xU0 for 1 minute is categorized as high potential testing with relatively short time duration compared to other HV equipment testing. The testing purpose is to trigger harmless defect to insulation dielectric at lower testing voltage, however it is necessary to be considered that this testing cannot assure the operational life time up to the designated cycle. The endurance testing is more recommended at 3xU0 for 24 hours [5]. Based on the testing review and calculation approaches, with the assumption of the designated life time of bushing is 50 years, the estimation of life time of bushing can be evaluate with the following equation: n appliedU k time_life_bushing  where k is the bushing designated life time constant, and n is coefficient of bushing life time as function of applied/operational voltage. In Fig. 8, the bushing expected life time as function of applied voltage is shown in blue line. For the tertiary bushing connected in delta and earthed at connection between phase S and T, the bushing experiences 66kV phase to earth voltage despite of 66kV phase to phase voltages. The maximum phase to earth voltage as in the specification of bushing is 42kV (Table III). With the continuous applied voltage at bushing phase S and T is 1.571xU0, the expected time is estimated as 130 days (n = 11.093). If the manufacturer applied the safety margin of 1.2 to the bushing design, then the expected life time will rise to 2.5 years. Theoretically expected life time for the continuous applied voltage 1.57xU0 can reach more than 2.5 year, whilst in reality the life time can exceed far beyond 2.5 years or even less depends on many conditions of the bushings. Figure 8. Expected life time of bushing as function of applied voltage. IV. TERTIARY WINDING DELTA CONNECTION PROTECTION SCHEME Earthing of delta winding will raise the voltage reference at the related bushings from phase to phase to be phase to earth and give more stress to the bushing insulation. C1 component of bushing will suffer the higher voltage which results in the increment of the dielectric losses, the thermal effect and the temperature. Special investigation carried out on drawn out bushings due to the tan δ of the insulation oil exceeding the normal value has shown these bushings met the requirement of routine testing as well as the new bushing testing [6]. Based on the report paper presented in CIGRE session 2002, the failure in bushing may be introduced as the following [7]:  Degradation of the oil and formation of oil products  Deposits of semi-conductive sediment on the surface under effect of electrical filed  Distortion of electrical field  Surface discharges, gas evolution and flashover. Earthing on point of delta will shift the phase-to-phase reference to phase-to-earth furthermore; the applied voltage to the bushings will exceed the rated voltage and introduces complex result to the accelerated ageing of the bushing life time. A. Directly Earthed Protection Scheme Directly earthing on delta winding enables simple protection scheme to the winding against the internal fault involving the ground/earth. An overcurrent relay fed from CT measuring the earthing connection from delta is sufficient to protect the delta winding. The other aspect shall be considered is the specification of bushings if it is intended to be directly earthed at one point. B. Floating/Not Earthed Protection Scheme Option to maintain the life time of tertiary bushing after directly earthed is removing the earthing and isolate the bushing to shift the phase-to-earth reference to phase- to-phase reference as the specification of the bushings. From the simulation of single phase to ground fault at tertiary winding connected in delta with infeed from 500kV and 150kV sides and 0 ohm fault resistance, there is no fault current in the tertiary winding, the voltage at faulted bushing will decrease and the healthy bushings will increase as high as the phase-to-phase voltage [7]. The symmetrical analysis shows there is zero sequence voltage. The installation of Potential Transformers at each phase and applying the unbalance voltage protection scheme will clearly discriminate the single phase to ground fault in the not earthed delta. The current protection scheme unable to operate due to the changes of current is not sufficient to be detected by the current based relays. There are two protection schemes can be applied for the floating delta connection: 1) Overvoltage protection scheme International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016 ©2016 Int. J. Electron. Electr. Eng. 218
  • 5. voltage as shown in Fig. 9. Since the floating delta is subjected to the voltage balance, this scheme provides more sensitivity in the single phase to ground fault even involving high resistance. Figure 9. Overvoltage protection scheme. 2) Zero sequence voltage protection scheme or known as the neutral displacement voltage scheme This scheme requires three Potential Transformers (PTs) connected in YNd and a voltage relay. The principle of this scheme is to detect any residual voltage from the open delta side as the unbalance voltage from the wye side of PT as shown in Fig. 10. This scheme provides more security but less sensitivity. Figure 10. Zero sequence voltage protection scheme. V. CONCLUSION AND FURTHER DISCUSSION A. Conclusion Online bushing monitoring on tertiary bushing at 500/150/66kV IBT connected in delta which is solidly earthed at connection point between phase S and T has shown the partial discharge activities. Theoretically, applying the operating voltage exceed the rated U0 to the tertiary bushing increase the risk of the bushing to fail. Tertiary bushing connected in delta which is solidly earthed has benefits in anticipating the occurrence of internal faults, however removing the earthing of delta will compensate the life time of the bushing due to the voltage reference. For the tertiary winding connected in delta, the removing of earthing at one point of delta shall be completed by the proper protection scheme. B. Further Discussion More detail data on the bushing are required to have a comprehensive description of bushing condition. The economics of rated voltage of U0 consideration as the specification of bushings and the earthing scheme of tertiary winding connected in delta shall be investigate later. Further research shall be carried out to investigate other IBTs which are in operation with the tertiary winding connected in delta and solidly earthed despite the tertiary bushing has been calculated theoretically to reach the