PROFILE IN VARIOUS ASSIGNMENTS
IN THE FIELD
MECHANICAL & ELECTRICAL SERVICES OF
ROHINI PATIL
DEE,DBM,MMS, PGDPM with 16+ years of experience
Contact No:-8237002837 Email:- rohini.patil1975@gmail.com
Responsibilities
 Spearheading MEP Services teams & coordination for MEP services activities in multiple
industry segments with various alternatives.
 In design build contract, the work performed –
 Feasibility & concept study of the project
 Formulation and freezing of Owners Project Requirement (OPR)
 Formulation of RFP for design/service consultants
 Evaluation & on boarding of design/service consultants
 Evaluation and on boarding of stakeholders .
 Finalising the design as per project requirement for all services in tandem.
 Supporting client to obtain all statutory approvals for entire infrastructure.
 Effective deliverables from respective stakeholders and providing value added services
facilitating efficient, time bound and quality Project Management which includes –
 Complete design validation.
 Preparation of CAPEX and OPEX
 Checking of tender documents prepared by consultants
 Prequalification of contractors
 Floating of the tender to qualified vendors
 Analysis, reframe and finalisation of tenders cost comparisons
 Support the client for techno commercial negotiations & zeroing prospective vendor.
 Post award of contract checking –
 All Quality Assurance Plans (QAP’s)
 General Arrangement drawings
 Material submittal
 Factory testing of all services equipment's
 Conducting & owning review meetings
 Co-ordination and control with architects, all service consultants and vendors for trouble
shooting and smooth execution of project in time , budgeted cost with quality based on tracked
MSP/ P 6 schedule .
 Evaluation, finalisation, documentation and freezing of project completion report (PCR) and
handing over documents for archival.
Responsibilities
Worked with Clientele
Accomplished Projects
General Electric Multimodal Facility, Chakan
Land Area: 67 Acres
Built Area: sq. ft.
Project Commencement:
Project Completion:
Services cost: 60 Cr.
Volkswagen – Training Centre & other
facilities, Pune
Land Area: 7.5 Acres
Built Area: 250,000 sq. ft.
Project Commencement: Oct 2011
Project Completion: Dec 2012
Services cost: 30 Cr
SE Composites Ltd. Office Facility,
Padubidri (Designed)
Land Area: 2 Acres
Built Area: 80,000 sq. ft.
Project Commencement: June 2008
Project Completion: NA
Services Cost : 40 Cr.
Mercedes Benz India, City Bus Project,
Chakan, Pune
Land Area: 3.5 Acres
Built Area: 100,000 sq. ft.
Project Commencement: July 2010
Project Completion: Feb 2011
Services Cost:- 40 Cr
Accomplished Projects
Accomplished Projects
Mercedes Benz - Q3 Block Allied
Structures, Chakan, Pune
Land Area: 10 Acres
Built Area: 500,000 sq. ft.
Project Commencement: Feb 2012
Project Completion: Ongoing
Services cost: 40 Cr.
Mercedes Benz India Ltd., Paint shop
project Chakan, Pune
Built Area: 11,000 sq. ft.
Project Commencement: Oct 2014
Project Completion: Ongoing
Services cost: 60 Cr.
Mercedes Benz India Ltd., QII Body Shop
East Side Expansion, Chakan, Pune
Built Area: 11,000 sq. ft.
Project Commencement: Oct 2014
Project Completion: Ongoing
Services cost: 20 Cr.
Design of Gas based captive power plant for
ONGC- Ankaleshwar 0f 3 MW.
Degremont India, Dehli-2.4 MW, Essar Oil
corporation -2 MW, HNGL Bhadurgarh-
4MW, GAIL - Delhi
4 MW, Cadila , Ahmadabad- 2 MW etc
Electrical Design and contract management
of Galaxy surfactants Ltd, Mumbai,
Jagdamba auto components, Kohinoor city
Mumbai, SSF Hyma muscat, Soujanya
colours Mumbai.
Electrical design and contract management of
Aeroflex Industries Mumbai, Bil care
pharmsuticals, Bangalore.
Barbeque nation hotel chain for Pune, Mumbai,
Ahmedabad, Delhi, Chennai, Vizag etc.
Accomplished & Ongoing Projects
Suzlon Energy Ltd, Expansion of Bay
No. 3 &4 Rotor Blade Unit -Padubidri
Built Area: 18,500 sq. ft.
Project Commencement: Jan 2015
Project Completion: Ongoing
Services cost: 1 Cr.
Suzlon Energy Ltd, New WTG Plant at
