ProjectDefinition
Project Outline
This proposal is based on an assessment of the current lighting system at the
Earls restaurant located at 3850 Lougheed Hwy in Burnaby BC.
The current system is based on an assessment conducted on October 10th
2014 of the restaurant’s front end dining area, back end preparation area,
service rooms, and exterior lighting. This report represents and accurate
outline of the costs and savings of this project achieved by upgrading the
lighting system to more efficient LED options.
All suggested options are available to be site tested at any local restaurants
by contacting CEEG Energy at the attached contact information.
Based on our assessment:
Annual Savings $9,080
Payback 1.9 years
Monthly Cost of Waiting $757
All suggested replacements are with new LED equivalents from locally
recognized brands and include CEEG’s 5 year warranty.
CEEG is an energy efficiency services company; outlined system costs include
assessments, redesigns, materials, installation, and warranty.
Name:
e‐mail:
Phone:
Name:
e‐mail:
Project Address: Phone:
Audit Date: Company:
Existing System Proposed System
System kWh System kWh Energy Cost Energy Cost
(monthly) (annual) (monthly) (annual)
5,710 68,523 179.56$               2,154.74$           
Project Costs Environmental Impact
Annual kWh saved
Estimated Incentive * Kg CO2 emissions saved (annual)
Total System Cost Tonnes CO2 emissions saved (5 years)
Additional Notes
      * Incentive based on Provincal Incentive Calculator and subject to approval
      Total System Costs include Materials, Installation, and Recycling of existing materials
      LED's include a 5 year warranty with a 1 year warranty on installation
      Maintenance savings are on replacement costs and any identified labour costs
      Energy rate used for year 1 calculations and cost of waiting: 0.12$             /kWh
      Payback based on published rise in annual electricity costs
Auditor
Ryan DiBenedetto
Project Name: rdibenedetto@ceegco.ca
Earls Restaurant 604‐880‐7413
Client
Tyler Pronyk
3850 Lougheed Hwy,Burnaby
10/10/2014 Earls
Energy Cost Energy Cost System kWh System kWh
(monthly) (annual) (monthly) (annual)
708.07$                  8,496.84$            1,448 17,377
System Cost 21,511.56$            51,146
Monthly Cost of Waiting
Payback (yrs) 1.9 756.65$                 
Maintanance Savings (annual) 2,737.72$            
Total Savings (annual) 9,079.82$             
4,341.00$              1,023
17,170.56$            5
Year 1 Energy Savings (annual) 6,342.10$             
StatementofWork
CEEG Energy
4170 Still Creek Dr.
Burnaby, BC
888-511-7105
Proposal to perform lighting upgrade services to Earls Restaurant
Date Prepared By: Prepared For:
October 10, 2014 CEEG Energy
4170 Still Creek Dr.
Burnaby, BC
888-511-7105
Earls Restaurant
3850 Lougheed Hwy
Burnaby, BC
Scope of Work
CEEG shall provide the services and deliverables as follows:
• Removal and recycling of the existing lighting fixtures including:
• Manage all correspondence with the local government to comply with
electrical installations
• Conduct the installation of all materials outlined in the section
“Deliverable Materials”
Existing Luminaire Input Wattage QTY
Incandescent A19 40 15
Halogen PAR 30 75 14
Halogen PAR38 90 37
Halogen MR16 50 52
CF Globe Lamps 14 7
Decorative Lighting 8 99
Below Bar Decorative 6 102
2’x4’ Lensed Troffer – 4Lamp T8 152 16
1’x4’ Lensed Troffer – 2Lamp T8 76 16
Strip Light – 1 Lamp T8 38 14
Metal Halide Exterior Wall Pack 70 2
Deliverable Materials
New Luminaire Input
Watts
QTY Manufacturer Warranty
LED A19 7 15 TCP 5 years
LED Globe 8 7 TCP 5 years
LED MR16 7 52 TCP 5 years
LED BR30 10 51 TCP 5 years
E26 Deco LED 4 99 TCP 5 years
2’ x 4’ LED Troffer 51 16 TCP 5 years
1’ x 4’ LED Troffer 26 16 TCP 5 years
LED Tape Light 75 1 Standard 5 years
LED Wallpack 20 2 Hubbell 5 years
1’ x 4’ LED Strip 19 14 Phillips 5 years
Contractor Responsibilities
• All work to be completed during regular business hours or as indicated by
the building owner
Client Responsibilities
• Customer must provide free and clear access to work area for duration of
project. If free and clear access is not or cannot be provided, additional
costs may be incurred
Notes
• LED's and installation include a 5 year warranty
• Maintenance savings are on replacement costs and identified labour
costs
• Energy rate used for year 1 calculations and cost of waiting is $0.12/kWh
and based on a government published blended rate for Vancouver, BC
• Payback based on published rise in annual electricity costs
• Taxes are extra
Completion Criteria
CEEG shall have fulfilled its obligations when the following occurs:
• CEEG accomplishes the contractor activities described within this
statement of work, including delivery to client of the materials listed in the
section entitled “Deliverable Materials,” and installation of the above
mentioned materials and client accepts such activities and materials
without unreasonable objections.
Total system costs include permits, materials, installation, and recycling of existing
materials.
Project Costs
Total System Cost $ 21,512
Total Incentives $ 4,341
Year 1 Energy Savings (annual) $ 6,342
Maintenance Savings (annual) $ 2,738
Total Savings (annual) $ 9,080
Payback (years) 1.9

