We SmCians have gone to Tiruppur at the construction stage of Flyover near Busstand by Siva Construction and undergone an implant training with the guidance of Site Engineer.
2. DESCRIPTION
• Cast in-situ method,
• Duration of 24months,
• Estimation approx. INR52Cr.
• 17 Piers of isolated footing
• Shallow foundation of 3m depth
• 16 Spans ( 4 curved Spans )
2
3. DESIGN DESCRIPTIONS
• Normal C/C distance of the pier( length of the span )
is 18m.
• C/C distance is 30m in the area of roundabout.
• M35 Grade of concrete is used in casting all except
Crash barrier (M40).
• Self weight of Span is 800 Tons and so it can
withstand nearly 1000 Tons.
3
6. DETAILS OF GRIDERS
• 4 Girders are used in the span of 18m
• 7 Girders are used in the span of 30m
• Web width 250mm
• Flange width 600mm
• Depth of the Girder 900mm
6
14. BEARINGS SPECIFICATION
• 80mm thickness ELASTOMETRIC NEOPRINE
BEARING was used for Symmetrical Span.
• PDFE POT BEARING was used for Obligatory
Span (30m).