Item 7. Good practices on purchasing and operating laboratory equipment
1. GOOD PRACTICES ON PURCHASING
AND OPERATING LABORATORY
EQUIPMENT
LESEGO MOOKETSI-SELEPE
DEPARTMENT OF AGRICULTURAL
RESEARCH, BOTSWANA
2. Available in English,
French, Arabic, Spanish and
Russian
at
http://www.fao.org/global-
soil-
partnership/glosolan/equip
ment/en/
3. PRESENTATION
PRACTICE
GOOD
BAD
GOOD PRACTICES ON PURCHASING LABORATORY EQUIPMENT
1. ASSESSMENT STAGE
2. RESEARCH AND QUOTATIONS
3. PROCUREMENT
4. RECEIVING THE ORDER
GOOD PRACTICES ON OPERATING LABORATORY EQUIPMENT
EQUIPMENT USE
4. PRINCIPLES
What is practice?
Dictionary definition: “The actual application or use of an idea, belief, or
method, as opposed to theories relating to it.”
When is it good or bad?
A practice is good when it effectively and successfully produce desirable
results. In laboratory testing it zooms into sensitivity and efficiency of
equipment and integrity obtained results.
A practice is bad when it has never been tested and proven/validated to give
good results.
5. PRINCIPLES…
1. ASSESSMENT/AUDIT
NEEDS and CAPACITIES
• Draw a plan breaking down required resources based on:
demand for service
personnel (trained or trainable)
Budget ( to cover all costs: purchasing, maintenance and
consumables)
Identified opportunity (donor) to consider
laboratory building
Carryout research and quotations
• To identify new versions
• To get an idea of prices
ACCESSIBILITIES
• Have a list of suppliers in your region
• Have a record of technical support provided by different suppliers
6. PRINCIPLES…
2. PROCUREMENT – prepared by a team (laboratory staff and
administration whose role is in processing orders).
Prepare an invitation to tender (ITT) or a request for a quotation
(RFQ)
Draw equipment technical specifications
Draw an ITT or RFQ stating:
• Procuring Entity’s details
• Required legal documents, validity period, delivery time
and warranty
• Equipment technical specifications
• Training required
• Bill of quantities
• Awarding of tender (full, part or none)
• Condition and method of payment
7. PRINCIPLES…
Tender evaluation
Compliance to:
• Provision of legal documents
• Equipment technical specifications
• Delivery period
Assurance of after sales support (CV of maintenance person and
maintenance plan)
Quality of equipment
Equipment costing
Tender offer
The most competent bidder will be given the order
• Based on quality of equipment and market competitive
pricing
Procurement officer under administration will prepare the order
Payment is done after satisfactory delivery
8. PRINCIPLES…
3. RECEIVING THE ORDER
Setting up
Prepare equipment room as specified in brochure e.g.
• Security
• Electric connection requirements
• Network points
• Ventilation
Installation
Confirm supply to order
Let provider
• Open packaging
• Install the equipment
• Be present during installation and take notes
Ensure that technicians attend the initial training
9. PRINCIPLES…
Calibration
Provider must ready the equipment for use
Produce a calibration plan
Contact
Manufacture/supplier details
Others users details
10. PRINCIPLES…
EQUIPMENT
Before use
Read user manual
Develop SOP
Develop performance monitoring tool
Identify safety measures required
• Carryout risk assessment (MSDS and equipment
operation)
• Personal protective equipment (PPE)
Draw maintenance plan
Check stock levels (system/manual)
Use
Wear appropriate PPE
Practice running the equipment immediately after training
Upload data to database or Laboratory Management System
11. PRINCIPLES…
After use
Record equipment performance
Dispose of waste generated as per risk assessment
recommendations
Tidy up around equipment, where required cover it
Check stock levels and process orders for all consumables
requiring refills