More Related Content

What's hot

Steve fraser managing director fbe presentation
Steve fraser managing director fbe presentationSteve fraser managing director fbe presentation
Steve fraser managing director fbe presentationFBE Manchester
 
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)IES VE
 
AEP texas project edison award winner
AEP texas project edison award winnerAEP texas project edison award winner
AEP texas project edison award winnerDave Bryant
 
Report: Access Northeast Project - Reliability Benefits and Energy Cost Savin...
Report: Access Northeast Project - Reliability Benefits and Energy Cost Savin...Report: Access Northeast Project - Reliability Benefits and Energy Cost Savin...
Report: Access Northeast Project - Reliability Benefits and Energy Cost Savin...Marcellus Drilling News
 
The Ins & Outs of Energy Efficiency in the Building Code - Bob Bach, P.Eng.
The Ins & Outs of Energy Efficiency in the Building Code - Bob Bach, P.Eng.The Ins & Outs of Energy Efficiency in the Building Code - Bob Bach, P.Eng.
The Ins & Outs of Energy Efficiency in the Building Code - Bob Bach, P.Eng.SBCBreakfastSessions
 

What's hot (7)

Steve fraser managing director fbe presentation
Steve fraser managing director fbe presentationSteve fraser managing director fbe presentation
Steve fraser managing director fbe presentation
 
Multifamily Energy Efficiency Webinar
Multifamily Energy Efficiency WebinarMultifamily Energy Efficiency Webinar
Multifamily Energy Efficiency Webinar
 
2015resume1
2015resume12015resume1
2015resume1
 
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
 
AEP texas project edison award winner
AEP texas project edison award winnerAEP texas project edison award winner
AEP texas project edison award winner
 
Report: Access Northeast Project - Reliability Benefits and Energy Cost Savin...
Report: Access Northeast Project - Reliability Benefits and Energy Cost Savin...Report: Access Northeast Project - Reliability Benefits and Energy Cost Savin...
Report: Access Northeast Project - Reliability Benefits and Energy Cost Savin...
 
The Ins & Outs of Energy Efficiency in the Building Code - Bob Bach, P.Eng.
The Ins & Outs of Energy Efficiency in the Building Code - Bob Bach, P.Eng.The Ins & Outs of Energy Efficiency in the Building Code - Bob Bach, P.Eng.
The Ins & Outs of Energy Efficiency in the Building Code - Bob Bach, P.Eng.
 

