RELAY CO-ORDINATION
BY
SHAIK ABDULLAH ADAM
PRINCIPAL ENGINEER – POWERPROJECTSINDIA – CHENNAI
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
1
IPSA
MV – TRANSFORMER /BASICS
AGENDA - 1
 INTRODUCTION MV RELAY CO-ORDINATION.
 NEED FOR PROTECTION COORDINATION.
 PROTECTION SYSTEM DESING.
 SIGNIFICANCE OF RELAY AND RELEASE .
 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS.
2
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
INTRODUCTION
 BASIC PHILOSOPHY - S S S ( Selectivity - Sensitivity – Speed)
 The selected protection principle affects the operating speed of the protection,
which has a significant impact on the harm caused by short circuits. The faster
the protection operates, the smaller the resulting hazards, damage and the
thermal stress will be.
 Further, the duration of the voltage dip caused by the short circuit fault will be
shorter, the faster the protection operates. Thus, the disadvantage to other parts
of the network due to undervoltage will be reduced to a minimum.
3
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
INTRODUCTION
 BASIC PHILOSOPHY
 The fast operation of the protection also reduces post-fault load peaks which, in
combination with the voltage dip, increase the risk of the disturbance spreading
into healthy parts of the network.
 In transmission networks, any increase of the operation speed of the protection
will allow the loading of the lines to be increased without increasing the risk of
losing the network stability.4
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
INTRODUCTION
 BASIC PHILOSOPHY
 Good and reliable selectivity of the protection is essential in order to limit the
supply interruption to the smallest area possible and to give a clear indication of
the faulted part of the network.
 This makes it possible to direct the corrective action to the faulty part of the
network and the supply to be restored as rapidly as possible.
5
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
INTRODUCTION
 BASIC PHILOSOPHY
AS PER IEEE242.2001
 Quick isolation of the affected portion of the system while maintaining normal
operation elsewhere.
 Reduction of the short-circuit current to minimize damage to the system, its
components, and the utilization equipment it supplies.
 Provision of alternate circuits, automatic throw overs, and automatic reclosing
devices
6
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
NEED FOR RELAY COORDINATION
 NEEDS OF RC
 Ensure the Equipment and Personnel Safety.
 To make proper discrimination of faulty portions and healthy portions of the
power system network.
 Reduce the outage time that will ensure the economic aspects.
7
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
PROTECTION SYSTEM DESIGN
 PROTECTION SCHEME:
 Protection schemes can be divided into two major groups:
a) Unit schemes b) Non-unit schemes :
 UNIT PROTECTION:
 Unit type schemes protect a specific area of the system i.e. a transformer,
transmission line, motor, generator or busbar. The unit protection schemes are
based on Kirchhoff’s Current Law – the sum of the currents entering an area
of the system must be zero.
 Any deviation from this must indicate an abnormal current path. In these
schemes, the effects of any disturbance or operating condition outside the
area of interest are totally ignored and the protection must be designed to
be stable above the maximum possible fault current that could flow through
the protected area.
8
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
PROTECTION SYSTEM DESIGN
 PROTECTION SCHEME:
 NON-UNIT PROTECTION:
 The non-unit schemes, while also intended to protect specific areas, have no
fixed boundaries. As well as protecting their own designated areas, the
protective zones can overlap into other areas. While this can be very
beneficial for backup purposes, there can be a tendency for too great an
area to be isolated if a fault is detected by different non unit schemes.
 The most simple of these schemes measures current and incorporates an
inverse time characteristic into the protection operation to allow protection
nearer to the fault to operate first.
9
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
PROTECTION SYSTEM DESIGN
 PROTECTION SCHEME:
 NON-UNIT PROTECTION:
 The non unit type protection system includes following schemes:
 Time graded over-current protection.
 Current graded over-current protection.
 Distance or Impedance protection.
 Interlocking protection.
 Differential protection.
10
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
PROTECTION SYSTEM DESIGN
 PROTECTION SYSTEM DESIGN :
 Protection system design is based on the knowledge that the faults or abnormal
operating conditions can lead to:
 overloads;
 phase-to-ground faults;
 phase to phase and three phase faults.
11
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 PROTECTION SYSTEM DESIGN :
 The detection of the above conditions is undertaken by the protective relays,
whose tasks are:
 To quickly isolate the faulted part of the electrical distribution system while
maintaining normal service for the rest of the system and minimizing damage
to the affected portion;
 To ensure that only the protective device nearest the faults opens to remove
the short-circuit, while the other upstream protective devices remain closed.
 The settings of the relays shall be selected to allow a reliable operation of
the system, keeping as long and as much as possible the feeders or the
system in service without risk of damage.
12
PROTECTION SYSTEM DESIGN
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
TYPE OF PROTECTION
 PROTECTION COORDINATION:
 To achieve the above goals the protective devices shall be properly selected,
adjusted and coordinated to ensure a reliable operation of the electrical system,
keeping as long and as much as possible the feeders or the system in service without
risk of damage.
 Two different kinds of protective devices are used to protect the electrical system, as
per the reference protection and metering diagrams:
 Electromagnetic relays, thermal overload relays and electronic/SST built-in
overcurrent and ground fault releases for low voltage distribution;
 Indirect relays fed from CTs and VTs for overcurrent and short-circuit protection,
motor protection and ground fault protection, for low and high voltage distribution.
13
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 PROTECTION COORDINATION:
 For the indirect relays, the microprocessor technology has been selected; the
protection functions which have been considered active in the multifunction
relays are indicated in the setting tables and in the one line diagrams.
14
Relay function ANSI code
Impedance (Distance) 21
Synchro check 25
Undervoltage 27
Reverse Power 32
Phase Current Balance 46
Thermal 49
Overvoltage 59
Frequency 81
Differential 87
AC Time and
Instantaneous Phase
Overcurrent
50/51
Breaker Failure 50BF
AC Time and Instantaneous
Ground Overcurrent
50G/51G
Trip Circuit Supervision 74TC
Time delay blocking relay 62
Auxiliary time delay blocking
relay
62A
Time delay blocking relay for
breaker failure scheme
62BE
Directional ground
overcurrent relay
67N
Directional overcurrent relay 67
TYPE OF PROTECTION
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 RC TYPES:
15
SIGNIFICANCE OF RELAY AND RELEASE
RELAY CO-ORDINATION
>1kV <1kV
MV LV
RELAY
RELEASE
OVER CURRENT OVER CURRENTEARTH FAULT EARTH FAULT
TIME OVER CURRENT(TOC)
OR IDMT [51]
DEFINITE MINI’M TIME(DMT)
OR DEFINITE TIME( DT) ,[50]
INSTANTANEOUS [50 I]
LONG [51]
SHORT [50 ]
INSTANTANEOUS [50 I]
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 OVER CURRENT PROTECTION:
 It finds its application from the fact that in the event of fault the current will increase to a value several
times greater than maximum load current.
 A relay that operates or picks up when its current exceeds a predetermined value (setting value) is
called Over-current Relay.
 Over-current protection protects electrical power systems against excessive currents which are
caused by short circuits, ground faults, etc.
 Over-current relays can be used to protect practically any power system elements, i.e. transmission
lines, transformers, generators, or motors.
 For feeder protection, there would be more than one over-current relay to protect different sections
of the feeder. These over-current relays need to coordinate with each other such that the relay
nearest fault operates first.
16
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 DESIGN PHILOSOPHY OF OVER CURRENT PROTECTION:
 Use time, current and a combination of both time and current are three ways
to discriminate adjacent over-current relays.
 Over-current Relay gives protection against:
 Phase faults.
 Earth faults.
 Winding faults.
17
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
Discrimination:
Current setting
Time setting
Current and time
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 DESIGN PHILOSOPHY OF OVER CURRENT PROTECTION:
 Short-circuit currents are generally several times (5 to 20) full load current.
Hence fast fault clearance is always desirable on short circuits.
 Primary requirement of Over-current protection is that the protection
should not operate for starting currents, permissible over-current, and
current surges. To achieve this, the time delay is provided.
18
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 DESIGN PHILOSOPHY OF OVER CURRENT PROTECTION:
 As per IEEE242 , there is NO discrimination co-ordination needed for LV
system but overlapping shall be avoided .
 But MV/HV 200ms minimum of time discrimination /grading is required
while do co-ordination.
19
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CHARACTERISTICS :
Depending on the time of operation of relays, they are categorized as follows:
 TOC – TIME OVER CURRENT (OR) INVERSE DEFINITE MINIMUM TIME ( IDMT) [51]
 Standard / Normal / Moderate Inverse [ IEC/IEEE /ANSI ]
 Long Inverse [ IEC/IEEE /ANSI ]
 Very Inverse [ IEC/IEEE /ANSI ]
 Extreme Inverse [ IEC/IEEE /ANSI ]
 DEFINITE MINIMUM TIME OR DEFINITE TIME [50]
 INSTANTANEOUS [50I]
20
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CHARACTERISTICS :
 TOC – TIME OVER CURRENT (OR) INVERSE DEFINITE MINIMUM TIME ( IDMT) [51]
 Inverse definite minimum time (IDMT) over-current Relay is one in which the
operating time is approximately inversely proportional to the fault current near
pick-up value and then becomes constant above the pick-up value of the
relay.
 The relay will go to a definite time after 20 times of pickup current.
21
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
TOC – TIME OVER CURRENT (OR) INVERSE DEFINITE MINIMUM TIME ( IDMT) [51]
 From the picture, it is clear that there is some definite time after which the Relay
will operate. It is also clear that the time of operation at Pick-up value is nearly
very high and as the fault current increases the time of operation decreases
maintaining some definite time.
22
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CHARECTERISTICS :
 DEFINITE MINIMUM TIME OR DEFINITE TIME [50]
 This relay is created by applying intentional time delay after crossing pick up
the value of the current. A definite minimum time overcurrent relay can be
adjusted to issue a trip output at an exact amount of time after it picks up.
Thus, it has a time setting adjustment and pickup adjustment.
23
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CHARECTERISTICS :
 INSTANTANEOUS [50I]
 This relay is referred as instantaneous over current relay, as ideally, the relay
operates as soon as the current gets higher than pick upsetting current. There
is no intentional time delay applied. But there is always an inherent time delay
which we cannot avoid practically. In practice, the operating time of an
instantaneous relay is of the order of a few milliseconds..
24
OVER CURRENT PROTECTION AND ITS CHARACTERISTICS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 RELAY SUITABILITY:
 As we discussed earlier , to provide desired settings at relays, ensure that the
minimum and maximum current and time settings available at selected relay. It
can ensured from vendor catalogue of that relay and Also have responsibility
to cross verification of ETAP library relay models are well verse modelled as per
the vendor catalogue.
 All relays, including instantaneous ( 50I ) have some minimum delay to operate
such as relay sensing needs 20ms and breaker operating time is 40ms as an
example.25
RELAY SUITABILITY
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 RELAY TRIP TIME CALCULATIONS
 STANDARD FOR RELAY CO-ORDINATION
 EQUIPMENT DETAILS
 BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS
 CO-ORDINATION TIME INTERVAL (CTI)
 STATIC AND NUMERICAL RELAYS
26
AGENDA - 1
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 RELAY TRIP TIME CALCULATIONS - IEC
 The formula for Trip time of a relay is based its standards and relay manufacturer.
WHERE, as per IEC 60255 -151 -2009CURVES
IActual - Fault Current or Fault current (A)
Iset - Setting Current or Relay pickup current (A)
T - TMS
k,  , β or c - Constants – It will be subjected to vary based on the curves.
27
RELAY TRIP TIME CALCULATION
-1
k
I Actual
I Set