end of lifetime but still remain in operation until this moment. ACKNOWLEDGMENT This work was supported by PT PLN (Persero) P3B Jawa Bali and PT Global Twin Star, The author would like to acknowledge the valuable discussion and measurement data from Mr. Johny Santoso dan Mr. Hasanuddin. REFERENCES [1] M. Marg and Chanakyapuri, “Study on the causes of failure of tertiary winding of power transformer and its protection,” Research Scheme on Power, Technical Report, no. 38, July 1984. [2] PST Monthly Operational Data in September 2013, PT PLN (Persero) P3B Jawa Bali, Jakarta, September 2013. [3] Insulated Bushings for Alternating Voltages above 1000Volt, IEC Standard 60137, 5th ed., August 2003. [4] Tan δ Measurement Reference Value on Bushing Online Monitoring, Power Transformer Online Monitoring System, Dynamic Rating. [5] F. H. Kreuger, Industrial High Voltage, Delft University Press, 1991. [6] V. Sokolov and B. Vanin, “Evaluation and identification of typical defects and failure modes in 110-750kV bushings,” in Proc. Sixty- Forth Annual Conference of Doble Clients, 1997, sec. 3.3. [7] R. A. Wibowo and S. Armaini, “Phase to ground fault performance analysis of delta winding of inter bus transformer Joko Muslim was born in Jambi, Indonesia, in 1980. He received the B.E. degree in electrical engineering from the Trisakti University, Jakarta, Indonesia, in 2003 and M.Eng degree in electrical engineering from Institut Teknologi Bandung (ITB), Bandung, Indonesia, joined research with Kyushu Institute of Technology (KIT), Kyushu, Japan in 2013. In 2003, he started his professional experience as Application Engineer. In 2005 he joined PLN Indonesia and assigned to Sumatera Transmission and Load Dispatch Center in Padang, West Sumatera and responsible for protection system engineering. Since 2013, he was reassigned to PLN Research Institute in Jakarta as Protection System Researcher. His current research interests include power system protection and stability, circuit breaker, current transformer and HV equipments, synchro phasor measurement system and generator control system. Mr. Muslim was member author of Sumatera Protection, CT, PT O&M guidance book. He is also an assessor of protection competency, instructor of PLN Academy, member of PLN Standards of Transmission Working Group, jury of Annual PLN Innovation and reviewer of PLN Conference. Didik F. Dakhlan was born in Boyolali, Central Java, Indonesia, in 1980. He received the B.E. degree in electrical engineering from Institut Teknologi Bandung (ITB), Bandung, Indonesia, in 2002 and MSc degree in electrical engineering from Technische Universiteit Delft (TU Delft), Delft, Netherlands, in 2009. He is now a PhD Candidate from Technische Universiteit Delft (TU Delft), Delft, Netherlands. International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016 ©2016 Int. J. Electron. Electr. Eng. 219 This scheme requires three Potential Transformers (PTs) connected in YNyn0 and three overvoltage relays. The principle of this scheme is to detect any unbalance 500kV/150kV,” PT PLN (Persero) Puslitbang Research Report, no. 16, 2009.
  • 6. In 2002 he joined PLN Indonesia and assigned to Java Bali Transmission and Load Dispatch Center in Jakarta and responsible for SCADA and protection system engineering. In 2010, he was assigned to PLN Research Institute in Jakarta as Protection System Researcher and became Deputy Manager of Transmission and Distribution System Research Planning in 2012. Since 2014, he was assigned as Deputy Manager of Protection, Installation, and Power System Laboratory. His current research interests include power system protection and control, power system stability, investigation of power system disturbance/failure, wide area protection and control, and generator control system. Mr. Dakhlan is also an assessor of protection competency, instructor of PLN Corporate University, secretary of PLN Standards of Transmission Working Group and reviewer of PLN Conference. Satyagraha A. Kadir was born in Karawang, West Java, Indonesia, in 1959. He received the B.E. degree in electrical engineering from Universitas Krisnadwipayana, Jakarta, Indonesia, in 1997. In 1981 he joined PLN Research Institute in Jakarta as Testing Engineer in Electrical Apparatus Laboratory. He is involved mostly in the power transformer, power cable and medium voltage switchgear testing. He was appointed as Manager of Research and Development of Transmission and Distribution during 2011-2014. Presently he is a senior researcher of electrical apparatus in PLN Research Institute. His current research interests include investigation of failure and performance electrical apparatus. Mr. Satyagraha was jury of Annual PLN Innovation up to 2014. He is also instructor of PLN Academy and member of PLN Standards of Distribution Working Group. Arrester C. S. Rahayu was born in Jakarta, Indonesia, in 1978. She received the B.E. degree in electrical engineering from Institut Teknologi Bandung (ITB), Bandung, Indonesia, in 2001 and MM degree in management from Universitas Indonesia, Jakarta, Indonesia, in 2003. She is now a PhD Candidate from Universitas Indonesia, Jakarta, Indonesia. In 2004, she joined PLN Indonesia and was assigned to PLN Region South Sumatra, Jambi and Bengkulu in Palembang, South Sumatra, and was responsible for distribution system and later on for Corporate Planning. In 2005, she was stationed in PLN Distribution Jakarta Raya and Tangerang in Corporate Planning Field. In 2006, she was transferred to PLN Head Office in Jakarta in Sub directorate Investment and Shareholders’ Ownership Management and was responsible for external funding. In 2009, she was assigned to Sub directorate Corporate Finance and was responsible for loan administration. In 2010, she was assigned to Human Resources and Talent Division and was responsible for leadership training. In 2011, she was assigned to PLN Research Institute in Jakarta as transmission and distribution system researcher and energy audit and techno economy researcher in 2013. Since 2014, she was assigned to PLN Head Office in Risk Management Division and is responsible for risk assessment. Her current research interests include T&D system, strategic management, corporate finance, project finance, risk management, and human resources. She was a member of PLN Standards of Distribution Working Group. She is also a member of PLN Standards of Transmission Working Group. International Journal of Electronics and Electrical Engineering Vol. 4, No. 3, June 2016 ©2016 Int. J. Electron. Electr. Eng. 220