Viewers also liked

Case Study- National Restaurant Chain
Case Study- National Restaurant ChainCase Study- National Restaurant Chain
Case Study- National Restaurant ChainBrandify
 
Corner View Restaurant Case Study
Corner View Restaurant Case StudyCorner View Restaurant Case Study
Corner View Restaurant Case StudyRecipe Marketing
 
M6 restaurant Interior Design
M6 restaurant Interior DesignM6 restaurant Interior Design
M6 restaurant Interior DesignAlice Cheng
 
Restaurant Renovation Design - Process Book
Restaurant Renovation Design - Process BookRestaurant Renovation Design - Process Book
Restaurant Renovation Design - Process Bookrajensen00
 
DESIGN: Restaurant Design 1.0
DESIGN: Restaurant Design 1.0DESIGN: Restaurant Design 1.0
DESIGN: Restaurant Design 1.0ArchiEducPH
 
Restaurant Design Awards 2010 Presentation Final
Restaurant Design Awards 2010 Presentation FinalRestaurant Design Awards 2010 Presentation Final
Restaurant Design Awards 2010 Presentation Finalabfine1
 
integrated project - interior design
integrated project - interior designintegrated project - interior design
integrated project - interior designChinWerng Tan
 
Ginny's restaurant case study fm
Ginny's restaurant case study fmGinny's restaurant case study fm
Ginny's restaurant case study fmAshish Barapatre
 
Restaurant design services
Restaurant design servicesRestaurant design services
Restaurant design servicesSrin Soft
 
Residential Design - Penthouse
Residential Design - PenthouseResidential Design - Penthouse
Residential Design - Penthouserajensen00
 
Restaurant Design - Conceptual Plan
Restaurant Design - Conceptual PlanRestaurant Design - Conceptual Plan
Restaurant Design - Conceptual Planrajensen00
 
Interior Design Project (Restaurant)
Interior Design Project (Restaurant)Interior Design Project (Restaurant)
Interior Design Project (Restaurant)MohamedMoawad
 
Restaurant Design Presentation
Restaurant Design PresentationRestaurant Design Presentation
Restaurant Design Presentationmaggielair
 
Restaurant Design: 18 Considerations to Remember
Restaurant Design: 18 Considerations to RememberRestaurant Design: 18 Considerations to Remember
Restaurant Design: 18 Considerations to RememberAaron Allen
 
Design Thinking Process
Design Thinking ProcessDesign Thinking Process
Design Thinking ProcessHeyy Gus
 
Themed restaurant
Themed restaurantThemed restaurant
Themed restaurantBinoy Thapa
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on ResortImtiaz Ahmad
 
Restaurant Presentation
Restaurant PresentationRestaurant Presentation
Restaurant PresentationShahid Sameer
 
Restaurant Business Plan Presentation
Restaurant Business Plan PresentationRestaurant Business Plan Presentation
Restaurant Business Plan PresentationMahadi Hasan
 

Viewers also liked (20)

Case Study- National Restaurant Chain
Case Study- National Restaurant ChainCase Study- National Restaurant Chain
Case Study- National Restaurant Chain
 
Corner View Restaurant Case Study
Corner View Restaurant Case StudyCorner View Restaurant Case Study
Corner View Restaurant Case Study
 
M6 restaurant Interior Design
M6 restaurant Interior DesignM6 restaurant Interior Design
M6 restaurant Interior Design
 
Restaurant Renovation Design - Process Book
Restaurant Renovation Design - Process BookRestaurant Renovation Design - Process Book
Restaurant Renovation Design - Process Book
 
DESIGN: Restaurant Design 1.0
DESIGN: Restaurant Design 1.0DESIGN: Restaurant Design 1.0
DESIGN: Restaurant Design 1.0
 
Restaurant Design Awards 2010 Presentation Final
Restaurant Design Awards 2010 Presentation FinalRestaurant Design Awards 2010 Presentation Final
Restaurant Design Awards 2010 Presentation Final
 
integrated project - interior design
integrated project - interior designintegrated project - interior design
integrated project - interior design
 
Ginny's restaurant case study fm
Ginny's restaurant case study fmGinny's restaurant case study fm
Ginny's restaurant case study fm
 