T βX +Trip time ( Top) t(G) =
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 RELAY TRIP TIME CALCULATIONS - IEC
WHERE, as per IEC 60255 -151 -2009CURVES
- PLUG SETTING MULTIPLIER [ PSM ]28
RELAY TRIP TIME CALCULATION
I Actual
I Set
-1
k
I Actual
I Set

T βX +Trip time ( Top) t(G) =
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 RELAY TRIP TIME CALCULATIONS - IEEE
as per IEEE C37.112-1996
WHERE,
IActual - Fault Current or Fault current (A)
Iset - Setting Current or Relay pickup current (A)
T - Time Dial
p , B ,A- Constants – It will be subjected to vary based on the curves.
29
RELAY TRIP TIME CALCULATION
-1
A
I Actual
I Set
p
T BX +Trip time ( Top) t(I) =
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 RELAY TRIP TIME CALCULATIONS - IEEE
WHERE, as per IEEE C37.112-1996
- PLUG SETTING MULTIPLIER [ PSM ]30
RELAY TRIP TIME CALCULATION
I Actual
I Set
-1
A
I Actual
I Set
p
T BX +Trip time ( Top) t(I) =
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CONSTANTS VALUES AS PER IEC & ANSI/IEEE
31
RELAY TRIP TIME CALCULATION
TOC CURVES - IEC K  β OR c
STANDARD INVERSE 0.14 0.02 0
LONG INVERSE 120 1 0
VERY INVERSE 13.5 1 0
EXTREME INVERSE 80 2 0
TOC CURVES - IEEE K p B
MODERATE INVERSE 0.0515 0.02 0.01140
VERY INVERSE 19.61 2 0.419
EXTREME INVERSE 28.2 2 0.1217
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 TMS SHORT NOTES:
 TIME DIAL OR TIME MULTIPLIER SETTINGS will be adjusted at graph based on
the curve positioning on plotted graph.
 The Desired Cases Are Two , 1)GRAPHS SHALL NOT BE OVER LAPPED AND
2) NEED TO MAINTAIN SOME TIME GRADINGS .
 IEC time multiplier setting (TMS).
 IEEE time dial (TD). In some relays and literature, a TDM (Time Dial Multiplier) is
used, instead of a TD (Time Dial).
 TDM =
32
RELAY TRIP TIME CALCULATION
TD
7
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 MODEL CALCULATION: IEC
Given Data: I Actual -132 A , I Set -33.7 A , TMS – 0.6 , CURVE: STANDARD INV
Solution:
Formula Used as per IEC:
33
RELAY TRIP TIME CALCULATION
- 1
k
I Actual
I Set

T βX +Trip time ( Top) t(G) =
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 MODEL CALCULATION:
 Trip time ( Top) = 3.034 Sec
34
RELAY TRIP TIME CALCULATION
- 1
k
I Actual
I Set