Anantpur
Built Area: 18,500 sq. ft.
Project Commencement: Jan 2015
Project Completion: Ongoing
Services cost: 60 Cr
Feasibility study for entire pipe
manufacturing unit for Finolex industries,
chichwad,Pune
Complete MEP concept finalization for
Firodiya Hospital Project, Chinchwad.
Alfa Laval Project – Shirwal
Land Area: 47 Acres
Project Commencement: Aug 2013
Project Completion: Dec 2014
Services cost: 60 Cr.
Lupin Research Park –Lavale , Pune
Land Area: 19 Acres
Built Area: 300,000 sq. ft. (B+G+3)
Project Commencement: May 2012
Project Completion: Ongoing
Services Cost:60 Cr.
Accomplished & Ongoing Projects
Ongoing Projects
Suzlon Energy Ltd, Expansion of Bay
No. O Rotor Blade Unit - Dhule
Built Area: 18,500 sq. ft.
Project Commencement: Jan 2015
Project Completion: Ongoing
Services Cost: 1 Cr.
Suzlon Energy Ltd, Manufacturing Rotor
Blade Unit - Jaisalmer
Built Area: 150,000 sq. ft.
Project Commencement: Dec 2014
Project Completion: Ongoing
Services Cost: 50 Cr.
Suzlon Energy Ltd, Manufacturing Rotor
Blade Unit - Ratlam
Built Area: 150,000 sq. ft.
Project Commencement: Dec 2014
Project Completion: Ongoing
Services cost:60 Cr.
Suzlon Energy Ltd, Manufacturing
Rotor Blade Unit - Anantapur
Built Area: 150,000 sq. ft.
Project Commencement: Dec 2014
Project Completion: Ongoing
Services cost: 120 Cr.
Suzlon Energy Ltd, Manufacturing
Rotor Blade Unit - Bhuj
Built Area: 150,000 sq. ft.
Project Commencement: Dec 2014
Project Completion: Ongoing
Services cost: 50 Cr
Suzlon Energy Ltd, New Nacelle Plant at
Anantpur
Built Area: 18,500 sq. ft.
Project Commencement: Jan 2015
Project Completion: Ongoing
Services cost: 60 Cr
Value Addition in Projects
Lupin Research Park , Pune
Sl. No Description Remark
1 Proposed and implemented Switchgears ratings
from oversized designs to optimum required
Savings @ 10% on panel costs
2 Proposed and implemented Transformer rating
from 3500 KVA to 3150 KVA as
Saving of cost of about 40 lacks and
avoided non standardisation of
equipment's
3 Change in UPS configuration scheme
implemented
Intangible
4 Proposed design up gradation and testing
modalities to ensure sustaining the DGs to bear
100% load conditions
Intangible
5 For selection lighting fixtures suggested good
brands and simplified the packages for lighting
s.a Trilux , Arco
Resulted in excellent reduction of
cost saving and delivery of fixtures on
site in required time
6 Implementing correct and cost effective solution
in design which was missed at the stage
designing s.a scrubber panel, pump panels, fire
fighting panels feeding from main D..G set
Avoided delay and cost reduction
Value Addition in Projects
Lupin Research Park , Pune
Sl. No Description Remark
7 Avoided the delay in installation of linear lights
by close coordination with Triux to deliver
correct length lighting fixtures on site
Intangible
8 Oversized design in rain water system reduced
to optimum requirement
Saving of cost of about 4 lacks
9 Change in UPS configuration scheme
implemented
Intangible
10 Direct procurement strategy for major CAPEX
items
Proved 5% - 7% savings in project
cost
11 Finalising the operation philosophy in detail to
optimise the available D.G Set in absence of grid
power
Intangible
12 Proposed and implemented option for
maintenance free solar lighting system
Added Leed points and OPEX cost with
a ROI in 3 years.
Project Photos
Lupin Research Park , Pune
Project Photos
Lupin Research Park , Pune
Value Addition in Projects
Sl. No Remark
1 Substantial CAPEX cost savings potential is
available in case heating systems are procured
locally.
Intangible
2 Close coordination with Paint process supplier
EISENMANN
Smooth and clash free execution of
project
3 Proposed reduction in transformer capacity
from 3150 to 2500 KVA with detail study of
loading pattern and transformer efficiency
Cost saving of about 1.CR. And
avoided standardisation of
equipment's and ease of operation
4 Direct procurement strategy for major CAPEX
items
Proved 5% - 7% savings in project
cost