Restaurant design services
Restaurant design servicesRestaurant design services
Restaurant design services
 
Residential Design - Penthouse
Residential Design - PenthouseResidential Design - Penthouse
Residential Design - Penthouse
 
restaurant development + design: Project Management 101
restaurant development + design: Project Management 101restaurant development + design: Project Management 101
restaurant development + design: Project Management 101
 
Restaurant Design - Conceptual Plan
Restaurant Design - Conceptual PlanRestaurant Design - Conceptual Plan
Restaurant Design - Conceptual Plan
 
Interior Design Project (Restaurant)
Interior Design Project (Restaurant)Interior Design Project (Restaurant)
Interior Design Project (Restaurant)
 
Restaurant Design Presentation
Restaurant Design PresentationRestaurant Design Presentation
Restaurant Design Presentation
 
Restaurant Design: 18 Considerations to Remember
Restaurant Design: 18 Considerations to RememberRestaurant Design: 18 Considerations to Remember
Restaurant Design: 18 Considerations to Remember
 
Design Thinking Process
Design Thinking ProcessDesign Thinking Process
Design Thinking Process
 
Themed restaurant
Themed restaurantThemed restaurant
Themed restaurant
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
 
Restaurant Presentation
Restaurant PresentationRestaurant Presentation
Restaurant Presentation
 
Restaurant Business Plan Presentation
Restaurant Business Plan PresentationRestaurant Business Plan Presentation
Restaurant Business Plan Presentation
 

Similar to LED Upgrade Saves Earls Restaurant $9,080 Annually

CEEG - Case Study (Restaurant) - Browns Social House
CEEG - Case Study (Restaurant) - Browns Social HouseCEEG - Case Study (Restaurant) - Browns Social House
CEEG - Case Study (Restaurant) - Browns Social HouseShawn Brown
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptxSayeedHvac
 
RSF Net zero operations 2020
RSF Net zero operations 2020RSF Net zero operations 2020
RSF Net zero operations 2020Shanti Pless
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Shanti Pless
 
Brookwood-GreenBrook Generic-ppt-Final
Brookwood-GreenBrook Generic-ppt-FinalBrookwood-GreenBrook Generic-ppt-Final
Brookwood-GreenBrook Generic-ppt-FinalMilton R. Howard
 
EnPC - Successful Deployment in Local Government
EnPC - Successful Deployment in Local GovernmentEnPC - Successful Deployment in Local Government
EnPC - Successful Deployment in Local GovernmentEMEX
 
Research Support Facility: Three years of net zero operations, occupants, and...
Research Support Facility: Three years of net zero operations, occupants, and...Research Support Facility: Three years of net zero operations, occupants, and...
Research Support Facility: Three years of net zero operations, occupants, and...Shanti Pless
 
Huge ‘Untapped’ Financial Benefits Exclusively For NYC Building Owners
Huge ‘Untapped’ Financial Benefits Exclusively For NYC Building Owners Huge ‘Untapped’ Financial Benefits Exclusively For NYC Building Owners
Huge ‘Untapped’ Financial Benefits Exclusively For NYC Building Owners EEReports.com
 
CSR Gyprock Coopers Plains
CSR Gyprock Coopers PlainsCSR Gyprock Coopers Plains
CSR Gyprock Coopers PlainsPK Mohan
 
BER - National Home Retrofit Programme
BER - National Home Retrofit ProgrammeBER - National Home Retrofit Programme
BER - National Home Retrofit ProgrammeSustainableEnergyAut
 
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the IncentiveNov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the IncentiveAnne Patenaude
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13GreenHomeNYC
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processShanti Pless
 
13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE FundingTim Rushenberg
 

Similar to LED Upgrade Saves Earls Restaurant $9,080 Annually (20)

CEEG - Case Study (Restaurant) - Browns Social House
CEEG - Case Study (Restaurant) - Browns Social HouseCEEG - Case Study (Restaurant) - Browns Social House
CEEG - Case Study (Restaurant) - Browns Social House
 