T βX +Trip time ( Top) t(G) =
- 1
0.14
132
33.7
0.02
0.6 0X +Trip time ( Top) t(G) =
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 MODEL CALCULATION:
Trip time ( Top) = 3.034 Sec Ω 3.04 Sec for fault current 132A and Setting current is
33.7 A
35
RELAY TRIP TIME CALCULATION
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 TOC CURVES - PRIOIRITY SELECTION: [51] ( TRIPPING TIME MODERATE)
 SOURCE / INCOMER SIDE - STANDARD INVERSE.
 EQUIPMENT LOAD SIDE- LONG INVERSE/ EXTREME INVERSE / VERY INVERSE.
 IOC - PRIOIRITY SELECTION: [50] ( TRIPPING TIME IMMEDIATE)
 SOURCE / INCOMER /EUIPMENT SIDE - DMT - TIME DELAY / TIME GRADE IS
DESIRED.
 LOAD SIDE – NO INTENTIONAL TIME DELAY ( INHERENT TIME DELAY)
36
RELAY TRIP TIME CALCULATION
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 TOC CURVES (IDMT) : [51] ( TRIPPING TIME MODERATE) As per ALSTOM P141
 Phase TOC [51]
 Neutral TOC [51N]
 Ground TOC [51G]
 Sensitive Ground TOC [51SEN]
 Negative Sequence TOC [51NS]
37
RELAY TRIP TIME CALCULATION
PROTECTION PHASE NEUTRAL GROUND SEN .GROUND NEG SEQ
TOC (IDMT) 51 51N 51G 51SG 51NS
LOCATION (TOC)
PREFERRED
ALL TRANSFORMER
MOTOR/
NEUTRAL
FEEDER -- --
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 IOC (DMT) : [50] ( TRIPPING TIME IMMEDIATE) as per ALSTOM P141
 Phase IOC [50I]
 Neutral IOC [50N]
 Ground IOC [50G]
 Sensitive Ground IOC [50SG]
 Negative Sequence IOC [50NS]
38
RELAY TRIP TIME CALCULATION
PROTECTION PHASE NEUTRAL GROUND SEN .GROUND NEG SEQ
INSTANTANEOUS 50I 50N 50G 50SG 50NS
DEFINITE/SHORT TIME
(DMT)
50D 50D 50D 50D 50D
LOCATION (INSTANT)
PREFERRED
LOAD SIDE/END
EQUIPMENT
TRANFORMER/
INCOMER
FEEDER -- --
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 STANDARDS:
 IEEE Std 242-2001, the IEEE Buff Book™ - IEEE Recommended Practice
for Protection and Coordination of Industrial and Commercial
Power Systems.
 IEEE Std 141-1993 , IEEE Recommended Practice for Electric Power
Distribution for Industrial Plants
The IEEE color books are organized into new form, termed as “The IEEE 3000
standard collection”
 IEEE 3004 Standards: Protection & Coordination
39
STANDARDS FOR RELAY CO-ORDINATION
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 STANDARDS:
 IEEE 3004 Standards: Protection & Coordination
 3004.1-2013 - IEEE Recommended Practice for the Application of
Instrument Transformers in Industrial and Commercial Power Systems
 3004.11-2019 - IEEE Recommended Practice for Bus and Switchgear
Protection in Industrial and Commercial Power Systems
 3004.5-2014 - IEEE Recommended Practice for the Application of
Low-Voltage Circuit Breakers in Industrial and Commercial Power
Systems
 3004.8-2016 - IEEE Recommended Practice for Motor Protection in
Industrial and Commercial Power Systems
40
STANDARDS FOR RELAY CO-ORDINATION
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 PROTECTION CO-ORDINATION : OVERCURRENT [51] AND EARTH FAULT [51G/N]
 EQUIPMENTS TO BE COVERED :
 TRANSFORMER
 MOTOR
41
EQUIPMENTS DETAILS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 INSTRUMENT TRANFORMERS: CURRENT TRANSFORMER
 STANDARDS FOR INSTRUMENT TRANSFORMERS:
 IEC 61869 1-5(CONVENTIONAL) 6-12 ( NON –CONVENTIONAL).
 IS 2705 1-4
 IEEE C57.31
42
BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 INTRUMENT TRANFORMERS: CURRENT TRANSFORMER
 A current transformer is a device that is used for the transformation of current
from a higher value into a proportionate current to a lower value.
 Current transformers will be used for measuring and protection purposes.
 STANDARD CT RATIOS: 5A / 1A
 For the secondary current, choose 1 A or 5 A depending on the instrument
or relay, and on the distance between the transformer and the instrument
it is feeding:
- 5A secondary is used when instruments or relays are close to the
transformer, i.e less than 10m (30ft).
- 1A secondary is preferably selected when the distance between the
current transformer and the instrument transformer or the relay is above
10m (30ft). Joule losses(I2r) by wire resistance are 25 times higher with 5A
than with 1A. Its widely choose for protection.
43
BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 INSTRUMENT TRANFORMERS: CURRENT TRANSFORMER
 PHASE CT / GROUND CT ( CBCT – CORE BALANCED CT)
 CBCT – Preferred on Resistance Grounded System , in order to sense the fault
current which is comparatively low value.
 CBCT ratio is widely used as 50:1A which is independent of the continuous
current flowing through the circuit.
 CBCT ratio is 50:1A for 100A resistance earthed system and CBCT value is LOWER
than the limited current value of the earthed system.
44
BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 INTRUMENT TRANFORMERS: CURRENT TRANSFORMER
CONFIGURATION CT FOR GROUND
PHASE CT CBCT
45
BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS
• In built function on Relay to
sense the Ground Fault
Current.
• Not – Suitable for
Resistance Grounded
System.
• A dedicated and high sensitive CT
(CBCT) connected with relay for Ground
fault current.
• Resistance Grounded system has limited
ground fault current to certain value
(100A- 800A) where CBCT is employed to
sense the lowest ground fault current.
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 INTRUMENT TRANFORMERS: CURRENT TRANSFORMER
CONNECTION CONFIGURATION
 TYPE1: NEUTRAL CURRENT MEASURED –WITHOUT CBCT
46
BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS
RELAY
R
Y
B
N
V
S1
S2 S1
S2 S1
S2 V
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 INTRUMENT TRANFORMERS: CURRENT TRANSFORMER
CONNECTION CONFIGURATION
 TYPE1: NEUTRAL CURRENT NOT MEASURED –WITHOUT CBCT
47
BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS
RELAY
R
Y
B
S1
S2 S1
S2 S1
S2
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 INTRUMENT TRANFORMERS: CURRENT TRANSFORMER
CONNECTION CONFIGURATION
 TYPE1: NEUTRAL CURRENT MEASURED –WITH CBCT
48
BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS
RELAY
R
Y
B
G
S1
S2 S1
S2 S1
S2
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
CTI: IEEE242 – 15.5
 When plotting coordination curves, certain time intervals should be maintained
between the curves of various protective devices to ensure correct selective
operation and to reduce nuisance tripping. Without adequate CTIs, these
protective devices could trip incorrectly.
49
CO-ORDINATION TIME INTERVAL [ CTI ]
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CTI:
 When coordinating inverse time overcurrent relays, the time interval
according to ANSI/ IEEE Std-242 is usually 0.3 to 0.4 seconds. This interval is
measured between relays in series at the instantaneous setting of the
load side feeder circuit breaker relay and upcoming incomer relays.
 The recommended time has the following components:
• circuit breaker opening time (5 cycles): 0.10 seconds
• relay overtravel: 0.10 seconds ( Electromechanical relay)
• safety factor for CT saturation, setting errors, etc.: 0.22 seconds.
 NOTE: CYCLE( T) = 1/ f , Where f- supply frequency [50Hz], then 1 cycle
=1/50 , =20ms (0.02 seconds).
50
CO-ORDINATION TIME INTERVAL [ CTI ]
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CTI:
 The recommended time has the following components:
Traditional Time ( 200ms)
 Relay Sensing time : 20ms
 Breaker opening time : 40ms
 CT saturation, setting error : 20ms
 Safety factor / Margin : 100ms
So total 180ms ≈ 200ms or 250ms is provided between series relay’s time
discrimination.
51
CO-ORDINATION TIME INTERVAL [ CTI ]
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CTI:
 The CTI time interval is changing with respect to the country where the
project is executed and plant’s complex network.
52
CO-ORDINATION TIME INTERVAL [ CTI ]
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CTI CALCULATION:
CTI =
WHERE,
tR – Relay Timing Error IN %
tCT – CT Error IN %
tOP – Breaker Operation Time Max.1000ms( Changeable With Country / Client)
When Fault Occurred The Immediate Breaker Operate To Isolate.
tOV – Over Travel Time of Electro-Mechanical Relay ( Not Applicable for
Numerical relay)
53
CO-ORDINATION TIME INTERVAL [ CTI ]
2tR + tCT
100
X tOP + tOv + tCB + tAT + tS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CTI CALCULATION:
CTI =
WHERE,
tCB – Breaker Opening Time ( Vendor catalogue) - 40-45ms.
tAT – Additional Time required by the relay.
tS – Safety factor
When the overcurrent relays have independent definite time delay
characteristics, it is not necessary to include the allowance for CT error. Hence:
54
CO-ORDINATION TIME INTERVAL [ CTI ]
2tR + tCT
100
X tOP + tOv + tCB + tAT + tS
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 CONCLUSION ON CTI :
CTI =
BETWEEN DOWNSTREAM AND UPSTREAM RELAYS CTI
55
CO-ORDINATION TIME INTERVAL [ CTI ]
2tR + tCT
100
X tOP + tOv + tCB + tAT + tS
RELAY TYPE CTI ( ms)
STATIC RELAY / SST MAX 350 NO MIN
ELECTRO MECHANICAL RELAY MIN 400
NUMERICAL RELAY 200 TO 300
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 EXAMPLE SCENARIOS:
SCENARIO 1: Load To Source All Feeders are
Cables And Source Incomer [CB7]
Is Located At Plant Premises.
CTI : 200ms each stage .
56
CO-ORDINATION TIME INTERVAL [ CTI ]
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 EXAMPLE SCENARIOS:
SCENARIO 2: Load To Source All Feeders are
Cables And Source Incomer [CB4]
Is Located At Plant Premises.
CTI : Even a single cable always maintain
an additional time interval to avoid nuisance
relations with utility.
So CTI is 600ms at Relay-5 [ utility ]when its
Down stream incomer relay Relay-4 has CTI 400ms.
57
CO-ORDINATION TIME INTERVAL [ CTI ]
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
 EXAMPLE SCENARIOS:
SCENARIO 3: Load To Source All Feeders are
Cables and has Transformer [CB5]
Is Located At Plant Premises.
CTI : In order to avoid tripping Transformer HV frequently
respect to LV faults 50- 100ms additional CTI is
added at Transformer HV Relay-5. Avoid frequent
In-rush currents on transformer.
So CTI is 500ms at Relay-5 [ Transformer HV ]when its
Down stream Transformer LV Relay-4 has CTI 400ms.
58
CO-ORDINATION TIME INTERVAL [ CTI ]
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
59
RELAYS
RELAY
STATIC ( SST) ELECTRO MECHANICAL
ANALOG
( DIODE)
DIGITAL
(THYRISTER)
NUMERICAL
(MICROPROCESSOR)
NOT WIDELY USED
28 August 2020 info@powerprojectsindia.com +91-996-218-8337
60
STATIC AND NUMERICAL RELAYS
STATIC NUMERICAL
Less Accuracy High Accuracy
Not compatible to IEC61850 Compatible to IEC61850
Functions are controlled by
microcontroller
Convert all signal into digital and
processed by microprocessors
Disturbance Recorder is not
available
Disturbance Recorder’s report
useful for analysis.
Non –Programmable Programmable
28 August 2020 info@powerprojectsindia.com +91-996-218-8337