5 Finalising the operation philosophy in detail Intangible
6 Supported MBIL to do the Liasoning with MSEDCL
authorities to get sanction of power
Intangible
Mercedes Benz Paint Shop, Chakan , Pune
Project Photos
Mercedes Benz Paint Shop, Chakan , Pune
Value Addition in Projects
Sl. No Remark
1 Suggested for nearest location of transformer
and D.G sets near factory premises instead of the
location suggested by client as per Vastu
.
Achieved the cost saving of about 1
Cr /Plant and avoided the voltage
drop and power losses for all the
RBU units
2 Proposed and implemented aluminium cables
for crane of required size instead of cu cables
which are asked by crane vendor
Resulted in smooth crane operation
and resulted in cost saving of 50 lacs
per plant
3 For selection lighting fixtures suggested LED
lighting in finishing area where more LUX level
is required.
Resulted in cost saving of about 1.0
CR
4 Direct procurement strategy for major CAPEX
items
Proved 5% - 7% savings in project
cost
5 On the plants where the bay expansion is
required suggested use of existing resources
and optimisation of cost
Intangible
6 Supported Suzlon to do the Liasoning with
respective state authorities to get sanction of
power
Intangible
Suzlon Rotor Blade Units at all over India
Project Photos
Suzlon Rotor Blade Units at all over India
Value Addition in Projects
Sl. No Remark
1 Coordination with Factory Mutual for Fire fighting
scheme approvals, with complete COMPLIANCE
till project completion and handover.
Intangible
2 Implementation of fabricated raceway for cable
laying & light fitting installation instead of
suspended rod
Achieved Cost saving of 5 % and ease
of installation
3 D.G Set with 100 % block loading was installed
avoiding deviation in specifications and
requirement
Intangible
4 Proposed options for lighting control s.a Schneider,
Honeywell ,GE .Concluded techno commercial
analysis and finally GE lighting control system was
finalised. Very close working with GE US team to
finalise the lighting control design and get it
executed from SM and SPCL.
Intangible
5 Owned and guided GE to do the liasoning with
MSEDCL for getting sanction of power. And
resulted in saving of cost of substation and land
Cost saving of 5 Cr.
General Electric Multimodal Manufacturing Facility, Chakan, Pune
Project Photos
General Electric Multimodal Manufacturing Facility, Chakan, Pune
Project Achievements
General Electric Multimodal Manufacturing Facility, Chakan, Pune
Retrospective learning's in my career
 Detail study of clients requirement needs to be understood before start of design. This will
avoid the reworking on the design aspects.
 The BOQ prepared should be crystal clear matching the specifications and drawings to avoid
incremental cost in project budget during execution.
 The contract documents should be very clear specifying the detail contract conditions to avoid
any further claims by vendor.
 The exact coordination between all services from design to execution considering the site
conditions is must.
 While finalising the CAPEX items , selection and suggestion of vendors should be proper by
consultant's to avoid confusion of client
 The Inspection of the CAPEX equipment's should be done considering the site conditions and
the design done.
 Selection of vendor should be perfect to achieve the project time , cost & quality.
 Before suggesting any new options to client detail study of the market trend is to carried out
in detail.
 Project deliverables should be the passion till completion to maintain the ownership of the
project.
Sl.No Educational
Qualification
Year Of passing Marks
obtained
Name of institute
1 P.G Diploma in Project
Management
2010-11 63% Pune University
2. Master in management
science
June-2002 61.75% Pune University
3. Diploma in Business
Management
April-1999 66.16% Shivaji University
4. Diploma in Electrical
Engineering
May -1994 62.45% B.T.E Mumbai
5. S.S.C March-1990 83.42% Maharashtra State
Board.
Educational Qualifications
THANK YOU