Respond! Clare Presentation 2015 A
Respond! Clare Presentation 2015 ARespond! Clare Presentation 2015 A
Respond! Clare Presentation 2015 A
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
 
Manufacturing (food)
Manufacturing  (food)Manufacturing  (food)
Manufacturing (food)
 
RSF Net zero operations 2020
RSF Net zero operations 2020RSF Net zero operations 2020
RSF Net zero operations 2020
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
 
Realizing the Economic Impacts of Energy Efficiency in Pennsylvania
Realizing the Economic Impacts of Energy Efficiency in PennsylvaniaRealizing the Economic Impacts of Energy Efficiency in Pennsylvania
Realizing the Economic Impacts of Energy Efficiency in Pennsylvania
 
Colin Powell GCP Architecture Slides
Colin Powell GCP Architecture SlidesColin Powell GCP Architecture Slides
Colin Powell GCP Architecture Slides
 
Brookwood-GreenBrook Generic-ppt-Final
Brookwood-GreenBrook Generic-ppt-FinalBrookwood-GreenBrook Generic-ppt-Final
Brookwood-GreenBrook Generic-ppt-Final
 
EnPC - Successful Deployment in Local Government
EnPC - Successful Deployment in Local GovernmentEnPC - Successful Deployment in Local Government
EnPC - Successful Deployment in Local Government
 
Research Support Facility: Three years of net zero operations, occupants, and...
Research Support Facility: Three years of net zero operations, occupants, and...Research Support Facility: Three years of net zero operations, occupants, and...
Research Support Facility: Three years of net zero operations, occupants, and...
 
Big Savings for Clean Generation Part III
Big Savings for Clean Generation Part IIIBig Savings for Clean Generation Part III
Big Savings for Clean Generation Part III
 
Huge ‘Untapped’ Financial Benefits Exclusively For NYC Building Owners
Huge ‘Untapped’ Financial Benefits Exclusively For NYC Building Owners Huge ‘Untapped’ Financial Benefits Exclusively For NYC Building Owners
Huge ‘Untapped’ Financial Benefits Exclusively For NYC Building Owners
 
CSR Gyprock Coopers Plains
CSR Gyprock Coopers PlainsCSR Gyprock Coopers Plains
CSR Gyprock Coopers Plains
 
BER - National Home Retrofit Programme
BER - National Home Retrofit ProgrammeBER - National Home Retrofit Programme
BER - National Home Retrofit Programme
 
CFL Our Services
CFL Our ServicesCFL Our Services
CFL Our Services
 
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the IncentiveNov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
 