More Related Content

What's hot

Transformer differential protection
Transformer differential protection Transformer differential protection
Transformer differential protection michaeljmack
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsPower System Operation
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)Rohini Haridas
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfJayWin2
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONMd Sarowar Alam
 
Electrical Protection Schemes in detail
Electrical Protection Schemes in detailElectrical Protection Schemes in detail
Electrical Protection Schemes in detailSlides Hub
 
ETAP - Transformer mva sizing
ETAP - Transformer mva sizingETAP - Transformer mva sizing
ETAP - Transformer mva sizingHimmelstern
 
Lecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptxLecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptxssuserb444c3
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protectionRishi Tandon
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsPower System Operation
 
Current differential line protection setting considerations
Current differential line protection setting considerationsCurrent differential line protection setting considerations
Current differential line protection setting considerationsAsim Ihsan
 
Relay coordination
Relay coordinationRelay coordination
Relay coordinationD Målîk
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.pptSalim Palayi
 
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptxMuhd Hafizi Idris
 
Overload capacity of power transformers
Overload capacity of power transformersOverload capacity of power transformers
Overload capacity of power transformersLeonardo ENERGY
 
Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrentmichaeljmack
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relaysPremanandDesai
 
ETAP - Transient stability 2
ETAP - Transient stability 2ETAP - Transient stability 2
ETAP - Transient stability 2Himmelstern
 

What's hot (20)

Transformer differential protection
Transformer differential protection Transformer differential protection
Transformer differential protection
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
Bus Bar Protection
Bus Bar ProtectionBus Bar Protection
Bus Bar Protection
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdf
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATION
 
Electrical Protection Schemes in detail
Electrical Protection Schemes in detailElectrical Protection Schemes in detail
Electrical Protection Schemes in detail
 
ETAP - Transformer mva sizing
ETAP - Transformer mva sizingETAP - Transformer mva sizing
ETAP - Transformer mva sizing
 
Lecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptxLecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptx
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
Current differential line protection setting considerations
Current differential line protection setting considerationsCurrent differential line protection setting considerations
Current differential line protection setting considerations
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.ppt
 
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Overload capacity of power transformers
Overload capacity of power transformersOverload capacity of power transformers
Overload capacity of power transformers
 
Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrent
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
ETAP - Transient stability 2
ETAP - Transient stability 2ETAP - Transient stability 2
ETAP - Transient stability 2
 

Similar to Ipsa mv relay co-ordiantion shaik adam

Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...Kashif Mehmood
 
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfH15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfEMERSON EDUARDO RODRIGUES
 
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Oktay Yaman
 
Fault analysis in power system using power systems computer aided design
Fault analysis in power system using power systems computer aided designFault analysis in power system using power systems computer aided design
Fault analysis in power system using power systems computer aided designIJAAS Team
 
protectionsettings-120425102109-phpapp01.ppt
protectionsettings-120425102109-phpapp01.pptprotectionsettings-120425102109-phpapp01.ppt
protectionsettings-120425102109-phpapp01.pptThien Phan Bản
 
protectionsettings-120425102109-phpapp01.ppt
protectionsettings-120425102109-phpapp01.pptprotectionsettings-120425102109-phpapp01.ppt
protectionsettings-120425102109-phpapp01.pptThien Phan Bản
 
Switchgear and Protection.................
Switchgear and Protection.................Switchgear and Protection.................
Switchgear and Protection.................MANOJ KHARADE
 
Switchgear and Protection ...........................
Switchgear and Protection ...........................Switchgear and Protection ...........................
Switchgear and Protection ...........................MANOJ KHARADE
 
Power system Protection Services in India
Power system Protection Services in IndiaPower system Protection Services in India
Power system Protection Services in IndiaSystem Protection
 
FEEDER PROTECTION SYSTEM FROM EARTH FAULT, SHORT CIRCUIT AND OVERLOAD FAULTS
FEEDER PROTECTION SYSTEM FROM EARTH FAULT, SHORT CIRCUIT AND OVERLOAD FAULTSFEEDER PROTECTION SYSTEM FROM EARTH FAULT, SHORT CIRCUIT AND OVERLOAD FAULTS
FEEDER PROTECTION SYSTEM FROM EARTH FAULT, SHORT CIRCUIT AND OVERLOAD FAULTSIRJET Journal
 