More Related Content

What's hot (20)

Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec Designer
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Updated cv shailendra 11.05.16
Updated cv shailendra 11.05.16Updated cv shailendra 11.05.16
Updated cv shailendra 11.05.16
 
Ashish Resume
Ashish ResumeAshish Resume
Ashish Resume
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
CV Sunil 2015 (1)
CV Sunil 2015 (1)CV Sunil 2015 (1)
CV Sunil 2015 (1)
 
Resume_Jan 2017
Resume_Jan 2017Resume_Jan 2017
Resume_Jan 2017
 
tamuthu
tamuthutamuthu
tamuthu
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
Akhil Resume 10.06.2015new
Akhil Resume 10.06.2015newAkhil Resume 10.06.2015new
Akhil Resume 10.06.2015new
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
 
CV-Goutam Sen
CV-Goutam SenCV-Goutam Sen
CV-Goutam Sen
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
Resume - Shabbir Ahmed 1
Resume - Shabbir Ahmed  1Resume - Shabbir Ahmed  1
Resume - Shabbir Ahmed 1
 
social profile.
social profile.social profile.
social profile.
 

Similar to Rohini Patil Profile

Similar to Rohini Patil Profile (20)

Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Fabio_CV 2014n
Fabio_CV 2014nFabio_CV 2014n
Fabio_CV 2014n
 
Cv project manager
Cv project managerCv project manager
Cv project manager
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
Sudarsang electrical designer
Sudarsang electrical designerSudarsang electrical designer
Sudarsang electrical designer
 
Date Mandar ( CV )
Date Mandar ( CV ) Date Mandar ( CV )
Date Mandar ( CV )
 
Resume - Sumit Jindal
Resume - Sumit JindalResume - Sumit Jindal
Resume - Sumit Jindal
 
RESUME_PRAKASH
RESUME_PRAKASHRESUME_PRAKASH
RESUME_PRAKASH
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
Arsalan CV final (December 2016)
Arsalan CV final (December 2016)Arsalan CV final (December 2016)
Arsalan CV final (December 2016)
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - Copy
 
CV_Gursharan Choudhary
CV_Gursharan ChoudharyCV_Gursharan Choudhary
CV_Gursharan Choudhary
 
Ravi Ranjan_CV
Ravi Ranjan_CVRavi Ranjan_CV
Ravi Ranjan_CV
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
CURRICULUM VITAE-SUNIL GOPINATH (2)
CURRICULUM VITAE-SUNIL GOPINATH (2)CURRICULUM VITAE-SUNIL GOPINATH (2)
CURRICULUM VITAE-SUNIL GOPINATH (2)
 