13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding
 

LED Upgrade Saves Earls Restaurant $9,080 Annually

  • 1. October 10th 2014 Tayber Yastremski Energy Manager TYastremski@ceegco.ca 888.511.7105 Ext. 103 Restaurant Case Study Earls 3850 Lougheed Hwy Burnaby, BC
  • 2. ProjectDefinition Project Outline This proposal is based on an assessment of the current lighting system at the Earls restaurant located at 3850 Lougheed Hwy in Burnaby BC. The current system is based on an assessment conducted on October 10th 2014 of the restaurant’s front end dining area, back end preparation area, service rooms, and exterior lighting. This report represents and accurate outline of the costs and savings of this project achieved by upgrading the lighting system to more efficient LED options. All suggested options are available to be site tested at any local restaurants by contacting CEEG Energy at the attached contact information. Based on our assessment: Annual Savings $9,080 Payback 1.9 years Monthly Cost of Waiting $757 All suggested replacements are with new LED equivalents from locally recognized brands and include CEEG’s 5 year warranty. CEEG is an energy efficiency services company; outlined system costs include assessments, redesigns, materials, installation, and warranty.
  • 3. Name: e‐mail: Phone: Name: e‐mail: Project Address: Phone: Audit Date: Company: Existing System Proposed System System kWh System kWh Energy Cost Energy Cost (monthly) (annual) (monthly) (annual) 5,710 68,523 179.56$               2,154.74$            Project Costs Environmental Impact Annual kWh saved Estimated Incentive * Kg CO2 emissions saved (annual) Total System Cost Tonnes CO2 emissions saved (5 years) Additional Notes       * Incentive based on Provincal Incentive Calculator and subject to approval       Total System Costs include Materials, Installation, and Recycling of existing materials       LED's include a 5 year warranty with a 1 year warranty on installation       Maintenance savings are on replacement costs and any identified labour costs       Energy rate used for year 1 calculations and cost of waiting: 0.12$             /kWh       Payback based on published rise in annual electricity costs Auditor Ryan DiBenedetto Project Name: rdibenedetto@ceegco.ca Earls Restaurant 604‐880‐7413 Client Tyler Pronyk 3850 Lougheed Hwy,Burnaby 10/10/2014 Earls Energy Cost Energy Cost System kWh System kWh (monthly) (annual) (monthly) (annual) 708.07$                  8,496.84$            1,448 17,377 System Cost 21,511.56$            51,146 Monthly Cost of Waiting Payback (yrs) 1.9 756.65$                  Maintanance Savings (annual) 2,737.72$             Total Savings (annual) 9,079.82$              4,341.00$              1,023 17,170.56$            5 Year 1 Energy Savings (annual) 6,342.10$             
  • 4. StatementofWork CEEG Energy 4170 Still Creek Dr. Burnaby, BC 888-511-7105 Proposal to perform lighting upgrade services to Earls Restaurant Date Prepared By: Prepared For: October 10, 2014 CEEG Energy 4170 Still Creek Dr. Burnaby, BC 888-511-7105 Earls Restaurant 3850 Lougheed Hwy Burnaby, BC Scope of Work CEEG shall provide the services and deliverables as follows: • Removal and recycling of the existing lighting fixtures including: • Manage all correspondence with the local government to comply with electrical installations • Conduct the installation of all materials outlined in the section “Deliverable Materials” Existing Luminaire Input Wattage QTY Incandescent A19 40 15 Halogen PAR 30 75 14 Halogen PAR38 90 37 Halogen MR16 50 52 CF Globe Lamps 14 7 Decorative Lighting 8 99 Below Bar Decorative 6 102 2’x4’ Lensed Troffer – 4Lamp T8 152 16 1’x4’ Lensed Troffer – 2Lamp T8 76 16 Strip Light – 1 Lamp T8 38 14 Metal Halide Exterior Wall Pack 70 2
  • 5. Deliverable Materials New Luminaire Input Watts QTY Manufacturer Warranty LED A19 7 15 TCP 5 years LED Globe 8 7 TCP 5 years LED MR16 7 52 TCP 5 years LED BR30 10 51 TCP 5 years E26 Deco LED 4 99 TCP 5 years 2’ x 4’ LED Troffer 51 16 TCP 5 years 1’ x 4’ LED Troffer 26 16 TCP 5 years LED Tape Light 75 1 Standard 5 years LED Wallpack 20 2 Hubbell 5 years 1’ x 4’ LED Strip 19 14 Phillips 5 years Contractor Responsibilities • All work to be completed during regular business hours or as indicated by the building owner Client Responsibilities • Customer must provide free and clear access to work area for duration of project. If free and clear access is not or cannot be provided, additional costs may be incurred Notes • LED's and installation include a 5 year warranty • Maintenance savings are on replacement costs and identified labour costs • Energy rate used for year 1 calculations and cost of waiting is $0.12/kWh and based on a government published blended rate for Vancouver, BC • Payback based on published rise in annual electricity costs • Taxes are extra
  • 6. Completion Criteria CEEG shall have fulfilled its obligations when the following occurs: • CEEG accomplishes the contractor activities described within this statement of work, including delivery to client of the materials listed in the section entitled “Deliverable Materials,” and installation of the above mentioned materials and client accepts such activities and materials without unreasonable objections. Total system costs include permits, materials, installation, and recycling of existing materials. Project Costs Total System Cost $ 21,512 Total Incentives $ 4,341 Year 1 Energy Savings (annual) $ 6,342 Maintenance Savings (annual) $ 2,738 Total Savings (annual) $ 9,080 Payback (years) 1.9