Power System Protection
Power System ProtectionPower System Protection
Power System ProtectionRahul Mehra
 
An adaptive protection scheme to prevent recloser-fuse miscoordination in dis...
An adaptive protection scheme to prevent recloser-fuse miscoordination in dis...An adaptive protection scheme to prevent recloser-fuse miscoordination in dis...
An adaptive protection scheme to prevent recloser-fuse miscoordination in dis...iosrjce
 
Microcontroller based transformer protectio
Microcontroller based transformer protectioMicrocontroller based transformer protectio
Microcontroller based transformer protectioAminu Bugaje
 
Smart Local Backup Protection for Smart Substation
Smart Local Backup Protection for Smart SubstationSmart Local Backup Protection for Smart Substation
Smart Local Backup Protection for Smart SubstationIJECEIAES
 
Electrical network protection guide schneider electric
Electrical network protection guide schneider electricElectrical network protection guide schneider electric
Electrical network protection guide schneider electricSouvik Dutta
 
Review on Different Techniques for Differential Protection of Power Transformer
Review on Different Techniques for Differential Protection of Power TransformerReview on Different Techniques for Differential Protection of Power Transformer
Review on Different Techniques for Differential Protection of Power TransformerIRJET Journal
 

Similar to Ipsa mv relay co-ordiantion shaik adam (20)

Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
Modelling and Implementation of Microprocessor Based Numerical Relay for Prot...
 
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfH15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
 
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
 
Fault analysis in power system using power systems computer aided design
Fault analysis in power system using power systems computer aided designFault analysis in power system using power systems computer aided design
Fault analysis in power system using power systems computer aided design
 
protectionsettings-120425102109-phpapp01.ppt
protectionsettings-120425102109-phpapp01.pptprotectionsettings-120425102109-phpapp01.ppt
protectionsettings-120425102109-phpapp01.ppt
 
protectionsettings-120425102109-phpapp01.ppt
protectionsettings-120425102109-phpapp01.pptprotectionsettings-120425102109-phpapp01.ppt
protectionsettings-120425102109-phpapp01.ppt
 
Switchgear and Protection.................
Switchgear and Protection.................Switchgear and Protection.................
Switchgear and Protection.................
 
Switchgear and Protection ...........................
Switchgear and Protection ...........................Switchgear and Protection ...........................
Switchgear and Protection ...........................
 
Protective relaying
Protective relayingProtective relaying
Protective relaying
 
Power system Protection Services in India
Power system Protection Services in IndiaPower system Protection Services in India
Power system Protection Services in India
 
FEEDER PROTECTION SYSTEM FROM EARTH FAULT, SHORT CIRCUIT AND OVERLOAD FAULTS
FEEDER PROTECTION SYSTEM FROM EARTH FAULT, SHORT CIRCUIT AND OVERLOAD FAULTSFEEDER PROTECTION SYSTEM FROM EARTH FAULT, SHORT CIRCUIT AND OVERLOAD FAULTS
FEEDER PROTECTION SYSTEM FROM EARTH FAULT, SHORT CIRCUIT AND OVERLOAD FAULTS
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 
An adaptive protection scheme to prevent recloser-fuse miscoordination in dis...
An adaptive protection scheme to prevent recloser-fuse miscoordination in dis...An adaptive protection scheme to prevent recloser-fuse miscoordination in dis...
An adaptive protection scheme to prevent recloser-fuse miscoordination in dis...
 
D010622334
D010622334D010622334
D010622334
 
Microcontroller based transformer protectio
Microcontroller based transformer protectioMicrocontroller based transformer protectio
Microcontroller based transformer protectio
 
Smart Local Backup Protection for Smart Substation
Smart Local Backup Protection for Smart SubstationSmart Local Backup Protection for Smart Substation
Smart Local Backup Protection for Smart Substation
 
RAMS Tech Paper
RAMS Tech PaperRAMS Tech Paper
RAMS Tech Paper
 
Electrical network protection guide schneider electric
Electrical network protection guide schneider electricElectrical network protection guide schneider electric
Electrical network protection guide schneider electric
 
128 electrical power-protection_guide
128 electrical power-protection_guide128 electrical power-protection_guide
128 electrical power-protection_guide
 
Review on Different Techniques for Differential Protection of Power Transformer
Review on Different Techniques for Differential Protection of Power TransformerReview on Different Techniques for Differential Protection of Power Transformer
Review on Different Techniques for Differential Protection of Power Transformer
 

Recently uploaded

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Ipsa mv relay co-ordiantion shaik adam