Rohini Patil Profile

  • 1. PROFILE IN VARIOUS ASSIGNMENTS IN THE FIELD MECHANICAL & ELECTRICAL SERVICES OF ROHINI PATIL DEE,DBM,MMS, PGDPM with 16+ years of experience Contact No:-8237002837 Email:- rohini.patil1975@gmail.com
  • 2. Responsibilities  Spearheading MEP Services teams & coordination for MEP services activities in multiple industry segments with various alternatives.  In design build contract, the work performed –  Feasibility & concept study of the project  Formulation and freezing of Owners Project Requirement (OPR)  Formulation of RFP for design/service consultants  Evaluation & on boarding of design/service consultants  Evaluation and on boarding of stakeholders .  Finalising the design as per project requirement for all services in tandem.  Supporting client to obtain all statutory approvals for entire infrastructure.  Effective deliverables from respective stakeholders and providing value added services facilitating efficient, time bound and quality Project Management which includes –  Complete design validation.  Preparation of CAPEX and OPEX  Checking of tender documents prepared by consultants  Prequalification of contractors
  • 3.  Floating of the tender to qualified vendors  Analysis, reframe and finalisation of tenders cost comparisons  Support the client for techno commercial negotiations & zeroing prospective vendor.  Post award of contract checking –  All Quality Assurance Plans (QAP’s)  General Arrangement drawings  Material submittal  Factory testing of all services equipment's  Conducting & owning review meetings  Co-ordination and control with architects, all service consultants and vendors for trouble shooting and smooth execution of project in time , budgeted cost with quality based on tracked MSP/ P 6 schedule .  Evaluation, finalisation, documentation and freezing of project completion report (PCR) and handing over documents for archival. Responsibilities
  • 5. Accomplished Projects General Electric Multimodal Facility, Chakan Land Area: 67 Acres Built Area: sq. ft. Project Commencement: Project Completion: Services cost: 60 Cr. Volkswagen – Training Centre & other facilities, Pune Land Area: 7.5 Acres Built Area: 250,000 sq. ft. Project Commencement: Oct 2011 Project Completion: Dec 2012 Services cost: 30 Cr
  • 6. SE Composites Ltd. Office Facility, Padubidri (Designed) Land Area: 2 Acres Built Area: 80,000 sq. ft. Project Commencement: June 2008 Project Completion: NA Services Cost : 40 Cr. Mercedes Benz India, City Bus Project, Chakan, Pune Land Area: 3.5 Acres Built Area: 100,000 sq. ft. Project Commencement: July 2010 Project Completion: Feb 2011 Services Cost:- 40 Cr Accomplished Projects
  • 7. Accomplished Projects Mercedes Benz - Q3 Block Allied Structures, Chakan, Pune Land Area: 10 Acres Built Area: 500,000 sq. ft. Project Commencement: Feb 2012 Project Completion: Ongoing Services cost: 40 Cr. Mercedes Benz India Ltd., Paint shop project Chakan, Pune Built Area: 11,000 sq. ft. Project Commencement: Oct 2014 Project Completion: Ongoing Services cost: 60 Cr. Mercedes Benz India Ltd., QII Body Shop East Side Expansion, Chakan, Pune Built Area: 11,000 sq. ft. Project Commencement: Oct 2014 Project Completion: Ongoing Services cost: 20 Cr.
  • 8. Design of Gas based captive power plant for ONGC- Ankaleshwar 0f 3 MW. Degremont India, Dehli-2.4 MW, Essar Oil corporation -2 MW, HNGL Bhadurgarh- 4MW, GAIL - Delhi 4 MW, Cadila , Ahmadabad- 2 MW etc Electrical Design and contract management of Galaxy surfactants Ltd, Mumbai, Jagdamba auto components, Kohinoor city Mumbai, SSF Hyma muscat, Soujanya colours Mumbai. Electrical design and contract management of Aeroflex Industries Mumbai, Bil care pharmsuticals, Bangalore. Barbeque nation hotel chain for Pune, Mumbai, Ahmedabad, Delhi, Chennai, Vizag etc. Accomplished & Ongoing Projects Suzlon Energy Ltd, Expansion of Bay No. 3 &4 Rotor Blade Unit -Padubidri Built Area: 18,500 sq. ft. Project Commencement: Jan 2015 Project Completion: Ongoing Services cost: 1 Cr. Suzlon Energy Ltd, New WTG Plant at Anantpur Built Area: 18,500 sq. ft. Project Commencement: Jan 2015 Project Completion: Ongoing Services cost: 60 Cr Feasibility study for entire pipe manufacturing unit for Finolex industries, chichwad,Pune Complete MEP concept finalization for Firodiya Hospital Project, Chinchwad.