  • 1. RELAY CO-ORDINATION BY SHAIK ABDULLAH ADAM PRINCIPAL ENGINEER – POWERPROJECTSINDIA – CHENNAI 28 August 2020 info@powerprojectsindia.com +91-996-218-8337 1 IPSA MV – TRANSFORMER /BASICS
  • 2. AGENDA - 1  INTRODUCTION MV RELAY CO-ORDINATION.  NEED FOR PROTECTION COORDINATION.  PROTECTION SYSTEM DESING.  SIGNIFICANCE OF RELAY AND RELEASE .  OVER CURRENT PROTECTION AND ITS CHARACTERISTICS. 2 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 3. INTRODUCTION  BASIC PHILOSOPHY - S S S ( Selectivity - Sensitivity – Speed)  The selected protection principle affects the operating speed of the protection, which has a significant impact on the harm caused by short circuits. The faster the protection operates, the smaller the resulting hazards, damage and the thermal stress will be.  Further, the duration of the voltage dip caused by the short circuit fault will be shorter, the faster the protection operates. Thus, the disadvantage to other parts of the network due to undervoltage will be reduced to a minimum. 3 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 4. INTRODUCTION  BASIC PHILOSOPHY  The fast operation of the protection also reduces post-fault load peaks which, in combination with the voltage dip, increase the risk of the disturbance spreading into healthy parts of the network.  In transmission networks, any increase of the operation speed of the protection will allow the loading of the lines to be increased without increasing the risk of losing the network stability.4 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 5. INTRODUCTION  BASIC PHILOSOPHY  Good and reliable selectivity of the protection is essential in order to limit the supply interruption to the smallest area possible and to give a clear indication of the faulted part of the network.  This makes it possible to direct the corrective action to the faulty part of the network and the supply to be restored as rapidly as possible. 5 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 6. INTRODUCTION  BASIC PHILOSOPHY AS PER IEEE242.2001  Quick isolation of the affected portion of the system while maintaining normal operation elsewhere.  Reduction of the short-circuit current to minimize damage to the system, its components, and the utilization equipment it supplies.  Provision of alternate circuits, automatic throw overs, and automatic reclosing devices 6 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 7. NEED FOR RELAY COORDINATION  NEEDS OF RC  Ensure the Equipment and Personnel Safety.  To make proper discrimination of faulty portions and healthy portions of the power system network.  Reduce the outage time that will ensure the economic aspects. 7 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 8. PROTECTION SYSTEM DESIGN  PROTECTION SCHEME:  Protection schemes can be divided into two major groups: a) Unit schemes b) Non-unit schemes :  UNIT PROTECTION:  Unit type schemes protect a specific area of the system i.e. a transformer, transmission line, motor, generator or busbar. The unit protection schemes are based on Kirchhoff’s Current Law – the sum of the currents entering an area of the system must be zero.  Any deviation from this must indicate an abnormal current path. In these schemes, the effects of any disturbance or operating condition outside the area of interest are totally ignored and the protection must be designed to be stable above the maximum possible fault current that could flow through the protected area. 8 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 9. PROTECTION SYSTEM DESIGN  PROTECTION SCHEME:  NON-UNIT PROTECTION:  The non-unit schemes, while also intended to protect specific areas, have no fixed boundaries. As well as protecting their own designated areas, the protective zones can overlap into other areas. While this can be very beneficial for backup purposes, there can be a tendency for too great an area to be isolated if a fault is detected by different non unit schemes.  The most simple of these schemes measures current and incorporates an inverse time characteristic into the protection operation to allow protection nearer to the fault to operate first. 9 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 10. PROTECTION SYSTEM DESIGN  PROTECTION SCHEME:  NON-UNIT PROTECTION:  The non unit type protection system includes following schemes:  Time graded over-current protection.  Current graded over-current protection.  Distance or Impedance protection.  Interlocking protection.  Differential protection. 10 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 11. PROTECTION SYSTEM DESIGN  PROTECTION SYSTEM DESIGN :  Protection system design is based on the knowledge that the faults or abnormal operating conditions can lead to:  overloads;  phase-to-ground faults;  phase to phase and three phase faults. 11 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 12.  PROTECTION SYSTEM DESIGN :  The detection of the above conditions is undertaken by the protective relays, whose tasks are:  To quickly isolate the faulted part of the electrical distribution system while maintaining normal service for the rest of the system and minimizing damage to the affected portion;  To ensure that only the protective device nearest the faults opens to remove the short-circuit, while the other upstream protective devices remain closed.  The settings of the relays shall be selected to allow a reliable operation of the system, keeping as long and as much as possible the feeders or the system in service without risk of damage. 12 PROTECTION SYSTEM DESIGN 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 13. TYPE OF PROTECTION  PROTECTION COORDINATION:  To achieve the above goals the protective devices shall be properly selected, adjusted and coordinated to ensure a reliable operation of the electrical system, keeping as long and as much as possible the feeders or the system in service without risk of damage.  Two different kinds of protective devices are used to protect the electrical system, as per the reference protection and metering diagrams:  Electromagnetic relays, thermal overload relays and electronic/SST built-in overcurrent and ground fault releases for low voltage distribution;  Indirect relays fed from CTs and VTs for overcurrent and short-circuit protection, motor protection and ground fault protection, for low and high voltage distribution. 13 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 14.  PROTECTION COORDINATION:  For the indirect relays, the microprocessor technology has been selected; the protection functions which have been considered active in the multifunction relays are indicated in the setting tables and in the one line diagrams. 14 Relay function ANSI code Impedance (Distance) 21 Synchro check 25 Undervoltage 27 Reverse Power 32 Phase Current Balance 46 Thermal 49 Overvoltage 59 Frequency 81 Differential 87 AC Time and Instantaneous Phase Overcurrent 50/51 Breaker Failure 50BF AC Time and Instantaneous Ground Overcurrent 50G/51G Trip Circuit Supervision 74TC Time delay blocking relay 62 Auxiliary time delay blocking relay 62A Time delay blocking relay for breaker failure scheme 62BE Directional ground overcurrent relay 67N Directional overcurrent relay 67 TYPE OF PROTECTION 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 15.  RC TYPES: 15 SIGNIFICANCE OF RELAY AND RELEASE RELAY CO-ORDINATION >1kV <1kV MV LV RELAY RELEASE OVER CURRENT OVER CURRENTEARTH FAULT EARTH FAULT TIME OVER CURRENT(TOC) OR IDMT [51] DEFINITE MINI’M TIME(DMT) OR DEFINITE TIME( DT) ,[50] INSTANTANEOUS [50 I] LONG [51] SHORT [50 ] INSTANTANEOUS [50 I] 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 16.  OVER CURRENT PROTECTION:  It finds its application from the fact that in the event of fault the current will increase to a value several times greater than maximum load current.  A relay that operates or picks up when its current exceeds a predetermined value (setting value) is called Over-current Relay.  Over-current protection protects electrical power systems against excessive currents which are caused by short circuits, ground faults, etc.  Over-current relays can be used to protect practically any power system elements, i.e. transmission lines, transformers, generators, or motors.  For feeder protection, there would be more than one over-current relay to protect different sections of the feeder. These over-current relays need to coordinate with each other such that the relay nearest fault operates first. 16 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 17.  DESIGN PHILOSOPHY OF OVER CURRENT PROTECTION:  Use time, current and a combination of both time and current are three ways to discriminate adjacent over-current relays.  Over-current Relay gives protection against:  Phase faults.  Earth faults.  Winding faults. 17 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS Discrimination: Current setting Time setting Current and time 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 18.  DESIGN PHILOSOPHY OF OVER CURRENT PROTECTION:  Short-circuit currents are generally several times (5 to 20) full load current. Hence fast fault clearance is always desirable on short circuits.  Primary requirement of Over-current protection is that the protection should not operate for starting currents, permissible over-current, and current surges. To achieve this, the time delay is provided. 18 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 19.  DESIGN PHILOSOPHY OF OVER CURRENT PROTECTION:  As per IEEE242 , there is NO discrimination co-ordination needed for LV system but overlapping shall be avoided .  But MV/HV 200ms minimum of time discrimination /grading is required while do co-ordination. 19 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 20.  CHARACTERISTICS : Depending on the time of operation of relays, they are categorized as follows:  TOC – TIME OVER CURRENT (OR) INVERSE DEFINITE MINIMUM TIME ( IDMT) [51]  Standard / Normal / Moderate Inverse [ IEC/IEEE /ANSI ]  Long Inverse [ IEC/IEEE /ANSI ]  Very Inverse [ IEC/IEEE /ANSI ]  Extreme Inverse [ IEC/IEEE /ANSI ]  DEFINITE MINIMUM TIME OR DEFINITE TIME [50]  INSTANTANEOUS [50I] 20 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 21.  CHARACTERISTICS :  TOC – TIME OVER CURRENT (OR) INVERSE DEFINITE MINIMUM TIME ( IDMT) [51]  Inverse definite minimum time (IDMT) over-current Relay is one in which the operating time is approximately inversely proportional to the fault current near pick-up value and then becomes constant above the pick-up value of the relay.  The relay will go to a definite time after 20 times of pickup current. 21 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 22. TOC – TIME OVER CURRENT (OR) INVERSE DEFINITE MINIMUM TIME ( IDMT) [51]  From the picture, it is clear that there is some definite time after which the Relay will operate. It is also clear that the time of operation at Pick-up value is nearly very high and as the fault current increases the time of operation decreases maintaining some definite time. 22 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 23.  CHARECTERISTICS :  DEFINITE MINIMUM TIME OR DEFINITE TIME [50]  This relay is created by applying intentional time delay after crossing pick up the value of the current. A definite minimum time overcurrent relay can be adjusted to issue a trip output at an exact amount of time after it picks up. Thus, it has a time setting adjustment and pickup adjustment. 23 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 24.  CHARECTERISTICS :  INSTANTANEOUS [50I]  This relay is referred as instantaneous over current relay, as ideally, the relay operates as soon as the current gets higher than pick upsetting current. There is no intentional time delay applied. But there is always an inherent time delay which we cannot avoid practically. In practice, the operating time of an instantaneous relay is of the order of a few milliseconds.. 24 OVER CURRENT PROTECTION AND ITS CHARACTERISTICS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 25.  RELAY SUITABILITY:  As we discussed earlier , to provide desired settings at relays, ensure that the minimum and maximum current and time settings available at selected relay. It can ensured from vendor catalogue of that relay and Also have responsibility to cross verification of ETAP library relay models are well verse modelled as per the vendor catalogue.  All relays, including instantaneous ( 50I ) have some minimum delay to operate such as relay sensing needs 20ms and breaker operating time is 40ms as an example.25 RELAY SUITABILITY 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 26.  RELAY TRIP TIME CALCULATIONS  STANDARD FOR RELAY CO-ORDINATION  EQUIPMENT DETAILS  BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS  CO-ORDINATION TIME INTERVAL (CTI)  STATIC AND NUMERICAL RELAYS 26 AGENDA - 1 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 27.  RELAY TRIP TIME CALCULATIONS - IEC  The formula for Trip time of a relay is based its standards and relay manufacturer. WHERE, as per IEC 60255 -151 -2009CURVES IActual - Fault Current or Fault current (A) Iset - Setting Current or Relay pickup current (A) T - TMS k,  , β or c - Constants – It will be subjected to vary based on the curves. 27 RELAY TRIP TIME CALCULATION -1 k I Actual I Set  T βX +Trip time ( Top) t(G) = 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 28.  RELAY TRIP TIME CALCULATIONS - IEC WHERE, as per IEC 60255 -151 -2009CURVES - PLUG SETTING MULTIPLIER [ PSM ]28 RELAY TRIP TIME CALCULATION I Actual I Set -1 k I Actual I Set  T βX +Trip time ( Top) t(G) = 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 29.  RELAY TRIP TIME CALCULATIONS - IEEE as per IEEE C37.112-1996 WHERE, IActual - Fault Current or Fault current (A) Iset - Setting Current or Relay pickup current (A) T - Time Dial p , B ,A- Constants – It will be subjected to vary based on the curves. 29 RELAY TRIP TIME CALCULATION -1 A I Actual I Set p T BX +Trip time ( Top) t(I) = 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 30.  RELAY TRIP TIME CALCULATIONS - IEEE WHERE, as per IEEE C37.112-1996 - PLUG SETTING MULTIPLIER [ PSM ]30 RELAY TRIP TIME CALCULATION I Actual I Set -1 A I Actual I Set p T BX +Trip time ( Top) t(I) = 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 31.  CONSTANTS VALUES AS PER IEC & ANSI/IEEE 31 RELAY TRIP TIME CALCULATION TOC CURVES - IEC K  β OR c STANDARD INVERSE 0.14 0.02 0 LONG INVERSE 120 1 0 VERY INVERSE 13.5 1 0 EXTREME INVERSE 80 2 0 TOC CURVES - IEEE K p B MODERATE INVERSE 0.0515 0.02 0.01140 VERY INVERSE 19.61 2 0.419 EXTREME INVERSE 28.2 2 0.1217 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 32.  TMS SHORT NOTES:  TIME DIAL OR TIME MULTIPLIER SETTINGS will be adjusted at graph based on the curve positioning on plotted graph.  The Desired Cases Are Two , 1)GRAPHS SHALL NOT BE OVER LAPPED AND 2) NEED TO MAINTAIN SOME TIME GRADINGS .  IEC time multiplier setting (TMS).  IEEE time dial (TD). In some relays and literature, a TDM (Time Dial Multiplier) is used, instead of a TD (Time Dial).  TDM = 32 RELAY TRIP TIME CALCULATION TD 7 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 33.  MODEL CALCULATION: IEC Given Data: I Actual -132 A , I Set -33.7 A , TMS – 0.6 , CURVE: STANDARD INV Solution: Formula Used as per IEC: 33 RELAY TRIP TIME CALCULATION - 1 k I Actual I Set  T βX +Trip time ( Top) t(G) = 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 34.  MODEL CALCULATION:  Trip time ( Top) = 3.034 Sec 34 RELAY TRIP TIME CALCULATION - 1 k I Actual I Set  T βX +Trip time ( Top) t(G) = - 1 0.14 132 33.7 0.02 0.6 0X +Trip time ( Top) t(G) = 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 35.  MODEL CALCULATION: Trip time ( Top) = 3.034 Sec Ω 3.04 Sec for fault current 132A and Setting current is 33.7 A 35 RELAY TRIP TIME CALCULATION 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 36.  TOC CURVES - PRIOIRITY SELECTION: [51] ( TRIPPING TIME MODERATE)  SOURCE / INCOMER SIDE - STANDARD INVERSE.  EQUIPMENT LOAD SIDE- LONG INVERSE/ EXTREME INVERSE / VERY INVERSE.  IOC - PRIOIRITY SELECTION: [50] ( TRIPPING TIME IMMEDIATE)  SOURCE / INCOMER /EUIPMENT SIDE - DMT - TIME DELAY / TIME GRADE IS DESIRED.  LOAD SIDE – NO INTENTIONAL TIME DELAY ( INHERENT TIME DELAY) 36 RELAY TRIP TIME CALCULATION 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 37.  TOC CURVES (IDMT) : [51] ( TRIPPING TIME MODERATE) As per ALSTOM P141  Phase TOC [51]  Neutral TOC [51N]  Ground TOC [51G]  Sensitive Ground TOC [51SEN]  Negative Sequence TOC [51NS] 37 RELAY TRIP TIME CALCULATION PROTECTION PHASE NEUTRAL GROUND SEN .GROUND NEG SEQ TOC (IDMT) 51 51N 51G 51SG 51NS LOCATION (TOC) PREFERRED ALL TRANSFORMER MOTOR/ NEUTRAL FEEDER -- -- 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 38.  IOC (DMT) : [50] ( TRIPPING TIME IMMEDIATE) as per ALSTOM P141  Phase IOC [50I]  Neutral IOC [50N]  Ground IOC [50G]  Sensitive Ground IOC [50SG]  Negative Sequence IOC [50NS] 38 RELAY TRIP TIME CALCULATION PROTECTION PHASE NEUTRAL GROUND SEN .GROUND NEG SEQ INSTANTANEOUS 50I 50N 50G 50SG 50NS DEFINITE/SHORT TIME (DMT) 50D 50D 50D 50D 50D LOCATION (INSTANT) PREFERRED LOAD SIDE/END EQUIPMENT TRANFORMER/ INCOMER FEEDER -- -- 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 39.  STANDARDS:  IEEE Std 242-2001, the IEEE Buff Book™ - IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems.  