  • 9. Alfa Laval Project – Shirwal Land Area: 47 Acres Project Commencement: Aug 2013 Project Completion: Dec 2014 Services cost: 60 Cr. Lupin Research Park –Lavale , Pune Land Area: 19 Acres Built Area: 300,000 sq. ft. (B+G+3) Project Commencement: May 2012 Project Completion: Ongoing Services Cost:60 Cr. Accomplished & Ongoing Projects
  • 10. Ongoing Projects Suzlon Energy Ltd, Expansion of Bay No. O Rotor Blade Unit - Dhule Built Area: 18,500 sq. ft. Project Commencement: Jan 2015 Project Completion: Ongoing Services Cost: 1 Cr. Suzlon Energy Ltd, Manufacturing Rotor Blade Unit - Jaisalmer Built Area: 150,000 sq. ft. Project Commencement: Dec 2014 Project Completion: Ongoing Services Cost: 50 Cr. Suzlon Energy Ltd, Manufacturing Rotor Blade Unit - Ratlam Built Area: 150,000 sq. ft. Project Commencement: Dec 2014 Project Completion: Ongoing Services cost:60 Cr. Suzlon Energy Ltd, Manufacturing Rotor Blade Unit - Anantapur Built Area: 150,000 sq. ft. Project Commencement: Dec 2014 Project Completion: Ongoing Services cost: 120 Cr. Suzlon Energy Ltd, Manufacturing Rotor Blade Unit - Bhuj Built Area: 150,000 sq. ft. Project Commencement: Dec 2014 Project Completion: Ongoing Services cost: 50 Cr Suzlon Energy Ltd, New Nacelle Plant at Anantpur Built Area: 18,500 sq. ft. Project Commencement: Jan 2015 Project Completion: Ongoing Services cost: 60 Cr
  • 11. Value Addition in Projects Lupin Research Park , Pune Sl. No Description Remark 1 Proposed and implemented Switchgears ratings from oversized designs to optimum required Savings @ 10% on panel costs 2 Proposed and implemented Transformer rating from 3500 KVA to 3150 KVA as Saving of cost of about 40 lacks and avoided non standardisation of equipment's 3 Change in UPS configuration scheme implemented Intangible 4 Proposed design up gradation and testing modalities to ensure sustaining the DGs to bear 100% load conditions Intangible 5 For selection lighting fixtures suggested good brands and simplified the packages for lighting s.a Trilux , Arco Resulted in excellent reduction of cost saving and delivery of fixtures on site in required time 6 Implementing correct and cost effective solution in design which was missed at the stage designing s.a scrubber panel, pump panels, fire fighting panels feeding from main D..G set Avoided delay and cost reduction
  • 12. Value Addition in Projects Lupin Research Park , Pune Sl. No Description Remark 7 Avoided the delay in installation of linear lights by close coordination with Triux to deliver correct length lighting fixtures on site Intangible 8 Oversized design in rain water system reduced to optimum requirement Saving of cost of about 4 lacks 9 Change in UPS configuration scheme implemented Intangible 10 Direct procurement strategy for major CAPEX items Proved 5% - 7% savings in project cost 11 Finalising the operation philosophy in detail to optimise the available D.G Set in absence of grid power Intangible 12 Proposed and implemented option for maintenance free solar lighting system Added Leed points and OPEX cost with a ROI in 3 years.
  • 15. Value Addition in Projects Sl. No Remark 1 Substantial CAPEX cost savings potential is available in case heating systems are procured locally. Intangible 2 Close coordination with Paint process supplier EISENMANN Smooth and clash free execution of project 3 Proposed reduction in transformer capacity from 3150 to 2500 KVA with detail study of loading pattern and transformer efficiency Cost saving of about 1.CR. And avoided standardisation of equipment's and ease of operation 4 Direct procurement strategy for major CAPEX items Proved 5% - 7% savings in project cost 5 Finalising the operation philosophy in detail Intangible 6 Supported MBIL to do the Liasoning with MSEDCL authorities to get sanction of power Intangible Mercedes Benz Paint Shop, Chakan , Pune