IEEE Std 141-1993 , IEEE Recommended Practice for Electric Power Distribution for Industrial Plants The IEEE color books are organized into new form, termed as “The IEEE 3000 standard collection”  IEEE 3004 Standards: Protection & Coordination 39 STANDARDS FOR RELAY CO-ORDINATION 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 40.  STANDARDS:  IEEE 3004 Standards: Protection & Coordination  3004.1-2013 - IEEE Recommended Practice for the Application of Instrument Transformers in Industrial and Commercial Power Systems  3004.11-2019 - IEEE Recommended Practice for Bus and Switchgear Protection in Industrial and Commercial Power Systems  3004.5-2014 - IEEE Recommended Practice for the Application of Low-Voltage Circuit Breakers in Industrial and Commercial Power Systems  3004.8-2016 - IEEE Recommended Practice for Motor Protection in Industrial and Commercial Power Systems 40 STANDARDS FOR RELAY CO-ORDINATION 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 41.  PROTECTION CO-ORDINATION : OVERCURRENT [51] AND EARTH FAULT [51G/N]  EQUIPMENTS TO BE COVERED :  TRANSFORMER  MOTOR 41 EQUIPMENTS DETAILS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 42.  INSTRUMENT TRANFORMERS: CURRENT TRANSFORMER  STANDARDS FOR INSTRUMENT TRANSFORMERS:  IEC 61869 1-5(CONVENTIONAL) 6-12 ( NON –CONVENTIONAL).  IS 2705 1-4  IEEE C57.31 42 BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 43.  INTRUMENT TRANFORMERS: CURRENT TRANSFORMER  A current transformer is a device that is used for the transformation of current from a higher value into a proportionate current to a lower value.  Current transformers will be used for measuring and protection purposes.  STANDARD CT RATIOS: 5A / 1A  For the secondary current, choose 1 A or 5 A depending on the instrument or relay, and on the distance between the transformer and the instrument it is feeding: - 5A secondary is used when instruments or relays are close to the transformer, i.e less than 10m (30ft). - 1A secondary is preferably selected when the distance between the current transformer and the instrument transformer or the relay is above 10m (30ft). Joule losses(I2r) by wire resistance are 25 times higher with 5A than with 1A. Its widely choose for protection. 43 BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 44.  INSTRUMENT TRANFORMERS: CURRENT TRANSFORMER  PHASE CT / GROUND CT ( CBCT – CORE BALANCED CT)  CBCT – Preferred on Resistance Grounded System , in order to sense the fault current which is comparatively low value.  CBCT ratio is widely used as 50:1A which is independent of the continuous current flowing through the circuit.  CBCT ratio is 50:1A for 100A resistance earthed system and CBCT value is LOWER than the limited current value of the earthed system. 44 BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 45.  INTRUMENT TRANFORMERS: CURRENT TRANSFORMER CONFIGURATION CT FOR GROUND PHASE CT CBCT 45 BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS • In built function on Relay to sense the Ground Fault Current. • Not – Suitable for Resistance Grounded System. • A dedicated and high sensitive CT (CBCT) connected with relay for Ground fault current. • Resistance Grounded system has limited ground fault current to certain value (100A- 800A) where CBCT is employed to sense the lowest ground fault current. 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 46.  INTRUMENT TRANFORMERS: CURRENT TRANSFORMER CONNECTION CONFIGURATION  TYPE1: NEUTRAL CURRENT MEASURED –WITHOUT CBCT 46 BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS RELAY R Y B N V S1 S2 S1 S2 S1 S2 V 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 47.  INTRUMENT TRANFORMERS: CURRENT TRANSFORMER CONNECTION CONFIGURATION  TYPE1: NEUTRAL CURRENT NOT MEASURED –WITHOUT CBCT 47 BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS RELAY R Y B S1 S2 S1 S2 S1 S2 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 48.  INTRUMENT TRANFORMERS: CURRENT TRANSFORMER CONNECTION CONFIGURATION  TYPE1: NEUTRAL CURRENT MEASURED –WITH CBCT 48 BASICS OF CURRENT TRANSFORMER AND ITS CONNECTIONS RELAY R Y B G S1 S2 S1 S2 S1 S2 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 49. CTI: IEEE242 – 15.5  When plotting coordination curves, certain time intervals should be maintained between the curves of various protective devices to ensure correct selective operation and to reduce nuisance tripping. Without adequate CTIs, these protective devices could trip incorrectly. 49 CO-ORDINATION TIME INTERVAL [ CTI ] 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 50.  CTI:  When coordinating inverse time overcurrent relays, the time interval according to ANSI/ IEEE Std-242 is usually 0.3 to 0.4 seconds. This interval is measured between relays in series at the instantaneous setting of the load side feeder circuit breaker relay and upcoming incomer relays.  The recommended time has the following components: • circuit breaker opening time (5 cycles): 0.10 seconds • relay overtravel: 0.10 seconds ( Electromechanical relay) • safety factor for CT saturation, setting errors, etc.: 0.22 seconds.  NOTE: CYCLE( T) = 1/ f , Where f- supply frequency [50Hz], then 1 cycle =1/50 , =20ms (0.02 seconds). 50 CO-ORDINATION TIME INTERVAL [ CTI ] 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 51.  CTI:  The recommended time has the following components: Traditional Time ( 200ms)  Relay Sensing time : 20ms  Breaker opening time : 40ms  CT saturation, setting error : 20ms  Safety factor / Margin : 100ms So total 180ms ≈ 200ms or 250ms is provided between series relay’s time discrimination. 51 CO-ORDINATION TIME INTERVAL [ CTI ] 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 52.  CTI:  The CTI time interval is changing with respect to the country where the project is executed and plant’s complex network. 52 CO-ORDINATION TIME INTERVAL [ CTI ] 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 53.  CTI CALCULATION: CTI = WHERE, tR – Relay Timing Error IN % tCT – CT Error IN % tOP – Breaker Operation Time Max.1000ms( Changeable With Country / Client) When Fault Occurred The Immediate Breaker Operate To Isolate. tOV – Over Travel Time of Electro-Mechanical Relay ( Not Applicable for Numerical relay) 53 CO-ORDINATION TIME INTERVAL [ CTI ] 2tR + tCT 100 X tOP + tOv + tCB + tAT + tS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 54.  CTI CALCULATION: CTI = WHERE, tCB – Breaker Opening Time ( Vendor catalogue) - 40-45ms. tAT – Additional Time required by the relay. tS – Safety factor When the overcurrent relays have independent definite time delay characteristics, it is not necessary to include the allowance for CT error. Hence: 54 CO-ORDINATION TIME INTERVAL [ CTI ] 2tR + tCT 100 X tOP + tOv + tCB + tAT + tS 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 55.  CONCLUSION ON CTI : CTI = BETWEEN DOWNSTREAM AND UPSTREAM RELAYS CTI 55 CO-ORDINATION TIME INTERVAL [ CTI ] 2tR + tCT 100 X tOP + tOv + tCB + tAT + tS RELAY TYPE CTI ( ms) STATIC RELAY / SST MAX 350 NO MIN ELECTRO MECHANICAL RELAY MIN 400 NUMERICAL RELAY 200 TO 300 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 56.  EXAMPLE SCENARIOS: SCENARIO 1: Load To Source All Feeders are Cables And Source Incomer [CB7] Is Located At Plant Premises. CTI : 200ms each stage . 56 CO-ORDINATION TIME INTERVAL [ CTI ] 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 57.  EXAMPLE SCENARIOS: SCENARIO 2: Load To Source All Feeders are Cables And Source Incomer [CB4] Is Located At Plant Premises. CTI : Even a single cable always maintain an additional time interval to avoid nuisance relations with utility. So CTI is 600ms at Relay-5 [ utility ]when its Down stream incomer relay Relay-4 has CTI 400ms. 57 CO-ORDINATION TIME INTERVAL [ CTI ] 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 58.  EXAMPLE SCENARIOS: SCENARIO 3: Load To Source All Feeders are Cables and has Transformer [CB5] Is Located At Plant Premises. CTI : In order to avoid tripping Transformer HV frequently respect to LV faults 50- 100ms additional CTI is added at Transformer HV Relay-5. Avoid frequent In-rush currents on transformer. So CTI is 500ms at Relay-5 [ Transformer HV ]when its Down stream Transformer LV Relay-4 has CTI 400ms. 58 CO-ORDINATION TIME INTERVAL [ CTI ] 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 59. 59 RELAYS RELAY STATIC ( SST) ELECTRO MECHANICAL ANALOG ( DIODE) DIGITAL (THYRISTER) NUMERICAL (MICROPROCESSOR) NOT WIDELY USED 28 August 2020 info@powerprojectsindia.com +91-996-218-8337
  • 60. 60 STATIC AND NUMERICAL RELAYS STATIC NUMERICAL Less Accuracy High Accuracy Not compatible to IEC61850 Compatible to IEC61850 Functions are controlled by microcontroller Convert all signal into digital and processed by microprocessors Disturbance Recorder is not available Disturbance Recorder’s report useful for analysis. Non –Programmable Programmable 28 August 2020 info@powerprojectsindia.com +91-996-218-8337