  • 16. Project Photos Mercedes Benz Paint Shop, Chakan , Pune
  • 17. Value Addition in Projects Sl. No Remark 1 Suggested for nearest location of transformer and D.G sets near factory premises instead of the location suggested by client as per Vastu . Achieved the cost saving of about 1 Cr /Plant and avoided the voltage drop and power losses for all the RBU units 2 Proposed and implemented aluminium cables for crane of required size instead of cu cables which are asked by crane vendor Resulted in smooth crane operation and resulted in cost saving of 50 lacs per plant 3 For selection lighting fixtures suggested LED lighting in finishing area where more LUX level is required. Resulted in cost saving of about 1.0 CR 4 Direct procurement strategy for major CAPEX items Proved 5% - 7% savings in project cost 5 On the plants where the bay expansion is required suggested use of existing resources and optimisation of cost Intangible 6 Supported Suzlon to do the Liasoning with respective state authorities to get sanction of power Intangible Suzlon Rotor Blade Units at all over India
  • 18. Project Photos Suzlon Rotor Blade Units at all over India
  • 19. Value Addition in Projects Sl. No Remark 1 Coordination with Factory Mutual for Fire fighting scheme approvals, with complete COMPLIANCE till project completion and handover. Intangible 2 Implementation of fabricated raceway for cable laying & light fitting installation instead of suspended rod Achieved Cost saving of 5 % and ease of installation 3 D.G Set with 100 % block loading was installed avoiding deviation in specifications and requirement Intangible 4 Proposed options for lighting control s.a Schneider, Honeywell ,GE .Concluded techno commercial analysis and finally GE lighting control system was finalised. Very close working with GE US team to finalise the lighting control design and get it executed from SM and SPCL. Intangible 5 Owned and guided GE to do the liasoning with MSEDCL for getting sanction of power. And resulted in saving of cost of substation and land Cost saving of 5 Cr. General Electric Multimodal Manufacturing Facility, Chakan, Pune
  • 20. Project Photos General Electric Multimodal Manufacturing Facility, Chakan, Pune
  • 21. Project Achievements General Electric Multimodal Manufacturing Facility, Chakan, Pune
  • 22. Retrospective learning's in my career  Detail study of clients requirement needs to be understood before start of design. This will avoid the reworking on the design aspects.  The BOQ prepared should be crystal clear matching the specifications and drawings to avoid incremental cost in project budget during execution.  The contract documents should be very clear specifying the detail contract conditions to avoid any further claims by vendor.  The exact coordination between all services from design to execution considering the site conditions is must.  While finalising the CAPEX items , selection and suggestion of vendors should be proper by consultant's to avoid confusion of client  The Inspection of the CAPEX equipment's should be done considering the site conditions and the design done.  Selection of vendor should be perfect to achieve the project time , cost & quality.  Before suggesting any new options to client detail study of the market trend is to carried out in detail.  Project deliverables should be the passion till completion to maintain the ownership of the project.
  • 23. Sl.No Educational Qualification Year Of passing Marks obtained Name of institute 1 P.G Diploma in Project Management 2010-11 63% Pune University 2. Master in management science June-2002 61.75% Pune University 3. Diploma in Business Management April-1999 66.16% Shivaji University 4. Diploma in Electrical Engineering May -1994 62.45% B.T.E Mumbai 5. S.S.C March-1990 83.42% Maharashtra State Board. Educational Qualifications THANK YOU